Airspace User Forum 2012
Flight efficiency: how to go further?
Razvan BUCOROIU Head of Operations Planning Unit
User Forum 2012, 24-25 January 2012 2
Route Efficiency KPIsPerformance Driven Airspace Design and Utilisation
Target
an improvement by 0.75 percentage points of the average horizontal en route flight
efficiency indicator in 2014 as compared to the situation in 2009
Based on the last filed flight plan
User Forum 2012, 24-25 January 2012 3
Route Efficiency KPIsPerformance Driven Airspace Design and UtilisationImplemented since 2007
RTE-DES
3.53% 3.54% 3.45% 3.22% 3.05%
2%
3%
4%
5%
6%
2007 2008 2009 2010 2011
RTE-FPL
4.91% 5.03% 4.90% 4.91% 4.74%
2%
3%
4%
5%
6%
2007 2008 2009 2010 2011
Route Efficiency KPI per AIRAC cycle
2008
2010
2011
2009
2007
2.5%
3.0%
3.5%
4.0%
4.5%
5.0%
5.5%
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
AIRAC
Rou
te E
xten
sion
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
RTE-DESRTE-FPL
Balanced approach
capacity/flight efficiencyrequired
Approximately 6 000 000 NM saved in 2011
User Forum 2012, 24-25 January 2012 4
•Summer 2007 - 121 proposals developed/implemented•Summer 2008 - 127 proposals developed/implemented•Summer 2009 - 170 proposals developed/implemented•Summer 2010 - 217 proposals developed/implemented•Summer 2011 – 200 proposals developed/implemented•Summer 2012 – 220 (approx.) proposals developed
•60 already implemented
•Route network •Free Route•TMA changes•RAD changes•CDR changes•Sectorisation•New concepts•Most penalised city pairs•Night network
•Increased efficiency and flexibility
Short/Medium Term Improvements ARN Version 7 and ARN Version 6
User Forum 2012, 24-25 January 2012 5
Short/Medium Term Improvements ARN Version 7 and ARN Version 6 – Free Route
Harmonised Free RouteCONOPS
User Forum 2012, 24-25 January 2012 6
Short/Medium Term ImprovementsMost penalised 50 city-pairs in terms of flight extension
17000 NM saved
for 2500 flights
per week
User Forum 2012, 24-25 January 2012 7
Short/Medium Term ImprovementsNight Network
User Forum 2012, 24-25 January 2012 8 8
Ad-hoc, modular
structures
Ad-hoc, modular
structures
System Support System Support
Airspace Configuration
Airspace Configuration
RollingProcessRollingProcess
Cross-border operations
Cross-border operations
2011- 2017
CDMProcess
Short/Medium Term ImprovementsFlexible Use of Airspace - Enhanced Network ASM Procedures
User Forum 2012, 24-25 January 2012 99
Levels 1,2 & 3 fixed in time Levels 1,2 & 3 interactive
Active Airspace ConfigurationsTime constrained snapshots
AMC & FMP separated Integrated ASM/ATFCM/ATS Activity
Static TRA/TSAs Variable Areas
AUP, CRAM, eAMI,….. SWIM enabled NOP
Short/Medium Term ImprovementsFlexible Use of Airspace - Enhanced Network ASM Procedures
User Forum 2012, 24-25 January 2012 10
• A new RAD evolution
• To address improvements for the RAD
• To ensure integration in the future European Route Network Improvement Plan
• To bring closer together airspace design and utilisation
• Several actions started to be addressed
• By end 2011 until mid 2012
• Start implementing changes based on an agreed way forward
• Enhanced approach to address airspace users needs
• Tackling RAD restrictions (removing, airspace design, etc)
• with high flight efficiency potential
• with no impact on capacity
Short/Medium Term ImprovementsRAD DEVELOPMENTS
User Forum 2012, 24-25 January 2012 11
Friday 15 July 2011
Dep ED, EG, EB, EHArr LG, LT, LC, H
Short/Medium Term ImprovementsMultiple Route Options – Choice for Airspace Users
User Forum 2012, 24-25 January 2012 12
Friday 15 July 2011
Arr ED, EG, EB, EHDep LG, LT, LC, H
Short/Medium Term ImprovementsMultiple Route Options – Choice for Airspace Users
User Forum 2012, 24-25 January 2012 13
Short/Medium Term ImprovementsEnhancing flight planning
19.5NMLMML - UUDD29 AUG 2010*
52.9NMUUDD - LMML
19.5NMLMML - UKBB
19.5NMLMML - UUDD
52.9NMUUEE - LMML
52.9NMUUEE - LMML01 OCT 2010
19.5NMLMML - UUEE
52.9NMUUDD - LMML28 AUG 2010*
19.5NMLMML - UUDD
52.9NMUKBB - LMML27 AUG 2010
19.5NMLMML - UUDD
52.9NMUUDD - LMML03 OCT 2010
19.5NMLMML - UUEE
UUEE - LMML
DEP - DEST
52.9NM02 OCT 2010
Potential distance saving
Date
VELBA
BLO
BITLA
KAS
YNN
T/UT343
N/UN731
T/UT343
N/UN731
AIRAC 6 MAY 20101. VELBA - no FL restrictions2. T/UT343 VELBA - BITLA implemented
BLO - YNN or YNN - BLO:via RODOP - 281.9NMvia EVIVI - 248.5NMvia VELBA - 229.0NM
RODOP
EVIVI
Existing options
New ATS routeAll options via VELBA are allowed including flights LMML - LBSF and vice-versa
Enhanced flight
planning support
User Forum 2012, 24-25 January 2012 14
Short/Medium Term ImprovementsEnhancing flight planning
Enhanced flight
planning support
User Forum 2012, 24-25 January 2012 15
Short/Medium Term ImprovementsEnhancing flight planning
Enhanced flight
planning support
User Forum 2012, 24-25 January 2012 16
• 1370 proposals in RNDSG/RDGE database 2008-2015
• 690 implemented
• 230 airline proposals
• 110 implemented
• 320 pure EUROCONTROL proposals
• Many others suggested by EUROCONTROL and proposed by ANSPs
• 160 already implemented
• Good participation in RNDSG
• Good input from AOG
• Such excellent cooperation must continue
FLIGHT EFFICIENCY IS A COMMON AND SHARED RESPOSNBILITY
Short/Medium Term ImprovementsSignificant airline input