UP25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
FE-1
DN
FE-1
FE-1
1 1.6 2.2 2.7
A
A.8
BA-13-05
CA-13-05
AA-13-05
1' - 3" 14' - 0" 15' - 0" 14' - 0" 1' - 3"
45' - 6"
23 T @ 11"
21' - 1" 6' - 7"
1' -
3"26
' - 0
"1'
- 3"
28' -
6"
1153 SFLEVEL 1
02
OUTDOOR AREAMAINTANANCE PLATFORM
1 1.6 2.2 2.7
A
A.8
BA-13-05
CA-13-05
A.4
AA-13-05
39'
14' - 0" 15' - 0" 14' - 0"
13' -
0"
13' -
0"
1260 SFLEVEL 2
01
OUTDOOR AREA
LEGEND
GENERAL NOTES:
X'TRAVEL DISTANCE (X = TOTALDISTANCETO EXIT IN FEET)
EYEWASH/SAFETY SHOWER
FIRE EXTINGUISHER
EGRESS WIDTH (IN INCHES)X"
1. FOR SIGN INFORMATION AND TYPE DESCRIPTIONS SEE SPECIFICATIONS SECTION 10 14 00.
2. FOR ARCHITECTURAL LEGEND SEE DWG CH-A-XXX-1201AD.
3. FOR ABBREVIATIONS SEE DWG CH-A-XXX-1201AD.
4. FOR FIRE EXTINGUISHER INFORMATION SEE SPECIFICATIONS SECTION 10 14 00.
FE-1
AREA AND HEIGHT LIMITATIONS
FIRE PROTECTION
INSULATION REQUIREMENTS
GENERAL INFORMATION
OCCUPANCY / EGRESS INFORMATION
MAXIMUM ALLOWABLE AREA PER STORY(TABLE 503)
ACTUAL AREA:
ACTUAL PER FLOOR:
MAXIMUM ALLOWABLE STORIES(TABLE 503)
ACTUAL NUMBER OF STORIES:
MAXIMUM ALLOWABLE HEIGHT(TABLE 503)
ACTUAL HEIGHT:
DESIGN OCCUPANCY(TABLE 1004.1.2)
EGRESS WIDTH BASED ONOCCUPANCY (TABLE 1005.1)
OCCUPANCY:
TABULAR AREA (T) [TABLE 503]:
SPRINKLER INCREASE (S) [506.3]:
FRONTAGE INCREASE (F) [506.2]:
ALLOWABLE AREA PER FLOOR (A):
ALLOWABLE AREA A = T + [TF/100] + [TS/100}
INTERMEDIATE LEVELS:AREA: # OF OCCUPANTS: # OF EXITS:MEZZANINE:
AREA:INDUSTRIAL EQUIPMENTPLATFORM (CBC 505.5):
AUTOMATIC SPRINKLER FORSTORY INCREASE (CBC 504.2):
OCCUPANCY: AREA: CLASSIFICATION:
OCCUPANCY: AREA: CLASSIFICATION:
ROOF:
DAYLIGHT CONTROLS:
PERIMETER SLAB INSULATION:
INSULATION (R-VALUE):
USE AND OCCUPANCYCLASSIFICATION (CHAPTER 3)
CONSTRUCTIONCLASSIFICATION (IBC 602 & TABLE 503)
FIRE EXTINGUISHERS (SECT 906)
SPRINKLERS (IBC SECT 903)
OTHER:
FIRST
SECOND
N/A
N/A
N/A
N/A
N/A
N/A
2A:40BC
N/A
N/A
1
N/A
N/AN/AN/A
WEATHER PROTECTION
-
N/A
N/A
1125 SF
1500 SF
1500 SF
OUTDOOR AREA
2625 SF
1
N/A
-
N/A
-
N/A
-
N/A
1260 SF
39'
4
44"
NUMBER OF OCCUPANCY PER FLOOR:
N/A
N/A
N/A
N/A
EXTERIOR DOORS:
WALLS:
WINDOWS:
ATTIC:
UNHEATTED SLAB ON GRADE:
SGHC:
ROLL-UP OR SLIDING DOORS:
N/A
NEW 2 STORY WATER TREATMENT SHELTEROUTDOOR AREA - WEATHER PROTECTION
DISTANCE TO FIRE HYDRANT TBD
WINDOW:
GLAZING PERCENTAGE:
N/A
N/ASKYLIGHT:
BUILDING:
PLUMBING FIXTURES
REQUIRED FIRE RESISTANT RATINGS
EXIT REQUIREMENTS
INTERIOR FINISHES
LOCAL OFFICIALS:
PROJECT DESCRIPTION
(CPC TABLE 422.1)
CPC TABLE A
WC LAVM F
SS
SINK
SS
SINK
MINIMUMFIXTURECOUNT
ACTUALFIXTURECOUNT
0 0 0 0
00
0 0
00
SHOWER
SHOWER
DF
DF
URINALS (CPC TABLE 422.1, FOOTNOTE #3)
- -
BUILDING ELEMENTS (TABLE 601)
STRUCTURAL FRAME
EXTERIOR BEARING WALLS
INTERIOR BEARING WALLS
INTERIOR NON-BEARING WALLS
FLOOR CONSTRUCTION
ROOF CONSTRUCTION
SHAFT ENCLOSURE (707.4)
STAIRWAY ENCLOSURE (1019.1)
CORRIDOR (TABLE 1016.1)
FIRE SEPARATION DISTANCE (TABLE 602)
DISTANCE FROM ADJACENTBUILDING OR PROPERTY LINE
ALLOWABLE AREA OF EXTERIORDOORS AND WINDOWS (704.8)
PHONE:
REQUIRED EXITS (CBC 1015.1 & 1021):
MAX. COMMON PATH TRAVEL:(CBC 1014.3)
MAX.TRAVEL DISTANCE ALLOWED:(TABLE 1016.2)
MAX. DEAD ENDS:(TABLE 1018.4)
CORRIDOR WIDTH (CBC 1018.2):
MIN. EGRESS WIDTH (CBC 1005.1):
- -
N/A
BUILDING DEPARTMENTCONTACTS
FIRE DEPARTMENTCONTACT
OTHER
BUILDING OFFICIAL:
PHONE:
PHONE:
PLANS EXAMINER:
FIRE MARSHAL:
PHONE:
OCCUPANCY SEPARATIONS (CBC 508.3.3)
INCIDENTAL USE AREAS (508.2)
ACCESSORY USE AREAS (508.3.1)
NON-SEPARATED USE (508.3.2)
PROJECT:PACIFIC GAS & ELECTRICCOMPANYTOPOCK REMEDIATION
ARCHITECT:CH2M HILL2020 SW 4th AVENUEPORTLAND, OREGON
N/A
N/A
30'
>30'
N/A
UNLIMITED
2013 CALIFORNIABUILDING CODE
1
75
20
200
44"
36"
N/A
TBD XXX-XXX-XXXX
TBD
TBD XXX-XXX-XXXX
XXX-XXX-XXXX
0 HR
0 HR
0 HR
0 HR
0 HR
0 HR
0 HR
0 HR
0 HR
CODE DATA
N/A
M F0 0
M F0 0
URINAL
WC LAV
M F0 0
M F0 0
M F0 0
URINAL
N/A
NOTES:
1. THE EQUIPMENT AND FACILITY SHOWNIS PART OF A CONTINGENT SYSTEM ANDMAY BE CONSTRUCTED IN THE FUTURE.
GAS TRANSMISSION & DISTRIBUTION
PACIFIC GAS AND ELECTRIC COMPANY
A
B
C
D
E
1 2 3 4 5 6 7 8 9 10
of
MICROFILM
REVSHEET NO.
SUPSD BY
SUPSDS
DWG LIST
BILL OF MATL
SHEETS
SAN FRANCISCO, CALIFORNIA
SOSUPVDSGNDWNCHKD
SCALESDATEOK
R E V I S I O N SR E V I S I O N S FILE
NAM
E:PL
OT
DAT
E:PL
OT
TIM
E:$P
LOTD
ATE
$PLO
TTIM
E
FOLD
FOLD
FOLD
FOLD
FOLD
FOLD
FOLD
FOLD
APPROVEDBY
SUPVCHKDDWNGM/SPECNO. DATE DESCRIPTIONAPVD BYSUPVCHKDDWNGM/SPECNO. DATE DESCRIPTION APVD BY
N1808
CHRDRV0 9/8/14 PRE-FINAL (90%) DESIGN AV
0
CODE SUMMARY SHEET
TOPOC GROUNDWATER REMEDIATION PROJECT
RVAV
RD-
09/08/14A-13-01
FRESH WATER PRE-INJECTIONTREATMENT SYSTEM
1/4" = 1'-0"1 Level 1_Code
1/4" = 1'-0"2 Level 2_Code
N
N4' 0' 4' 8'
SCALE 1/4"=1'
CONTINGENT
DRAFTNOT FOR
CONSTRUCTION
Code Schedule
-Applicable
Code Standard
a Zoning Code: San Bernardino County Development Codeb Building code: 2013 CALIFORNIA BUILDING CODE (CBC), TITLE 24,
PART 2c Fire code: 2013 CALIFORNIA FIRE CODE (CFC), TITLE 24,
PART 9d Mechanical
code:2013 CALIFORNIA MECHANICAL CODE (CMC),TITLE 24, PART 4
e Plumbingcode:
2013 CALIFORNIA PLUMBING CODE (CPC), TITLE24, PART 5
f Electricalcode:
2013 CALIFORNIA ELECTRICAL CODE (CEC), TITLE24, PART 3
g Energy code: 2013 CALIFORNIA ENERGY CODE (CEC), TITLE 24,PART 6; See 2013 Non-residential compliance manualfor support
h Green Code: 2013 CALIFORNIA GREEN BUILDING STANDARDSCODE (CGBSC). TITLE 24, PART 11, applicable tonewly constructed buildings.
i Accessibility: CH11B ACCESSIBILITY TO PUBLIC BUILDINGS,PUBLIC ACCOMODATIONS, COMMERCIALBUILDINGS AND PUBLIC HOUSING
j FireExtinguishers:
CCR T19 D1 CH3 PORTABLE FIRE EXTINGUISHERS
k Health andSanitation:
Title 6 Health and Sanitation, Chapter 6.96, HazardousMaterial Business Plans and The California AccidentalRelease Prevention Program (HMBP & CARPP),Reference for the California State Health Safety Code
l Fire Sprinklerstandard:
2013 NFPA 13 – Installation of Sprinkler Systems
m FlammableLiquidsstandard:
2008 NFPA 30 – Flammable and Combustible LiquidsCode
n Fire Alarmstandard:
2013 NFPA 72 – National Fire Alarm Code
o Exit Signs 2009 NFPA 170 – Standard for Fire Safety andEmergency Symbols
p HazardIdentificationstandard:
2012 NFPA 704 – Standard System for Identification ofthe Hazards of Materials for Emergency Response
q ASCE 7 2010 ASCE 7 – Minimum Design Loads for Buildingsand Other Structures
r Fire Doors 1997 UL10B – Fire Test for Door Assemblies;2013 NFPA 80 – FIRE DOORS AND OTHER OPENINGPROTECTIVES
s PanicHardware
2007 UL 305 – Panic Hardware
t Fire Dampers 2006 UL 555 – Fire Dampersu Cabinets 2005 UL 1275 – Flammable Liquid Storage Cabinets
Code Schedule
-Applicable
Code Standard
a Zoning Code: San Bernardino County Development Codeb Building code: 2013 CALIFORNIA BUILDING CODE (CBC), TITLE 24,
PART 2c Fire code: 2013 CALIFORNIA FIRE CODE (CFC), TITLE 24,
PART 9d Mechanical
code:2013 CALIFORNIA MECHANICAL CODE (CMC),TITLE 24, PART 4
e Plumbingcode:
2013 CALIFORNIA PLUMBING CODE (CPC), TITLE24, PART 5
f Electricalcode:
2013 CALIFORNIA ELECTRICAL CODE (CEC), TITLE24, PART 3
g Energy code: 2013 CALIFORNIA ENERGY CODE (CEC), TITLE 24,PART 6; See 2013 Non-residential compliance manualfor support
h Green Code: 2013 CALIFORNIA GREEN BUILDING STANDARDSCODE (CGBSC). TITLE 24, PART 11, applicable tonewly constructed buildings.
i Accessibility: CH11B ACCESSIBILITY TO PUBLIC BUILDINGS,PUBLIC ACCOMODATIONS, COMMERCIALBUILDINGS AND PUBLIC HOUSING
j FireExtinguishers:
CCR T19 D1 CH3 PORTABLE FIRE EXTINGUISHERS
k Health andSanitation:
Title 6 Health and Sanitation, Chapter 6.96, HazardousMaterial Business Plans and The California AccidentalRelease Prevention Program (HMBP & CARPP),Reference for the California State Health Safety Code
l Fire Sprinklerstandard:
2013 NFPA 13 – Installation of Sprinkler Systems
m FlammableLiquidsstandard:
2008 NFPA 30 – Flammable and Combustible LiquidsCode
n Fire Alarmstandard:
2013 NFPA 72 – National Fire Alarm Code
o Exit Signs 2009 NFPA 170 – Standard for Fire Safety andEmergency Symbols
p HazardIdentificationstandard:
2012 NFPA 704 – Standard System for Identification ofthe Hazards of Materials for Emergency Response
q ASCE 7 2010 ASCE 7 – Minimum Design Loads for Buildingsand Other Structures
r Fire Doors 1997 UL10B – Fire Test for Door Assemblies;2013 NFPA 80 – FIRE DOORS AND OTHER OPENINGPROTECTIVES
s PanicHardware
2007 UL 305 – Panic Hardware
t Fire Dampers 2006 UL 555 – Fire Dampersu Cabinets 2005 UL 1275 – Flammable Liquid Storage Cabinets
UP25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
FE-1
DN
FE-1
FE-1
A-13-04
A-13-04
A-13-04BA-13-04 D
A
C
1 1.6 2.2 2.7
A
A.8
BA-13-05
CA-13-05
AA-13-05
1' - 3" 14' - 0" 15' - 0" 14' - 0" 1' - 3"
45' - 6"
24 T @ 11"
22' - 0" 6' - 7"
1' -
3"26
' - 0
"1'
- 3"
28' -
6"
5' -
6"
2' -
8"2'
- 10
"2'
- 10
"
4' - 7" 5' - 10" 3' - 7" 4' - 7" 5' - 10" 4' - 7" 3' - 7" 5' - 10" 4' - 7"
A-13-04
A-13-04
A-13-04BA-13-04 D
A
C
1 1.6 2.2 2.7
A
A.8
BA-13-05
CA-13-05
A.4
AA-13-05
1' - 6" 14' - 0" 15' - 0" 14' - 0" 1' - 6"
46' - 0"
1' -
6"13
' - 0
"13
' - 0
"1'
- 6"
5' -
6"2'
- 8
5/8"
3' -
4"3'
- 4"
2' -
2"
7' - 6" 6' - 6" 7' - 6" 7' - 6" 6' - 6" 7' - 6"
4' - 0" 4' - 0" 4' - 0" 4' - 0"
NOTES:
1. THE EQUIPMENT AND FACILITY SHOWNIS PART OF A CONTINGENT SYSTEM ANDMAY BE CONSTRUCTED IN THE FUTURE.
GAS TRANSMISSION & DISTRIBUTION
PACIFIC GAS AND ELECTRIC COMPANY
A
B
C
D
E
1 2 3 4 5 6 7 8 9 10
of
MICROFILM
REVSHEET NO.
SUPSD BY
SUPSDS
DWG LIST
BILL OF MATL
SHEETS
SAN FRANCISCO, CALIFORNIA
SOSUPVDSGNDWNCHKD
SCALESDATEOK
R E V I S I O N SR E V I S I O N S FILE
NAM
E:PL
OT
DAT
E:PL
OT
TIM
E:$P
LOTD
ATE
$PLO
TTIM
E
FOLD
FOLD
FOLD
FOLD
FOLD
FOLD
FOLD
FOLD
APPROVEDBY
SUPVCHKDDWNGM/SPECNO. DATE DESCRIPTIONAPVD BYSUPVCHKDDWNGM/SPECNO. DATE DESCRIPTION APVD BY
N1808
CHRDRV0 9/8/14 PRE-FINAL (90%) DESIGN AV
0
FLOOR PLANS
TOPOC GROUNDWATER REMEDIATION PROJECT
RVAV
RD-
09/08/14A-13-02
FRESH WATER PRE-INJECTIONTREATMENT SYSTEM
1/4" = 1'-0"1 FIRST FLOOR 1/4" = 1'-0"2 SECOND FLOOR
N
N4' 0' 4' 8'
SCALE 1/4"=1'
CONTINGENT
DRAFTNOT FOR
CONSTRUCTION
A-13-04
A-13-04
A-13-04BA-13-04 D
A
C
1 1.6 2.2 2.7
A
A.8
BA-13-05
CA-13-05
A.4
AA-13-05
3" /
1'-0
"
STANDING SEAM METAL ROOF
GUTTER
GUTTER
2' - 0" 14' - 0" 15' - 0" 14' - 0" 2' - 0"
3' -
0"13
' - 0
"13
' - 0
"3'
- 0"
3" /
1'-0
"
NOTES:
1. THE EQUIPMENT AND FACILITY SHOWNIS PART OF A CONTINGENT SYSTEM ANDMAY BE CONSTRUCTED IN THE FUTURE.
GAS TRANSMISSION & DISTRIBUTION
PACIFIC GAS AND ELECTRIC COMPANY
A
B
C
D
E
1 2 3 4 5 6 7 8 9 10
of
MICROFILM
REVSHEET NO.
SUPSD BY
SUPSDS
DWG LIST
BILL OF MATL
SHEETS
SAN FRANCISCO, CALIFORNIA
SOSUPVDSGNDWNCHKD
SCALESDATEOK
R E V I S I O N SR E V I S I O N S FILE
NAM
E:PL
OT
DAT
E:PL
OT
TIM
E:$P
LOTD
ATE
$PLO
TTIM
E
FOLD
FOLD
FOLD
FOLD
FOLD
FOLD
FOLD
FOLD
APPROVEDBY
SUPVCHKDDWNGM/SPECNO. DATE DESCRIPTIONAPVD BYSUPVCHKDDWNGM/SPECNO. DATE DESCRIPTION APVD BY
N1808
CHRDRV0 9/8/14 PRE-FINAL (90%) DESIGN AV
0
ROOF PLAN
TOPOC GROUNDWATER REMEDIATION PROJECT
RVAV
RD-
09/08/14A-13-03
FRESH WATER PRE-INJECTIONTREATMENT SYSTEM
1/4" = 1'-0"1 T.O. STEEL
N
N4' 0' 4' 8'
SCALE 1/4"=1'
CONTINGENT
DRAFTNOT FOR
CONSTRUCTION
FIRST FLOOR626' - 0"
SECOND FLOOR640' - 0"
T.O. STEEL653' - 0"
11.62.22.7 CA-13-05
14' - 0"15' - 0"14' - 0"
METAL ROOF
EXPOSED STEAL
13' -
0"
14' -
0"
DOWNSPOUTTYP.
ALUMINUM BARGRILLE 6" DEEP
FIRST FLOOR626' - 0"
SECOND FLOOR640' - 0"
T.O. STEEL653' - 0"
AA.8 BA-13-05
A.4 AA-13-05
METAL ROOF
EXPOSED STEAL
DOWNSPOUTTYP.
GUTTER, TYP.
26' - 0"
13' -
0"
14' -
0"
ALUMINUM BARGRILLE 6" DEEP
13' - 0" 13' - 0"
FIRST FLOOR626' - 0"
SECOND FLOOR640' - 0"
T.O. STEEL653' - 0"
1 1.6 2.2 2.7CA-13-0514' - 0" 15' - 0" 14' - 0"
13' -
0"
14' -
0"
METAL ROOF
EXPOSED STEAL
DOWNSPOUTTYP.
ALUMINUM BAR GRILLE 6" DEEP
FIRST FLOOR626' - 0"
SECOND FLOOR640' - 0"
T.O. STEEL653' - 0"
A A.8BA-13-05A.4A
A-13-05
METAL ROOF
EXPOSED STEAL
DOWNSPOUTTYP.
GUTTER, TYP.
26' - 0"
13' -
0"
14' -
0"
ALUMINUM BARGRILLE 6" DEEP
13' - 0"13' - 0"
NOTES:
1. THE EQUIPMENT AND FACILITY SHOWNIS PART OF A CONTINGENT SYSTEM ANDMAY BE CONSTRUCTED IN THE FUTURE.
GAS TRANSMISSION & DISTRIBUTION
PACIFIC GAS AND ELECTRIC COMPANY
A
B
C
D
E
1 2 3 4 5 6 7 8 9 10
of
MICROFILM
REVSHEET NO.
SUPSD BY
SUPSDS
DWG LIST
BILL OF MATL
SHEETS
SAN FRANCISCO, CALIFORNIA
SOSUPVDSGNDWNCHKD
SCALESDATEOK
R E V I S I O N SR E V I S I O N S FILE
NAM
E:PL
OT
DAT
E:PL
OT
TIM
E:$P
LOTD
ATE
$PLO
TTIM
E
FOLD
FOLD
FOLD
FOLD
FOLD
FOLD
FOLD
FOLD
APPROVEDBY
SUPVCHKDDWNGM/SPECNO. DATE DESCRIPTIONAPVD BYSUPVCHKDDWNGM/SPECNO. DATE DESCRIPTION APVD BY
N1808
CHRDRV0 9/8/14 PRE-FINAL (90%) DESIGN AV
0
EXTERIOR ELEVATIONS
TOPOC GROUNDWATER REMEDIATION PROJECT
RVAV
RD-
09/08/14A-13-04
FRESH WATER PRE-INJECTIONTREATMENT SYSTEM
1/4" = 1'-0"A North 1/4" = 1'-0"B East
1/4" = 1'-0"C South 1/4" = 1'-0"D West
4' 0' 4' 8'
SCALE 1/4"=1'
CONTINGENT
DRAFTNOT FOR
CONSTRUCTION
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
FIRST FLOOR626' - 0"
SECOND FLOOR640' - 0"
T.O. STEEL653' - 0"
1 1.6 2.2 2.7CA-13-05
T.O. Footing623' - 0"
B.O. Footing621' - 0"
FIRST FLOOR626' - 0"
SECOND FLOOR640' - 0"
T.O. STEEL653' - 0"
1 1.6 2.2 2.7CA-13-05
T.O. Footing623' - 0"
B.O. Footing621' - 0"
FIRST FLOOR626' - 0"
SECOND FLOOR640' - 0"
T.O. STEEL653' - 0"
A A.8
BA-13-05
T.O. Footing623' - 0"
B.O. Footing621' - 0"
A.4
AA-13-05
26' - 0"
13' -
0"
14' -
0"
13' - 0"13' - 0"
NOTES:
1. THE EQUIPMENT AND FACILITY SHOWNIS PART OF A CONTINGENT SYSTEM ANDMAY BE CONSTRUCTED IN THE FUTURE.
GAS TRANSMISSION & DISTRIBUTION
PACIFIC GAS AND ELECTRIC COMPANY
A
B
C
D
E
1 2 3 4 5 6 7 8 9 10
of
MICROFILM
REVSHEET NO.
SUPSD BY
SUPSDS
DWG LIST
BILL OF MATL
SHEETS
SAN FRANCISCO, CALIFORNIA
SOSUPVDSGNDWNCHKD
SCALESDATEOK
R E V I S I O N SR E V I S I O N S FILE
NAM
E:PL
OT
DAT
E:PL
OT
TIM
E:$P
LOTD
ATE
$PLO
TTIM
E
FOLD
FOLD
FOLD
FOLD
FOLD
FOLD
FOLD
FOLD
APPROVEDBY
SUPVCHKDDWNGM/SPECNO. DATE DESCRIPTIONAPVD BYSUPVCHKDDWNGM/SPECNO. DATE DESCRIPTION APVD BY
N1808
CHRDRV0 9/8/14 PRE-FINAL (90%) DESIGN AV
0
BUILDING SECTIONS
TOPOC GROUNDWATER REMEDIATION PROJECT
RVAV
RD-
09/08/14A-13-05
FRESH WATER PRE-INJECTIONTREATMENT SYSTEM
3/16" = 1'-0"A Section 1
3/16" = 1'-0"B Section 2 3/16" = 1'-0"C Section 3
4' 0' 4' 8'
SCALE 1/4"=1'
CONTINGENT
DRAFTNOT FOR
CONSTRUCTION