Alamo Colleges Energy Conservation
Programs:
Continuous Commissioning®
The Achieving the Dream Leader College designation recognizes an institution’s impact in the effort to improve student success and eliminate achievement gaps nationwide.
JOHN W. STRYBOS, P.E.
ASSOCIATE VICE CHANCELLOR OF FACILITIES
DECEMBER 18, 2013
Outline⋅ Alamo Colleges⋅ Energy Conservation Programs
– Continuous Commissioning®
– Demand Response– Summer Initiatives
⋅ SECO– Lighting Retrofits– Plant Retrofits
⋅ Alternative Energy Initiatives⋅ Sustainability
– American Colleges and University President’s Climate Commitment (ACUPCC) reporting
– Texas Senate Bill 898
2
Alamo CollegesSan Antonio College (SAC)
St. Phillip’s College (SPC)
Palo Alto College (PAC)
Northwest Vista College (NVC)
Northeast Lakeview College (NLC)
19251,591,739 ft2 31 Buildings~ 20,000 students
2007367,005 ft2. 16 Buildings~ 15,000 students
1995587,996 ft2. 12 Buildings~ 6,000 students
1985571,342 ft2. 24 Buildings~ 8,000 students
1898779,843 ft2. 18 Buildings
SWC: 381,195 ft2. 6 Buildings
Total Area: 4,512,648 ft²
MLK:
3
Continuous Commissioning ® at Alamo
An ongoing process to resolve operation problems, improve comfort, indoor air quality, and optimize
energy consumption; using existing systems of commercial and institutional buildings.
4
Energy savings typically pay for process in less than 2 years
CC® Targets for Alamo Colleges
⋅ Air Handler Optimization– Occupied/unoccupied schedules– Supply air temperature reset schedule– Duct static pressure reset schedule– Economizer mode– Humidity control
⋅ Terminal Box Optimization– Minimum flow setting– Air flow calibration/verification
⋅ Central Plant Optimization– Chilled and hot water reset schedules– Chiller staging
• Training of Facilities Personnel!
5
CC ® Savings: New Buildings
Performing Arts (Convocation) Building at
Palo Alto College
CC® measures implemented: September 20, 2011
Approximately 50% demand and consumption reduction
The $20.4 million facility built in May 2009.
6
CC® Savings: New campus - NLC
Temp. StPts
Outside air intake
TU Min. Airflow
CEP Optimization
CO2 control
DP StPt
DAT & SP Resets
SP Resets
Equipment verification
Pseudo-Economizer
7
Summer Initiatives
⋅ Turn off boilers when outside air temperature is above 90 °F
⋅ Four day work
week schedules.
⋅ CC® MeasuresSummer 2013
total cost savings: $303,340 $272,313 are due to electricity savings, $31,026 are due to gas
savings.
8
Summer Total Utility Cost
The total utility cost for all the campuses has continued to reduce despite the rate and weather variations.
9
District-Wide Energy Monitoring
District online access:http://ac-em-iaq/
State Energy Conservation Office's (SECO) Texas LoanSTAR Program
⋅ Interior and Exterior Lighting Projects ⋅ Boiler Retrofits⋅ Chiller and cooling tower replacements ⋅ Pump VFD installation ⋅ Solar Thermal Pool Heating System⋅ Install thermal storage systems: NLC, NVC and PAC⋅ AHU Fan VFD installation ⋅ Enhanced Commissioning (CC®)
11
Light Retrofits
Interior Lighting RetrofitRetrofit existing 32 W, T8 lamps with 28 W, extended life T8 lamps.
High Bay Lighting Retrofit Replace existing HID light fixtures with 32 W, T8 and/or T5 high bay fluorescent lamps with >1.15 ballasts factor.
$ Savings
NLC NVC PAC SAC SPC SWC
Grainger $ 37,574 $ 37,671 $ 49,120 $ 67,375 $ 44,066 $ 31,827
TEESI $ 10,236 $ 14,285 $ 32,889 $ 54,510 $ 30,775 $ 16,751
Building Energy Savings
Campus Cost Savings
12
Central Plant Retrofit: SAC
Replacement of two water cooled centrifugal chillers of the same capacity, and the existing wooden cooling tower.
Existing chillers efficiency: ⋅0.682 kW/Ton and the New chillers efficiency:⋅0.54 kW/Ton.
Implementation date: March 2013
13
Demand Response Program
Program Option
Performance Period:Call Ahead
Notice:Max
Events per Year:Max
Hours per Year:1-Year Term:
Option 2 June 1 to September 30 2 hours 25 75 $67.00
⋅ Program Description:
⋅ Alamo Colleges Performance:
⋅ Rebate: $95,800
Contract kW 20-Jun 27-Jun 28-Jun 11-Jul 24-Jul 31-Jul 1-Aug 2-Aug 6-Aug 7-Aug 3-Sep 12-Sep 30-Sep
PAC Meter#2 50 20 33 13 31 51 46 43 69 46 40 22 35 41SPC - New 100 0 26 0 0 0 24 54 37 120 124 0 55 39NLC - Main 150 245 136 219 201 268 166 223 239 382 216 584 139 218PAC Meter #1 150 277 133 0 295 380 181 213 234 293 305 254 261 214SPC - old 200 140 167 113 266 246 221 300 0 222 198 224 256 147NVC 300 245 300 552 380 300 301 300 83 363 312 135 353 173SAC 350 362 390 224 327 525 340 423 209 486 505 412 329 508
ACCD Total 1,300 1,289 1,185 1,120 1,501 1,769 1,279 1,556 872 1,912 1,701 1,631 1,428 1,340
14
Green Initiatives: Solar PanelsSouthwest campus⋅400 kW PV power generation⋅Federal Stimulus grant award ($3 Million)
15
Northwest Vista College⋅155 kW PV power generation⋅CPS Rebate for educational institutions: $100,000
Senate Bill 898
“Reduce entity electrical consumption by at least 5 percent each year for 10 years, beginning September 1, 2011”
FY2012 FY2013
Alamo Colleges
6% 8%
SAC 6% 7%
SPC -4% 4%
PAC 21% 3%
NVC 4% 8%
NLC 10% 19%
SWC 0% 5%
Annual Reduction Achieved:
16
ACUPCC
⋅ Commitment signed by Chancellor, August 2008⋅ Develop a comprehensive climate neutrality Plan (2050)⋅ Adopted an energy efficiency purchasing plan (Energy
Star certified products)⋅ Developing new construction policies that comply with
the U.S. Green Building Council LEED standards.⋅ Provide Action Plan, Greenhouse Gas Reports (every 2
years), and Progress reports⋅ Adopting a District-Wide Environmental and
sustainability policy
17
Energy Savings and Emission Reduction
ItemsTotal Energy
Savings
Electricity Usage (MWh) 149,339
Electric Demand (kW) 214,535
Gas Use (MCF) 485,927
Emission Reductions FY07 FY08 FY09 FY10 FY11 FY12 FY13
Electricity Emissions
NOx (tons) 6.13 5.42 7.18 3.74 5.02 7.24 8.91SOx (tons) 4.15 3.67 4.86 1.35 1.82 2.61 3.22CO2 (tons) 6,357 5,621 7,443 3,462 4,649 6,695 8,246
Gas Emissions
NOx (tons) 2.31 2.74 1.83 2.74 2.66 3.27 3.25CO2 (tons) 1,977 2,348 1,570 2,349 2,282 2,799 2,786
Alamo Colleges Annual Savings
19
Cumulative Savings20
Return on Investment
21
The Return on Investment for fiscal year 2013:
Accomplishments (Major Completed Projects)
⋅ 2012 – District wide – SAWS toilet Fixture replacement⋅ 2011 – SPC-SWC - SECO Solar Panels⋅ 2011 – District Wide – CPS Energy Audits⋅ 2011 – District Wide – SECO ECRM Assessment⋅ 2009 – District Wide – 4 day work week⋅ 2008 – NVC Recycled water⋅ 2004 - Recycling⋅ 2004 – PAC – 4 Day work week⋅ 2003 – SAC, SPC and PAC - SECO ECRM Projects
22
Alamo Colleges Awards Received for Green Commitment
⋅ 2010 Going Green Award in the Building Management category sponsored by the San Antonio Business Journal
⋅ Second Nature’s 1st annual Climate Leadership Award for Institutional Excellence in Climate Leadership (American College & University Presidents’ Climate Commitment)
23
Current Projects
⋅ NLC – Recycled Water⋅ SAC – First Responders Academy Water line⋅ SAC – First Responders Academy On Site Package
Treatment Plant⋅ District Wide – SECO projects⋅ District Wide – Sustainability Policy and Procedures
24
Next Steps
⋅ Possible LEED Certified Projects– Manzanillo Hall at Northwest Vista College (In progress)– Mountain Laurel– Huisache Hall
⋅ District Wide Solar Panel installations where possible
⋅ PAC, SAC, SPC Rainwater harvesting
25
Thanks.
The Achieving the Dream Leader College designation recognizes an institution’s impact in the effort to improve student success and eliminate achievement gaps nationwide.
Contact:John StrybosAssociate Vice Chancellor of FacilitiesAlamo Community College [email protected]
Website:www.alamo.edu