+ All Categories
Home > Documents > ALARA Programs & Occupational Dose Trend in Wolsong NPP

ALARA Programs & Occupational Dose Trend in Wolsong NPP

Date post: 01-Feb-2016
Category:
Upload: storm
View: 51 times
Download: 0 times
Share this document with a friend
Description:
ALARA Programs & Occupational Dose Trend in Wolsong NPP. Korea Hydro & Nuclear Power Co., Ltd Wolsong Nuclear Power Plant Unit 3&4. Contents. Introduction of Wolsong NPP Brief History of Wolsong NPP Generation Capacity of Wolsong NPP History of Korea Regulatory Law - PowerPoint PPT Presentation
28
ALARA Programs & Occupational ALARA Programs & Occupational Dose Trend in Wolsong NPP Dose Trend in Wolsong NPP Korea Hydro & Nuclear Power Co., Ltd Korea Hydro & Nuclear Power Co., Ltd Wolsong Nuclear Power Plant Unit 3&4 Wolsong Nuclear Power Plant Unit 3&4
Transcript
Page 1: ALARA Programs & Occupational  Dose Trend in Wolsong NPP

ALARA Programs & Occupational ALARA Programs & Occupational Dose Trend in Wolsong NPPDose Trend in Wolsong NPP

Korea Hydro & Nuclear Power Co., LtdKorea Hydro & Nuclear Power Co., LtdWolsong Nuclear Power Plant Unit 3&4Wolsong Nuclear Power Plant Unit 3&4

Page 2: ALARA Programs & Occupational  Dose Trend in Wolsong NPP

Introduction of Introduction of Wolsong NPPWolsong NPP Brief History of Wolsong NPPBrief History of Wolsong NPP Generation Capacity of Wolsong NPPGeneration Capacity of Wolsong NPP

History of Korea Regulatory Law History of Korea Regulatory Law

ALARA program improvements in KHNPALARA program improvements in KHNP ALARA Program before 2000ALARA Program before 2000 ALARA Program after 2000ALARA Program after 2000 Calling ALARA Committee & Making DecisionCalling ALARA Committee & Making Decision General Review of ALARA ProgramGeneral Review of ALARA Program Cases of ImprovementsCases of Improvements

Results of ALARA Program ImprovementsResults of ALARA Program Improvements

ConclusionsConclusions

ContentsContents

Page 3: ALARA Programs & Occupational  Dose Trend in Wolsong NPP

Brief History of WolsongBrief History of Wolsong

1975.10: Opening of Wolsong NPP

construction office

1983. 4: Commercial operation of unit #1

1997. 6: Commercial operation of unit #2

1998. 6: Commercial operation of unit #3

1999. 9: Commercial operation of unit #4

Page 4: ALARA Programs & Occupational  Dose Trend in Wolsong NPP

Generation Capacity of WolsongGeneration Capacity of Wolsong

Unit #1 Unit #2,3,4

678MW 700MW×3

NSSS AECL AECL

TBN/GEN NEI Parsons DooSan/GE

HyunDai/DongA HyunDai, DaeWoo

CANDU (PHWR, 2-Loops)

Natural Uranium (U-235, 0.7%)

Heavy Water (D2O)Moderator & Coolant

Fuel

Reactor Type

CATEGORY

CAPACITY

Construction

Supplier

Generation Capacity: Total 2,778 MW

Page 5: ALARA Programs & Occupational  Dose Trend in Wolsong NPP

History of Korea Regulatory Law History of Korea Regulatory Law

Korea regulatory law in radiation protection

1958 : Establish the atomic act

1983 : General revision based on ICRP-9(MPD, MPAD, MPC)

1994 : Include the concept of “ALARA”

1996 : Apply the dose limit concept (no quarterly limit)

1998 : Apply 100mSv/5yr (50mSv/yr maximum) to effective dose

limit but 200mSv/5yr until 2002

1999 : Require to implement “ALARA”

2001 : Apply the concept of ALI, DAC

Page 6: ALARA Programs & Occupational  Dose Trend in Wolsong NPP

Previous (before 2000) Present (after 2000)

ALARA

Committee

Expected dose:

above 250man-mSv

Expected dose:

above 200man-mSv

ALARA

Implementation

Committee

Expected dose:

100~250man-mSv

Expected dose:

70~200man-mSv

ALARA Prog. Improvements in KHNPALARA Prog. Improvements in KHNP

Before 2000 : Plant specific ALARA procedure

After 2000. 10 : Standard ALARA procedure

Page 7: ALARA Programs & Occupational  Dose Trend in Wolsong NPP

ALARA Program before 2000ALARA Program before 2000 ALARA Committee

PWR PHWR

Organi

-zation

Chairman

Vice chairman

Member

Secretary

General manager

Deputy general manager

Plant senior manager

Appointed person

Radiation safety section

senior manager

General manager

Deputy general manager

Plant section senior manager

QA section senior manager

Plant senior manager (sub-contractor)

Radiation safety section senior

manager

Responsibility

- Review ALARA program- Review dose reduction plan

for work. If expected dose is

above 250man-mSv

- Review ALARA program- Review dose reduction plan

for work. If expected dose is above

above 250man-mSv

Page 8: ALARA Programs & Occupational  Dose Trend in Wolsong NPP

ALARA Program before 2000ALARA Program before 2000 ALARA Implementation Committee

PWR PHWR

Organization

Radiation safety Section senior

manager

ALARA staff

Radiation protection sect. manager

Work planner and supervisor

Radiation safety section

senior manager

Radiation protection sect. manager

Maintenance section manager

Work supervisor

Responsibility

- Review & approve dose reduction

plan for work expected dose

100~250man-mSv

- Review & approve ALARA sheet

for work expected dose

100~250man-mSv

Page 9: ALARA Programs & Occupational  Dose Trend in Wolsong NPP

Chairman

General manager

Secretary

Rad. safety sect.

senior manager

Member Member Member Member

Deputy general

manager QA section

senior manager All plant

senior manager Subcontractor

senior manager

ALARA Program after 2000ALARA Program after 2000

Organization of ALARA Committee

Page 10: ALARA Programs & Occupational  Dose Trend in Wolsong NPP

General reviews & approval of ALARA program RP Policy, Annual Target, Long-term ALARA strategy etc

If expected dose for work is above 200 man-mSv Review & approve radiation protection optimization plan

Review ALARA results after work if actual dose exceeded by 25% mor

e than expected dose

Review & approve radiation safety control plan during O/H periods

Reviews & approval of optimization plan for radiation protection

when requested by chairman

ALARA Program after 2000ALARA Program after 2000

Responsibility of ALARA Committee

Page 11: ALARA Programs & Occupational  Dose Trend in Wolsong NPP

ALARA Program after 2000ALARA Program after 2000

Organization of ALARA Implementation Committee

Chairman

Rad. safety sect. senior manager

Secretary

Radiation protection section manager

Member Member Member Member

Workgroup section manager

Subcontractor

workgroup senior manager

Radiation service

subcontractor senior manager

A person who is

recommended by chairman

Page 12: ALARA Programs & Occupational  Dose Trend in Wolsong NPP

If expected dose for work is above 70~200 man-mSv Review & approve radiation protection optimization planning

Review ALARA results after work if actual dose exceeded by 25%

more than expected dose

Review & approve radiation safety control plan for following

workplace If airborne tritium concentration exceeds 10DAC

If expected dose exceeds 10 man-mSv

Review & approval of optimization plan for radiation protection

when requested by chairman

ALARA Program after 2000ALARA Program after 2000

Responsibility of ALARA Implementation Commit.

Page 13: ALARA Programs & Occupational  Dose Trend in Wolsong NPP

Minimum 50% of the committee membership

must be attended

Issued meeting agenda must be agreed by two-

thirds of the attendee

Urgent items & imperative cases can be

decided in writing by the committee members

without the committee meeting

Call ALARA Commit.Call ALARA Commit. & Make Decision& Make Decision

Page 14: ALARA Programs & Occupational  Dose Trend in Wolsong NPP

ALARA DocumentationALARA Documentation

Kinds of documentsRetention periods

Radiation work plan

(Over 10 under 70 man mSv)

Doc. reviewed by ALARA Implementation committee

(Over 70 under 200 man mSv)

Doc. reviewed by ALARA committee

(Over 200 man mSv)

3 years

5 years

Plant life time

Page 15: ALARA Programs & Occupational  Dose Trend in Wolsong NPP

Any Works

Expected doseunder 10 man-mSv

Use general RWP

Perform works

Expected Dose10 ~ 70 man-mSv

- Use RWP- Evaluate expected dose every work steps

Perform works

Expected Dose70 ~ 200 man-mSv

Work group makes & submits to rad. section - expected dose sheet - ALARA check list

Open ALARA Implementation committeeReview & approve - expected dose sheet - ALARA check list

Perform works

A

Expected Doseover 200 man-mSv

Work group makes & submits to rad. section - expected dose sheet - ALARA check list

Open ALARA committeeReview & approve - expected dose sheet - ALARA check list

B

Perform works

Reviews of ALARA ProgramReviews of ALARA Program

Page 16: ALARA Programs & Occupational  Dose Trend in Wolsong NPP

A

Review after works

If actual dose exceeds 25% of expected dose

Open ALARA Implementation committee Review & discuss & apply - dose reduction method to hereafter works

B

Review after work

If actual dose exceeds 25% of expected dose

Open ALARA committee Review & discuss & apply - dose reduction method to hereafter works

Reviews of ALARA ProgramReviews of ALARA Program

Page 17: ALARA Programs & Occupational  Dose Trend in Wolsong NPP

High internal exposure dose (IED) in Wolsong NPP Internal exposure dose of PHWR is higher than that of PWR Furthermore, IED reaches up to 40% of EED in the beginning

of operation Internal exposure is mainly caused by airborne tritium

0

500

1,000

1,500

2,000

2,500

3,000(man-mSv)

Internal 0.4 396.7 0.2 412.4

External 1,211.5 1,268.4 1,114.0 1,096.1

2004(PWR)

2004(PHWR)

2005(PWR)

2005(PHWR)

Cases of ImprovementsCases of Improvements

The Comparison of Occupational Dose

Page 18: ALARA Programs & Occupational  Dose Trend in Wolsong NPP

The Improvement of the Respirator using Ice Cubes Tritium removal media: replace vermiculate and pa

per filter by ice cubes Year of development: 1992 Components: canister, half face mask, rubber hose Ice cube mass: 670g/canister Tritium removal efficiency: above 95% within 2 hour

s Improvements

The prevention of solid rad-waste generation The respiration became fresher and less stifling

Easy-to-get and cost-effective tritium removal medium

Cases of ImprovementsCases of Improvements

Page 19: ALARA Programs & Occupational  Dose Trend in Wolsong NPP

The Development of Movable Tritium Eliminator Application

D2O leak from moderator and coolant system

Spills from equipment failure Maintenance for the systems or facilities including tritium

Purpose Preventing diffusion of airborne tritium Reducing internal exposure of workers

Tritium removal mechanism Adsorption of airborne tritium into water

Cases of ImprovementsCases of Improvements

Page 20: ALARA Programs & Occupational  Dose Trend in Wolsong NPP

The Other Efforts for IED Reduction Use of temporary ventilation fan and duct Use of portable air tent Improvement of D2O collection tools Development of dryer used for decontamination paper

Cases of ImprovementsCases of Improvements

Page 21: ALARA Programs & Occupational  Dose Trend in Wolsong NPP

Diminishment of internal exposure dose Internal exposure dose of PHWR has been diminished Portion of IED have decreased to half of previous’ Result of continuous efforts to reduce airborne tritium

0

1,000

2,000

3,000

4,000(man-mSv)

Internal 205 221 307 282 231

External 752 1,224 862 1,349 688

2001 2002 2003 2004 2005

Occupational dose for Wolsong NPP1 Occupational dose for Wolsong NNP2

0

1,000

2,000

3,000

4,000 (man-mSv)

Internal 505 774 737 546 448

External 725 2,100 2,032 1,268 1,272

1997 1998 1999 2000 2001

Results of ALARA programResults of ALARA program

Page 22: ALARA Programs & Occupational  Dose Trend in Wolsong NPP

Decrease in Exposure Dose Annual dose has not increased (but no. of units increased) Average dose per person & unit have been diminished

Results of ALARA programResults of ALARA program

Annual dose & no. of operating units Annual Avg. Dose per unit & person

Page 23: ALARA Programs & Occupational  Dose Trend in Wolsong NPP

0

1,000

2,000

3,000

4,000

5,000

6,000

KOREA CANADA INDIA ARGENTINA CHINA AVERAGE

(man- mSv/unit)‘00

‘01

‘02

‘03

‘04

‘05

Annual radiation exposure dose per PHWR plant

Page 24: ALARA Programs & Occupational  Dose Trend in Wolsong NPP

Diminishment of Over-exposure Workers No. of over-exposure workers exceeded 20mSv/year

has increased before 1990. There was no over-exposure workers for last 7 years

Results of ALARA programResults of ALARA program

Status of over-exposure workers

Page 25: ALARA Programs & Occupational  Dose Trend in Wolsong NPP

Remark: 1) was happened during in-core detector motor repair work at Kori #2 NPP.

Total dose was 52.09mSv per person.

Page 26: ALARA Programs & Occupational  Dose Trend in Wolsong NPP

Tendency in Exposure Dose Annual dose has not increased (but no. of NPP increased) Average dose per person & unit have been diminished Concentrate radiation control & ALARA activity during O/H

Year

Dose (man-mSv)% ofO/H Dose

Normal Operation

O/H Total

2000 1,811 9,583 11,394 84

2001 2,181 8,571 10,752 80

2002 2,671 6,644 9,315 71

2003 2,756 7,532 10,288 73

2004 2,627 10,398 13,025 80

2005 2,607 9,323 11,930 78

Results of ALARA programResults of ALARA program

Year

Dose (man-mSv)% ofO/H Dose

Normal Operation

O/H Total

2000 750 1,463 2,213 66

2001 779 1,898 2,677 71

2002 877 1,661 2,538 65

2003 1,137 2,027 3,164 64

2004 845 2,485 3,330 75

2005 809 2,207 3,016 73

Exposure dose for all NPPs Exposure dose for PHWR

Page 27: ALARA Programs & Occupational  Dose Trend in Wolsong NPP

Atomic law in Korea request actual ALARA implementation

First time, management had a duty to ensure doses were ALARA KHNP developed the standard ALARA program Apply lower dose limits & organize stronger members

Successful achievement in dose reduction Annual total dose has not increased No. of over-exposure workers has been diminished until

1999 & there was no over-exposure worker till now