    DESIGN AND CONSTRUCTION OF THE RIONDESIGN AND CONSTRUCTION OF THE RION

    ANTIRION BRIDGE FOUNDATIONSANTIRION BRIDGE FOUNDATIONS

    Alain PECKER

    TechnischeTechnischeUniversitUniversitttHamburgHamburg--HarburgHarburg,, January 29, 2008January 29, 2008

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    2/78

    Finance

    Design

    Build

    Own

    Operate

    Transfer

    Continental Greece

    Peloponese

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    3/78

    KEY DATESKEY DATES

    LaunchLaunch of tender :of tender : 19921992

    ContractContract awardaward:: DecemberDecember19971997

    StartStart of construction :of construction : 19991999

    Opening to trafficOpening to traffic :: AugustAugust 20042004

    TotalTotal costcost :: 770 Mi Euros (630 construction)770 Mi Euros (630 construction)

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    4/78

    OUTLINE OF PRESENTATIONOUTLINE OF PRESENTATION

    Overview of projectOverview of project

    Geotechnical and environmental conditionsGeotechnical and environmental conditions

    Description ofDescription of foundationfoundation systemsystem

    Design strategyDesign strategy

    Construction methodsConstruction methods

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    5/78

    Gulf of Corinth

    RIONRION

    ANTIRIONANTIRION

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    6/78

    RION ANTIRION

    286 560

    2252

    560 560 286

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    7/78

    65 m90

    m

    230 m

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    8/78

    GEOTECHNICAL CONDITIONSGEOTECHNICAL CONDITIONS

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    9/78

    65 m.

    RION ANTIRION

    SAND AND GRAVEL

    CLAYSILT

    WEAK ALLUVIUMS :

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    10/78

    0

    20

    40

    60

    80

    100

    0 100 200 300 400 500

    Undrained shear strength (kN/m2

    )

    Dep

    thbelowgroundsu

    rface

    0 100 200 300 400 500 600

    Shear wave velocity (m/s)

    SOIL CHARACTERISTICSSOIL CHARACTERISTICS

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    11/78

    ENVIRONMENTAL CONDITIONSENVIRONMENTAL CONDITIONS

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    12/78

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    13/78

    UnacceptableUnacceptable

    performanceperformanceBasicobjective

    Essential/Hazardousobjective

    Safety

    Criticalobjective

    FrequentFrequent

    OccasionalOccasional

    RareRare

    VeryVery RareRareEarthquaked

    esign

    Earthquaked

    esignlevel

    level

    Earthquake performanceEarthquake performance levellevel

    FullyFully

    operationaloperationalOperationalOperational LifeLife

    safesafe

    NearNear

    collapsecollapse

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    14/78

    DESIGN SPECTRUMDESIGN SPECTRUM

    SeaSeabedbedlevellevel

    0.0

    0.5

    1.0

    1.5

    0.0 1.0 2.0 3.0 4.0 5.0

    Period (s)

    Spectralaccele

    ration

    (g) Damping 5 %

    M = 7.0

    Return period 2000 y

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    15/78

    TECTONIC MOVEMENTS

    PLAN : HORIZONTAL OPENING : 2 m

    ELEVATION :VERTICAL SLIP : 2 m

    PIER BASE

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    16/78

    180 000 t

    RION ANTIRION

    SHIP IMPACT :

    16 knots

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    17/78

    CONTROLCONTROLLLING FACTORSING FACTORS

    No rock formation at less than 500 mNo rock formation at less than 500 m Large water depth : 65 mLarge water depth : 65 m

    PerformancePerformance objectives (2000objectives (2000 yearyearreturnreturnperiodperiod))::

    Damages acceptable but bridgeDamages acceptable but bridge repairablerepairable,, andandrere--usableusable

    horizontal sliding acceptable ; tilt prohibited (

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    18/78

    FOFOUNUNDATIONS ?DATIONS ?

    PILESPILES

    EMBEDDED CAISSONSEMBEDDED CAISSONS

    SOIL SUBSTITUTIONSOIL SUBSTITUTION

    SHALLOW FOUNDATIONSHALLOW FOUNDATION

    Soil reinforcement with stiff inclusionsSoil reinforcement with stiff inclusions

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    19/78

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    20/78

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    21/78

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    22/78

    SOIL REINFORCEMENTSOIL REINFORCEMENT

    Driven steel pipesDriven steel pipes

    Diameter 2 m, Thickness 20 mmDiameter 2 m, Thickness 20 mm

    Length 25 m to 30 mLength 25 m to 30 m

    Spacing 7 m x 7 mSpacing 7 m x 7 m

    Gravel layer : 3m thickGravel layer : 3m thick

    202000 INCLUSIONS UNDER EACH FOUNDATIONUNDER EACH FOUNDATION

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    23/78

    FOUNDATION LAYOUT

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    24/78

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    25/78

    ROLE OFROLE OF INCLUSIONSINCLUSIONS

    + GRAVEL LAYER+ GRAVEL LAYER

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    26/78

    1 1 n 1 + 1

    1nn ++=

    N Brittle links + Ductile link = Ductile chain

    PPPP

    1

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    27/78

    CAPACITY DESIGN PHILOSOPHYCAPACITY DESIGN PHILOSOPHY

    Plastic hinge = Gravel bedPlastic hinge = Gravel bed FuseFuse

    OverstrengthOverstrength = Reinforced soil= Reinforced soil

    COMBINED EFFECT PROVIDESCOMBINED EFFECT PROVIDES

    Bounds for forces in the superstructureBounds for forces in the superstructure

    Control of failure modeControl of failure mode(horizontal sliding)(horizontal sliding)

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    28/78

    Facing a new design situationFacing a new design situation

    Keep things as simple as possibleKeep things as simple as possible ThreeThree stepsstepsprocessprocess

    CConceptualonceptual designdesign : New: New toolstools ((YieldYieldDesignDesign TheoryTheory))

    AmAmenable to parametric studiesenable to parametric studies

    Validation :Validation : PhysicalPhysical modelingmodeling (centrifuge)(centrifuge)

    FFinalinal designdesign : non: non linearlinearfinite element modelsfinite element modelsdynamicdynamic macromacro elementelement

    Structural analysesStructural analyses

    DESIGN STRATEGYDESIGN STRATEGY

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    29/78

    SEISMIC CAPACITYSEISMIC CAPACITY

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    30/78

    BEARING CAPACITY

    underCOMBINED LOADS

    xF

    Q N

    T

    B

    O

    N

    T

    CBNN

    CBTT

    CBMM

    /

    /

    / 2

    =

    =

    =

    Yield design theory

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    31/78

    200 400 600 800 1000

    Horizontal shear force at foundation level (MN)

    0

    5000

    10000

    15000

    20000

    25000

    30000

    35000

    0

    Overturningmoment(MNm)

    BOUNDINGBOUNDING

    SURFACESURFACE

    WITHOUT

    inclusions

    WITH

    inclusions

    WITH

    Gravel layer

    WITHOUT

    Gravel

    layer

    NN= 8= 8660 MN0 MN --LL = 25 m= 25 m --SS= 7 m= 7 m

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    32/78

    0

    10000

    20000

    30000

    0 200 400 600 800

    Horizontal shear force (MN)

    Overt

    urningmo

    ment(MN

    -m)

    9m x 9m

    7m x 7m

    INCLUSIONSINCLUSIONS

    SPACINGSPACING

    M=V.hM=V.h

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    33/78

    EXPERIMENTAL VALIDATIONEXPERIMENTAL VALIDATION

    Centrifuge testsCentrifuge tests

    Ultimate failure loadsUltimate failure loads Monotonic testsMonotonic tests

    Push over testPush over test

    Cyclic behaviorCyclic behavior Cyclic testsCyclic tests

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    34/78

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    35/78

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    36/78

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    37/78

    0

    200

    400

    600

    800

    1000

    1200

    0 10 20 30 40 50 60 70 80

    Horizontal shear force at foundation level (MN)

    Ove

    rturningmoment

    (MN-m)

    CYCLIC TEST # 2CYCLIC TEST # 2

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    38/78

    MONOTONIC FAILURE LOADMONOTONIC FAILURE LOAD

    0

    20

    40

    60

    80

    100

    120

    0 50 100

    Measured failure load (MN)

    Com

    putedfailureload(MN)

    CYCLIC LOADCYCLIC LOAD

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    39/78

    CYCLIC LOADCYCLIC LOAD

    75% Failure load75% Failure load

    -50

    -30

    -10

    10

    30

    50

    -0.50 -0.30 -0.10 0.10 0.30 0.50

    Horizontal displacement (m)

    Horizonta

    lforce(M

    N)

    1

    1010

    1

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    40/78

    0

    5000

    10000

    15000

    20000

    25000

    30000

    35000

    0 100 200 300 400 500 600 700

    Horizontal shear force (MN)

    Overturningm

    oment(M

    N-m)

    FINITE ELEMENT ANALYSISFINITE ELEMENT ANALYSIS

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    41/78

    GRAVEL BED DESIGNGRAVEL BED DESIGN

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    42/78

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    43/78

    SEISMIC DEMANDSEISMIC DEMAND

    SOIL STRUCTURE INTERACTIONSOIL STRUCTURE INTERACTION

    DYNAMIC MACRO ELEMENT

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    44/78

    V

    MH

    NEAR FIELD

    FAR FIELD

    K C

    M

    Nonlinearities :

    geometrical (interface behaviour) :

    Uplift model

    material (elasto-plastic soil behaviour) :

    Plasticity model

    Wave propagation :

    dissipation of radiation energy

    Dynamic elastic impedances

    DYNAMIC MACRO ELEMENT

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    45/78

    RHEOLOGICAL MODELRHEOLOGICAL MODEL

    1 2 3

    1 2 3 4

    0

    C0

    NEAR FIELDFAR FIELD

    FOU

    NDATION

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    46/78

    SOIL STRUCTURE INTERACTIONSOIL STRUCTURE INTERACTION

    -500

    -250

    0

    250

    500

    0 10 20 30 40 50

    Simplified model

    Finite element model

    Time (s)Time (s)

    Horizontal

    Hor

    izontalsh

    ear

    sh

    earforce

    (MN)

    force

    (MN)

    PIER OFFSET DURING EARTHQUAKEPIER OFFSET DURING EARTHQUAKE

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    47/78

    PIER OFFSET DURING EARTHQUAKEPIER OFFSET DURING EARTHQUAKE

    U

    -0.15

    -0.10

    -0.05

    0.00

    0.05

    0.10

    0.15

    -0.40 -0.35 -0.30 -0.25 -0.20 -0.15 -0.10 -0.05 0.05 0.10

    Ux[m]

    y

    [m]

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    48/78

    TECTONIC MOVEMENTSTECTONIC MOVEMENTS

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    49/78

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    50/78

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    51/78

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    52/78

    CONSTRUCTION METHODSCONSTRUCTION METHODS

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    53/78

    Off-Shore Foundations

    Cable stayed

    bridge

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    54/78

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    55/78

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    56/78

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    57/78

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    58/78

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    59/78

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    60/78

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    61/78

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    62/78

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    63/78

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    64/78

    Inclusions

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    65/78

    Steel Pipe Driving & Gravel Bed Installation

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    66/78

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    67/78

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    68/78

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    69/78

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    70/78

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    71/78

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    72/78

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    73/78

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    74/78

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    75/78

    AUGUST 8AUGUST 8thth, 2004, 2004

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    76/78

    END OF AN EXCEPTIONALEND OF AN EXCEPTIONAL

    TECHNICAL CHALLENGETECHNICAL CHALLENGE

    AND HUMAN ADVENTUREAND HUMAN ADVENTURE

    CONCLUSIONSCONCLUSIONS

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    77/78

    Key factors to the successKey factors to the success

    Correct assessment of foundation performanceCorrect assessment of foundation performance

    criterioncriterion

    Time allowed for designTime allowed for design

    Close collaboration andClose collaboration and confidenceconfidencebetween allbetween all

    parties:parties:Owner, Contractor, Design team, CheckerOwner, Contractor, Design team, Checker

    ACKNOWLEDGMENTSACKNOWLEDGMENTS

  • 8/12/2019 Alain Pecker -- Rion Antirion (Presentation)

    78/78

    GEFYRA SA (Concessionaire)GEFYRA SA (Concessionaire)

    Jean PaulJean Paul TeyssandierTeyssandier

    GEFYRA KINOPRAXIA (Contractor)GEFYRA KINOPRAXIA (Contractor)

    Gilles deGilles de MaublancMaublanc , Pierre, Pierre MorandMorand

    DESIGN JVDESIGN JVJean Marc TourtoisJean Marc Tourtois

    DESIGN CHECKERDESIGN CHECKER

    Peter TaylorPeter Taylor

    Ralph Peck, Ricardo DobryRalph Peck, Ricardo Dobry