Vendor Ranking Page: 1 Contract ID: BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENS EXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N 0301 Letting Date: Contract Description: Area / District: 11/01/20 Completion Date 20170331999 April 14, 2017 ACIMF-I059(385), ACIMF-I059(394) JEFFERSON 999 County: Contract Time: Call Order: Project(s): Alabama Department of Transportation 4/14/2017 DATE: Amount Rank Vendor Name 1 30042 JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV $474,778,175.95
Transcript
Page 1: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Vendor Ranking Page: 1

Contract ID:

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

0301Letting Date:

Contract Description:

Area / District: 11/01/20 Completion Date

20170331999

April 14, 2017

ACIMF-I059(385), ACIMF-I059(394)

JEFFERSON999 County:

Contract Time:

Call Order:

Project(s):

Alabama Department of Transportation 4/14/2017DATE:

AmountRank Vendor Name

1 30042 JohnsonBros.Corp.A SouthlandCo&OscarRendaContracting,Inc.JV

$474,778,175.95

Page 2: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 1

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

0001 TotalSECTION:

0010 201A002

Clearing And Grubbing (MaximumAllowable Bid $ 4,000.00 Per Acre)(Approximately 15 Acres)

(1)

LS

60,000.00 60,000.00

0020 206A000

Removal Of Old Bridge, Station72+22.13

(1)

LS

1,000,000.00 1,000,000.00

0030 206A001

Removal Of Old Bridge, Station109+25.87

(1)

LS

3,000,000.00 3,000,000.00

0040 206A002

Removal Of Old Bridge, Station111+98.20

(1)

LS

3,000,000.00 3,000,000.00

0050 206A050

Removal Of Old Bridge, Partial,Station 179+64.96

(1)

LS

1,000,000.00 1,000,000.00

0060 206A051

Removal Of Old Bridge, Partial,Station 65+01.28 (WEST)

(1)

LS

800,000.00 800,000.00

0070 206A052

Removal Of Old Bridge, Partial,Station 64+03.28 (EAST)

(1)

LS

750,000.00 750,000.00

Page 3: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 2

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

0080 206A053

Removal Of Old Bridge, Partial,Station 75+02.37

(1)

LS

500,000.00 500,000.00

0090 206A054

Removal Of Old Bridge, Partial,Station 82+64.65

(1)

LS

750,000.00 750,000.00

0100 206B009

Removal Of Old Box Culvert, Partial,Station 14+50.00

(1)

LS

800,000.00 800,000.00

0110 206C000

Removing Concrete Sidewalk

8,414.000

SQYD

15.00 126,210.00

0120 206C001

Removing Concrete Pavement

15,385.000

SQYD

31.00 476,935.00

0130 206C002

Removing Concrete Slope Paving

7,720.000

SQYD

20.00 154,400.00

0140 206C010

Removing Concrete Driveway

858.000

SQYD

16.00 13,728.00

0150 206C013

Removing Bridge End Slab

932.000

SQYD

30.00 27,960.00

0160 206C014

Removing Bridge End Slab (Partial)

86.000

SQYD

34.00 2,924.00

Page 4: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 3

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

0170 206C016

Removing Concrete Slope Paving(Under Bridges)

5,407.000

SQYD

27.50 148,692.50

0180 206D000

Removing Pipe

19,045.000

LF

12.00 228,540.00

0190 206D001

Removing Guardrail

8,235.000

LF

4.00 32,940.00

0200 206D003

Removing Curb And Gutter

23,852.000

LF

13.00 310,076.00

0210 206D008

Removing Retaining Wall

2,429.000

LF

120.00 291,480.00

0220 206D010

Removing Safety Barrier

1,429.000

LF

33.00 47,157.00

0230 206D011

Removing Fence

16,103.000

LF

5.00 80,515.00

0240 206E000

Removing Headwalls

5.000

Each

1,400.00 7,000.00

0250 206E001

Removing Inlets

67.000

Each

1,400.00 93,800.00

0260 206E002

Removing Junction Boxes

51.000

Each

1,400.00 71,400.00

Page 5: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 4

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

0270 206E003

Removing Manholes

63.000

Each

1,400.00 88,200.00

0280 206E008

Removing Guardrail End Anchor (AllType)

29.000

Each

34.50 1,000.50

0290 206E020

Removing Existing Overhead SignStructure

13.000

Each

17,000.00 221,000.00

0300 206E041

Removing Impact Attenuators

2.000

Each

4,500.00 9,000.00

0310 206E060

Removing Tree (Less Than 8 Inch)

5.000

Each

600.00 3,000.00

0320 206E061

Removing Tree (8 - 18 Inch)

23.000

Each

12.00 276.00

0330 210A000

Unclassified Excavation

213,434.000

CUYD

25.00 5,335,850.00

0340 210D000

Borrow Excavation

5,000.000

CUYD

20.00 100,000.00

0350 210D101

Borrow Excavation (Sand Fill,Complete In Place)

27.000

CUYD

17.50 472.50

Page 6: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 5

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

0360 214A000

Structure Excavation

46,586.000

CUYD

4.00 186,344.00

0370 214B000

Foundation Backfill, Local

500.000

CUYD

6.00 3,000.00

0380 214B001

Foundation Backfill, Commercial

8,281.000

CUYD

35.00 289,835.00

0390 215A000

Unclassified Bridge Excavation

43,847.000

CUYD

35.00 1,534,645.00

0400 215B000

Cofferdams Or Sheeting AndShoring, Station 170+62.91

(1)

LS

1,000,000.00 1,000,000.00

0410 215B001

Cofferdams Or Sheeting AndShoring, Station 149+46.68

(1)

LS

900,000.00 900,000.00

0420 215B002

Cofferdams Or Sheeting AndShoring, Station 165+81.50

(1)

LS

700,000.00 700,000.00

0430 215B003

Cofferdams Or Sheeting AndShoring, Station 151+93.91

(1)

LS

600,000.00 600,000.00

0440 215B004

Cofferdams Or Sheeting AndShoring, Station 166+66.22

(1)

LS

950,000.00 950,000.00

Page 7: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 6

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

0450 215B005

Cofferdams Or Sheeting AndShoring, Station 179+64.96

(1)

LS

175,000.00 175,000.00

0460 215B006

Cofferdams Or Sheeting AndShoring, Station 65+01.28 (WEST)

(1)

LS

500,000.00 500,000.00

0470 215B007

Cofferdams Or Sheeting AndShoring, Station 64+03.28 (EAST)

(1)

LS

100,000.00 100,000.00

0480 215B008

Cofferdams Or Sheeting AndShoring, Station 151+46.44

(1)

LS

250,000.00 250,000.00

0490 215B009

Cofferdams Or Sheeting AndShoring, Station 109+25.87

(1)

LS

962,655.25 962,655.25

0500 215B010

Cofferdams Or Sheeting AndShoring, Station 111+98.20

(1)

LS

962,655.25 962,655.25

0510 231B000

Roadbed Stabilizing Material, ALDOT#410

12,600.000

Ton

27.00 340,200.00

0520 240A000

Settlement Plate Assembly

15.000

Each

2,500.00 37,500.00

Page 8: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 7

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

0530 251A000

Contaminated Soil Remediation(Specialty Item)

12,500.000

CUYD

45.00 562,500.00

0540 301A012

Crushed Aggregate Base Course,Type B, Plant Mixed, 6" CompactedThickness

4,915.000

SQYD

15.00 73,725.00

0550 304A008

Soil-Cement, 6 Inches Thick

1,000.000

SQYD

11.00 11,000.00

0560 305B077

Crushed Aggregate, Section 825, ForMiscellaneous Use

20,400.000

Ton

36.00 734,400.00

0570 305B078

Crushed Aggregate, Section 825,Type B, For Miscellaneous Use

29,257.000

Ton

36.00 1,053,252.00

0580 404H000

Paver-Laid Surface Treatment TackCoat

17.000

Gal

20.00 340.00

0590 404I000

Paver-Laid Surface Treatment PlantMix

24.000

Ton

1,500.00 36,000.00

0600 405A000

Tack Coat

14,047.000

Gal

5.00 70,235.00

Page 9: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 8

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

0610 407B000

Joint Sealant For Hot Mix AsphaltPavement

7.000

Mile

300.00 2,100.00

0620 408A052

Planing Existing Pavement(Approximately 1.10" Thru 2.0" Thick)

31,642.000

SQYD

2.50 79,105.00

0630 408B001

Micro-Milling ExistingPavement(Approximately 1.10" Thru2.00" Thick)

69,398.000

SQYD

2.50 173,495.00

0640 410C000

Contractor Retained Profilograph

1.000

Each

50,000.00 50,000.00

0650 410H000

Material Remixing Device

1.000

Each

200,000.00 200,000.00

0660 420A015

Polymer Modified Open GradedFriction Course

4,720.000

Ton

116.50 549,880.00

0670 420B000

Open Graded Friction Course TackCoat

4,104.000

Gal

18.50 75,924.00

0680 423A003

Stone Matrix Asphalt Wearing Layer,1/2" Maximum Aggregate Size

1,080.000

Ton

132.50 143,100.00

Page 10: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 9

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

0690 423B002

Stone Matrix Asphalt Binder Layer,3/4" Maximum Aggregate Size

1,289.000

Ton

126.00 162,414.00

0700 424A280

Superpave Bituminous ConcreteWearing Surface Layer, 1/2"Maximum Aggregate Size Mix, ESALRange E

1,628.000

Ton

118.00 192,104.00

0710 424A360

Superpave Bituminous ConcreteWearing Surface Layer, 1/2"Maximum Aggregate Size Mix, ESALRange C/D

5,005.000

Ton

108.50 543,042.50

0720 424B280

Superpave Bituminous ConcreteUpper Binder Layer, 3/4" MaximumAggregate Size Mix, ESAL Range E

1,943.000

Ton

115.00 223,445.00

0730 424B581

Superpave Bituminous ConcreteLower Binder Layer, 1" MaximumAggregate Size Mix, ESAL Range E

21,950.000

Ton

93.50 2,052,325.00

0740 424B589

Superpave Bituminous ConcreteLower Binder Layer, Leveling, 1"Maximum Aggregate Size Mix, ESALRange E

594.000

Ton

90.00 53,460.00

Page 11: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 10

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

0750 424B650

Superpave Bituminous ConcreteUpper Binder Layer, 3/4" MaximumAggregate Size Mix, ESAL RangeC/D

3,014.000

Ton

119.50 360,173.00

0760 424B654

Superpave Bituminous ConcreteUpper Binder Layer, Patching, 3/4"Maximum Aggregate Size Mix, ESALRange C/D

1,737.000

Ton

117.50 204,097.50

0770 424B661

Superpave Bituminous ConcreteUpper Binder Layer, Widening, 3/4"Maximum Aggregate Size Mix, ESALRange C/D

76.000

Ton

124.50 9,462.00

0780 424B681

Superpave Bituminous ConcreteLower Binder Layer, 1" MaximumAggregate Size Mix, ESAL RangeC/D

1,964.000

Ton

89.00 174,796.00

0790 424B684

Superpave Bituminous ConcreteLower Binder Layer, Patching, 3/4"Maximum Aggregate Size Mix, ESALRange C/D

400.000

Ton

233.50 93,400.00

Page 12: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 11

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

0800 424B692

Superpave Bituminous ConcreteLower Binder Layer, Widening, 1"Maximum Aggregate Size Mix, ESALRange C/D

109.000

Ton

148.00 16,132.00

0810 424C280

Superpave Bituminous ConcreteBase Layer, 1" Maximum AggregateSize Mix, ESAL Range E

7,699.000

Ton

98.00 754,502.00

0820 424C360

Superpave Bituminous ConcreteBase Layer, 1" Maximum AggregateSize Mix, ESAL Range C/D

2,837.000

Ton

88.00 249,656.00

0830 424C370

Superpave Bituminous ConcreteBase Layer, Widening, 1" MaximumAggregate Size Mix, ESAL RangeC/D

130.000

Ton

135.50 17,615.00

0840 428A001

Scoring Bituminous PavementSurface

1.000

Mile

6,000.00 6,000.00

0850 430B012

Aggregate Surfacing (ALDOT #410Or #467)

1,000.000

Ton

85.00 85,000.00

0860 430B022

Aggregate Surfacing (ALDOT #810Or 8910)

350.000

Ton

95.00 33,250.00

Page 13: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 12

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

0870 450A000

Plain Cement Concrete Pavement,8Inches Thick

4,290.000

SQYD

80.00 343,200.00

0880 450B000

Reinforced Cement Concrete BridgeEnd Slab

706.000

SQYD

200.00 141,200.00

0890 455A000

Grinding Concrete Pavement

2,150.000

SQYD

8.00 17,200.00

0900 460A000

Patching

54,000.000

LB

8.00 432,000.00

0910 502A000

Steel Reinforcement

437,889.000

LB

1.00 437,889.00

0920 502A001

Steel Reinforcement (Grade 60)

9,401,800.000

LB

1.00 9,401,800.00

0930 502B000

Steel Reinforcement For BridgeSuperstructure, Station 170+62.91,Approximately 477,000 Lbs. (Grade60)

(1)

LS

500,000.00 500,000.00

0940 502B001

Steel Reinforcement For BridgeSuperstructure, Station 149+46.68,Approximately 339,800 Lbs. (Grade60)

(1)

LS

350,000.00 350,000.00

Page 14: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 13

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

0950 502B002

Steel Reinforcement For BridgeSuperstructure, Station 165+81.50,Approximately 545,800 Lbs. (Grade60)

(1)

LS

500,000.00 500,000.00

0960 502B003

Steel Reinforcement For BridgeSuperstructure, Station 151+93.91,Approximately 1,078,000 Lbs. (Grade60)

(1)

LS

950,000.00 950,000.00

0970 502B004

Steel Reinforcement For BridgeSuperstructure, Station 166+66.22,Approximately 465,200 Lbs. (Grade60)

(1)

LS

450,000.00 450,000.00

0980 502B005

Steel Reinforcement For BridgeSuperstructure, Station 179+64.96,Approximately 21,600 Lbs. (Grade60)

(1)

LS

20,000.00 20,000.00

0990 502B006

Steel Reinforcement For BridgeSuperstructure, Station 65+01.28(WEST), Approximately 166,100 Lbs.(Grade 60)

(1)

LS

200,000.00 200,000.00

Page 15: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 14

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

1000 502B007

Steel Reinforcement For BridgeSuperstructure, Station 64+03.28(EAST), Approximately 65,400 Lbs.(Grade 60)

(1)

LS

50,000.00 50,000.00

1010 502B008

Steel Reinforcement For BridgeSuperstructure, Station 151+46.44,Approximately 297,400 Lbs. (Grade60)

(1)

LS

250,000.00 250,000.00

1020 502B009

Steel Reinforcement For BridgeSuperstructure, Station 82+64.65,Approximately 5,600 Lbs. (Grade 60)

(1)

LS

5,000.00 5,000.00

1030 505A004

Steel Test Piles (HP 14x73)

1.000

Each

5,000.00 5,000.00

1040 505A006

Steel Test Piles (HP 14x117)

3.000

Each

5,000.00 15,000.00

1050 505B089

Dynamic Loading Tests (HP 14x73)

1.000

Each

6,000.00 6,000.00

1060 505B091

Dynamic Loading Tests (HP 14x117)

3.000

Each

6,000.00 18,000.00

1070 505B094

Dynamic Loading Tests (HP 14x102)

8.000

Each

6,000.00 48,000.00

Page 16: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 15

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

1080 505G003

Pile Points (Type A, 12")

10.000

Each

200.00 2,000.00

1090 505G004

Pile Points (Type A, 14")

3,982.000

Each

200.00 796,400.00

1100 505H000

Pilot Holes

1,450.000

LF

300.00 435,000.00

1110 505M002

Steel Piling Furnished And Driven(HP 12x53)

806.000

LF

115.00 92,690.00

1120 505M004

Steel Piling Furnished And Driven(HP 14x73)

2,607.000

LF

130.00 338,910.00

1130 505M006

Steel Piling Furnished And Driven(HP 14x117)

125,850.000

LF

80.00 10,068,000.00

1140 505M011

Steel Piling Furnished And Driven(HP 14X102)

47,386.000

LF

85.00 4,027,810.00

1150 505M012

Steel Piling Furnished And Driven(HP 14 x 89)

1,153.000

LF

85.00 98,005.00

Page 17: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 16

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

1160 506A003

Drilled Shaft Excavation, 5'-0"Diameter

408.000

LF

770.00 314,160.00

1170 506A005

Drilled Shaft Excavation, 3'-6"Diameter

5,855.000

LF

700.00 4,098,500.00

1180 506B002

Special Drilled Shaft Excavation, 3'-6"Diameter

4,374.000

LF

850.00 3,717,900.00

1190 506B005

Special Drilled Shaft Excavation, 5'-0"Diameter

91.000

LF

1,650.00 150,150.00

1200 506C041

Drilled Shaft Construction, 3'-6"Diameter, Class DS1 Concrete

10,229.000

LF

170.00 1,738,930.00

1210 506C044

Drilled Shaft Construction, 5'-0"Diameter, Class DS1 Concrete

499.000

LF

200.00 99,800.00

1220 506F006

Permanent Drilled Shaft Casing, 5'-0"Diameter

110.000

LF

450.00 49,500.00

1230 506G001

Crosshole Sonic Logging, 3'-6"Diameter

376.000

Each

2,000.00 752,000.00

Page 18: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 17

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

1240 506G004

Crosshole Sonic Logging, 5'-0"Diameter

11.000

Each

2,500.00 27,500.00

1250 508A000

Structural Steel

92,268.000

LB

5.00 461,340.00

1260 508B000

Structural Steel Superstructure,(273'-6", 315'-0" Cont. Spans),Approx. 1,871,200 Lbs.(SpecItem)(Grade 50)

1.000

Each

4,500,000.00 4,500,000.00

1270 508B001

Structural Steel Superstructure,(205'-0", 205'-0" Cont. Spans)Approx. 851,700 Lbs. (SpecialtyItem)(Grade 50)

1.000

Each

2,500,000.00 2,500,000.00

1280 508B002

Structural Steel Superstructure,(184'-10",185'-0 1/8",184'-0"Cont.Spans)Approx.1,133,400Lbs.(Spec Item)(Grd 50)

1.000

Each

2,500,000.00 2,500,000.00

1290 508B003

Structural Steel Superstructure,(272'-0", 272'-0" Cont. Spans)Approx. 1,420,900 Lbs. (SpecialtyItem)(Grade 50)

1.000

Each

3,000,000.00 3,000,000.00

Page 19: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 18

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

1300 508B004

Structural Steel Superstructure,(205'-0", 205'-0", Cont. Spans)Approx. 853,500 Lbs. (Specialty Item)(Grade 50)

1.000

Each

1,750,000.00 1,750,000.00

1310 508B005

Structural Steel Superstructure,(215'-0",280'-0",215'-0" Cont.Spans)Approx. 2,876,800 Lbs.(SpecItem)(Grade 50)

1.000

Each

6,000,000.00 6,000,000.00

1320 508B006

Structural Steel Superstructure,(170'-0",255'-0",160'-0" Cont.Spans)Approx. 1,808,200 Lbs.(SpecItem) (Grade 50)

1.000

Each

3,750,000.00 3,750,000.00

1330 508B007

Structural Steel Superstructure,(140'-0",170'-",140'-0" Cont. Spans),Approx. 919,800 Lbs. (SpecItem)(Grade 50)

1.000

Each

2,000,000.00 2,000,000.00

1340 508B008

Structural Steel Superstructure,(190'-0",242'-0",200'-0"Cont.Spans),Approx. 1,452,500 Lbs.(SpecItem)(Grade 50)

1.000

Each

3,000,000.00 3,000,000.00

Page 20: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 19

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

1350 508B009

Structural Steel Superstructure,(177'-0",250'-0",215'-0"Cont.Spans),Approx. 1,482,000 Lbs.(SpecItem)(Grade 50)

1.000

Each

3,000,000.00 3,000,000.00

1360 508B010

Structural Steel Superstructure,(50'-9",71'-1",50'-9" Cont. Spans),Approx. 58,000 Lbs.(Spec Item)(Grade 50)

1.000

Each

150,000.00 150,000.00

1370 508B011

Structural Steel Superstructure,(WEST)(84'-10 1/4",84'-101/4"Cont.Spans)Approx. 68,000Lbs.(Spec Item)(Grade 50)

1.000

Each

200,000.00 200,000.00

1380 508B012

Structural Steel Superstructure,(WEST)(82'-6 1/16",82'-61/16"Cont.Spans)Approx. 68,500Lbs.(Spec Item)(Grade 50)

1.000

Each

225,000.00 225,000.00

1390 508B013

Structural Steel Superstructure,(WEST) (70'-0",70'-0" Cont. Spans),Approx. 60,500Lbs.(Spec Item)(Grade 50)

1.000

Each

200,000.00 200,000.00

Page 21: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 20

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

1400 508B014

Structural Steel Superstructure,(WEST) (201'-8",125'-10"Cont.Spans) Approx. 485,300 Lbs.(Spec Item) (Grade 50)

1.000

Each

1,000,000.00 1,000,000.00

1410 508B015

Structural Steel Superstructure,(WEST) (27'-7" Simple Span),Approx. 5,200 Lbs. (Spec Item)(Grade 50)

1.000

Each

20,000.00 20,000.00

1420 508B016

Structural Steel Superstructure,(EAST)(84'-10 1/4",84'-101/4"Cont.Spans)Approx. 40,700Lbs.(Spec Item)(Grade 50)

1.000

Each

100,000.00 100,000.00

1430 508B017

Structural Steel Superstructure,(EAST)(111-7 3/4",111-73/4"Cont.Spans), Approx. 65,500Lbs.(Spec Item)(Grade 50)

1.000

Each

200,000.00 200,000.00

1440 508B018

Structural Steel Superstructure,(EAST) (65'-6", 65'-6" Cont. Spans),Approx. 32,300 Lbs. (Spec Item)(Grade 50)

1.000

Each

150,000.00 150,000.00

Page 22: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 21

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

1450 508B019

Structural Steel Superstructure,(EAST) (65'-6" Simple Span H8),Approx. 17,000 Lbs. (Spec Item)(Grade 50)

1.000

Each

50,000.00 50,000.00

1460 508B020

Structural Steel Superstructure,(EAST) (65'-6" Simple Span H9),Approx. 17,000 Lbs. (Spec Item)(Grade 50)

1.000

Each

60,000.00 60,000.00

1470 508B021

Structural Steel Superstructure,(EAST) (65'-10 1/4" Simple SpanH10), Approx. 16,800 Lbs. (SpecItem) (Grade 50)

1.000

Each

60,000.00 60,000.00

1480 508B022

Structural Steel Superstructure,(Span 8 @ 83'-4 1/4" Simple Span),Approx. 112,300 Lbs. (Spec Item)(Grade 50)

1.000

Each

300,000.00 300,000.00

1490 508B023

Structural Steel Superstructure,(Span D31 @ 48'-4 5/16' SimpleSpan), Approx. 15,420 Lbs. (SpecItem) (Grade 50)

1.000

Each

75,000.00 75,000.00

Page 23: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 22

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

1500 508B024

Structural Steel Superstructure,(WB-Finger Joint), Approximately329,400Lbs. (Specialty Item) (Grade50)

1.000

Each

1,750,000.00 1,750,000.00

1510 508B025

Structural Steel Superstructure,(EB-Finger Joint), Approximately344,400 Lbs. (Specialty Item) (Grade50)

1.000

Each

1,750,000.00 1,750,000.00

1520 508F000

Bridge Deck Drainage System(Specialty Item)

(1)

LS

1,750,000.00 1,750,000.00

1530 508F001

Bridge Deck Drainage System(Specialty Item)

(1)

LS

1,850,000.00 1,850,000.00

1540 508I000

Structural Steel Bent Cap Number, II(Approximately 265,000 Lbs)(Specialty Item) (Grade 50)

1.000

Each

700,000.00 700,000.00

1550 510A007

Bridge Substructure Concrete

46,899.000

CUYD

700.00 32,829,300.00

1560 510B001

Bridge Concrete, Class B

17.000

CUYD

1,000.00 17,000.00

Page 24: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 23

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

1570 510C051

Bridge Concrete Superstructure,Station 170+62.91, Approximately2,119 Cubic Yards

(1)

LS

1,750,000.00 1,750,000.00

1580 510C052

Bridge Concrete Superstructure,Station 149+46.68, Approximately1,625 Cubic Yards

(1)

LS

1,300,000.00 1,300,000.00

1590 510C053

Bridge Concrete Superstructure,Station 165+81.50, Approximately2,378 Cubic Yards

(1)

LS

2,000,000.00 2,000,000.00

1600 510C054

Bridge Concrete Superstructure,Station 151+93.91, Approximately4,362 Cubic Yards

(1)

LS

3,000,000.00 3,000,000.00

1610 510C055

Bridge Concrete Superstructure,Station 179+64.96, Approximately 75Cubic Yards

(1)

LS

100,000.00 100,000.00

1620 510C056

Bridge Concrete Superstructure,Station 166+66.22, Approximately2,136 Cubic Yards

(1)

LS

1,500,000.00 1,500,000.00

Page 25: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 24

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

1630 510C057

Bridge Concrete Superstructure,Station 65+01.28, Approximately 662Cubic Yards (WEST)

(1)

LS

600,000.00 600,000.00

1640 510C058

Bridge Concrete Superstructure,Station 64+03.28, Approximately 271Cubic Yards (EAST)

(1)

LS

300,000.00 300,000.00

1650 510C059

Bridge Concrete Superstructure,Station 151+46.44, Approximately1,420 Cubic Yards

(1)

LS

1,000,000.00 1,000,000.00

1660 510C060

Bridge Concrete Superstructure,Station 82+64.65, Approximately 20Cubic Yards

(1)

LS

20,000.00 20,000.00

1670 510E000

Grooving Concrete Bridge Decks

36,211.000

SQYD

7.00 253,477.00

1680 511A001

Elastomeric Bearing Type 2

362.000

Each

1,800.00 651,600.00

1690 511A004

Elastomeric Bearing Type 4

198.000

Each

1,800.00 356,400.00

1700 511A005

Elastomeric Bearing Type 5

119.000

Each

2,000.00 238,000.00

Page 26: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 25

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

1710 511A053

Elastomeric Bearing Type 2 (MarkB4)

2.000

Each

1,850.00 3,700.00

1720 511A071

Elastomeric Bearing Type 4 (MarkVB2)

68.000

Each

1,850.00 125,800.00

1730 511A072

Elastomeric Bearing Type 4 (MarkVB3)

26.000

Each

1,700.00 44,200.00

1740 511A073

Elastomeric Bearing Type 4 (MarkVB4)

202.000

Each

1,700.00 343,400.00

1750 511A074

Elastomeric Bearing Type 4 (MarkVB5)

268.000

Each

1,700.00 455,600.00

1760 513B004

Pretensioned-Prestressed ConcreteGirders, Type II (Specialty Item)

1,953.000

LF

225.00 439,425.00

1770 513B005

Pretensioned-Prestressed ConcreteGirders, Type III (Specialty Item)

1,007.000

LF

245.00 246,715.00

1780 513B012

Pretensioned-Prestressed ConcreteGirders,Type III Modified (SpecialtyItem)

98.000

LF

300.00 29,400.00

Page 27: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 26

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

1790 513B015

Pretensioned-Prestressed ConcreteGirders, Type BT-54 (Specialty Item)

5,003.000

LF

300.00 1,500,900.00

1800 513B017

Pretensioned-Prestressed ConcreteGirders, Type BT-72 (Specialty Item)

5,689.000

LF

300.00 1,706,700.00

1810 513B019

Pretensioned-Prestressed ConcreteGirders, Type BT-63 (Specialty Item)

554.000

LF

300.00 166,200.00

1820 513B029

Pretensioned-Prestressed ConcreteGirders, Type BT-54 Modified(Speciality Item)

4,751.000

LF

300.00 1,425,300.00

1830 513B031

Pretensioned-Prestressed ConcreteGirders,Type BT-63Modified(Specialty Item)

8,445.000

LF

300.00 2,533,500.00

1840 513B032

Pretensioned-Prestressed ConcreteGirders, Type BT-72 Modified(Specialty Item)

3,777.000

LF

300.00 1,133,100.00

1850 516C000

Coating Concrete Surfaces (Bridge29)

(1)

LS

575,000.00 575,000.00

Page 28: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 27

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

1860 516C001

Coating Concrete Surfaces ( Bridge30)

(1)

LS

575,000.00 575,000.00

1870 517A000

Handrail , Galvanized Steel

65.000

LF

250.00 16,250.00

1880 521B000

Coating Existing Bridge At Station161+09.79

(1)

LS

510,000.00 510,000.00

1890 524A010

Culvert Concrete

2,390.000

CUYD

1,250.00 2,987,500.00

1900 529A020

Retaining Wall # 1

192.000

SQFT

60.00 11,520.00

1910 529A021

Retaining Wall # 2A

3,157.000

SQFT

60.00 189,420.00

1920 529A022

Retaining Wall # 2B

386.000

SQFT

60.00 23,160.00

1930 529A023

Retaining Wall # 2C

4,055.000

SQFT

60.00 243,300.00

1940 529A024

Retaining Wall # 3A

975.000

SQFT

60.00 58,500.00

Page 29: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 28

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

1950 529A025

Retaining Wall # 3B

1,578.000

SQFT

60.00 94,680.00

1960 529A026

Retaining Wall # 4A

1,673.000

SQFT

60.00 100,380.00

1970 529A027

Retaining Wall # 4B

384.000

SQFT

60.00 23,040.00

1980 529A028

Retaining Wall # 4C

1,756.000

SQFT

60.00 105,360.00

1990 529A029

Retaining Wall # 7

424.000

SQFT

60.00 25,440.00

2000 530A001

18" Roadway Pipe (Class 3 R.C.)

2,401.000

LF

75.00 180,075.00

2010 530A002

24" Roadway Pipe (Class 3 R.C.)

782.000

LF

90.00 70,380.00

2020 530A003

30" Roadway Pipe (Class 3 R.C.)

973.000

LF

100.00 97,300.00

2030 530A004

36" Roadway Pipe (Class 3 R.C.)

894.000

LF

112.00 100,128.00

2040 530A005

42" Roadway Pipe (Class 3 R.C.)

128.000

LF

130.00 16,640.00

Page 30: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 29

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

2050 530A006

48" Roadway Pipe (Class 3 R.C.)

304.000

LF

148.00 44,992.00

2060 530A101

18" Roadway Pipe (Class 3 R.C.)(Extension)

317.000

LF

80.00 25,360.00

2070 530A102

24" Roadway Pipe (Class 3 R.C.)(Extension)

49.000

LF

89.00 4,361.00

2080 530A103

30" Roadway Pipe (Class 3 R.C.)(Extension)

35.000

LF

101.00 3,535.00

2090 530A801

18" Roadway Pipe (14 Gauge C.C.S.)(Stack Pipe)(No Bedding Required)

54.000

LF

90.00 4,860.00

2100 530B002

29" Span, 18" Rise Roadway Pipe(Class 3 R.C.)

88.000

LF

100.00 8,800.00

2110 533A097

15" Storm Sewer Pipe (Class 3 R.C.)

95.000

LF

77.00 7,315.00

2120 533A098

18" Storm Sewer Pipe (Class 3 R.C.)

862.000

LF

80.00 68,960.00

2130 533A099

24" Storm Sewer Pipe (Class 3 R.C.)

527.000

LF

88.00 46,376.00

Page 31: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 30

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

2140 533A100

30" Storm Sewer Pipe (Class 3 R.C.)

45.000

LF

101.00 4,545.00

2150 533A856

15" Storm Sewer Pipe

58.000

LF

77.00 4,466.00

2160 533A857

18" Storm Sewer Pipe

6,921.000

LF

80.00 553,680.00

2170 533A858

24" Storm Sewer Pipe

2,619.000

LF

90.00 235,710.00

2180 533A859

30" Storm Sewer Pipe

269.000

LF

101.00 27,169.00

2190 533A861

42" Storm Sewer Pipe

294.000

LF

131.00 38,514.00

2200 533A901

8" Storm Sewer Pipe (Ductile Iron)

68.000

LF

90.00 6,120.00

2210 533B098

22" Span, 14" Rise Storm Sewer Pipe(Class 3 R.C.)

127.000

LF

92.00 11,684.00

2220 533B099

29" Span, 18" Rise Storm Sewer Pipe(Class 3 R.C.)

139.000

LF

101.00 14,039.00

Page 32: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 31

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

2230 533B101

44" Span, 27" Rise Storm Sewer Pipe(Class 3 R.C.)

15.000

LF

147.00 2,205.00

2240 533B202

29" Span, 18" Rise Storm Sewer Pipe

221.000

LF

101.00 22,321.00

2250 534E001

Cleaning Existing Pipe (Less Than OrEqual To 48" Horizontal Opening)

67.000

LF

27.00 1,809.00

2260 535A652

24" Side Drain Pipe (Temporary)

875.000

LF

97.00 84,875.00

2270 539A002

8 Inch Trench Drain

774.000

LF

97.00 75,078.00

2280 546A000

Micropiles

1,424.000

LF

230.00 327,520.00

2290 546B000

Micropile Verification Load Test

2.000

Each

20,000.00 40,000.00

2300 546C000

Micropile Proof Load Test

2.000

Each

10,000.00 20,000.00

2310 570A000

Soil Nail Wall

498.000

SQYD

600.00 298,800.00

Page 33: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 32

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

2320 570B000

Excavation For Soil Nail Wall

1,321.000

CUYD

37.50 49,537.50

2330 580E000

Post Tensioning SuperstructureStrand ( Bridge 29)

2,165,000.000

LB

3.50 7,577,500.00

2340 580E001

Post Tensioning SuperstructureStrand ( Bridge 30)

2,265,000.000

LB

3.50 7,927,500.00

2350 580E002

Post Tensioning Superstructure Bar( Bridge 29)

63,000.000

LB

3.75 236,250.00

2360 580E003

Post Tensioning Superstructure Bar( Bridge 30)

64,000.000

LB

3.75 240,000.00

2370 583F000

Precast Segments-Concrete (6500PSI) ( Bridge 29)

34,450.000

CUYD

435.00 14,985,750.00

2380 583F001

Precast Segments-Concrete (6500PSI) ( Bridge 30)

35,800.000

CUYD

435.00 15,573,000.00

2390 583G000

Precast Segment Production ( Bridge29)

(1)

LS

40,600,000.00 40,600,000.00

Page 34: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 33

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

2400 583G001

Precast Segment Production ( Bridge30)

(1)

LS

40,600,000.00 40,600,000.00

2410 583H000

Grooving Precast Segment BridgeDecks ( Bridge 29)

56,730.000

SQYD

6.00 340,380.00

2420 583H001

Grooving Precast Segment BridgeDecks ( Bridge 30)

58,956.000

SQYD

6.00 353,736.00

2430 583I000

Steel Reinforcment for BridgeSuperstructure (Grade 60) ( Bridge29)

7,205,000.000

LB

1.05 7,565,250.00

2440 583I001

Steel Reinforcment for BridgeSuperstructure (Grade 60) ( Bridge30)

7,495,000.000

LB

1.05 7,869,750.00

2450 583J000

Cast In-Place Barriers, (4000 PSI)(Bridge 29)

12,962.000

LF

40.00 518,480.00

2460 583J001

Cast In-Place Barriers, (4000 PSI)(Bridge 30)

13,287.000

LF

40.00 531,480.00

2470 600A000

Mobilization

(1)

LS

48,700,000.00 48,700,000.00

Page 35: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 34

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

2480 601A000

Furnishing Base, Soil And StructureLaboratories

1.000

Each

250,000.00 250,000.00

2490 605B000

Special Underdrain Outlet, Type A

2.000

Each

800.00 1,600.00

2500 605B001

Special Underdrain Outlet, Type B

2.000

Each

1,000.00 2,000.00

2510 606A000

6" Underdrain Pipe

500.000

LF

50.00 25,000.00

2520 608A000

Separation Geotextile

473.000

SQYD

10.00 4,730.00

2530 610D003

Filter Blanket, Geotextile

9,175.000

SQYD

8.00 73,400.00

2540 614A000

Slope Paving

707.000

CUYD

300.00 212,100.00

2550 614A001

Slope Paving (Under Bridges)

430.000

CUYD

400.00 172,000.00

2560 618A000

Concrete Sidewalk, 4" Thick

23,527.000

SQYD

45.00 1,058,715.00

Page 36: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 35

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

2570 618A002

Concrete Sidewalk, 4" Thick(Includes Brick Paver)

4,915.000

SQYD

45.00 221,175.00

2580 618B003

Concrete Driveway, 6" Thick(Includes Wire Mesh)

188.000

SQYD

60.00 11,280.00

2590 619A002

18" Roadway Pipe End Treatment,Class 1

4.000

Each

1,420.00 5,680.00

2600 619A011

72" Roadway Pipe End Treatment,Class 1

1.000

Each

15,000.00 15,000.00

2610 619B017

29" Span, 18" Rise Roadway PipeEnd Treatment, Class 1

1.000

Each

2,000.00 2,000.00

2620 619B019

44" Span, 27" Rise Roadway PipeEnd Treatment, Class 1

1.000

Each

2,000.00 2,000.00

2630 620A000

Minor Structure Concrete

24.000

CUYD

1,200.00 28,800.00

2640 621A003

Junction Boxes, Type 4 Or 1P

4.000

Each

4,300.00 17,200.00

Page 37: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 36

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

2650 621A011

Junction Boxes, Type 1 Or 1P

152.000

Each

4,500.00 684,000.00

2660 621A013

Junction Boxes, Type Special

1.000

Each

55,000.00 55,000.00

2670 621A019

Junction Boxes, Type 1 Or 2P

8.000

Each

4,000.00 32,000.00

2680 621A022

Junction Boxes, Type 1 (Modified)

4.000

Each

4,000.00 16,000.00

2690 621A034

Junction Boxes, Type 4 (Modified)

1.000

Each

18,000.00 18,000.00

2700 621B003

Junction Box Units, Type 4 Or 1P

2.000

Each

1,500.00 3,000.00

2710 621B011

Junction Box Units, Type 1 Or 1P

28.000

Each

1,200.00 33,600.00

2720 621B014

Junction Box Units, Type 1 Or 2P

10.000

Each

1,200.00 12,000.00

2730 621C008

Inlets, Type E

1.000

Each

5,500.00 5,500.00

2740 621C015

Inlets, Type S1 Or S3 (1 Wing)

28.000

Each

1,290.00 36,120.00

Page 38: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 37

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

2750 621C016

Inlets, Type S2 Or S4 (1 Wing)

2.000

Each

3,105.00 6,210.00

2760 621C017

Inlets, Type S1 Or S3 (2 Wing)

23.000

Each

1,350.00 31,050.00

2770 621C018

Inlets, Type S2 Or S4 (2 Wing)

2.000

Each

3,500.00 7,000.00

2780 621C024

Inlets, Type C Or P1

29.000

Each

3,750.00 108,750.00

2790 621C032

Inlets, Type C (Modified)

1.000

Each

3,750.00 3,750.00

2800 621C069

Inlets, Type E3

10.000

Each

3,750.00 37,500.00

2810 621C070

Inlets, Type E4

3.000

Each

5,800.00 17,400.00

2820 621C074

Inlets, Type E3 (Modified)

6.000

Each

5,800.00 34,800.00

2830 621C100

Inlets, Type PR

5.000

Each

3,000.00 15,000.00

2840 621C109

Inlets, Type PD

2.000

Each

3,000.00 6,000.00

Page 39: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 38

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

2850 621C129

Inlets, Type C (Partial)

3.000

Each

2,600.00 7,800.00

2860 621C158

Inlets, Type E3 (Partial)

11.000

Each

3,330.00 36,630.00

2870 621D015

Inlet Units, Type S1 Or S3

20.000

Each

1,000.00 20,000.00

2880 621D016

Inlet Units, Type S2 Or S4

2.000

Each

1,150.00 2,300.00

2890 621D033

Inlet Units, Type C Or P1

28.000

Each

903.00 25,284.00

2900 621D046

Inlet Units, Type E3

11.000

Each

976.00 10,736.00

2910 621D047

Inlet Units, Type E4

2.000

Each

1,050.00 2,100.00

2920 621D109

Inlet Units, Type PD

2.000

Each

975.00 1,950.00

2930 621E004

Manholes, Type L Or M (Storm)

18.000

Each

3,000.00 54,000.00

2940 621F005

Manhole Units, Type L Or M (Storm)

22.000

Each

2,000.00 44,000.00

Page 40: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 39

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

2950 622A001

Manhole Covers Reset (Storm)

1.000

Each

675.00 675.00

2960 623A000

Concrete Gutter

222.000

LF

33.00 7,326.00

2970 623B000

Concrete Curb, Type N

150.000

LF

33.00 4,950.00

2980 623B001

Concrete Curb, Type N Special

74.000

LF

33.00 2,442.00

2990 623C000

Combination Curb & Gutter, Type C

3,827.000

LF

33.00 126,291.00

3000 623C003

Combination Curb & Gutter, Type C(Modified)

13,536.000

LF

33.00 446,688.00

3010 623C004

Combination Curb & Gutter, Type C(Special)

463.000

LF

55.00 25,465.00

3020 629A024

Concrete Median Or Safety Barrier,Type Special (Reinforced)

325.000

LF

290.00 94,250.00

3030 629A059

Concrete Median Or Safety Barrier,Type GS-54(PP)

220.000

LF

415.00 91,300.00

Page 41: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 40

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

3040 629A072

Concrete Median or Safety Barrier,Type GS-54-PP (Special)

27.000

LF

415.00 11,205.00

3050 629A078

Concrete Median or Safety Barrier,Type CSF-36 (Modified)

14,478.000

LF

90.00 1,303,020.00

3060 629A084

Concrete Median Or Safety Barrier,Type CSF-56 (OPP)

1,489.000

LF

265.00 394,585.00

3070 629A087

Concrete Median or Safety Barrier,Type CSF-36 (Reinforced) (RetainingWall Mounted)

822.000

LF

285.00 234,270.00

3080 629C001

Concrete Median Or Safety BarrierEnd Section (Type TES Modified)

9.000

Each

5,600.00 50,400.00

3090 630A001

Steel Beam Guardrail, Class A, Type2

6,264.000

LF

34.00 212,976.00

3100 630C003

Guardrail End Anchor, Type 13

11.000

Each

2,100.00 23,100.00

3110 630C050

Guardrail End Anchor, Type 20Series

6.000

Each

3,200.00 19,200.00

Page 42: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 41

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

3120 630C070

Guardrail End Anchor, Type 10Series

1.000

Each

3,100.00 3,100.00

3130 634A001

Industrial Fence, 5 Feet High

134.000

LF

35.00 4,690.00

3140 634C000

Industrial Fence, 6 Feet High PlusBarbed Wire (Vertical Arms)

52.000

LF

35.00 1,820.00

3150 634D039

Gate, 4 Feet Wide , Complete WithFittings (With Barbed Wire)

4.000

Each

725.00 2,900.00

3160 634E000

Industrial Fence, 6 Feet High, SpecialMounting

3,868.000

LF

88.00 340,384.00

3170 637B000

Fence Set

5,747.000

LF

14.00 80,458.00

3180 645K500

Manhole Frame And Cover Reset

20.000

Each

563.00 11,260.00

3190 650A000

Topsoil

9,500.000

CUYD

50.00 475,000.00

3200 650B000

Topsoil From Stockpiles

12,292.000

CUYD

20.00 245,840.00

Page 43: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 42

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

3210 652A100

Seeding

5.000

Acre

700.00 3,500.00

3220 652C000

Mowing

93.000

Acre

115.00 10,695.00

3230 654A003

Solid Sodding (Centipede)

407,322.000

SQYD

4.00 1,629,288.00

3240 656A010

Mulching

5.000

Acre

685.00 3,425.00

3250 659C006

Erosion Control Product, Type C6

1,945.000

SQYD

5.00 9,725.00

3260 660A000

Plant Topsoil

414.000

CUYD

50.00 20,700.00

3270 660C053

Shrubs, Gardenia JasminoidesRadicans (Dwarf Gardenia)

78.000

Each

20.00 1,560.00

3280 660C074

Shrubs, Liriope Muscari (Big BlueLiriope)

2,291.000

Each

2.50 5,727.50

3290 660C090

Shrubs, Ophiopogon Japonicus(Mondo Grass)

391.000

Each

2.50 977.50

Page 44: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 43

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

3300 660C097

Shrubs, Prunus Laurocerasus'Schipkaensis' (Schip Laurel)

66.000

Each

130.00 8,580.00

3310 660C124

Shrubs, Hemerocallis 'Stella DeOro' (Stella De Oro Daylily)

350.000

Each

10.00 3,500.00

3320 660C150

Shrubs, Pennisetum Alopecuroides'Hamelin' (Fountain Grass)

262.000

Each

15.00 3,930.00

3330 660C173

Shrubs, Loropetalum Chinese 'Ruby(Ruby Loropetalum)

41.000

Each

37.50 1,537.50

3340 660C193

Shrubs, Calamagrostis Acautiflora(Feather Reed Grass 'Karl Foerster')

138.000

Each

25.00 3,450.00

3350 660C200

Shrubs, Hosta X 'AugustMoon' (Hybrid Hosta)

141.000

Each

20.00 2,820.00

3360 660C205

Shrubs, Miscanthus Sinensis 'Adagio'

21.000

Each

20.00 420.00

3370 660C252

Shrubs, Japanese Prostate PlumYew (Cephalotaxus Harringtonia"Prostrata")

52.000

Each

112.50 5,850.00

Page 45: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 44

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

3380 660D155

Trees, Cercis Reniformis'Oklahoma' (Oklahoma Redbud)

15.000

Each

300.00 4,500.00

3390 660D157

Trees, Acer Rubrum'Armstrong' (Armstrong Maple)

26.000

Each

245.00 6,370.00

3400 660D198

Trees, Acer Palmatum 'dissectumatropurpureum' (Ever Red JapaneseMaple)

8.000

Each

375.00 3,000.00

3410 660D202

Trees, Quercus Lyrata"Highbeam" (Highbeam OvercupOak)

103.000

Each

375.00 38,625.00

3420 660D220

Trees, Ulmus Parvifolia'Everclear' (Everclear Lacebark Elm)

16.000

Each

412.00 6,592.00

3430 660J000

Plant Mulch

155.000

CUYD

80.00 12,400.00

3440 665A000

Temporary Seeding

95.000

Acre

275.00 26,125.00

3450 665B001

Temporary Mulching

285.000

Ton

400.00 114,000.00

Page 46: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 45

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

3460 665C010

Temporary Pipe

234.000

LF

17.00 3,978.00

3470 665D001

Temporary Pipe End Treatment

4.000

Each

1,000.00 4,000.00

3480 665E000

Polyethylene

16,146.000

SQYD

1.25 20,182.50

3490 665F000

Hay Bales

720.000

Each

7.75 5,580.00

3500 665G000

Sand Bags

12,216.000

Each

4.00 48,864.00

3510 665I000

Temporary Riprap, Class 2

90.000

Ton

60.00 5,400.00

3520 665J002

Silt Fence

87,904.000

LF

2.50 219,760.00

3530 665K000

Drainage Sump Excavation

500.000

CUYD

20.00 10,000.00

3540 665N000

Temporary CoarseAggregate,ALDOT Number 1

815.000

Ton

30.00 24,450.00

Page 47: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 46

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

3550 665N001

Temporary CoarseAggregate,ALDOT Number 4

40.000

Ton

30.00 1,200.00

3560 665O001

Silt Fence Removal

87,904.000

LF

0.50 43,952.00

3570 665P005

Inlet Protection, Stage 3 Or 4

423.000

Each

300.00 126,900.00

3580 665Q002

Wattle

36,014.000

LF

3.75 135,052.50

3590 665T000

Temporary Earth Berms

1,292.000

LF

10.00 12,920.00

3600 666A001

Pest Control Treatment

49.000

Acre

100.00 4,900.00

3610 674A000

Construction Safety Fence

3,000.000

LF

1.65 4,950.00

3620 680A001

Geometric Controls

(1)

LS

3,000,000.00 3,000,000.00

3630 698A000

Construction Fuel (Maximum BidLimited to $ 29,500,000.00)

(1)

LS

3,000,000.00 3,000,000.00

Page 48: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 47

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

3640 701A076

Solid White, Class 2T, Type A TrafficStripe (5" Wide)

7.000

Mile

2,600.00 18,200.00

3650 701A077

Solid Yellow, Class 2T, Type A TrafficStripe (5" Wide)

4.000

Mile

2,600.00 10,400.00

3660 701A078

Broken White, Class 2T, Type ATraffic Stripe (5" Wide)

7.000

Mile

1,810.00 12,670.00

3670 701A087

Broken White, Class W, Type ATraffic Stripe (5" Wide)

10.000

Mile

10,000.00 100,000.00

3680 701A091

Solid White, Class W, Type A TrafficStripe (5" Wide)

7.000

Mile

16,750.00 117,250.00

3690 701A099

Solid Yellow, Class W, Type A TrafficStripe (5" Wide)

7.000

Mile

16,750.00 117,250.00

3700 701A108

Broken Black, Class W, Type BTraffic Stripe (5" Wide)

9.000

Mile

10,000.00 90,000.00

3710 701A227

Solid White, Class 2, Type A TrafficStripe (5" Wide)

6.000

Mile

3,420.00 20,520.00

Page 49: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 48

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

3720 701A230

Solid Yellow, Class 2, Type A TrafficStripe (5" Wide)

8.000

Mile

3,420.00 27,360.00

3730 701A239

Broken White, Class 2, Type A TrafficStripe (5" Wide)

9.000

Mile

2,513.00 22,617.00

3740 701B009

Dotted, Class 2T, Type A TrafficStripe (5" Wide)

6,271.000

LF

2.10 13,169.10

3750 701B027

Dotted, Class W, Type A TrafficStripe (5" Wide)

4,195.000

LF

3.00 12,585.00

3760 701B036

Dotted Class W,Type B TrafficStripe,Black(5" Wide)

4,195.000

LF

3.00 12,585.00

3770 701B055

Dotted, Class 2T, Type A TrafficStripe(Lane Drop 10" Wide)

2,400.000

LF

2.20 5,280.00

3780 701B059

Dotted, Class W, Type A TrafficStripe(Lane Drop 10" Wide)

8,396.000

LF

5.00 41,980.00

3790 701B063

Dotted, Class 2, Type A TrafficStripe(Lane Drop 10" Wide)

1,907.000

LF

3.00 5,721.00

Page 50: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 49

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

3800 701B075

Dotted, Class W, Type B TrafficStripe, Black (Lane Drop 10" Wide)

8,396.000

LF

4.50 37,782.00

3810 701B207

Dotted, Class 2, Type A Traffic Stripe(5" Wide)

11,588.000

LF

2.00 23,176.00

3820 701C000

Broken Temporary Traffic Stripe

2.000

Mile

1,510.00 3,020.00

3830 701C001

Solid Temporary Traffic Stripe

4.000

Mile

1,510.00 6,040.00

3840 701C002

Broken Temporary Traffic Stripe(Paint)

7.000

Mile

1,510.00 10,570.00

3850 701C003

Solid Temporary Traffic Stripe (Paint)

12.000

Mile

1,510.00 18,120.00

3860 701D008

Solid Traffic Stripe Removed (Plastic)

10.000

Mile

2,815.00 28,150.00

3870 701D009

Solid Traffic Stripe Removed (Tape)

1.000

Mile

3,015.00 3,015.00

3880 701D015

Broken Traffic Stripe Removed(Plastic)

7.000

Mile

2,515.00 17,605.00

Page 51: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 50

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

3890 701D016

Broken Traffic Stripe Removed(Tape)

1.000

Mile

2,715.00 2,715.00

3900 701F000

Dotted Temporary Traffic Stripe

430.000

LF

1.00 430.00

3910 701G146

Solid White, Class W, Type A TrafficStripe (5"Wide)

1,225.000

LF

5.00 6,125.00

3920 701G256

Broken Yellow, Class 2, Type ATraffic Stripe (5" Wide)

260.000

LF

2.00 520.00

3930 701H011

Dotted Traffic Stripe Removed(Plastic)

9,231.000

LF

0.50 4,615.50

3940 703A002

Traffic Control Markings, Class 2,Type A

19,071.000

SQFT

5.00 95,355.00

3950 703A011

Traffic Control Markings, Class W,Type A

6,605.000

SQFT

29.00 191,545.00

3960 703B002

Traffic Control Legends, Class 2,Type A

855.000

SQFT

5.00 4,275.00

Page 52: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 51

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

3970 703B011

Traffic Control Legends, Class W,Type A

328.000

SQFT

28.15 9,233.20

3980 703C001

Removal Of Existing Traffic ControlMarkings Or Legends (Plastic)

5,396.000

SQFT

3.55 19,155.80

3990 703D001

Temporary Traffic Control Markings

3,682.000

SQFT

2.50 9,205.00

4000 705A011

Pavement Markers, Class C, Type1-A

6,086.000

Each

5.00 30,430.00

4010 705A012

Pavement Markers, Class C, Type1-B

1,448.000

Each

5.00 7,240.00

4020 705A030

Pavement Markers, Class A-H, Type2-C

717.000

Each

5.00 3,585.00

4030 705A031

Pavement Markers, Class A-H, Type1-A

5,820.000

Each

5.00 29,100.00

4040 705A032

Pavement Markers, Class A-H, Type1-B

197.000

Each

5.00 985.00

Page 53: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 52

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

4050 705A038

Pavement Markers, Class A-H, Type2-E

99.000

Each

5.00 495.00

4060 707G000

Barrier Rail Mounted Delineator(Mono-Directional)

481.000

Each

25.00 12,025.00

4070 710A115

Class 4, Aluminum Flat Sign Panels0.08" Thick Or Steel Flat Sign Panels14 Gauge (Type III Or Type IVBackground)

784.000

SQFT

20.00 15,680.00

4080 710A126

Class 8, Aluminum Flat Sign Panels0.08" Thick Or Steel Flat Sign Panels14 Gauge (Type IX Background)

435.000

SQFT

23.00 10,005.00

4090 710A140

Class 6, Aluminum Multiple Flat SignPanels 0.125" Thick Or Steel MultipleFlat Sign Panels 12 Gauge(Ty. IIIBackground)

10,477.000

SQFT

31.00 324,787.00

4100 710A141

Class 6, Aluminum Flat Sign Panels0.125" Thick Or Steel Flat SignPanels 12 Gauge (Type IIIBackground)

677.000

SQFT

31.00 20,987.00

Page 54: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 53

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

4110 710A142

Class 2A, Aluminum Flat Sign Panels0.125" Thick Or Steel Flat SignPanels 12 Gauge (Type III, IV, VII OrVIII Bckgd)

276.000

SQFT

31.00 8,556.00

4120 710B004

Roadway Sign Post (3" O.D. SteelUniform Diameter)

66.000

LF

115.00 7,590.00

4135 710B007

Roadway Sign Post (W6 x 15 SteelBeam)

39.000

LF

125.00 4,875.00

4140 710B011

Roadway Sign Post (W6 x 12 SteelBeam)

200.000

LF

125.00 25,000.00

4150 710B019

Roadway Sign Post (3 1/2" x 3 1/2" x1/4" Square Tubular Steel)

56.000

LF

57.00 3,192.00

4160 710B021

Roadway Sign Post (#3 U Channel,Galvanized Steel or 2 ", 14 GaSquare Tubular Steel)

1,960.000

LF

12.50 24,500.00

4170 710C000

Removal Of Existing Roadway Signs

(1)

LS

89,000.00 89,000.00

4180 713A000

Permanent Barricades

48.000

LF

137.00 6,576.00

Page 55: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 54

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

4190 715A000

Overhead Roadway Sign StructureNo. 100

(1)

LS

570,600.00 570,600.00

4200 715A001

Overhead Roadway Sign StructureNo. 101

(1)

LS

62,200.00 62,200.00

4210 715A003

Overhead Roadway Sign StructureNo. 103

(1)

LS

648,000.00 648,000.00

4220 715A005

Overhead Roadway Sign StructureNo. 105

(1)

LS

105,000.00 105,000.00

4230 715A006

Overhead Roadway Sign StructureNo. 106

(1)

LS

110,000.00 110,000.00

4250 715A009

Overhead Roadway Sign StructureNo. 109

(1)

LS

132,000.00 132,000.00

4270 715A011

Overhead Roadway Sign StructureNo. 111

(1)

LS

158,000.00 158,000.00

4280 715A012

Overhead Roadway Sign StructureNo. 112

(1)

LS

67,000.00 67,000.00

Page 56: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 55

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

4290 715A013

Overhead Roadway Sign StructureNo. 113

(1)

LS

67,000.00 67,000.00

4300 715A015

Overhead Roadway Sign StructureNo. 115

(1)

LS

60,000.00 60,000.00

4310 715A016

Overhead Roadway Sign StructureNo. 116

(1)

LS

53,000.00 53,000.00

4320 715A017

Overhead Roadway Sign StructureNo. 117

(1)

LS

48,000.00 48,000.00

4330 715A018

Overhead Roadway Sign StructureNo. 118

(1)

LS

48,000.00 48,000.00

4340 715A019

Overhead Roadway Sign StructureNo. 119

(1)

LS

65,000.00 65,000.00

4350 715A020

Overhead Roadway Sign StructureNo. 120

(1)

LS

200,000.00 200,000.00

4360 717A000

Overhead Roadway Sign StructureNo. No. 107 Renovation

(1)

LS

10,365.00 10,365.00

Page 57: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 56

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

4370 717A001

Overhead Roadway Sign StructureNo. No. 114 Renovation

(1)

LS

10,365.00 10,365.00

4380 720A025

Vehicular Impact AttenuatorAssembly (Unidirectional,TL-3)

8.000

Each

46,000.00 368,000.00

4390 726A000

Portable Concrete Safety Barriers,Type 6

16,450.000

LF

60.00 987,000.00

4400 726A001

Portable Concrete Safety Barriers,Type 6-A

130.000

LF

85.00 11,050.00

4410 726A005

Portable Concrete SafetyBarriers,Type 6(Bridge Bolted)

2,959.000

LF

77.00 227,843.00

4420 726D025

Portable Impact Attenuator Assembly(Unidirectional,TL-3)

12.000

Each

15,000.00 180,000.00

4430 728A000

Truck Mounted Impact AttenuatorUnit

6.000

Each

88,000.00 528,000.00

4440 730A000

Removal Of Existing Traffic ControlUnit ( 18th St N @ 9th Ave N)

(1)

LS

5,000.00 5,000.00

Page 58: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 57

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

4450 730A001

Removal Of Existing Traffic ControlUnit ( 22nd St N @ 9th Ave N)

(1)

LS

12,000.00 12,000.00

4460 730A002

Removal Of Existing Traffic ControlUnit ( 23rd St N @ 9th Ave N)

(1)

LS

5,000.00 5,000.00

4470 730A012

Removal Of Existing Traffic ControlUnit (Partial) ( 21st St N @ 9th AveN)

(1)

LS

3,500.00 3,500.00

4480 730C000

Furnishing And Installing TrafficControl Unit ( 31st Street atWestbound Ramps)

(1)

LS

7,500.00 7,500.00

4490 730C001

Furnishing And Installing TrafficControl Unit ( 31st Street atEastbound Ramps)

(1)

LS

40,000.00 40,000.00

4500 730C002

Furnishing And Installing TrafficControl Unit ( Richard Arrington Blvdat Carraway Blvd)

(1)

LS

12,500.00 12,500.00

4510 730C003

Furnishing And Installing TrafficControl Unit ( 25th St Ramps atRichard Arrington Blvd)

(1)

LS

9,000.00 9,000.00

Page 59: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 58

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

4520 730C004

Furnishing And Installing TrafficControl Unit ( 21st St N at 9th Ave)

(1)

LS

12,000.00 12,000.00

4530 730E000

Metal Traffic Signal Pole Foundation

6.000

Each

3,800.00 22,800.00

4540 730F000

Metal Traffic Signal Pole With 65Foot Mast Arm And 20 Foot MastArm Assembly

1.000

Each

12,645.00 12,645.00

4550 730F001

Metal Traffic Signal Pole With 45Foot Mast Arm Assembly

1.000

Each

11,400.00 11,400.00

4560 730F002

Metal Traffic Signal Pole With 25Foot Mast Arm Assembly

1.000

Each

6,600.00 6,600.00

4570 730F003

Metal Traffic Signal Pole With 60Foot Mast Arm And 35 Foot MastArm Assembly

1.000

Each

12,700.00 12,700.00

4580 730G001

Metal Traffic Signal Strain Pole

2.000

Each

6,500.00 13,000.00

4590 730K000

Traffic Signal Junction Box

9.000

Each

385.00 3,465.00

Page 60: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 59

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

4600 730L005

2", Non-Metallic, Conduit

1,834.000

LF

4.25 7,794.50

4610 730M010

Interconnect Cable, underground, No.14 AWG, 9/C, IMSA 20-1

20.000

LF

7.00 140.00

4620 730N000

Luminaire Extension Assembly, 12Foot

2.000

Each

4,021.00 8,042.00

4630 730P022

Vehicular Signal Head, 12 Inch, 3Section, Type LED

18.000

Each

1,127.00 20,286.00

4640 730Q011

Pedestrian Signal Head, Type LED

25.000

Each

1,730.00 43,250.00

4650 730U400

Radar Detection System ( RichardArrington Blvd At Carraway Blvd)

(1)

LS

40,000.00 40,000.00

4660 730U401

Radar Detection System ( 25th StRamps At Richard Arrington Blvd)

(1)

LS

40,000.00 40,000.00

4670 730U402

Radar Detection System ( 21st St Nat 9th Ave N)

(1)

LS

40,000.00 40,000.00

Page 61: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 60

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

4680 740B000

Construction Signs

9,946.000

SQFT

10.25 101,946.50

4690 740C000

Special Construction Signs

1,701.000

SQFT

15.50 26,365.50

4700 740D000

Channelizing Drums

2,151.000

Each

53.50 115,078.50

4710 740E000

Cones (36 Inches High)

100.000

Each

18.50 1,850.00

4720 740F001

Barricades, Type II

9.000

Each

129.00 1,161.00

4730 740F002

Barricades, Type III

60.000

Each

205.00 12,300.00

4740 740I002

Warning Lights, Type B

36.000

Each

975.00 35,100.00

4750 740L004

Vertical Panel, Type II (Single-Sided)

11.000

Each

206.00 2,266.00

4760 740M001

Ballast For Cone

100.000

Each

10.25 1,025.00

4770 741C010

Portable Sequential Arrow AndChevron Sign Unit

12.000

Each

4,052.00 48,624.00

Page 62: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 61

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

4780 742A003

Portable Changeable Message Sign,Type 3

32.000

Each

15,400.00 492,800.00

4790 745A000

Uniformed Police Officer

25,000.000

HOUR

70.00 1,750,000.00

4800 750A263

High Mast Luminaire Assembly withFive, LED, 400 Watt EquivalentLuminaires

2.000

Each

113,000.00 226,000.00

4810 750A264

High Mast Luminaire Assembly withSix, LED, 400 Watt EquivalentLuminaires

11.000

Each

128,000.00 1,408,000.00

4820 750A266

High Mast Luminaire Assembly withEight, LED, 400 Watt EquivalentLuminaires

23.000

Each

133,575.00 3,072,225.00

4830 750A268

High Mast Luminaire Assembly withTen, LED, 400 Watt EquivalentLuminaires

2.000

Each

150,512.00 301,024.00

4840 750A270

High Mast Luminaire Assembly withTwelve, LED, 400 Watt EquivalentLuminaires

1.000

Each

172,000.00 172,000.00

Page 63: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 62

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

4850 750B571

Roadway Luminaire Assembly withOne, LED Low Profile UnderpassPendant, 150 Watt Luminaire

9.000

Each

4,850.00 43,650.00

4860 750B601

Roadway Luminaire Assembly withOne, LED, 250 Watt EquivalentLuminaire

42.000

Each

10,100.00 424,200.00

4870 750B602

Roadway Luminaire Assembly withOne, LED, 400 Watt EquivalentLuminaire

10.000

Each

9,400.00 94,000.00

4880 750B607

Roadway Luminaire Assembly withTwo, LED, 400 Watt EquivalentLuminaire

5.000

Each

17,215.00 86,075.00

4920 750B708

Roadway Luminaire Assembly withOne, Decorative LED, 120 WattLuminaire, Type B6

2.000

Each

12,400.00 24,800.00

4930 750B709

Roadway Luminaire Assembly, withOne Decrative LED, 120 WATT andthree Indirect 58 WATT Luminaires,Type B6A

25.000

Each

25,600.00 640,000.00

Page 64: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 63

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

4940 750B710

Roadway Luminaire Assembly, withOne Decrative LED, 120 Watt andFour Indirect 58 Watt Luminaires,Type B6B

33.000

Each

30,840.00 1,017,720.00

4950 750C010

Pole Foundation,Roadway

181.000

Each

756.00 136,836.00

4960 750C011

Pole Foundation, High Mast

39.000

Each

2,960.00 115,440.00

4970 750D200

Electrical Junction Box,Type 1

160.000

Each

468.00 74,880.00

4980 750D201

Electrical Junction Box, Type 2

924.000

Each

388.00 358,512.00

4990 750D202

Electrical Junction Box, Type 3

42.000

Each

690.00 28,980.00

5000 750E112

Conduit, 1 Inch, Rigid Nonmetallic

27,379.000

LF

12.50 342,237.50

5010 750E113

Conduit, 1 1/4 Inch, Rigid Nonmetallic

12,339.000

LF

5.20 64,162.80

5020 750E114

Conduit,1 1/2 Inch,Rigid Nonmetallic

15,012.000

LF

5.56 83,466.72

Page 65: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 64

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

5030 750E115

Conduit,2 Inch,Rigid Nonmetallic

36,108.000

LF

16.00 577,728.00

5040 750E119

Conduit,4 Inch,Rigid Nonmetallic

100.000

LF

39.00 3,900.00

5050 750E123

Conduit, 3/4 Inch, Rigid Metallic

1,475.000

LF

17.00 25,075.00

5060 750E124

Conduit, 1 Inch, Rigid Metallic

4,930.000

LF

18.00 88,740.00

5070 750E125

Conduit, 1 1/4 Inch, Rigid Metallic

4,640.000

LF

34.00 157,760.00

5080 750E126

Conduit, 1 1/2 Inch, Rigid Metallic

5,755.000

LF

34.00 195,670.00

5090 750E128

Conduit, 2 1/2 Inch, Rigid Metallic

2,240.000

LF

54.00 120,960.00

5100 750F022

Conductor, #10 AWG

3,870.000

LF

1.00 3,870.00

5110 750F023

Conductor, #8 AWG

31,180.000

LF

2.00 62,360.00

5120 750F024

Conductor, #6 AWG

56,500.000

LF

1.80 101,700.00

Page 66: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 65

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

5130 750F025

Conductor, #4 AWG

86,481.000

LF

2.00 172,962.00

5140 750F026

Conductor, #2 AWG

98,600.000

LF

2.50 246,500.00

5150 750F027

Conductor, #1/0 AWG

77,848.000

LF

4.00 311,392.00

5160 750F029

Conductor, #3/0 AWG

3,695.000

LF

5.50 20,322.50

5170 750F030

Conductor, #4/0 AWG

6,200.000

LF

6.50 40,300.00

5180 750F035

Conductor, 500 KCMIL

300.000

LF

14.75 4,425.00

5190 750G010

Combined Duct And Cable,2 #6AWG/ 1 #6 AWG GND

22,670.000

LF

13.75 311,712.50

5200 750G012

Combined Duct And Cable, 4 #6AWG/ 1 #6 AWG GND

4,281.000

LF

15.85 67,853.85

5210 750G022

Combined Duct And Cable, 4 #4AWG/ 1 #6 AWG GND

635.000

LF

15.00 9,525.00

Page 67: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 66

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

5220 750G032

Combined Duct and Cable, 4 #2AWG/ 1 #6 AWG GND

280.000

LF

21.00 5,880.00

5230 750G100

Combined Duct And Cable,2 #4AWG/ 1 #4 AWG GND

11,460.000

LF

12.00 137,520.00

5240 750G102

Combined Duct And Cable,4 #4AWG/ 1 #4 AWG GND

7,290.000

LF

18.00 131,220.00

5250 750G110

Combined Duct And Cable,2 #2AWG/ 1 #2 AWG GND

6,945.000

LF

17.00 118,065.00

5260 750G112

Combined Duct And Cable, 4 #2AWG/ 1 #2 AWG GND

8,465.000

LF

21.00 177,765.00

5270 750G120

Combined Duct And Cable, 2 #1/0AWG/ 1 #1/0 AWG GND

2,600.000

LF

23.00 59,800.00

5280 750G122

Combined Duct And Cable, 4 #1/0AWG/ 1 #1/0 AWG GND

5,355.000

LF

30.00 160,650.00

5290 750G142

Combined Duct And Cable, 4 #3/0AWG/ 1 #2 AWG GND

445.000

LF

35.50 15,797.50

Page 68: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 67

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

5300 750G152

Combined Duct And Cable/ 4 #4/0AWG, 1 #2 AWG GND

1,140.000

LF

42.00 47,880.00

5310 750H005

Service Pole

21.000

Each

10,550.00 221,550.00

5320 750I015

Lighting Control Center

8.000

Each

9,550.00 76,400.00

5330 750I016

Lighting Control Center, Special

14.000

Each

350,000.00 4,900,000.00

5340 750T000

Luminaire, High Bay, Nominal 56Watt w/ Glare Shield, Type B1A orR1

338.000

Each

10,200.00 3,447,600.00

5350 750T001

Luminaire, High Bay, Nominal 212Watt w/ Glare Shield, Type B1B orB1C

62.000

Each

15,000.00 930,000.00

5360 750T002

Luminaire, High Bay, Nominal 112Watt w/ Glare Shield, Type B3, B3Aor R1A

76.000

Each

8,250.00 627,000.00

5370 750T003

Luminaire, High Bay, Nominal 112Watt w/ Glare Shield, Type B1

345.000

Each

13,600.00 4,692,000.00

Page 69: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 68

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

5380 750U000

RGB Decorative Light Assembly,Surface Mount w/ Continuous Baffle,Type B5, B5A, R4 or R4A

7,845.000

LF

1,000.00 7,845,000.00

5390 750U001

RGB Decorative Light Assembly,Pendant Mount w/ Continuous Baffle,Type B4

12,524.000

LF

570.00 7,138,680.00

5400 750U002

RGB Decorative Light Assembly,Pendant Mount w/ Continuous Baffle,Type R2

10,998.000

LF

700.00 7,698,600.00

5410 751J005

Remove Luminaire Pole Foundation,High Mast

37.000

Each

3,000.00 111,000.00

5420 751J006

Remove Luminaire Pole Foundation,Concrete

62.000

Each

1,500.00 93,000.00

5430 751L002

Remove Lighting Control Center, 6Circuit

4.000

Each

450.00 1,800.00

5440 751L025

Remove Roadway LuminaireAssembly

417.000

Each

375.00 156,375.00

Page 70: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 69

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

5450 751L037

Remove High Mast LuminaireAssembly

37.000

Each

25,100.00 928,700.00

5460 751M000

Remove Conductors

(1)

LS

13,250.00 13,250.00

5470 751M002

Remove Conductors and Conduits

(1)

LS

47,500.00 47,500.00

5480 756A022

4" Electrical Conduit, 1 Line, Type 5Installation

2,375.000

LF

47.00 111,625.00

5490 756A027

6" Electrical Conduit, 1 Line, Type 1Installation

116.000

LF

145.00 16,820.00

5500 756A028

6" Electrical Conduit, 1 Line, Type 5Installation

313.000

LF

94.00 29,422.00

5510 756A029

5" Electrical Condiut, 2 Lines, Type 5Installation

200.000

LF

141.00 28,200.00

5520 756A031

4" Electrical Conduit, 3 Lines, Type 5Installation

720.000

LF

141.00 101,520.00

Page 71: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 70

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

5530 756A042

6 Inch Electrical Conduit, 2 Lines,Type 5 Installation

700.000

LF

188.00 131,600.00

5540 766A000

Roadway Closure Rental Fee

(1)

LS

4,200,000.00 4,200,000.00

5550 792A000

Site Furnishings ( TREE GRATE)

8.000

Each

1,350.00 10,800.00

5560 999 000

Trainee Hours At 80 Cents Per Hour

5,600.000

HOUR

0.80 4,480.00

5565 750D202

Electrical Junction Box, Type 3

AA 1

880.000

Each

5570 750E111

Conduit,3/4 Inch, Rigid Nonmetallic

AA 1

90,695.000

LF

5580 750E123

Conduit, 3/4 Inch, Rigid Metallic

AA 1

18,740.000

LF

5590 750F022

Conductor, #10 AWG

AA 1

275,696.000

LF

Page 72: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 71

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

5600 750F024

Conductor, #6 AWG

AA 1

79,018.000

LF

5610 750G100

Combined Duct And Cable,2 #4AWG/ 1 #4 AWG GND

AA 1

590.000

LF

5620 750Z300

Decorative Lighting

AA 1

(1)

LS

5625 750D202

Electrical Junction Box, Type 3

AA 2

880.000

Each

680.00 598,400.00

5630 750E111

Conduit,3/4 Inch, Rigid Nonmetallic

AA 2

87,276.000

LF

4.20 366,559.20

5640 750E123

Conduit, 3/4 Inch, Rigid Metallic

AA 2

19,335.000

LF

17.00 328,695.00

5650 750F022

Conductor, #10 AWG

AA 2

265,901.000

LF

0.85 226,015.85

Page 73: Alabama Department of Transportationalletting.dot.state.al.us/BidTabs/bidtab_pdf/lapr1417.pdf · (1) JohnsonBros.Corp.A SouthlandCo&OscarRenda Contracting,Inc.JV 0170 206C016 Removing

Tabulation of Bids

Call Order:

Contract Time:

Project(s):

Area/District:

County:

April 14, 2017

BRIDGE REPLACEMENT AND INTERCHANGE MODIFICATIONS ON I-20/59 FROM I-65 TO N OF THE 31ST ST N; ON E.B. STEPHENSEXPRESSWAY; AND ON 9TH AVE N FROM 15TH ST N TO 23RD ST N

Letting Date: 0301

JEFFERSON999 Contract ID:

11/01/20 Completion Date

20170331999

ACIMF-I059(385), ACIMF-I059(394)

Page: 72

Contract Description:

Alabama Department of Transportation 4/14/2017DATE:

Unit PriceQuantity and Units

Line No / Item ID

Unit Price Ext Amount Unit Price

Item Description

Alt Set / Alt Member Ext AmountExt Amount

(1) JohnsonBros.Corp.ASouthlandCo&OscarRenda

Contracting,Inc.JV

5660 750F024

Conductor, #6 AWG

AA 2

83,578.000

LF

1.80 150,440.40

5670 750G100

Combined Duct And Cable,2 #4AWG/ 1 #4 AWG GND

AA 2

7,880.000

LF

12.00 94,560.00

5680 750Z300

Decorative Lighting

AA 2

(1)

LS

10,283,400.00 10,283,400.00

5690 109C001

Alternative Technical Concept No. 1,ATC JB-01

(1)

LS

1,562,387.53 1,562,387.53

$474,778,175.95Section Totals:

( ) indicates item is bid as Lump Sum

$474,778,175.95Contract Totals


Recommended