+ All Categories
Home > Documents > AKA CONSTRUCTIONSakaconstructions.in/wp-content/uploads/2018/10/aka... · KVIC Housing Project,...

AKA CONSTRUCTIONSakaconstructions.in/wp-content/uploads/2018/10/aka... · KVIC Housing Project,...

Date post: 18-Jul-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
27
[Type text] RELIABLE AS CONCRETE Contact: Ashwani Atri - 7508854525 E-mail: [email protected] AKA CONSTRUCTIONS
Transcript
Page 1: AKA CONSTRUCTIONSakaconstructions.in/wp-content/uploads/2018/10/aka... · KVIC Housing Project, Sector-43, CHANDIGARH. 5. Longowal Institute, Longowal. QUALITY POLICY STATEMENT Meet

[Type text]

RELIABLE AS CONCRETE

Contact:

Ashwani Atri - 7508854525

E-mail:

[email protected]

AKA CONSTRUCTIONS

Page 2: AKA CONSTRUCTIONSakaconstructions.in/wp-content/uploads/2018/10/aka... · KVIC Housing Project, Sector-43, CHANDIGARH. 5. Longowal Institute, Longowal. QUALITY POLICY STATEMENT Meet

GREETINGS FROM OWNER

Greetings & welcome to AKA Construction. We are proud of many great

projects we have built. AKA Construction has a history of responsible

business conduct. We strongly believe that real business success is not just

about profits measured in numbers but also, as importantly, about how those

numbers are achieved. Our corporate strategy reflects our commitment to

sustainable business practices and balancing responsibility alongside growth

& productivity.

I would like to take this opportunity to pledge that I & AKA Construction

team will endeavour to devote our full efforts to exceed our customers’

expectations & fully satisfy their needs and requirements.

THANK YOU

ASHWANI KUMAR ATRI

Page 3: AKA CONSTRUCTIONSakaconstructions.in/wp-content/uploads/2018/10/aka... · KVIC Housing Project, Sector-43, CHANDIGARH. 5. Longowal Institute, Longowal. QUALITY POLICY STATEMENT Meet

INTRODUCTION

AKA CONSTRUCTION is owned and managed by Mr.Ashwani Atri who is

a sole proprietor and with team of well experienced professional engineers

dealing with all kinds of contracts for construction.

AKA CONSTRUCTION was established in May 1985.Mr. Dilbagh Singh

the Chief Executive of the organization & working with AKA since 1998.

As a contractor he has completed many civil engineering projects, residential

buildings and Industrial buildings. AKA CONSTRUCTION has completed

many projects such as housing colonies, A-class residences, swimming

pools, Infrastructure works, Industrial buildings, and also renovation works.

Since the inception of the company it has been attained and maintained ever

rising standards of performance. AKA CONSTRUCTION engaged in

construction, contracting & property development. Working of AKA

constructions are same as the tag line of the company that it is “Reliable as

Concrete”.

We use high quality raw material throughout our service in every field as we

are one of the renowned quality centric organization and quality is our prior

aim. We procure the raw material from quality driven organization that is

checked at our quality inspection unit as to provide unique quality service to

our esteemed clients. We offer these services after complete planning and

designing of the project.

Our team of experts and professional engineers are gaining experience from

past many years in the field of civil engineering. Our team is managed and

guided by our expert mentor Mr. Ashwani Atri who has achieved excellent

exposure in civil engineering services by providing complete client

satisfaction. We use latest and high-performance machinery & equipments in

Page 4: AKA CONSTRUCTIONSakaconstructions.in/wp-content/uploads/2018/10/aka... · KVIC Housing Project, Sector-43, CHANDIGARH. 5. Longowal Institute, Longowal. QUALITY POLICY STATEMENT Meet

our services. We provide these services in various parts of the country and

make a permanent relationship with our esteemed clients.

Mr. Ashwani Atri have an experience of more than 34 years in construction

business with a reputation of giving best in the industry at reasonable rates.

we have been serving in tri-city and northern region. We are obliged to tell

that we have completed more than five hundred projects in various areas

with full customer satisfaction.

We would like to also share some of the working experience of Mr. Ashwani

Atri-

1. AWHO Housing Complex, Phase-2, MOHALI.

2. NIPER, PHASE 9, MOHALI.

3. C.E.D.T., INDUSTRIAL AREA, Phase -7, MOHALI.

4. KVIC Housing Project, Sector-43, CHANDIGARH.

5. Longowal Institute, Longowal.

Page 5: AKA CONSTRUCTIONSakaconstructions.in/wp-content/uploads/2018/10/aka... · KVIC Housing Project, Sector-43, CHANDIGARH. 5. Longowal Institute, Longowal. QUALITY POLICY STATEMENT Meet

QUALITY POLICY STATEMENT

Meet and exceed specified Engineering standards, complete within allotted

time, comply with safety requirements and satisfy customer’s needs.

MISSION STATEMENT. Our mission is to provide Active, Value Added

services to customers without compromising on quality Vision. AKA

Construction’s Vision becomes a bench mark civil contractor in Building,

Structures and Industries like Food, Chemical, and real estate developer.

VALUES: AKA CONSTRUCTION strictly fellow the value;

☼ Punctuality

☼ Commitment with job

☼ Honesty

☼ Trust

☼ Courage

☼ Respect

QUALITY ASSURANCE

We are one of the renowned quality- oriented organization and quality is our

main aim towards which we are dedicated. We use high quality raw material

throughout our service in every field as we are one of the renowned quality

centric organization and quality is our prior aim. We procure the raw

material from quality driven organization that is checked at our quality

inspection unit as to provide unique quality service to our esteemed clients.

We offer these services after complete planning and designing of the project.

Further we ensure that the entire task done by us meets international quality

standards. We follow certain quality guidelines that include:

1. Delivery of non-problematic services as per the specifications of clients

2. Consistent quality improvement

3. Innovative and cost effective services

4. Timely execution of service

Page 6: AKA CONSTRUCTIONSakaconstructions.in/wp-content/uploads/2018/10/aka... · KVIC Housing Project, Sector-43, CHANDIGARH. 5. Longowal Institute, Longowal. QUALITY POLICY STATEMENT Meet

SCOPE OF WORK

Services Offered by AKA Construction is committed to provide its high-

quality services with effective and efficient teams in the following fields:

We provide all types of construction works. Our management and teams

work in accordance with the client’s requirements and try to complete all

the projects through its cost-effective ideas, high quality and optimum

utilization of resources. Our scope includes:

Commercial construction

Residential construction

Industrial construction

Office space construction

Project supervision.

Multi storied Towers

Educational Institutions

Hospitals

Hotels/Motels

Executive Floors

Overhead and underground water tanks

Page 7: AKA CONSTRUCTIONSakaconstructions.in/wp-content/uploads/2018/10/aka... · KVIC Housing Project, Sector-43, CHANDIGARH. 5. Longowal Institute, Longowal. QUALITY POLICY STATEMENT Meet

COMPANY USP

AKA constructions have an experience of more than twenty-five years in

making best quality residential homes for their customers. we go with the

philosophy that you wish anything for construction of your dream home and

we will deliver it to you with proper time and best quality assurance.

Detailing of every aspect for your home would be taken care of.

Team of architect and interior designers works as per international standards

to make a flawless home for their structure. Team AKA works on every

aspect of your home from demarcation to Interiors under the guidance of Mr.

Ashwani Atri.

Page 8: AKA CONSTRUCTIONSakaconstructions.in/wp-content/uploads/2018/10/aka... · KVIC Housing Project, Sector-43, CHANDIGARH. 5. Longowal Institute, Longowal. QUALITY POLICY STATEMENT Meet

LIST OF PROJECTS COMPLETED

INSTITUTIONS

1. Jainder Public school, Sector-2, PANCHKULA

2. Amarjain Public school, Sector- 2, CHANDIGARH

3. Maharishi Dayanad public school, PIPLI

4. S.D Public school, Sector -32,CHANDIGARH

5. K.B. D.A.V. Public school, Sector- 7, CHANDIGARH

6. Saint soldier paradise public school, DHAKOLI

RESIDENTIAL

1. HOUSE NO. 48, Sector- 18, CHANDIGARH

2. HOUSE NO. 1532, Sector -27, CHANDIGARH

3. HOUSE NO. 128, Sector 36, CHANDIGARH

4. HOUSE NO. 1302, Sector 18, CHANDIGARH

5. HOUSE NO. 1057, Phase 7,MOHALI

6. HOUSE NO. 1492, Phase 10, MOHALI

7. 2 KANAL HOUSE (Lubi Pump), Sarabha Nagar, LUDHIANA

8. HOUSE NO. 3440, Sector -27 D, CHANDIGARH

COMMERCIAL AND INDUSTRIAL

1. PLOT NO. 786, Sector -82, MOHALI

2. PLOT NO. 738, Sector-82, MOHALI

Page 9: AKA CONSTRUCTIONSakaconstructions.in/wp-content/uploads/2018/10/aka... · KVIC Housing Project, Sector-43, CHANDIGARH. 5. Longowal Institute, Longowal. QUALITY POLICY STATEMENT Meet

3. PLOT NO. 736, Sector-82, MOHALI

4. PLOT NO. 563, Sector-82, MOHALI

5. PLOT NO. 1273, Sector- 82, MOHALI

6. PLOT NO. 521, Phase-9, Industrial Area, MOHALI

7. PLOT NO. 561, PLOT NO.631, PHASE-8 B, Industrial Area, MOHALI

8. Indian oil city gas agency, Sector-25, CHANIDGARH

CURRENT WORK IN PROGRESS

1. HOUSE NO. 6191, AEROCITY, MOHALI

2. HOUSE NO. 5141, Sector-117, TDI, MOHALI

3. PLOT NO. 403, Phase-9, Industrial Area, MOHALI

4. HOUSE NO. 91, Sector-2, CHANDIGARH

Page 10: AKA CONSTRUCTIONSakaconstructions.in/wp-content/uploads/2018/10/aka... · KVIC Housing Project, Sector-43, CHANDIGARH. 5. Longowal Institute, Longowal. QUALITY POLICY STATEMENT Meet

PHOTO GALLERY

Page 11: AKA CONSTRUCTIONSakaconstructions.in/wp-content/uploads/2018/10/aka... · KVIC Housing Project, Sector-43, CHANDIGARH. 5. Longowal Institute, Longowal. QUALITY POLICY STATEMENT Meet
Page 12: AKA CONSTRUCTIONSakaconstructions.in/wp-content/uploads/2018/10/aka... · KVIC Housing Project, Sector-43, CHANDIGARH. 5. Longowal Institute, Longowal. QUALITY POLICY STATEMENT Meet
Page 13: AKA CONSTRUCTIONSakaconstructions.in/wp-content/uploads/2018/10/aka... · KVIC Housing Project, Sector-43, CHANDIGARH. 5. Longowal Institute, Longowal. QUALITY POLICY STATEMENT Meet
Page 14: AKA CONSTRUCTIONSakaconstructions.in/wp-content/uploads/2018/10/aka... · KVIC Housing Project, Sector-43, CHANDIGARH. 5. Longowal Institute, Longowal. QUALITY POLICY STATEMENT Meet

INTERIORS-

1.BATHROOM

Page 15: AKA CONSTRUCTIONSakaconstructions.in/wp-content/uploads/2018/10/aka... · KVIC Housing Project, Sector-43, CHANDIGARH. 5. Longowal Institute, Longowal. QUALITY POLICY STATEMENT Meet

2.STAIRCASE

3.MODULAR KITCHEN

Page 16: AKA CONSTRUCTIONSakaconstructions.in/wp-content/uploads/2018/10/aka... · KVIC Housing Project, Sector-43, CHANDIGARH. 5. Longowal Institute, Longowal. QUALITY POLICY STATEMENT Meet
Page 17: AKA CONSTRUCTIONSakaconstructions.in/wp-content/uploads/2018/10/aka... · KVIC Housing Project, Sector-43, CHANDIGARH. 5. Longowal Institute, Longowal. QUALITY POLICY STATEMENT Meet
Page 18: AKA CONSTRUCTIONSakaconstructions.in/wp-content/uploads/2018/10/aka... · KVIC Housing Project, Sector-43, CHANDIGARH. 5. Longowal Institute, Longowal. QUALITY POLICY STATEMENT Meet
Page 19: AKA CONSTRUCTIONSakaconstructions.in/wp-content/uploads/2018/10/aka... · KVIC Housing Project, Sector-43, CHANDIGARH. 5. Longowal Institute, Longowal. QUALITY POLICY STATEMENT Meet

4.FALL CEILING

Page 20: AKA CONSTRUCTIONSakaconstructions.in/wp-content/uploads/2018/10/aka... · KVIC Housing Project, Sector-43, CHANDIGARH. 5. Longowal Institute, Longowal. QUALITY POLICY STATEMENT Meet

PHOTOS AT WORK-

5.Slab casting

Page 21: AKA CONSTRUCTIONSakaconstructions.in/wp-content/uploads/2018/10/aka... · KVIC Housing Project, Sector-43, CHANDIGARH. 5. Longowal Institute, Longowal. QUALITY POLICY STATEMENT Meet
Page 22: AKA CONSTRUCTIONSakaconstructions.in/wp-content/uploads/2018/10/aka... · KVIC Housing Project, Sector-43, CHANDIGARH. 5. Longowal Institute, Longowal. QUALITY POLICY STATEMENT Meet
Page 23: AKA CONSTRUCTIONSakaconstructions.in/wp-content/uploads/2018/10/aka... · KVIC Housing Project, Sector-43, CHANDIGARH. 5. Longowal Institute, Longowal. QUALITY POLICY STATEMENT Meet

TESTIMONIAL FROM

CUSTOMERS

HOUSE NO. 1057, Phase-10, MOHALI

We have shown many visitors through the new building from the community

Everyone comments on the beautiful construction and excellent

finishes. They were also amazed when we tell them the work was completed

in 23 weeks.

Please accept my congratulations as a client on the success of your company

in ensuring your commitment, professionalism and work ethic is maintained

at all levels of your business.

SD/-

Anil Sharma

Page 24: AKA CONSTRUCTIONSakaconstructions.in/wp-content/uploads/2018/10/aka... · KVIC Housing Project, Sector-43, CHANDIGARH. 5. Longowal Institute, Longowal. QUALITY POLICY STATEMENT Meet

House No. 6191, Sector-82, AEROCITY, MOHALI

Total Construction has now successfully completed projects. We have found

Total’s team to be refreshingly co-operative and attentive. Under the

direction of Mr. Ashwani Atri, Total brings a level of client side

understanding that sets them apart from others and makes them a contractor

of choice when considering the project. We have no hesitation in

recommending AKA constructions.

SD/-

S.S Gandhi

Page 25: AKA CONSTRUCTIONSakaconstructions.in/wp-content/uploads/2018/10/aka... · KVIC Housing Project, Sector-43, CHANDIGARH. 5. Longowal Institute, Longowal. QUALITY POLICY STATEMENT Meet

Plot No. 738, Sector-82, MOHALI

I entrusted Mr. Ashwani Atri with building of commercial space in sector 82,

Chandigarh. they exceeded my expectations due to their working style and

devotion towards work. The obvious strength of AKA constructions is its

many good, capable, and devoted people. During the project we found,

without exception, all of your people to be trustworthy professionals who

were committed to the successful completion of a quality product, on a

timely basis, and consistent with the plans made by the team and the design

firm.

With your team’s ability not only to build for us what was planned, but also

to make numerous good suggestions along the way, you added much value

to what is now a finished product for the entire team to be proud of.

SD/-

Sushma Sahni

Page 26: AKA CONSTRUCTIONSakaconstructions.in/wp-content/uploads/2018/10/aka... · KVIC Housing Project, Sector-43, CHANDIGARH. 5. Longowal Institute, Longowal. QUALITY POLICY STATEMENT Meet

House No. 3440, Sector-27 D, CHANDIGARH

Our experience with Construction Results was marked by high integrity,

good quality, and high value work.

Because of the cooperation and sensitivity of Construction Results, we were

able to continue our programs during the construction period.

Construction Results began our relationship by providing a very competitive

bid; demonstrating a willingness to work through options; and accepting a

challenging schedule.

We appreciated the manner in which the site was maintained and the

pleasant, can-do attitude of the Construction Results team…we recommend

them strongly.

SD/-

Munish Verma

Page 27: AKA CONSTRUCTIONSakaconstructions.in/wp-content/uploads/2018/10/aka... · KVIC Housing Project, Sector-43, CHANDIGARH. 5. Longowal Institute, Longowal. QUALITY POLICY STATEMENT Meet

Factory No. 521&523, Phase 9 Industrial Area, MOHALI

I have known Mr.Ashwani Atri from past 4 years.firstly,I called up him to

built some portion of my factory.their work was good,so we started with

some more projects.till now Mr.Ashwani have completed four projects that

includes residential and commercial projects . Few great experience we had

working with you and your people in all aspects of the building process:

The superintendent on site made every effort to coordinate construction with

the congregation’s worship life and programs;

Your employees did quality work in a timely fashion;

Your employees expertly solved the detail problems that inevitably arise

when transforming the architect’s drawings into reality;

When it became apparent that the project was going to be completed under

budget, we were able to restore some of the detail work that we had cut from

the project;

The project was completed on schedule so we could keep the date we had

scheduled for the dedication of the building.

SD/-

Lalit Jain


Recommended