Date post: | 18-Jan-2016 |
Category: |
Documents |
Upload: | vivian-paul |
View: | 213 times |
Download: | 1 times |
Alice
MTR DCS
F.Jouve 15 th DCS workshop CERN 13/03/2006
UX-A,B,D
Detector
PVSS II PVSS II
Detector
Ethernet
Database(s)
OPCclient
DIMclient
1672
Detector
?
High Voltage
Low Voltage
Environment monitor
User interface
PVSS II
HV LV
Muon-Trg
Co
ntr
ol
roo
m
(AC
R)
[FSM?]
ELMB(I/O device)
Crate Control
Efficiencysystem
VME(wiener)
Details?
CR4-Z06
SY1527
E
CR3
CAEN OPCserver
PVSS IIOPC client
2
UX-D
Wiener4
E
CR3
Wiener OPCserver
PVSS IIOPC client
ACC
C
4
CR3
PCI-CANWiener OPCserver
PVSS IIOPC client
17
ACC
CR3
PCI-CANELMB OPCserver
PVSS IIOPC client
C
?
?
CR3
SG2
CR5
SG2
Gas system
PLC
Gas
E
Detector
PVSS IIDIP
[GWG]
Gas
GasPVS
S
INFN TURIN
LPC CLERMONT
LV /VME crates DCS. (LPC CLERMONT)
F.Jouve 15 th DCS workshop CERN 13/03/2006
Status
Databases In progress…..The parameter table is defined(we are expecting the PS delivery asap to check specificationsFixed values are being tuned.
Hardware:LV proto Ok with canbus opc server.1 crate tested:( 1 x 3.5 V & 1x -2 V channels)VME proto crates ok (2 crates daisy chain tested)
HV: Just starting...one single channel R/W
Alice
LV DCS. (LPC CLERMONT)
F.Jouve 15 th DCS workshop CERN 13/03/2006
SOFTOPC WIENER
CAN BUS
CAN0 CAN1 CAN0 CAN1
17 Wiener VME crates
CAN0 CAN1
Canbus card
4 Wiener crates PL500/F12
ethernet card
ETHERNET BUS
Rackable pc located in the counting room
4 crates 1 crate4 crates 8 crates2 crates 2 crates
F.Jouve 15 th DCS workshop CERN 13/03/2006
Planning
Alice
F.Jouve 15 th DCS workshop CERN 13/03/2006
Planning
In progress…
We are impatiently waiting for our power supplies.
We intend to test them in our lab.
Obviously, we won’t have the detector there but we plan to simulatedifferent configurations in order to have a realistic working(consumption/load..and so on..)