• Customer in Fairfax County was seeking a pilot project to add a visual confirmation of water level at a flood control structure and also to monitor debris loading. Naturally an outdoor camera was the right solution.
AUG Conference April 2016 Tenaya Lodge Yosemite 3
Requirements
• Pan, Tilt, & Zoom • High Resolution • Motion and or Still Images • Viewable at night • Low Power – Minimal Solar Panel and Battery • Cellular access viewable through web browsers for
computers, tablets and smart phones • Password protected • Remote activation
AUG Conference April 2016 Tenaya Lodge Yosemite 4
AUG Conference April 2016 Tenaya Lodge Yosemite 5
Solution
The power consumption of the cellular device, camera, and IR illuminator, was so great, (3amps plus) during operation, meant that the use of the camera would be limited if the solar panel and battery were to be minimal.
AUG Conference April 2016 Tenaya Lodge Yosemite 6
Solution • To limit the power consumption of the system, activation of
the camera needed to be customer driven only when needed.
• The Customer had already implemented an ALERT Flood Warning System that included a two way component for activating flashing beacons.
• By equipping the site with a low powered ALERT controller we provided the system operator with the capability of turning on the modem and camera equipment when visibility of the site was needed and keeping the equipped powered down most of the time and drawing no power.
•
AUG Conference April 2016 Tenaya Lodge Yosemite 7
AUG Conference April 2016 Tenaya Lodge Yosemite 8
Site Layout
AUG Conference April 2016 Tenaya Lodge Yosemite 9
Site Design
AUG Conference April 2016 Tenaya Lodge Yosemite 10
Site Design
AUG Conference April 2016 Tenaya Lodge Yosemite 11
Site Design
AUG Conference April 2016 Tenaya Lodge Yosemite 12
Equipment Provided
• HSE 3512 Controller • Axis PTZ Dome Camera • Sierra Wireless Cell Modem • 20 Watt Solar Panel • 100 Amp Hr Battery • IR Illuminator – 50ft range • 20ft 4” Galvanized Pole • Equipment Cabinet
AUG Conference April 2016 Tenaya Lodge Yosemite 13
Final Configuration
• User has the ability to turn the camera on and off from the base
station, tablet or smart phone with internet access and browser • Ability to change the settings of the camera for image resolution, and
frame rate • A timer was implemented so the camera and cell modem would be
turned off if inactive for 5 minutes. • A pulse command could be sent to re-trigger the timer to keep the
camera on. • Expandable to have local activation with sensor inputs with settable
thresholds • Full weather station expandable • Full Pan, tilt and zoom capability • IR illuminator has a photo cell so it will only be active during dark
hours, minimizing current draw.
AUG Conference April 2016 Tenaya Lodge Yosemite 14
Installation Photos
AUG Conference April 2016 Tenaya Lodge Yosemite 15
Installation Photos
AUG Conference April 2016 Tenaya Lodge Yosemite 16
Installation Photos
AUG Conference April 2016 Tenaya Lodge Yosemite 17
AUG Conference April 2016 Tenaya Lodge Yosemite 18
AUG Conference April 2016 Tenaya Lodge Yosemite 19
Lessons Learned
• Rain on dome impairs image during storms particularly with headlights shining on it at night. Potential solution – Rainex (for plastic)
• System warm-up time varies but can be a bit over 3 minutes and the wait is frustrating. We are looking at replacing the controller with low power cell modem with control output – always on and powers up camera and IR Illuminator.
AUG Conference April 2016 Tenaya Lodge Yosemite 20
Application Uses
• Public Works – Low Water Crossings, Flooded
Roadways • Emergency Managers - High Water Rescues • Flood Control – Facility Maintenance, Debris
Loading – Stage Verification – Staff Gauge reference
AUG Conference April 2016 Tenaya Lodge Yosemite 21
Flooded Roadways - Staff Gauge Verification
AUG Conference April 2016 Tenaya Lodge Yosemite 22
Flooded Roadways - Staff Gauge Verification
AUG Conference April 2016 Tenaya Lodge Yosemite 23
Flooded Roadways - Staff Gauge Verification
AUG Conference April 2016 Tenaya Lodge Yosemite 24
Flooded Roadways - Staff Gauge Verification
AUG Conference April 2016 Tenaya Lodge Yosemite 25
Flooded Roadways - Staff Gauge Verification
AUG Conference April 2016 Tenaya Lodge Yosemite 26
Flooded Roadways - Staff Gauge Verification
AUG Conference April 2016 Tenaya Lodge Yosemite 27
Flooded Roadways - Barricade Response Deployment
AUG Conference April 2016 Tenaya Lodge Yosemite 28
Flooded Roadways - Barricade Response Deployment
AUG Conference April 2016 Tenaya Lodge Yosemite 29
Flooded Roadways - Barricade Response Deployment
AUG Conference April 2016 Tenaya Lodge Yosemite 30
Flooded Roadways - Advanced Warning Device Verification
AUG Conference April 2016 Tenaya Lodge Yosemite 31
Flooded Roadways - Advanced Warning Device Verification
AUG Conference April 2016 Tenaya Lodge Yosemite 32
Flooded Roadways - after event clean-up response
AUG Conference April 2016 Tenaya Lodge Yosemite 33
Flooded Roadways - after event clean-up response
AUG Conference April 2016 Tenaya Lodge Yosemite 34
Flooded Roadways - after event clean-up response
AUG Conference April 2016 Tenaya Lodge Yosemite 35
Flooded Roadways - after event clean-up response
AUG Conference April 2016 Tenaya Lodge Yosemite 36
Flooded Roadways - after event clean-up response
AUG Conference April 2016 Tenaya Lodge Yosemite 37
Flooded Roadways - undermined roadways
AUG Conference April 2016 Tenaya Lodge Yosemite 38
Flooded Roadways - undermined roadways
AUG Conference April 2016 Tenaya Lodge Yosemite 39
Flooded Roadways - undermined roadways
AUG Conference April 2016 Tenaya Lodge Yosemite 40
Flooded Roadways - undermined roadways
AUG Conference April 2016 Tenaya Lodge Yosemite 41
Flood Control - Staff Gauge Verification
AUG Conference April 2016 Tenaya Lodge Yosemite 42
Flood Control - Staff Gauge Verification
AUG Conference April 2016 Tenaya Lodge Yosemite 43
Flood Control - Staff Gauge Verification
AUG Conference April 2016 Tenaya Lodge Yosemite 44
Flood Control - Control Structure Debris Loading
AUG Conference April 2016 Tenaya Lodge Yosemite 45
Flood Control - Control Structure Debris Loading
AUG Conference April 2016 Tenaya Lodge Yosemite 46
Flood Control - Control Structure Debris Loading