+ All Categories
Home > Documents > Alcoa Milt Products - United States Environmental ... · Remedial Investigation Feasibility Study...

Alcoa Milt Products - United States Environmental ... · Remedial Investigation Feasibility Study...

Date post: 16-Mar-2020
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
20
ALCOA Alcoa Milt Products 4879 State Street PO Box 3567 Bettendorf, IA 52722-8030 USA Tel: 1 563 459 2000 Mr. James Colbert Remedial Project Manager USEPA Iowa - Nebraska Branch Superfund Division Region VII 90 IN 5 th Street Kansas City, Kansas 66101 '- Re: Additional Work - Administrative Order on Consent for Removal Actions and Remedial Investigation Feasibility Study Dear Jim, Alcoa received the subject request for additional soil gas investigation work on Friday September 24, 2004. This letter is to confirm Alcoa's commitment to completing the new tasks requested by EPA under Section XII of the 1995 Consent Order to better characterize the sub-slab soil gas plume located west of the plant on South Bellingham Road. Attachment 1 is a schedule describing when the additional work will be completed. In addition to the work tasks outlined in your letter, door-to-door communication with residents and homeowners was completed over a two-day period including Friday September 17 and Monday September 20, 2004. Alcoa also met with Riverdale City officials on the evening of September 20. The objective of the interactive communication was to answer any questions and respond to concerns that residents have regarding the soil gas findings. Future plans to investigate the source of soil gas and obtain access agreements to install sub-slab ventilation systems were also discussed. Attachment 2 is the work plan for installing sub-slab ventilation systems. The plan consists of a site map, description of general installation procedure, EPA Guidance Document titled "Radon Technology For Mitigators", and ventilation system engineering specification and drawings. An EPA trained and certified technician from a heating and plumbing contractor is installing the ventilation systems. It is anticipated that ventilation systems will be installed in the homes that continued to be occupied after the access agreements are signed.
Transcript
Page 1: Alcoa Milt Products - United States Environmental ... · Remedial Investigation Feasibility Study Dear Jim, ... characterize the sub-slab soil gas plume located west of the plant

ALCOA

Alcoa Milt Products

4879 State StreetPO Box 3567Bettendorf, IA 52722-8030 USATel: 1 563 459 2000

Mr. James ColbertRemedial Project ManagerUSEPAIowa - Nebraska BranchSuperfund Division Region VII90 IN 5th StreetKansas City, Kansas66101 '-

Re: Additional Work - Administrative Order on Consent for Removal Actions andRemedial Investigation Feasibility Study

Dear Jim,

Alcoa received the subject request for additional soil gas investigation work on FridaySeptember 24, 2004. This letter is to confirm Alcoa's commitment to completing the newtasks requested by EPA under Section XII of the 1995 Consent Order to bettercharacterize the sub-slab soil gas plume located west of the plant on South BellinghamRoad. Attachment 1 is a schedule describing when the additional work will becompleted.

In addition to the work tasks outlined in your letter, door-to-door communication withresidents and homeowners was completed over a two-day period including FridaySeptember 17 and Monday September 20, 2004. Alcoa also met with Riverdale Cityofficials on the evening of September 20. The objective of the interactive communicationwas to answer any questions and respond to concerns that residents have regarding thesoil gas findings. Future plans to investigate the source of soil gas and obtain accessagreements to install sub-slab ventilation systems were also discussed.

Attachment 2 is the work plan for installing sub-slab ventilation systems. The planconsists of a site map, description of general installation procedure, EPA GuidanceDocument titled "Radon Technology For Mitigators", and ventilation system engineeringspecification and drawings. An EPA trained and certified technician from a heating andplumbing contractor is installing the ventilation systems. It is anticipated that ventilationsystems will be installed in the homes that continued to be occupied after the accessagreements are signed.

Page 2: Alcoa Milt Products - United States Environmental ... · Remedial Investigation Feasibility Study Dear Jim, ... characterize the sub-slab soil gas plume located west of the plant

EPA is requesting that Alcoa communicate the option of indoor air sampling in thehomes prior to installing the ventilation systems. When we last discussed this as a groupon August 31, 2004 and again on September 10, 2004 we agreed to sample homes afterthe ventilation systems are installed and that sampling prior to installing ventilationsystems would be conducted if residents requested it. However, based on your letter thatwas received September 24, 2004, Alcoa will also communicate to residents along SouthBellingham Road that they have the option to request indoor air sampling prior toinstallation of sub-slab ventilation systems.

Finally, Alcoa received the preliminary results from the indoor air sampling andadditional sub-slab sampling. See Attachment 3 for more detail. The preliminary datafrom the additional sub-slab sampling at the new Yankee Plastic facility located behindseveral of the homes on South Bellingham Road indicated that soil gas concentrationsbeneath the slab are significantly less than what is detected beneath the homes at issue.Specifically values beneath the Yankee Plastic slab ranged from 2.4 ug/m3 - 2.8 ug/m3whereas the values beneath 240 and 226 South Bellingham Road ranged from 160 ug/m3- 710 ug/m3 and 6.9 ug/m3 - 7.4 ug/m3 respectively. 240 South Bellingham is locateddirectly adjacent to and east of the new Yankee Plastic Slab. 226 South Bellingham islocated to the north and east of the Yankee Plastic slab. The soil gas data indicates thatthe soil gas plume is limited. Therefore, we would like to discuss with EPA the need foradditional groundwater and soil gas investigations.

Sincerely

Bud SturtzerAlcoa Remediation

Page 3: Alcoa Milt Products - United States Environmental ... · Remedial Investigation Feasibility Study Dear Jim, ... characterize the sub-slab soil gas plume located west of the plant

Attachment 1

Schedule

Task Description

Indoor air sampling at houses located at226 and 240 South Bellingham Road

Indoor air sampling at potentiallyimpacted houses as required

Define extent of contamination associatedwith groundwater vapors in the vicinity ofthe South Bellingham Road area

Development of work plan for indoor airsampling

Development of work plan forinvestigation to determine extent ofcontamination

Development of work plan for installationof ventilation systems in houses

Start

9-23-04

TBD

9-23-04

9-18-04

9-18-04

9-3-04

End

9-24-04

TBD

TBD

9-28-04

TBD

9-23-04

Comment

Preliminary results being validated.

TBD after contacting residents living inS. Bellingham homes. Access letter willbe sent with option to sample indoor air.

Preliminary results show Yankee Plasticsub-slab data west of 240 S. Bellinghamsignificantly less than concentrationsfound at 240 S. Bellingham.

EPA approved work plan via e-mail on9-28-04

Preliminary results show Yankee Plasticsub-slab data west of 240 S. Bellinghamsignificantly less than concentrationsfound at 240 S. Bellingham.

Two systems installed at Alcoa ownedhomes 240 and 226 S. Bellingham. Theobjective is to secure access agreementto ventilate all occupied homes alongSouth Bellingham Road.

Page 4: Alcoa Milt Products - United States Environmental ... · Remedial Investigation Feasibility Study Dear Jim, ... characterize the sub-slab soil gas plume located west of the plant

REC2BWSB?)

ftry r ̂ "'̂.vt*l o .t^tf

Attachment 2 SUPStftoMD BjV331Q?S

Sub-slab Ventilation System InstallationWork Plan

Note:

1. Ventilation systems will be provided at Alcoa expense to all households on SouthBellingham Road within a reasonable timeframe of securing access agreement.

2. Attachment 2 "Sub-slab Ventilation System Installation Work Plan" also containsa site photograph, installation procedures, engineering specifications, and EPAGuidance on installing ventilation systems.

3. Installation of ventilation systems will be done at the direction of an EPA trainedand certified professional.

Page 5: Alcoa Milt Products - United States Environmental ... · Remedial Investigation Feasibility Study Dear Jim, ... characterize the sub-slab soil gas plume located west of the plant

1N

CM

ao

00_ O

Legend

<0» Subslab Gas Sample

Figure 1

Sept 2004 Sampling Locations

Alcoa-Davenport Works

Page 6: Alcoa Milt Products - United States Environmental ... · Remedial Investigation Feasibility Study Dear Jim, ... characterize the sub-slab soil gas plume located west of the plant

Sub-slab Ventilation Installation Procedure*

Outdoor

• Mount Level 2 electric fan and housing to side of house (see picture for detail)

• Connect 4" diameter PVC riser pipe to fan

• Extend 4" diameter riser PVC pipe 10 feet from ground surface

Indoor

• Hammer drill 4" diameter hole through basement concrete slab

• Connect 4" diameter PVC pipe from hole in basement slab to exterior fan housing

• Seal PVC pipe connection around 4" hole in basement slab

• Seal cover over sump pump to minimize or eliminate potential vapor intrusionthrough sump

• The basements should be ventilated for a couple days prior to post ventilationtesting to let the seals fully cure at the door, the pit lids, and the floor suctionpoints.

*Refer to EPA Guidance "Radon Technology For Mitigators" and equipmentspecification sheets for more detail.

Work to install the ventilation system is conducted by a EPA certified radon gas mitigator(Steve Breitkreuz, Ace Plumbing and Heating, St. Joseph Michigan 49805)

Page 7: Alcoa Milt Products - United States Environmental ... · Remedial Investigation Feasibility Study Dear Jim, ... characterize the sub-slab soil gas plume located west of the plant

Attachment 2Ventilation System Work Plan

Ventilation System Specifications

Page 8: Alcoa Milt Products - United States Environmental ... · Remedial Investigation Feasibility Study Dear Jim, ... characterize the sub-slab soil gas plume located west of the plant
Page 9: Alcoa Milt Products - United States Environmental ... · Remedial Investigation Feasibility Study Dear Jim, ... characterize the sub-slab soil gas plume located west of the plant

Ace Plumbing & Heating of St. Joseph, Inc.

DATE:

TO:

ATTN:

FROM:

2724 NILES AVENUE, ST. JOSEPH, Ml 49085PH 269-983-6353 - PAX 269-983-01 08

Total Pages (including cover sheet)

MESSAGE:

Page 10: Alcoa Milt Products - United States Environmental ... · Remedial Investigation Feasibility Study Dear Jim, ... characterize the sub-slab soil gas plume located west of the plant

HP Series-11.75" O.D. FFt Series * 13.25" O.D. HP 2000 Ser. 9,375" O.D. . UL ListedMaximum

• NEW...UV resistant plastic, ULlisted and durable

<• Factory sealed and caulked toprevent leakage

• Watertight electrical terminal box• Approved for mounting in wet

locations • i.e. Outdoors• Totally enclosed for protection» 100% Speed Controllable<• Automatic reset thermal

overload protectionFive Year Full Factory Warranty

N Fantech now uses a new engineered thermoplastic with significantlyimproved ultra violet properties to protect against plastic yellowing.

When selecting a fan for your specific application see the chart below showing our 3 types.Type 1 Fan; Good soil conditions, small subslab footprint, good communication, low to moderate radon levels, and one

suction point per fan.Type 2 Fan: Medium to moderate subslab footprint, higher radon levels, one or two suction points per fan.Type 3 Fan: Poor soil conditions, large subslab footprint, when drawing large areas from one suction point or when drawing

from more than one point with the same fan.

FAN^ND COUPLING DETAIL AND COMPARISONS

Model # TypeCoupling Coupling Wholesale eachto 3'fype to 4'̂ pipe Weight Retail 1-3 4-7 8+

102-43togl

Not Recomm

I

Call RCI with orders at: 1-800-523-2084 Page 2 Fax: 317-846-5882 Phone: 317-846-7486

Page 11: Alcoa Milt Products - United States Environmental ... · Remedial Investigation Feasibility Study Dear Jim, ... characterize the sub-slab soil gas plume located west of the plant

MINI U-TUBE

MU-93 $7.75• Adjustable• Low cost• Easy installation• Easy to understand label• Reads up to 4" w.c.• "Contact for Service" area

for you to fill in on label.

FAN CORD KIT

FC-06 $5.00FCC-01 (connector only) 1.50

• Fan Power Supply Cord• 6"long• 3 conducter w/ ground• 16 guage• Includes a water tight

connector

Jo WeaverJo has been General Manager of RCIsince inception over 15 years ago. She isreally on top of the daily operations andonly gets upset when someone forgets topay their bill. We are extremely happy withthe job Jo is doing.

INDIANA SEAL COUPLINGSPart*B156-125B156-15B156-22B156-32B156-33W156-33B156-42B156-43W156-43B156-44W156-44B151-44W151-44B102-43B106-44W106-44B156-66B106-64B106-66B106-86ISB-4X3ISB-6X4ISB-80ISB-96ISB-112

1.25" to 1.25"1.50" to 1.50"2.00" to 2.00"3.00" to 2.00"3.00" to 3.00"3.00" to 3.00"4.00" to 2.00"4.00" to 3.00"4.00" to 3.00"4.00" to 4.00"4.00" to 4.00"4.50" to 4.00"4.50" to 4.00"6.00" to 3.00"6.00" to 4.00"6.00" to 4.00"6.00" to 6.00"8.00" to 4.00"8.00" to 6.00"10.0" to 6.00"4.00" to 3.00"6.00" to 4.00"

Color;BlackBlackBlackBlackBlackWhiteBlackBlackWhiteBlackWhiteBlackWhiteBlackBlackWhiteBlackBlackBlackBlackReducerReducer

Small hose clampMedium hose clampLarge hose clamp

See chart on page 2 for coupling size requirements to fit all fans

Price each$4.253.253.505.004.257.007.755.508,505.758.255.259.006.505.509.00

12.0013.5012.5028.004.506.501.301.501.65

Call RCI with orders at: 1-800-523-2084 Page 3 Fax: 317-846-5882 Phone: 317-846-7486

Page 12: Alcoa Milt Products - United States Environmental ... · Remedial Investigation Feasibility Study Dear Jim, ... characterize the sub-slab soil gas plume located west of the plant

Patent Pending

• Bypasses water and melting icefrom entering the fan

• Installs in 5 minutes or less• Greatly reduces fan warranty

seryice calls• Includes: Fan Guard, 3' of tubing,

3' of tubing insulation, lowerfitting and instructions

• Also used on a horizontal pipeto drain trapped water

FG-33 Fits 3" Sen. 40 PVC....S9.95FG-43 Fits 4" Sch. 40 PVC....$9.95

Ask for free installation video (while supplies

FAN GUARD

Purchase the "FANGUARD" and "VARMENT GUARD" for under $15.00 to protect the systemand reduce your warranty service callbacks to practically zero.

DRILL TAP' Used to installthe lower fittingwhen installing a"FANGUARD"

> Drills and tapsin one motion

• Requires min.3/8" Drill chuck& reversible drill

DT-24 $24.00

VARMENT GUARD

• The perfect combination touse with the "Fan Guard"

• Fast and economical• Low air restriction through the

1/2" stainless steel mesh• Includes 2 screws for attachment

VG-320Fits3"S&D $4.76VG-420Fits4"S&D 5.00VG-340Fits3"Sch.40 4.75VG-440 Fits 4"Sch. 40 5.00

PROTECTS & PROFESSIONALIZES OUTSIDE FAN INSTALLATIONS•Transition box adapts fan to pipe and allows PVC to run flush withhouse

• Made of durable paintable ABS plastic• Houses all 4" & 6" duct fans (except GP Series fans)• Covers and protects fan, couplings and fittings• Three piece assembly• 31 " -tall, 13" X 13" wide/deep• Versatile interior or exterior ground level or inverted under eave

installation

i AC*

Patent # 4,995,309

/ / 1/ W

FH89 • Complete - includes base plate,

transition box, and a black housingWFH89 • Same as above except housing is white...,FHTB «Includes base plate & black housing only,..

FHTO • Includes black housing onlyWFHTB • Includes base plate &. white housing only..WFHTO • Includes white housing only

FH89WFH89FHTBFHTOWFHTBWFHTO

$67.5072.5052.5036.5057.5041.50

Call RCl with orders at: 1-800-523-2084 Page 4 Fax: 317-846-5882 Phone: 317-846-7486

Page 13: Alcoa Milt Products - United States Environmental ... · Remedial Investigation Feasibility Study Dear Jim, ... characterize the sub-slab soil gas plume located west of the plant

<

SUMP COVERSSUMP PIT COVER (Dome) SUMP PIT COVER (Flat) Flat with Viewport

SPC-2487.093 w/ 4" hole...$37.00SPC-2487P.093 no hole 37.00SPC-2488.187 w/4" ho!e.....45.00SPC-2488P.187 no hole 45.00

• Molded ABS .093" or .187"• Recessed coupling for 4" PVC• 24" O.D. 3" tall fits most pits• Heavy center support brace• Clear acrylic viewing port• Factory installed foam seals• Easy to install without pump

removal

UL-18B (21" solid) $12.50UL-18H (21" w/holes)..20.00UL-24B (28" solid) 22.50

• Black ABS plastic•3/16" thick• UL-18H has one 4", one 1.5"

& one electric cord hole• Includes necessary

grommets

VPL-21 (21 "complete)$28.00

VPG-1 (viewport & grommet only)17.00

• VPL-21 includes lid, viewportand grommet

• Viewport & grommet removeseasily for repairs or adjustments

REDUCER BUSHING• PVC Reducer bushing for installing a 3" pipe

into our SPC series sump cover PB-43 $2.10

RADON RETARDER

• Regular plastic film doesn't work• High tensile strength• 3.5 mil• Lightweight• High puncture resistance• Resists soil alkalies

\ • Remains flexible to -70° below• Provides moisture barrier

(prevents deterioration)• R400WB available 100' x 22'

,: \l/

The chart below compares RadonRetarder to standard sheeting.

Tensile-Strength (PSI)

R400WB 7250vs.

6 milPolyvs.

10 mil

2705

Poly2215

PunctureIb. force

15.3

6.4

8.1 R400WB $144.00 per roll

R400 TAPE

R4-TAPE (150' roll) $23.00• White barrier material with

adhesive made to adhere toR400 Radon Retarder

R400 ADHESIVE

HN-208 $2.25• Henrys wet patch cement• Use to seal R400 to crawl

space walls• Use in wet or dry conditions

R400 SPRAY• Multi Purpose Spray

Adhesive• 17 oz. can• Used on seams of R400• Read Caution on

container before using inan unventilated area

S-707

Call RCI with orders at: 1-800-523-2084 Page 5 Fax: 317-846-5882 Phone: 317-846

Page 14: Alcoa Milt Products - United States Environmental ... · Remedial Investigation Feasibility Study Dear Jim, ... characterize the sub-slab soil gas plume located west of the plant

AIRMATECAP

AM03 3" $7.00AM04 4" $7.50AM06 6" $12.00

• Stamped aluminum• Fits inside PVC or D&S• Low air restriction

PVC EXHAUST CAP

RC20 4" Sen. 20...$10.50RC40-3 3" Sch.40...$10.50RC40 4" Sen. 40,..$13.00

• PVC construction• Available to fit outside

schedule 20 or 40 PVC• Low air restriction

BACKDRAFTDAMPER

RSK-4 4" $13.25RSK-5 5" $,15.00RSK-6 6" $19.00• Allows air to exit• Stops air entry

VACUUM MONITOR / ALARM

• Detects low pressure below .25 w.c.• Alerts owner with red light & high

pitched audio alarm.• Three year warranty

WVM-93B $39.959 V. battery powered

WVM-93C $39.95110 AC current powered

Order 4 or more deduct $5.00 each

* <>•Aljf/n

COSMETIC FLANGE

CF-30(3") $2.50CF-50 (411).... $2.50• Covers exterior wall

penetration mistakes• Fits sch. 20 or 40 PVC• Low cost• Easy installation

DWYER MANOMETERS

MK-225..... $24.50Dwyer Model 25 provides constantreliable monitoring of system suction& provides easily readable incre-ments at low readings. Constructedof virtually indestructible white sty-rene acrylonitrile housing; includesmounting screws, double-columntubing, connectors, fluid, pointer flagsand instructions.

DWYER U-TUBE

IiN

Manometer measurespositive, negative(vacuum) and differen-tial pressures. Simpleto install and providesan accurate readout.Comes with 3/4 oz ofred gauge oil, pair ofcarrying plugs, pair ofnonkink tube connec-tors and instructions.

UT-1221 $14.50

Call RCI with orders at: 1-800-523-2084 Page 7 Fax:317-846-5882 Phone:317-846-7486

Page 15: Alcoa Milt Products - United States Environmental ... · Remedial Investigation Feasibility Study Dear Jim, ... characterize the sub-slab soil gas plume located west of the plant

GEOCEL 2000) Elastomeric Copolymer

GEOCEL 3300Polyurethane

G2000 $3.40 ea.24+(case) 2.95 ea.

• Superior elongation• Adhesion to damp surfaces• 100% resealability• Gunnable at 0- F.• Paintable• 30 year life expectancy«11 oz. tubes• Color: clear

VULKEM SEALANT

CAULKS AND FOAMGSIKAFLEXPolyurethanefutel

~A/

\\ /G3300 $3.60 ea.24+(case) 3.10 ea.

• Moisture Cure• Low Odor• Interior/ Exterior perimeter

sealing• Adheres to most common

substrates without priming• 10.302. tubes• Color: limestone or white

CAULKING GUNS See

SK-103

• 1 -component, $lyurethane-base• Moistuce-cured^• Non-sag, elastotoeric sealant• Designed for joints with maximumdepth of 1/2 inch

« Bo/ds to most conduction material• 10/3 oz. tube seals TC.4 linear

fefet of 1/4" joint.• Odorless, paintable & nonstaining.

page 17

>

[I -VULKEMI SEALANT

v -

HENRY'S ROOF PATCH GEOCEL SILICONE

VS-30 ; ..$11.50•Self leveling• One-part polyurethane

self-leveling caulk• Adheres to most materials '--without priming.

• Color: limestone.• 30 oz. tubes.

HN208 $2.25 ea.• Excellent for applying Radon

Barrier in wet locations• Spreads easily• Produces tough elastic film thatwon't run in hot weather orcrack in cold weather

• 11 oz. tubes cover 17 linear feetof 3/8" bead

• Color: black

G8125 (10.3 oz.) $2.25*G8150 (10.3 02.) 4.00**

* G8125 is a clear acetoxy curesilicone (emits a odor whilecuring) works great for most jobs

"*G8150is a clear neutral curehigh performance silicone thatemits little to no curing odor.

• Yields approx. 1/4" X 1/4" bead24.7' long

GEOCEL FOAM

G145-12 (12oz.)...$4.00G145-20 (20 oz.)....7.25G145-20G (20 oz)...7.25*'gun adaptable

• Nozzle style• Expands 250% - 300%• Provides initial R-value of 4.7per inch when cured

• Cured foam withstands tempof 240 F

•• 12 oz. - yield 3/8" bead 275 l.f.' • 20 oz. - yield 3/8" bead 460 l.f.

TOUCH {N SEAL. TS-24G (gun adaptable)

$11.00TS-24N (nozzle) $ 9.50TS-SG (Sharpshooter gun)

$74.00• 24 oz. canyields up to 3500 linearfeet of 1/4" diameter bead

• Use with TS-SG for excellentcontrol

• TS-SG releases foam in beadform

• Cure time of 45 min. (50% R.H.)• No CFC's• Quick.cure, high yield

PC-22..$4.25• Gun cleaningsolvent

1 Msthylene clorideremoves uncuredfoam

Call RCI with orders at: 1-800-523-2084 Pages Fax:317-846-5882 Phone:317-846-7486

Page 16: Alcoa Milt Products - United States Environmental ... · Remedial Investigation Feasibility Study Dear Jim, ... characterize the sub-slab soil gas plume located west of the plant

FLOOR & SUMP LID SEALSDRANGERThe Dranjer line of products permits the unrestricted flow of water into sump pumps and floor drains, but seal outradon, mold, spores, insects and other gases coming in from the sub-floor area. Dranjers are passive and easy toinstall.

2 3/4' 0.0.

F-Series DrgnjersSelf-sealing floor drains specifically designed for use inconjunction with sub-slab suction systems. Strainerplate easily removes for cleaning,

FR-2 For existing floor drains from 2" to 8" inches indiameter, flexible flange seals tight $

FR-2 $16.75FN-2 For new construction or condensate drainage

FN-2 $22.50FS-2 Installs in sump pump cover

FS-2 $21.00

SMALL RETROFIT DRAWER1""OOfcLNO.O-W

Fits floor drains from 2 in. to 8 in.

Operation

NEW INSTALLATION OHANJERMO06U NO. J.NG

For open floe' d'ftJra and cafch Daiui dmig to bo 3d Irao

D-R2 $12.95Fits regular drainsfrom 2 - 8"

J-N6 $23.95For new construction

SUMP DRANJER^ BETROf ITMODEL NO, J-SS

LAR6E RETROFIT ORAMJ5R

**» I

Pits floor drains from 6 in. to 11 in.

J-S5 $15.95installs under sump lid

J-RH5 $22.95Large retro fit 6" to 11"

Call RCI with orders at: 1-800-523-2084 Page 9 Fax:317-846-5882 Phone:317-846-7486TOTflL P.0S

Page 17: Alcoa Milt Products - United States Environmental ... · Remedial Investigation Feasibility Study Dear Jim, ... characterize the sub-slab soil gas plume located west of the plant
Page 18: Alcoa Milt Products - United States Environmental ... · Remedial Investigation Feasibility Study Dear Jim, ... characterize the sub-slab soil gas plume located west of the plant

Attachment 3

Preliminary Results:

1. Indoor Air Sampling at 240 and 226 South Bellingham Road

2. Sub-slab Sampling Beneath Yankee Plastic Concrete Slab

Page 19: Alcoa Milt Products - United States Environmental ... · Remedial Investigation Feasibility Study Dear Jim, ... characterize the sub-slab soil gas plume located west of the plant

/IN

ooCN

0

I— O

Legend

Subslab Gas Sample

Figure 1

Sept 2004 Sampling Locations

Alcoa-Davenport Works

Page 20: Alcoa Milt Products - United States Environmental ... · Remedial Investigation Feasibility Study Dear Jim, ... characterize the sub-slab soil gas plume located west of the plant

Summary of Subslab Gas and Indoor/Outdoor Air Sample DataVapor Intrusion Assessment at 226 and 240 S. Bel.

Alcoa-Davenport226 S. Bellingham

Location

Sample #

cis-1,2-DCE

trans-1,2-DCE

PCE

TCE

VC

July 2004 Sampling EventFrontPorch

AB-2657

0.011J

O.056

1.1

0.17

0.043

Subslab

SG-1076C

<0.056

<0.056

7.4

4.2

<0.02

Subslab

SG-1091C

O.056

<0.056

6.9

0.037

<0.02

Subslab

SG-1098C

0.01 3J

<0.056

7.1

0.16

<0.02

September 2004 Sampling Event

Front Porch

226-3447-AB

<0.056

<0.056

0.2

0.034

<0.02

LivingRoom

226-2361 -IA

0.77

<0.056

3

0.65

0.077

BasementStairs

226-1 171C-IA

0.11

<0.056

0.7

0.13

0.01 4J

Sump

226-3049-IA

0.072

<0.056

0.7

0.094

0.0067J

SG-1091C & SG-1098C are a duplicate pair

Units = ug/m3

240 S. Bellingham

Location

Sample #

cis-1 ,2-DCE

trans-1,2-DCE

PCE

TOE

VC

July 2004 SamplingEvent

Subslab

SG-1080C

<0.056

<0.056

160

0.27

<0.02

Subslab

SG-1086C

0.23

0.074

710

34

<0.02

September 2004 Sampling EventFrontPorch

240-2771-AB

<0.056

<0.056

0.19

0.034

<0.02

LivingRoom

240-3437-IA

0.26

<0.056

8.4

0.25

0.04

BasementStairs

240-3367-IA

0.13

<0.056

4.5

0.14

0.01 9 J

BasementStairs

240-1 21 8A-IA

0.12

<0.056

4.6

0.14

0.01 9J

Sump

240-2759-IA

0.11

<0.056

4.7

0.150.01 7J

240-3367-IA & 240-1218A-IA are a duplicate pair

Units = ug/m3

Subslab Gas Under Warehouse Slab

Location

Sample #

cis-1 ,2-DCE

trans-1 ,2-DCE

PCEFCEVC

September 2004Sampling EventSE

QuadrantYP-1308-

SG

<0.056

<0.056

2.8

0.039

<0.02

Center

YP-2741-SG

<0.056

<0.056

2.4

0.076

<0.02

Units = ug/m3

Air Results Summary for EPA-pc1 .xls Page 1 of 1 10/4/2004


Recommended