12x8
R
8"Ø
12x8
RASA SUPPLY AIR
RETURN AIR
R - RISE, D - DROP
DUCT SIZE, RECTANGULAR,
FLEXIBLE CONNECTION
ELBOW, RECTANGULAR(r=1.5W)
ACOUSTICAL INSULATION LINING
HVAC LEGEND
DUCT SIZE, ROUND
DUCT SECTION, SUPPLY
DUCT SECTION, RETURN OR EXHAUST
CHANGE OF ELEVATION
FIRST FIGURE IS SIDE SHOWN
MAEA EXHAUST AIR
MAKE-UP AIR
R - RISE, D - DROPCHANGE OF ELEVATIONAD
ACOUSTICAL INSULATION LINING
Ex.OA OUTDOOR AIR
EXISTING
VD
TEE, RECTANGULAR MAIN AND TAP,
FOT - FLAT ON TOP, FOB - FLAT ON BOTTOM
TEE, RECTANGULAR MAIN AND TAP
VOLUME DAMPER
TEE RECTANGULAR
TRANSITIONS
ELBOW, WITH VANES, RECTANGULAR(r=1.5W)
WITH DAMPER
ELBOW, WITH VANES, RECTANGULAR
WYE, RECTANGULAR
TYPE
CFM
SIZECEILING OR REGISTER DESIGNATION
CEILING RETURN GRILLE
FD
WALL SUPPLY GRILLE OR REGISTER
FIRE DAMPER
WALL EXHAUST/RETURN GRILLE OF REGISTER
CEILING SUPPLY DIFFUSER
24"x24"'S1' 100
T
H
THERMOSTAT
HUMIDISTAT
C CONTROLLER, AS INDICATED
S THERMOSTAT REMOTE SENSOR
FLOOR OR CEILING SUPPLY
FLOOR OR CEILING EXHAUST/RETURN
GRILLE OR REGISTER
GRILLE OR REGISTER
SAN
PLUMBING LEGEND
SS
SS SS
SV
SD
SD SD
ABBREVIATIONSYMBOL DESCRIPTION
SAN
VENT
STM
STM
WCO
SANITARY DRAIN ABOVE FLOOR/GRADE
SANITARY DRAIN BELOW FLOOR/GRADE
SANITARY VENT
STORM DRAIN ABOVE FLOOR/GRADE
STORM DRAIN BELOW FLOOR/GRADE
WALL CLEANOUT
FCO FLOOR CLEANOUT
SS SS LCO LINE CLEANOUT
GCO GRADE CLEANOUT
DCW DOMESTIC COLD WATER
DHW DOMESTIC HOT WATER
oo oo STANDPIPE-
DHWR DOMESTIC HOT WATER RETURN
GAS NATURAL GASGAS
MECHANICAL NOTES
MECHANICAL DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL OTHER DRAWINGS FOR THIS PROJECT.
1 GENERAL:.1 CONFORM WITH APPLICABLE REQUIREMENTS OF THE MINISTRY OF LABOUR, AND THE OCCUPATIONAL HEALTH
AND SAFETY ACT AND REGULATIONS FOR CONSTRUCTION PROJECTS..2 DO COMPLETE INSTALLATION IN ACCORDANCE WITH THE FOLLOWING:
.1 ONTARIO BUILDING CODE (OBC); .2 NATURAL GAS AND PROPANE INSTALLATION CODE (GAS CODE); .3 ASHRAE; .4 SMACNA; .5 NFPA; .6 ALL OTHER RELEVANT CODES AND STANDARDS, AS APPLICABLE.
.3 OBTAIN ALL PERMITS REQUIRED FOR THE INSTALLATION OF MECHANICAL TRADES WORK, ARRANGE FOR INSPECTIONS AND TESTS, AND PAY ALL FEES AND COSTS FOR THE PERMITS, INSPECTIONS AND FEES. OBTAIN PERMITS IMMEDIATELY AFTER NOTIFICATION OF AWARD OF CONTRACT.
.4 PROVIDE THREE COPIES OF COMPLETE OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT FURNISHED UNDER THIS CONTRACT. BIND INSTRUCTIONS IN 3-RING BINDERS. INCLUDE THE FOLLOWING: .1 SCHEMATIC DIAGRAM OF ELECTRICAL SYSTEMS. .2 CONTROL SHOP DRAWINGS AND OPERATING SEQUENCE INCLUDING WIRING OF COMPONENTS. .3 WIRING DIAGRAM OF CONTROL PANELS. .4 OPERATING INSTRUCTIONS, INCLUDING START-UP AND SHUT-DOWN PROCEDURE. .5 MAINTENANCE INSTRUCTIONS INCLUDING PREVENTIVE MAINTENANCE INSTRUCTIONS FOR COMPONENTS OF THE
EQUIPMENT. .6 COMPLETE PARTS LIST OF ASSEMBLIES AND THEIR COMPONENT PARTS, SHOWING MANUFACTURER'S NAME, CATALOGUE
NUMBER, AND NEAREST REPLACEMENT SOURCE. .7 LIST OF RECOMMENDED SPARE PARTS AND QUANTITY OF EACH ITEM TO BE STOCKED. .8 MANUFACTURERS' WARRANTIES AND GUARANTEES.
.5 CLEAN ALL MECHANICAL SYSTEMS AT PROJECT COMPLETION.
.6 COMPLETE AS-BUILT DRAWINGS SHOWING ALL CHANGES AS WORK PROGRESSES.
2 CONTRACTOR QUALIFICATIONS:.1 ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH THE “TRADE QUALIFICATION AND APPRENTICESHIP ACT”
AND REGULATIONS, BY PERSONS WHO HOLD THE FOLLOWING CERTIFICATES OF QUALIFICATION (AS APPLICABLE): .1 PLUMBER; .2 REFRIGERATION & AIR CONDITIONING SYSTEMS MECHANIC; .3 RESIDENTIAL AIR CONDITIONING SYSTEMS MECHANIC; .4 SHEET METAL WORKER.
.2 ALL FUELS-RELATED WORK TO BE CARRIED OUT IN ACCORDANCE WITH TSSA REQUIREMENTS AND ONTARIO REGULATION 215/01, “FUEL INDUSTRY CERTIFICATES” BY PERSONS WHO HOLD THE APPROPRIATE CERTIFICATES FOR THE WORK BEING PERFORMED.
3 EXISTING FACILITIES AND DEMOLITION:.1 LOCATE AND PROTECT ALL EXISTING EXTERIOR SITE SERVICES..2 RETAIN AND PROTECT ALL EXISTING INTERIOR SERVICES AND BUILDING FABRIC. MAKE GOOD ANY AND ALL DAMAGE RESULTING
FROM THIS WORK.
4 FIXTURES AND EQUIPMENT:.1 PROVIDE SHOP DRAWINGS AND PRODUCT DATA FOR ALL MECHANICAL FIXTURES AND EQUIPMENT FOR APPROVAL, PRIOR TO
PROCUREMENT..2 INSTALL ALL MECHANICAL FIXTURES AND EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S
INSTRUCTIONS..3 LOCATE ALL EQUIPMENT WITH CLEARANCES, AS REQUIRED BY THE MANUFACTURER, THE FUEL CODES, AND ALL
OTHER CODES AND REGULATIONS, INCLUDING THE FOLLOWING CLEARANCES: .1 TO PERMIT PROPER EQUIPMENT OPERATION; .2 TO PERMIT SUFFICIENT AIRFLOW AROUND EQUIPMENT; .3 FOR EQUIPMENT SERVICE; .4 SUFFICIENT DISTANCE FROM COMBUSTIBLE MATERIAL; .5 WITH SUFFICIENT VENT CLEARANCES; .6 SUFFICIENT DISTANCE FROM ROOF EDGES OR OTHER HAZARDS; .7 SERVICE PLATFORMS FOR APPLIANCES INSTALLED 10 FT OR MORE ABOVE FLOOR; .8 WITH FIXED ACCESS TO ROOF FOR BUILDING HEIGHT GREATER THAN 13', AND STAIRWAY ACCESS TO ROOF GREATER THAN 26'.
5 EQUIPMENT SUPPLIED BY OTHERS:.1 MAKE ALL MECHANICAL SERVICE CONNECTIONS TO EQUIPMENT SUPPLIED BY OTHERS..2 CONFIRM ALL SERVICE CONNECTIONS WITH MANUFACTURER AND SUPPLIER, PRIOR TO INSTALLATION. THIS SHALL INCLUDE ALL
CONNECTION SIZES, LOCATIONS AND DETAILS, AND SHALL TAKE INTO ACCOUNT EQUIPMENT CLEARANCES AND INSTALLATIONREQUIREMENTS.
6 PIPING AND ESCUTCHEONS:.1 PROVIDE DIELECTRIC UNIONS AT ALL PIPING LOCATIONS WHERE DISSIMILAR METALS ARE JOINED..2 PROVIDE ESCUTCHEONS ON ALL PIPES PASSING THROUGH WALLS, PARTITIONS, FLOORS AND CEILINGS,
CHROME, NICKEL PLATED BRASS OR TYPE 302 STAINLESS STEEL.
7 ACCESS DOORS:.1 SUPPLY ACCESS DOORS, AS REQUIRED IN DUCTWORK AND WALL/CEILING ASSEMBLIES, TO ALL CONCEALED MECHANICAL
EQUIPMENT AND OPERATING DEVICES. ACCESS DOORS IN WALL/CEILING ASSEMBLIES TO BE INSTALLED BY OTHER TRADES..2 ACCESS DOORS SHALL BE FIRE-RATED TYPE, WHERE USED IN FIRE-RATED ASSEMBLIES, AND SHALL MATCH THE RATING OF THE
ASSEMBLY.
8 PIPE INSULATION:.1 INSTALL IN ACCORDANCE WITH THERMAL INSULATION ASSOCIATION OF CANADA (TIAC) NATIONAL STANDARDS..2 MAX. FLAME SPREAD RATING: 25..3 MAX. SMOKE DEVELOPED RATING: 50..4 DOMESTIC COLD WATER (DCW):
.1 1” RIGID MOULDED MINERAL FIBRE WITH VAPOUR RETARDER JACKET. .2 INSULATE ALL PIPING IN FLOORS, WALLS AND CEILINGS, TO POINT OF FIXTURE CONNECTIONS.
.5 DOMESTIC HOT WATER (DHW): .1 1” RIGID MOULDED MINERAL FIBRE FOR PIPING UP TO 1-1/4” SIZE. .2 INSULATE ALL PIPING IN FLOORS, WALLS AND CEILINGS, TO POINT OF FIXTURE CONNECTIONS.
.6 OUTER JACKET: .1 CONCEALED LOCATIONS: ALL SERVICE JACKET.
.2 EXPOSED LOCATIONS: PVC JACKET. .3 MECHANICAL/SERVICE ROOMS: PVC JACKET.
9 WATER SERVICE AND WATER SUPPLY PIPING:.1 SUBMERSIBLE WELL PUMP: BLACK POLYETHYLENE PIPE, 150 PSI..2 ABOVE GROUND: COPPER TUBE, HARD DRAWN, TYPE L. CAN. OR US MANUFACTURE, INCLUDING FITTINGS. LEAD-FREE SOLDER..3 WATER SUPPLY PIPING IS SHOWN SCHEMATICALLY. ALL PIPING SHALL BE CONCEALED UNLESS OTHERWISE NOTED..4 INSTALL TUBING CLOSE TO BUILDING STRUCTURE TO MINIMIZE FURRING, CONSERVE HEADROOM AND SPACE. GROUP EXPOSED
PIPING AND RUN PARALLEL TO WALLS..5 ISOLATE ALL EQUIPMENT, FIXTURES AND BRANCHES WITH VALVES..6 TEST WATER SYSTEM AT 1½ TIMES SYSTEM OPERATING PRESSURE OR MINIMUM 860 KPA, WHICHEVER IS GREATER. TEST
PRESSURE AND TIMEFRAME SHALL BE AS REQUIRED BY OBC 7.3.7.2..7 FLUSH OUT, DISINFECT AND RINSE SYSTEM, PRIOR TO CONSTRUCTION COMPLETION..8 WATER HEATERS:
.1 SHALL BE PIPED WITH HEAT TRAPS ON THE INLET AND OUTLET PIPING, AS CLOSE AS PRACTICAL TO THE TANK, IN ACCORDANCEWITH OBC 12.3.1.4.
.2 TEMPERATURE AND PRESSURE RELIEF VALVES: .1 MAXIMUM TEMPERATURE SETTING OF 210F (99F); .2 MAXIMUM PRESSURE SETTING OF 150 PSI; .3 DISCHARGE PER OBC 7.6.1.12.:
.1 TERMINATE WITH AN INDIRECT CONNECTION PIPED TO FLOOR DRAIN, SUMP OR OTHER SAFE LOCATION, WITH A 300mm AIR BREAK; OR
.2 TERMINATE AT A DISTANCE NOT LESS THAN 150mm AND NOT MORE THAN 300mm FROM A FLOOR AND DISCHARGE VERTICALLY DOWN,
.9 TRAP SEAL PRIMERS AND ACCESS TO THEM, SHALL BE LOCATED IN THE WASHROOM OR AREA THAT THEY SERVE.
.10 SUPPLY AND INSTALL WATER HAMMER ARRESTORS AT THE MIDPOINT AND END OF RUNS OF WATER SUPPLY PIPING AS REQUIRED BY OBC 7.6.1.14.
10 DRAINAGE, WASTE AND VENT PIPING:.1 COORDINATE SANITARY SERVICE INSTALLATIONS WITH SUPPLY AUTHORITY..2 APPROXIMATE SUB-FLOOR PIPING ELEVATIONS HAVE BEEN INDICATED ON THE DRAWINGS. GENERAL CONTRACTOR SHALL BE
RESPONSIBLE FOR SETTING FINAL INVERTS BASED ON SITE CONDITIONS..3 BELOW GROUND/FLOOR:
.1 ABS DWV SOLID WALL SCHEDULE 40, CERTIFIED TO CAN/CSA STANDARD B181.1. .2 PVC DWV, TYPE SDR26 SDR35.
.4 ABOVE GROUND: .1 PVC DWV SOLID WALL SCHEDULE 40, CERTIFIED TO CAN/CSA STANDARD B181.2, FOR NONCOMBUSTIBLE CONSTRUCTION
(FLAME-SPREAD RATING NOT MORE THAN 25 PER CAN/ULC-S102.2). .2 PVC DWV SOLID WALL SCHEDULE 40, CERTIFIED TO CAN/CSA STANDARD B181.2, FOR NONCOMBUSTIBLE CONSTRUCTION
(FLAME-SPREAD RATING NOT MORE THAN 25 AND SMOKE DEVELOPED CLASSIFICATION NOT MORE THAN 50 PER CAN/ULC-S102.2 - PLENUMS).
.5 PROVIDE CLEANOUTS AS REQUIRED BY THE ONTARIO BUILDING CODE.
.6 VENT COMPLETE PLUMBING SYSTEM IN ACCORDANCE WITH THE ONTARIO BUILDING CODE.
11 PROPANE GAS PIPING:.1 COORDINATE PROPANE SERVICE INSTALLATION WITH SUPPLY AUTHORITY..2 STEEL PIPE, SCHEDULE 40, SEAMLESS, SCREWED FITTINGS..3 TEST SYSTEM IN ACCORDANCE WITH NATURAL GAS AND PROPANE INSTALLATION CODE.
12 DUCTWORK:.1 RECTANGULAR DUCT:
.1 RIGID GALVANIZED STEEL, LOCK FORMING QUALITY TO ASTM A653/A653M .2 THICKNESS, FABRICATION, REINFORCEMENT AND SUPPORT/ATTACHMENT TO ASHRAE OR SMACNA.
.2 ROUND DUCT: .1 RIGID GALVANIZED STEEL, LOCK FORMING QUALITY TO ASTM A653/A653M .2 THICKNESS, FABRICATION, REINFORCEMENT AND SUPPORT/ATTACHMENT TO ASHRAE OR SMACNA. .3 FLEXIBLE BRANCH DUCT (PERMITTED WITHIN 2m/6ft FROM OUTLET):
.1 ALL METAL TYPE: TRIPLE LOCK, ALUMINUM CORRUGATED DUCT, MANUFACTURED USING AN ALUMINUM STRIP, WHICH IS SPIRALLY WOUND AND MECHANICALLY JOINED TOGETHER FORMING AN AIR TIGHT AND LEAKPROOF SEAM.
.3 SEAL CLASSIFICATION: .1 CLASS A: LONGITUDINAL SEAMS, TRANSVERSE JOINTS, DUCT WALL PENETRATIONS AND CONNECTIONS MADE AIRTIGHT
WITH SEALANT AND TAPE.
.4 FITTINGS .1 FABRICATION: TO SMACNA. .2 RADIUSED ELBOWS.
.1 RECTANGULAR: STANDARD WITH CENTRELINE RADIUS 1.5 TIMES DUCT DIMENSION, WITH SINGLE THICKNESS TURNING VANES.
.2 ROUND: FIVE PIECE WITH CENTRELINE RADIUS 1.5 TIMES DIAMETER. .3 MITRED ELBOWS, RECTANGULAR: WITH DOUBLE THICKNESS TURNING VANES.
5 BRANCHES: .1 RECTANGULAR MAIN AND BRANCH: WITH RADIUS ON BRANCH 1.5 TIMES WIDTH OF DUCT 45
DEGREES ENTRY ON BRANCH. .2 ROUND MAIN AND BRANCH: ENTER MAIN DUCT AT 45 DEGREES WITH CONICAL CONNECTION. .3 PROVIDE VOLUME CONTROL DAMPER IN BRANCH DUCT NEAR CONNECTION TO MAIN DUCT. .4 MAIN DUCT BRANCHES: WITH SPLITTER DAMPER.
.6 TRANSITIONS: .1 DIVERGING: 20 DEGREES MAXIMUM INCLUDED ANGLE. .2 CONVERGING: 30 DEGREES MAXIMUM INCLUDED ANGLE.
.7 FIRE STOPPING .1 RETAINING ANGLES AROUND DUCT, ON BOTH SIDES OF FIRE SEPARATION IN ACCORDANCE WITH
SECTION. .2 FIRE STOPPING MATERIAL AND INSTALLATION MUST NOT DISTORT DUCT.
.8 DAMPERS: .1 MANUFACTURE TO SMACNA STANDARDS. .2 SINGLE BLADE DAMPERS:
.1 FABRICATE FROM SAME MATERIAL AS DUCT, BUT ONE SHEET METAL THICKNESS HEAVIER. V_GROOVE STIFFENED. .2 SIZE AND CONFIGURATION TO RECOMMENDATIONS OF SMACNA. .3 LOCKING QUADRANT (WITH SHAFT EXTENSION TO ACCOMMODATE INSULATION THICKNESS, IF REQUIRED). .4 INSIDE AND OUTSIDE NYLON END BEARINGS. .5 CHANNEL FRAME OF SAME MATERIAL AS ADJACENT DUCT, COMPLETE WITH ANGLE STOP.
.9 DUCT LEAKAGE: IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL.
.10 ALL DUCT AND SEAL MATERIALS TO HAVE A FLAME SPREAD RATING OF LESS THAN 25 AND A SMOKE DEVELOPED CLASSIFICATIONOF LESS THAN 50.
.11 PAINT VISIBLE INTERIOR SURFACES OF ALL PLENUM BOXES MATTE BLACK.
.12 PROVIDE FLEXIBLE CONNECTIONS AT ALL EQUIPMENT DUCT CONNECTION POINTS.
13 DUCT INSULATION:.1 REFER TO DRAWING FOR DUCT THAT IS IDENTIFIED TO BE INSULATED..2 INSTALL IN ACCORDANCE WITH THERMAL INSULATION ASSOCIATION OF CANADA (TIAC) NATIONAL STANDARDS..3 MAX. FLAME SPREAD RATING: 25..4 MAX. SMOKE DEVELOPED RATING: 50..5 THERMAL INSULATION - RECTANGULAR DUCT:
.1 1” (R4.3) RIGID MINERAL FIBRE BOARD WITH VAPOUR RETARDER JACKET.
.2 ALUMINUM JACKET WITH MOISTURE BARRIER..6 THERMAL INSULATION - ROUND DUCT:
.1 1” (R3.1) MINERAL FIBRE BLANKET WITH VAPOUR RETARDER JACKET.
.2 ALUMINUM JACKET WITH MOISTURE BARRIER..7 ACOUSTIC DUCT LINING:
.1 1” (R4.3) ACOUSTIC QUALITY MINERAL FIBRE DUCT LINER, WITH MAT FACING, BACTERIA AND FUNGUS RESISTANT.
.2 FASTEN TO INTERIOR SHEET METAL SURFACE WITH 100% COVERAGE OF ADHESIVE AND 5/16” WELDPINS NOT LESS THAN 2 ROWS PER SURFACE AND NOT MORE THAN 16 IN ON CENTRES.
.3 SEAL BUTT JOINTS, EXPOSED EDGES, WELD PIN AND CLIP PENETRATIONS AND DAMAGED AREAS OF LINER WITH 2” JOINTTAPE AND SEALER.
14 MECHANICAL FIRE PROTECTION:.1 REFER TO ARCHITECTURAL DRAWINGS, TO VERIFY LOCATION OF ALL FIRE SEPARATIONS AND FIRE-RATED MEMBRANES..2 ALL PIPING SHALL BE TIGHTLY FITTED AND SEALED WITH FIRESTOPPING MATERIAL AT ALL FIRE SEPARATIONS AND FIRE-RATED
MEMBRANES..3 FIRE DAMPERS:
.1 FIRE DAMPERS SHALL BE CAN/ULC-S112 (STANDARD METHOD OF FIRE TEST OF FIRE DAMPER ASSEMBLIES) LISTED ANDLABELLED.
.2 FIRE DAMPERS SHALL BE NFPA 80 (STANDARD FOR FIRE DOORS AND OTHER OPENING PROTECTIVES), NFPA 90A (STANDARDFOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS), AND NFPA 101 (LIFE SAFETY CODE)COMPLIANT.
.3 DUCTWORK SHALL BE FITTED WITH FIRE DAMPERS AT ALL FIRE SEPARATIONS AND FIRE-RATED MEMBRANES.
.4 SUPPLY AND INSTALL ACCESS DOORS IN ARCHITECTURAL FINISH (WALL, CEILING OR FLOOR) TO ACCESS DUCT, IN COMMONAREA WHERE POSSIBLE.
.5 SUPPLY AND INSTALL TIGHTLY-FITTED ACCESS DOOR IN DUCT TO ACCESS, INSPECT AND RESET FIRE DAMPER.
.6 TYPES: DYNAMIC - FOR USE IN AIR HANDLING SYSTEMS THAT DO NOT SHUTDOWN UPON FIRE ALARM.
.7 RATING: 1-1/2 HR (30MIN TO 2HR FIRE RESISTANCE RATING)..4 ALL MECHANICAL MATERIALS USED WITHIN CEILING RETURN AIR PLENUMS SHALL FLAME-SPREAD RATING NOT MORE THAN 25
AND SMOKE DEVELOPED CLASSIFICATION NOT MORE THAN 50 PER CAN/ULC-S102.2..5 MOCK-UPS:
.1 PREPARE MOCK-UPS OF TYPICAL FIRESTOP INSTALLATION OF THE FOLLOWING, FOR REVIEW AND APPROVAL BY THEOWNER, ENGINEER AND MUNICIPAL BUILDING INSPECTOR:
.1 SANITARY PIPING - WALL AND CEILING/FLOOR FIRE SEPARATION; .2 DCW AND DHW PIPING - WALL AND CEILING/FLOOR FIRE SEPARATION;
.3 FIRE DAMPER INSTALLATION - WALL AND CEILING/FLOOR FIRE SEPARATION..2 ALL FIRESTOP INSTALLATIONS SHALL BE COMPLETED IN ACCORDANCE WITH THE APPROPRIATE PRODUCT INSTALLATION
INSTRUCTIONS, AND THE REFERENCED UL/ULC LISTING AND/OR TEST STANDARD..3 SUPPLY A COPY OF THE PRODUCT INSTALLATION INSTRUCTIONS WITH ULC LISTING AND/OR TEST STANDARD REFERENCE,
FOR EACH INSTALLATION..4 MOCK-UP MAY REMAIN AS PART OF WORK.
15 EQUIPMENT IN HAZARDOUS LOCATIONS:.1 THE GARAGE AREA, AND ADJACENT ROOMS, UP TO A LEVEL OF 50mm ABOVE THE FLOOR SHALL BE CONSIDERED A CLASS I
(FLAMMABLE GASES OR VAPOURS) ZONE 2 LOCATION..2 ALL EQUIPMENT USED WITHIN THE AREA SHALL BE APPROVED FOR THE CLASSIFICATION.
16 MECHANICAL IDENTIFICATION:.1 IDENTIFY MECHANICAL EQUIPMENT WITH LAMICOID NAMEPLATES..2 LABEL ALL PIPING AT LEAST ONCE IN EVERY ROOM, AND AT NO MORE THAN 25 FT CENTERS.
17 EARTHQUAKE LOAD:.1 ALL MECHANICAL WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE EARTHQUAKE LOAD AND EFFECTS REQUIRED BY THE
ONTARIO BUILDING CODE..2 MECHANICAL ELEMENTS AND COMPONENTS (EQUIPMENT, PIPES, DUCTS, ETC.), AND THEIR CONNECTIONS TO THE BUILDING
SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SMACNA/ANSI SEISMIC RESTRAINT MANUAL OR OTHER GUIDELINEREFERENCED IN THE ONTARIO BUILDING CODE.
.3 PROVIDE SHOP DRAWINGS FOR SUPPORT, CONNECTIONS AND SEISMIC RESTRAINT OF ALL MECHANICAL EQUIPMENT, PIPES ANDDUCTS, INCLUDING, BUT NOT LIMITED TO:.1 FURNACES AND ENERGY RECOVERY VENTILATORS;.2 CONDENSING;.3 INFRARED HEATERS;.4 TYPICAL DUCT SUPPORTING SYSTEM;.5 TYPICAL SAN, DCW, DHW PIPE SUPPORTING SYSTEM;.6 TYPICAL PROPANE PIPE SUPPORTING SYSTEM.THESE SHOP DRAWINGS SHALL BE DESIGNED AND SEALED BY A PROFESSIONAL ENGINEER IN THE PROVINCE OF ONTARIO, WITHEXPERIENCE IN SEISMIC ENGINEERING.
18 EQUIPMENT AND MATERIALS SUPPORT:.1 ALL MECHANICAL EQUIPMENT, PIPING, DUCTWORK, AND RELATED ITEMS SHALL BE SECURELY SUPPORTED, ATTACHED AND
FASTENED TO BUILDING STRUCTURE..2 PIPE HANGERS AND SUPPORTS SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH MSS STANDARD SP-58, PIPE
HANGERS AND SUPPORTS - MATERIALS, DESIGN, MANUFACTURE, SELECTION, APPLICATION, AND INSTALLATION.
19 COORDINATION:.1 INFORMATION INVOLVING ACCURATE DIMENSIONING OF THE BUILDING SHALL BE TAKEN FROM SITE BY CONTRACTOR..2 DRAWINGS ARE IN DIAGRAMMATIC FORM, INTENDED TO CONVEY THE SCOPE OF WORK AND GENERAL ARRANGEMENT FOR
EQUIPMENT. COORDINATE PHYSICAL LOCATION OF ALL EQUIPMENT WITH OTHER TRADES AND ALLOW FOR ANY ADDITIONALPIPING, DUCTING, FITTINGS, SUPPORTS, ETC., IN ORDER TO AVOID INTERFERENCE AND FACILITATE THE WORK.
.3 CONTRACTOR TO MAKE ANY NECESSARY MODIFICATIONS OR ADDITIONS, WITHOUT CHARGE, TO ACCOMMODATE SITECONDITIONS AND COORDINATION.
.4 COORDINATE ALL MECHANICAL EQUIPMENT WIRING, INCLUDING LOW VOLTAGE CONTROL WIRING, WITH ELECTRICAL TRADES.
20 START-UP, COMMISSIONING AND TRAINING:.1 COMMISSIONING:
.1 START-UP AND COMMISSION THE FOLLOWING SYSTEMS:.1 PLUMBING FIXTURES;.2 HVAC;.3 GAS DETECTION AND EXHAUST SYSTEM.
.2 PERFORM SYSTEMATIC TESTS, PROCEDURES AND CHECKS ON SYSTEMS, AS FOLLOWS:.1 TO VERIFY OPERATION IN ACCORDANCE WITH CONTRACT DOCUMENTS, DESIGN CRITERIA aND INTENT, AND
MANUFACTURER'S REQUIREMENTS;.2 TO ENSURE APPROPRIATE DOCUMENTATION IS PROVIDED;.3 TO EFFECTIVELY TRAIN BUILDING OPERATIONAL STAFF.
.3 SYSTEMS ARE TO BE OPERATED AT FULL CAPACITY, WITH CORRECTION OF ALL DEFICIENCIES AND ADJUSTMENTS TO MEETOPTIMUM PERFORMANCE.
.4 PROVIDE WRITTEN REPORT AT END OF COMMISSIONING OUTLINING EQUIPMENT OPERATIONAL CONDITIONS ANDPARAMETERS.
.2 TESTING, ADJUSTING AND BALANCING:.1 TEST, ADJUST AND BALANCE (TAB) ALL PLUMBING AND HVAC EQUIPMENT AND SYSTEMS; INCLUDING THE FOLLOWING:
.1 FURNACES;
.2 CONDENSING UNITS;
.3 ENERGY RECOVERY VENTILATORS..2 TAB PROCEDURE SHALL BE COMPLETED IN ACCORDANCE WITH ASHRAE STANDARD 111, MEASUREMENT, TESTING,
ADJUSTING AND BALANCING OF BUILDING HVAC SYSTEMS..3 PROVIDE DETAILED REPORT AT END OF TAB, IN ACCORDANCE WITH THE REPORTING PROCEDURES OF ASHRAE STANDARD
111..3 DEMONSTRATION AND TRAINING:
.1 DEMONSTRATE OPERATION AND MAINTENANCE OF EQUIPMENT AND SYSTEMS TO OWNER'S PERSONNEL ONE WEEK PRIORTO DATE OF FINAL INSPECTION
.2 PRIOR TO DEMONSTRATION AND TRAINING, ENSURE THAT EQUIPMENT HAS BEEN INSPECTED AND PUT INTO OPERATION,INCLUDING COMPLETION OF COMMISSIONING AND TESTING, ADJUSTING, AND BALANCING.
.3 DEMONSTRATE START_UP, OPERATION, CONTROL, ADJUSTMENT, TROUBLE_SHOOTING, SERVICING, AND MAINTENANCEOF EACH ITEM OF EQUIPMENT.
.4 INSTRUCT PERSONNEL IN PHASES OF OPERATION AND MAINTENANCE USING OPERATION AND MAINTENANCE MANUALSAS BASIS OF INSTRUCTION. REVIEW CONTENTS OF MANUAL IN DETAIL TO EXPLAIN ASPECTS OF OPERATION ANDMAINTENANCE.
.5 ENSURE ADEQUATE AMOUNT OF TIME REQUIRED FOR INSTRUCTION OF EACH ITEM OF EQUIPMENT.
EXHAUST FAN
DISCONNECTSWITCH
ANDMOTOR
STARTER
BREAKER &BRANCH CCT.
EXHAUST FANCONTROLLER
- MANUAL -- OFF -
- AUTO -
INTERLOCKEXHAUST
FAN ONFOR MANUAL
OR AUTO
24V
120V
15A, 120V/1PHBREAKER &
BRANCH CCT.
DAMPERMOTOR
24V
120V
15A, 120V/1PHBREAKER &
BRANCH CCT.
24V
120V
15A, 120V/1PHBREAKER &
BRANCH CCT.
INTERLOCKDAMPER MOTOR OPENFOR MANUAL OR AUTOSIGNAL FAN START-UP
RELAY OUTPUTCO DETECTIONTO EXHAUST FANCONTROLLER
SEQUENCE OF OPERATION
MANUAL - DAMPER OPEN- EXHAUST FAN ON
AUTO - GAS DETECTION ALARM - DAMPER OPEN - EXHAUST FAN ON
EXHAUST SYSTEM - CONTROL SCHEMATIC
GASDETECTION
CONTROLLER
GASDETECTION
SENSOR/TRANSMITTER
CO
24V
120V
EF-2A, EF-2B
NOTES:MECHANICAL CONTRACTOR SHALL SUPPLY EQUIPMENTELECTRICAL CONTRACTOR SHALL WIRE AND CONNECTALL EQUIPMENT
GASDETECTION
SENSOR/TRANSMITTER
NO2
24V
120V
24V
120V
24V
120V
SENSOR/TRANSMITTEROUTPUT TOGAS DETECTION CONTROLLER
GASDETECTION
SENSOR/TRANSMITTER
CO
GASDETECTION
SENSOR/TRANSMITTER
NO2
24V
120V
GASDETECTION
SENSOR/TRANSMITTER
CO(MAIN. PIT)
REV DATE:
Drawing No.:
12/3/2020
MECHANICALNOTES & LEGENDS
MM
MM
MP
2020-04-27
AS SHOWN
-M1
Project Title:
Township of South Glengarry
MUNICIPAL GARAGEFACILITY
ALL DRAWINGS, SPECIFICATIONS AND RELATED DOCUMENTS ARE THE COP RIGHTPROPERT OF THE ENGINEER AND MUST BE RETURNED UPON RE UEST.
REPRODUCTION OF DRAWINGS, SPECIFICATIONS, AND RELATED DOCUMENTS INPART OR WHOLE IS FORBIDDEN WITHOUT THE ENGINEERS WRITTEN PERMISSION.
THE CONTRACTOR MUST CHECK AND VERIF ALL DIMENSIONS ON THE OB PRIORTO START OF CONSTRUCTION.
DRAWINGS ARE NOT TO BE SCALED
RevisionsDateByNo.
Telephone: (613) 499-207768 William St. Suite 200Brockville, Ont.
0 MP 2020-12-01 FOR REVIEW
1 MP 2020-12-03 ISSUED FOR TENDER
ALL DRAWINGS, SPECIFICATIONS AND RELATED DOCUMENTS ARE THE COPYRIGHTPROPERTY OF THE ENGINEER AND MUST BE RETURNED UPON REQUEST.
REPRODUCTION OF DRAWINGS, SPECIFICATIONS, AND RELATED DOCUMENTS INPART OR WHOLE IS FORBIDDEN WITHOUT THE ENGINEERS' WRITTEN PERMISSION.
THE CONTRACTOR MUST CHECK AND VERIFY ALL DIMENSIONS ON THE JOB PRIORTO START OF CONSTRUCTION.
DRAWINGS ARE NOT TO BE SCALED
RDBN .
T W S . S
B , O .
REV DATE
D N .
MECHANICALNOTES & LEGENDS
MM
MM
MP
AS SHOWN
M2
P T
Township of South Glengarry
MUNICIPAL GARAGEFACILITY
MP FOR REVIEW
MP ISSUED FOR TENDER
UP - FUTURE STAIR
PROVIDE PRE-FRAMING
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
BUILDINGSAN. CLEANOUTAPPROX. INV. 96.95 FT
4" SAN @ 1:100REFER TO SITE PLAN
OIL INTERCEPTORWITH STRUCTURAL STEEL COVERVENT IN ACCORDANCE WITH OBC & MFR REQ'MENTS
APPROX. INV. AT OILINTERCEPTOR 97.40 FT.
SS INT-1FD-1
FCO
SSSS
FCO
SS
WH-1WATER HEATER- 1" DCW (INSUL) WITH UNION & ISOLATING VALVE- 1" DHW (INSUL) WITH UNION & ISOLATING VALVE- TEMP/PRESS RELIEF VALVE PIPED TO FLOOR- MIXING VALVE & HEAT TRAP
oooo
oooo
oooo
oooo
oooo
FD-1
FD-1
WC-2
LA-2
LA-1
WC-1
4" SAN WITH BASECLEANOUT FROM
MEZZANINE( FOR FUTURE)
12" DCW (INSUL)
12" DHW (INSUL)TO MEZZANINE FLOOR
CW
UV LIGHTWATER FILTER
WATER SOFTENERPRESSURE TANK
PT-1
DCWFROM WELL
OFFICE 1ABOARDROOM
CORR
MECH RM
JAN
UNIV W/R
W/R
STOCK ROOM
CORR
CORR
oooo
oooo
oooo
oooo
oooo
oooo
oooo
oooo
oooo
oooo
oooo
oooo
oooo
oooo
oooo
oooo
oooo
oooo
oooo
oooo
oooo
oooo
oooo
oooo
oooo
oooo
oooo
oooo
oooo
oooo
oooo
oo
1" DCW (INSUL)3/4" DHW (INSUL)
WITH VALVESON U/S OF CEILING
1" DCW (INSUL)3/4" DHW (INSUL)WITH VALVESON U/S OF CEILING
HY-1
SF-1 SF-1SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
4" SAN @ 1:100 4" SAN @ 1:100FCOFCO
APPROX.INV.98.00 FT.
SF-1SF-1
TRENCH DRAIN @ 1:100 TRENCH DRAIN @ 1:100
SF-1
APPROX.INV. OF TRENCH99.00 FT.
TRENCH DRAIN @ 1:100 TRENCH DRAIN @ 1:100
3/4" DCW (INSUL)3/4" DHW (INSUL)
ON U/S OF CEILING
3/4" DCW (INSUL)3/4" DHW (INSUL)ON U/S OF CEILING
APPROX.INV. OF TRENCH
99.00 FT.
3/4" DHWR (INSUL)ON U/S OF CEILING
FCOFCO
APPROX. INV.OF TRENCH98.12 FT.
APPROX. INV.OF TRENCH
98.12 FT.
SHUT-OFF VALVE &CIRCUIT BALANCINGVALVE
SHUT-OFF VALVE &CIRCUIT BALANCING
VALVE
SF-1
HY-1
SCALE: 18" = 1'-0"
MAIN FLOOR PLAN - PLUMBING
SSSS
FIN. FLR. ELEV.100.00 FT (ASSUMED)
RP-1DHW RECIRC PUMP
UP - FUTURE STAIR
PROVIDE PRE-FRAMING
F-1FURNACE
- SA 19"x 16" (NOM) OFF UNIT ELBOW WITH TURNING VANES AND TRANSITION TO SUPPLY
AIR MAIN DUCT- RA 22"x 15" (NOM) OFF UNIT
WITH FILTER RACK AND FILTER ELBOW WITH TURNING VANES TO RETURN AIR MAIN DUCT
- 1/2" GAS CONNECTION WITH UNION, ISOLATING VALVE AND DRIP LEG
- COMBUSTION/VENTILATION AIR PIPED TO WALL TERMINATION- CONDENSATE DRAIN WITH PUMP PIPED TO SANITARY
CU-1CONDENSING UNIT
30.1 MCA, 240V/1PH
D
SA 20x10 SA 14x10
D D DD
DDD
DDDD
SA 14x10SA 10x10
210S114x4
210S114x4
210S114x4
210S114x4
50S17x475S1
7x4
110S18x4
140S18x4
140S18x4
110S18x4
SA 3
2x1
0
SA 12x4TO MEZZANINE WITH DAMPER SA 12x4
TO MEZZANINEWITH DAMPER
SA 12x4TO MEZZANINEWITH DAMPER
EF-1EXHAUST FANEA10x4 DUCT (INSUL)TO EXTERIOR WALL CAP
RA 22x10
RA 1
0x1
0
RA 16x10
R112x8
R18x6 R1
10x8
R116x16
RA 18x12TO MEZZANINE WITH
DAMPER
ENERGY RECOVERY VENTILATOR- HRV SA 6" DIA. TO FURNACE RETURN AIR MAIN DUCT- HRV RA 6" DIA FROM FURNACE SUPPLY AIR MAIN DUCT- HRV OA 6" DIA. (INSUL) FROM EXTERIOR WALL TERMINATION- HRV EA 6" DIA. (INSUL) TO EXTERIOR WALL TERMINATION- CONDENSATE DRAIN PIPED TO SANITARY
ERV-1
OFFICE 1ABOARDROOM
CORR
MECH RM
JAN
UNIV W/RW/R
STOCK ROOM
CORR
CORR
EXHAUST FANMOUNT AT 12' AFF
EF-2A EXHAUST FANMOUNT AT 12' AFF
EF-2B
EXHAUST FAN CONTROLLER EF-2A
GAS DETECTION CONTROLLER
GAS DETECTION SENSORS /TRANSMITTERS- CO AT 4' AFF- NO2 AT 1' BELOW CEILING
EXHAUST FAN CONTROLLER EF-2B
GAS DETECTION CONTROLLER
GAS DETECTION SENSORS /TRANSMITTERS- CO AT 4' AFF- NO2 AT 1' BELOW CEILING
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
INFRARED RADIANT HEATER- 1/2" NAT. GAS CONNECTION WITHUNION, ISOLATING VALVE & DRIP LEG- VENT & COMB. AIR TO EXTERIORWALL TERMINATION
IR-1
36 x 24 EXHAUST AIR INLETMOUNTED AT 10' AFFWITH EXTERIOR LOUVER ANDINTERIOR MOTORIZED DAMPERINTERLOCK WITH EXHAUSTFAN EF-2A
36 x 24 EXHAUST AIR INLETMOUNTED AT 10' AFF WITH
EXTERIOR LOUVER ANDINTERIOR MOTORIZED DAMPER
INTERLOCK WITH EXHAUST FANEF-2B
1-1/2" PROPANE AT U/S OFGARAGE CEILING
GAS DETECTION (EF-2A)- CO AT 4' AFF- NO2 AT 1' BELOW CEILING
GAS DETECTION (EF-2B)- CO AT 4' AFF
- NO2 AT 1' BELOW CEILING
T
GAS
T
PROPANE DOWNWALL TO LEVEL 1
INFRARED RADIANT HEATER- 1/2" NAT. GAS CONNECTION WITHUNION, ISOLATING VALVE & DRIP LEG- VENT & COMB. AIR TO EXTERIORWALL TERMINATION
IR-1
GAS
T
1-1/2" PROPANE AT U/S OFGARAGE CEILING
GAS DETECTION (EF-2B)CO IN MAINT. PIT
2" PROPANE AT U/SOF GARAGE
CEILING
SCALE: 18" = 1'-0"
MAIN FLOOR PLAN - HVAC
TO PROPANE TANKS(REFER TO SITE PLAN)
T
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
114" PROPANE AT U/SOF GARAGE CEILING
D
SA 12x4TO MEZZANINEWITH DAMPER
GASGAS WH-1WATER HEATER3
4" GAS CONNECTION WITH UNION, ISOLATINGVALVE & DRIP LEGCOMB/VENT AIR TO WALL TERMINATION
EF-1EXHAUST FANEA10x4 DUCT (INSUL)TO EXTERIOR WALL CAP
A DRAWIN S, SPECIFICATIONS AND RE ATED DOCUMENTS ARE THE COP RI HTPROPERT OF THE EN INEER AND MUST BE RETURNED UPON RE UEST.
REPRODUCTION OF DRAWIN S, SPECIFICATIONS, AND RE ATED DOCUMENTS INPART OR WHO E IS FORBIDDEN WITHOUT THE EN INEERS WRITTEN PERMISSION.
THE CONTRACTOR MUST CHECK AND VERIF A DIMENSIONS ON THE JOB PRIORTO START OF CONSTRUCTION.
DRAWIN S ARE NOT TO BE SCA ED
RevisionsDateByNo.
Telephone: (613) 499-207768 William St. Suite 200Brockville, Ont.
REV DATE:
Drawing No.:
12/3/2020
MECHANICALMAIN FLOOR PLANS
MM
MM
MP
2020-11-27
AS SHOWN
-M3
Project Title:
Township of South Glengarry
MUNICIPAL GARAGEFACILITY
0 MP 2020-12-01 FOR REVIEW
1 MP 2020-12-03 ISSUED FOR TENDER
AutoCAD SHX TextCD
OPEN TO BELOW
FUTURE MEZZANINE
FUTURE OFFICE / STORAGE AREA
DOWN - FUTURE STAIR DOWN - FUTURE STAIR
PROVIDE PRE-FRAMING
175S212x4
175S212x4
175S212x4
175S212x4
SCALE: 14" = 1'-0"MEZZANINE FLOOR PLAN - HVAC
R218x12
4" SAN CAPPED FORFUTURE
SF-1
WATER SUPPLY - SCHEMATICSCALE: NTS
SUBMERSIBLEWELL PUMP
P-1
INSTALL WATER PIPE ANDPOWER LINES IN BIG 'O' DUCT
GRADE
POLYETHYLENE PIPE100 PSI, TO C.A.S. B137.1
114" POLYETHYLENE PIPEMIN. 1525mm COVER
PITLESS ADAPTOR
WELL SHALL MEET THEREQUIREMENTS OF THE
ONTARIO WATERRESOURCES ACT &
O.REG.903
DRAIN VALVE
PRESSURE SWITCH
PRESSURE GAUGE
PT-1PRESSURE
TANK
114" DCW
114" DCWELECTRICAL POWERSUPPLIES
PUMP CONTROL BOX
ELECTRICAL POWER SUPPLYAND DISCONNECT SWITCH
PARTICLE FILTER
TODISTRIBUTION
WATER SOFTENER
UV LIGHT
SOLENOID VALVE
10M ANCHORS@ 24"c.c. (MAX.)
4" Ø SAN. DRAIN W/ TRAPTO BE CONNECTEDTO EXISTING CATCH BASIN
WATER LEVEL
6" 2'-0" 6"
3'-0"
114"
4"2"
13
4"
CATCH BASIN DETAIL
STEEL GRATE TO BE TYPE "B" ASMANUFACTURED BY BORDEN METALPRODUCTS OR APPROVED EQUALMAIN BARS TO BE 112"x
316"
10M CONTINUOUSAROUND PERIMETER
10M BAR @ 12" c.c
3'-0
"
24"x24" 'L' BARS @ 12" c.c( TYP @ CORNERS)
PROVIDE WATER STOPAT ALL CONSTRUCTION
JOINTS (TYP)
ALL ANGLES TO BESHOP PRIMED & PAINTED
NOTE:AS AN ALTERNATIVE, CONTRACTOR MAYPROVIDE A PRECAST CONCRETE CATCH BASIN,O.P.S.D. 705.10 WITH A CAST IRON, SQUAREFRAME AND FLAT GRATE, O.P.S.D. 400.20 INLIEU OF CAST IN PLACE CONCRETE CATCHBASIN.
SAN. CLEANOUT
134"x114"x
316"
STEEL ANGLE FRAME
OIL INTERCEPTORINT-1
TOP OFOIL INTERCEPTOR98.18 FT.
APPROX.INV.97.40 FT.
STRUCTURALSTEEL COVER
21.8"±
37.0"
19.75"
100 FT.
TRENCH DETAIL
ALL DRAWIN S, SPECIFICATIONS AND RELATED DOCUMENTS ARE THE COP RI HTPROPERT OF THE EN INEER AND MUST BE RETURNED UPON RE UEST.
REPRODUCTION OF DRAWIN S, SPECIFICATIONS, AND RELATED DOCUMENTS INPART OR WHOLE IS FORBIDDEN WITHOUT THE EN INEERS WRITTEN PERMISSION.
THE CONTRACTOR MUST CHEC AND VERIF ALL DIMENSIONS ON THE OB PRIORTO START OF CONSTRUCTION.
DRAWIN S ARE NOT TO BE SCALED
RevisionsDateByNo.
Telephone: (613) 499-207768 William St. Suite 200Brockville, Ont.
REV DATE:
Drawing No.:
12/3/2020
MECHANICALMEZZANINE FLOOR PLAN
MM
MM
MP
2020-11-27
AS SHOWN
-M4
Project Title:
Township of South Glengarry
MUNICIPAL GARAGEFACILITY
0 MP 2020-12-01 FOR REVIEW
1 MP 2020-12-03 ISSUED FOR TENDER
P-1
ELECTRICAL LEGEND
DESIGNATIONS
DISTRIBUTION
M
3
M
NOTE: HEIGHT IS FROM FINISHED FLOOR TO CENTRELINE OF EQUIPMENT, UNLESS OTHERWISE NOTED.
HEIGHT
GFCIAFCIACAFFCDCWWH
GROUND FAULT CIRCUIT INTERRUPTERARC FAULT CIRCUIT INTERRUPTERABOVE COUNTERABOVE FINISHED FLOORCLOTHES DRYERCLOTHES WASHERWATER HEATER
72"/1825mm (TOP)DISTRIBUTION PANEL
MOTION SENSOR CONTROL - (CEILING)
DUPLEX RECEPTACLE (WALL) - 15A/120V
12"/300mmDUPLEX RECEPTACLE (SPLIT) - 15A/120V
NON-STANDARD RECEPTACLE
AS NOTEDDIRECT EQUIPMENT CONNECTION
NON-FUSED DISCONNECT SWITCH
54"/1370mmFUSED DISCONNECT SWITCH
MOTOR STARTERBRANCH CIRCUIT
BRANCH CIRCUIT, SWITCHED
BRANCH CIRCUIT, HOMERUNS TO PANEL
12"/300mm
AS NOTED
54"/1370mm
SINGLE POLE TOGGLE SWITCH - 20A/120V 35.5" / 900mm
3-WAY TOGGLE SWITCH - 20A/120V TO
MOTION SENSOR CONTROL - (SWITCH) 43.3 / 1100mm
LIGHTINGF
F
FLUORESCENT LIGHT FIXTURE - RECESSED
FLUORESCENT LIGHT FIXTURE - SURFACE
LIGHT FIXTUREF - FLUORESCENTH - HIGH INTENSITY DISCHARGEL - INCANDESCENT
DATA COMMUNICATIONSTELEPHONE OUTLET (WALL)
TELEPHONE OUTLET (FLOOR)
DATA OUTLET (WALL)
DATA OUTLET (FLOOR)
DATA & TELEPHONE OUTLET (WALL)
TELEVISION OUTLET (WALL)
TELEVISION OUTLET (FLOOR)
12"/300mm
12"/300mm
12"/300mm
12"/300mm
E1
E2
E3
EXIT & EMERGENCY LIGHTING
E
90"/2300mm
90"/2300mm
90"/2300mm
90"/2300mm
90"/2300mm
90"/2300mm
EXIT LIGHT, SURFACE MOUNTED, SINGLE FACE
EXIT LIGHT, END OR CEILING MOUNTED, SINGLE FACE
EXIT LIGHT, END OR CEILING MOUNTED, DOUBLE FACE
COMBINATION EXIT & EMERGENCY LIGHT
EMERGENCY LIGHT, BATTERY PACK
EMERGENCY LIGHT, DOUBLE REMOTE
EMERGENCY LIGHT, SINGLE REMOTE
WP WEATHERPROOF
ELECTRICAL NOTES
ELECTRICAL DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL OTHER DRAWINGS FOR THISPROJECT.
1 GENERAL:.1 CONFORM WITH APPLICABLE REQUIREMENTS OF THE MINISTRY OF LABOUR, AND THE OCCUPATIONAL
HEALTH AND SAFETY ACT AND REGULATIONS FOR CONSTRUCTION PROJECTS..2 DO COMPLETE INSTALLATION IN ACCORDANCE WITH THE FOLLOWING:
.1 ONTARIO ELECTRICAL SAFETY CODE; .2 ELECTRICAL SAFETY AUTHORITY; .3 ELECTRICAL SUPPLY AUTHORITY.
.3 SUBMIT TO ELECTRICAL SAFETY AUTHORITY AND SUPPLY AUTHORITY NECESSARY NUMBER OFDRAWINGS AND SPECIFICATIONS FOR APPROVAL PRIOR TO COMMENCEMENT OF WORK.
.4 COORDINATE AND OBTAIN ELECTRICAL SERVICE LAYOUT FROM THE SUPPLY AUTHORITY.
.5 PAY ALL ELECTRICAL PERMIT AND INSPECTION FEES.
.6 GROUND COMPLETE SYSTEM IN ACCORDANCE WITH THE ONTARIO ELECTRICAL SAFETY CODE ANDELECTRICAL SAFETY AUTHORITY.
.7 IDENTIFICATION AND LABELLING: .1 IDENTIFY ELECTRICAL EQUIPMENT WITH LAMICOID NAMEPLATES, INCLUDING AMPERAGE,
VOLTAGE, PHASE AND POWER SOURCE. .2 PROVIDE TYPEWRITTEN PANEL DIRECTORIES. .3 PROVIDE ADHESIVE LABEL ON ALL SWITCH, RECEPTACLE AND DEVICE COVER PLATES INDICATING
SUPPLY CIRCUIT DESIGNATION..8 PROVIDE THREE COPIES OF COMPLETE OPERATING AND MAINTENANCE INSTRUCTIONS FOR
EQUIPMENT FURNISHED UNDER THIS CONTRACT. BIND INSTRUCTIONS IN 3-RING BINDERS. INCLUDETHE FOLLOWING:
.1 SCHEMATIC DIAGRAM OF ELECTRICAL SYSTEMS.
.2 CONTROL SHOP DRAWINGS AND OPERATING SEQUENCE INCLUDING WIRING OF COMPONENTS.
.3 WIRING DIAGRAM OF CONTROL PANELS.
.4 OPERATING INSTRUCTIONS, INCLUDING START-UP AND SHUT-DOWN PROCEDURE.
.5 MAINTENANCE INSTRUCTIONS INCLUDING PREVENTIVE MAINTENANCE INSTRUCTIONS FORCOMPONENTS OF THE EQUIPMENT.
.6 COMPLETE PARTS LIST OF ASSEMBLIES AND THEIR COMPONENT PARTS, SHOWINGMANUFACTURER'S NAME, CATALOGUE NUMBER, AND NEAREST REPLACEMENT SOURCE.
.7 LIST OF RECOMMENDED SPARE PARTS AND QUANTITY OF EACH ITEM TO BE STOCKED.
.8 MANUFACTURERS' WARRANTIES AND GUARANTEES. .9 CLEAN ALL ELECTRICAL SYSTEMS AT PROJECT COMPLETION. .10 COMPLETE AS-BUILT DRAWINGS SHOWING ALL CHANGES AS WORK PROGRESSES.
2 CONTRACTOR QUALIFICATIONS:.1 ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH THE “TRADES QUALIFICATION AND
APPRENTICESHIP ACT” AND REGULATIONS, BY PERSONS WHO HOLD THE FOLLOWING CERTIFICATESOF QUALIFICATION (AS APPLICABLE):.1 ELECTRICIAN: CONSTRUCTION & MAINTENANCE.
3 EXISTING FACILITIES AND DEMOLITION:.1 LOCATE AND PROTECT ALL EXISTING EXTERIOR SITE SERVICES..2 RETAIN AND PROTECT ALL EXISTING INTERIOR SERVICES AND BUILDING FABRIC. MAKE GOOD ANY
AND ALL DAMAGE RESULTING FROM THIS WORK.
4 FIXTURES AND EQUIPMENT:.1 PROVIDE SHOP DRAWINGS AND PRODUCT DATA FOR ALL ELECTRICAL FIXTURES AND EQUIPMENT FOR APPROVAL, PRIOR TO PROCUREMENT..2 INSTALL ALL ELECTRICAL FIXTURES AND EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S
INSTRUCTIONS..3 EQUIPMENT AND MATERIAL TO BE CSA CERTIFIED. WHERE THERE IS NO ALTERNATIVE TO SUPPLYING
EQUIPMENT WHICH IS NOT CSA CERTIFIED, OBTAIN SPECIAL APPROVAL FROM ELECTRICAL SAFETYAUTHORITY.
5 EQUIPMENT SUPPLIED BY OTHERS:.1 MAKE ALL ELECTRICAL SERVICE CONNECTIONS TO EQUIPMENT SUPPLIED BY OTHERS..2 CONFIRM ALL SERVICE CONNECTIONS WITH MANUFACTURER AND SUPPLIER, PRIOR TO INSTALLATION.
THIS SHALL INCLUDE ALL CONNECTION SIZES, LOCATIONS AND DETAILS, AND SHALL TAKE INTOACCOUNT EQUIPMENT CLEARANCES AND INSTALLATION REQUIREMENTS.
6 CONDUITS:.1 RIGID GALVANIZED STEEL, WITH THREADED FITTINGS, WHERE SUBJECT TO MECHANICAL INJURY, IN
SERVICE AREAS ONLY..2 ELECTRICAL METALLIC TUBING (EMT), HOT DIPPED GALVANIZED STEEL, WITH THREADED
CONNECTORS AND COUPLINGS, WHERE NOT SUBJECT TO MECHANICAL INJURY, IN SERVICE AREASONLY.
.3 RIGID PVC CONDUIT BELOW FLOOR AND IN CORROSIVE AREAS.
7 WIRES AND CABLE:.1 VOLTAGE DROP:
.1 FEEDER CONDUCTORS SHALL BE SIZED FOR A MAXIMUM VOLTAGE DROP OF 2% AT DESIGN LOAD. .2 BRANCH CIRCUIT CONDUCTORS SHALL BE SIZED FOR A MAXIMUM VOLTAGE DROP OF 3% AT
DESIGN LOAD..2 BUILDING WIRES: IN CONDUIT SYSTEMS TO BE STRANDED COPPER CONDUCTORS FOR 10 AWG AND
LARGER, MINIMUM SIZE 12 AWG, TYPE RW90..3 BUILDING WIRES IN CONCEALED LOCATIONS TO BE COPPER, MINIMUM SIZE 12 AWG, TYPE AC90..4 ALL WIRING SHALL BE CONCEALED IN WALLS AND CEILINGS, UNLESS OTHERWISE NOTED OR
APPROVED. SURFACE-MOUNTED WIRING IS NOT PERMITTED.
8 DATA AND TELEPHONE:.1 SUPPLY AND INSTALL 2 RUNS, 4” CONDUIT FROM SITE TELEPHONE SERVICE LOCATION TO MAIN ELECTRICAL ROOMS..2 SUPPLY AND INSTALL TELEPHONE BACKBOARD..3 DATA/TELEPHONE: .1 DATA AND TELPHONE WIRES CAT 6.
.2 DATA AND TELEPHONE OUTLETS SHALL BE PROVIDED IN SEPARATE OUTLET BOXES ANDSEPARATE CONDUIT.
.3 SUPPLY, INSTALL AND TERMINATE DATA AND TELEPHONE CABLES AT OUTLETS AND AT TELESERVICE SPACE.
9 SERVICE EQUIPMENT:.1 ELECTRICAL SERVICE EQUIPMENT, PANELBOARDS AND DISCONNECT SWITCHES SHALL BE PRODUCT
OF ONE MANUFACTURER THROUGHOUT PROJECT - CUTLER-HAMMER, SIEMENS OR SQUARE D..2 LOW-VOLTAGE DRY-TYPE DISTRIBUTION TRANSFORMERS SHALL MEET THE MINIMAL NOMINAL
EFFICIENCY LEVELS OF ASHRAE 90.1 (TABLE 8.4.4.)..3 CIRCUIT BREAKERS SHALL BE BOLT-ON TYPE..4 WORKING SPACE ABOUT ELECTRICAL EQUIPMENT SHALL BE PROVIDED IN ACCORDANCE WITH THE
ONTARIO ELECTRICAL SAFETY CODE, INCLUDING THE FOLLOWING: .1 WORKING SPACE OF 3'4” (1m) WITH SECURE FOOTING; .2 MINIMUM HEADROOM OF 7'3” (2.2m).
10 WIRING DEVICES:.1 WIRING DEVICES OF ONE MANUFACTURER THROUGHOUT PROJECT - HUBBELL OR LEVITON..2 COMMERCIAL PROJECTS:
.1 OUTLET BOXES: .1 GANG BOXES WHERE WIRING DEVICES ARE GROUPED.
.2 BLANK COVER PLATES FOR BOXES WITHOUT WIRING DEVICES. .2 SWITCHES:
.1 HEAVY DUTY, 20A/120V; .2 SINGLE POLE, AND THREE-WAY, AS APPLICABLE; .3 COLOUR: SELECTED BY OWNER.
.3 DUPLEX RECEPTACLES: .1 EXTRA HARD USE, CSA TYPE 5-15 R, 15A/125V; .2 GFI (GROUND FAULT CIRCUIT INTERRUPTER) WITH DETECT AND TRIP ON GROUND FAULT,
STATUS INDICATOR LIGHT AND TEST SWITCH; .3 COLOUR: SELECTED BY OWNER.
.4 COVER PLATES:.1STAINLESS STEEL.
11 LIGHTING:.1 GENERAL LIGHTING:
.1 SUPPORT ALL LIGHTING IN ACCORDANCE WITH THE ONTARIO ELECTRICAL SAFETY CODE AND BULLETINS.
.2 LIGHT FIXTURES SUPPORTED BY SUSPENDED CEILING SYSTEMS SHALL HAVE ADDITIONALSUPPORT TO BUILDING STRUCTURE IN ACCORDANCE WITH ONTARIO ELECTRICAL SAFETY CODEBULLETIN #30-4-11.
.2 FUNCTIONAL TESTING OF LIGHTING CONTROL, IN ACCORDANCE WITH ASHRAE 90.1 (9.4.3): .1 LIGHTING CONTROL DEVICES AND CONTROL SYSTEMS SHALL BE TESTED TO ENSURE THAT
CONTROL HARDWARE AND SOFTWARE ARE CALIBRATED, ADJUSTED, PROGRAMMED, AND INPROPER WORKING CONDITION IN ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS ANDMANUFACTURER'S INSTALLATION INSTRUCTIONS.
.3 EXIT AND EMERGENCY LIGHTING: .1 CONNECT DC CIRCUIT FROM EMERGENCY LIGHT BATTERY PACK TO ALL EXIT AND EMERGENCY
LIGHTS. .2 SIZE EMERGENCY LIGHTING POWER PACK TO PROVIDE FULL LOAD POWER FOR 30 MIN. .3 EMERGENCY LIGHT BATTERY PACKS (UNIT EQUIPMENT) SHALL BE INSTALLED IN SUCH A MANNER
THAT IT WILL BE AUTOMATICALLY ACTUATED UPON FAILURE OF THE POWER SUPPLY TO THENORMAL LIGHTING IN THE AREA COVERED BY THAT UNIT EQUIPMENT PER OESC 46-304(4).
.4 SITE LIGHTING: .1 CONTRACTOR SHALL PROVIDE A FULL PHOTOMETRIC LAYOUT FOR THE PROPOSED SITE LIGHTING
FIXTURES.
12 FIRE PROTECTION:.1 REFER TO ARCHITECTURAL DRAWINGS, TO VERIFY LOCATION OF ALL FIRE SEPARATIONS AND
FIRE-RATED MEMBRANES..2 ALL CABLING AND CONDUIT SHALL BE TIGHTLY FITTED AND SEALED WITH FIRESTOPPING MATERIAL AT
ALL FIRE SEPARATIONS AND FIRE-RATED MEMBRANES..3 ALL MATERIALS SHALL HAVE A FLAME-SPREAD RATING NOT MORE THAN 25 AND A SMOKE DEVELOPED
CLASSIFICATION NOT MORE THAN 50..4 MOCK-UPS:
.1 PREPARE MOCK-UPS OF TYPICAL FIRESTOP INSTALLATION OF THE FOLLOWING, FOR REVIEW ANDAPPROVAL BY THE OWNER, ENGINEER AND MUNICIPAL BUILDING INSPECTOR:.1 CONDUIT AND CABLING - WALL AND CEILING/FLOOR FIRE SEPARATION.
.2 ALL FIRESTOP INSTALLATIONS SHALL BE COMPLETED IN ACCORDANCE WITH THE APPROPRIATEPRODUCT INSTALLATION INSTRUCTIONS, AND THE REFERENCED UL/ULC LISTING AND/OR TESTSTANDARD.
.3 SUPPLY A COPY OF THE PRODUCT INSTALLATION INSTRUCTIONS WITH ULC LISTING AND/OR TESTSTANDARD REFERENCE, FOR EACH INSTALLATION.
.4 MOCK-UP MAY REMAIN AS PART OF WORK.
13 EARTHQUAKE LOAD:.1 ALL ELECTRICAL WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE EARTHQUAKE LOAD AND
EFFECTS REQUIRED BY THE ONTARIO BUILDING CODE..2 ELECTRICAL ELEMENTS AND COMPONENTS (FIXTURES, EQUIPMENT, CONDUIT, ETC.), AND THEIR
CONNECTIONS TO THE BUILDING SHALL BE CONSTRUCTED IN ACCORDANCE WITH THESMACNA/ANSI SEISMIC RESTRAINT MANUAL OR OTHER GUIDELINE REFERENCED IN THE ONTARIOBUILDING CODE.
.3 PROVIDE SHOP DRAWINGS FOR SUPPORT, CONNECTIONS AND SEISMIC RESTRAINT OF ALLELECTRICAL FIXTURES, EQUIPMENT, AND CONDUIT, INCLUDING, BUT NOT LIMITED TO:
.1 SERVICE AND DISTRIBUTION EQUIPMENT; .2 LIGHT FIXTURES AND CEILING FANS; .3 ELECTRIC HEATING UNITS; .4 TYPICAL CONDUIT AND CABLE SUPPORTING SYSTEM. THESE SHOP DRAWINGS SHALL BE DESIGNED AND SEALED BY A PROFESSIONAL ENGINEER IN THE
PROVINCE OF ONTARIO, WITH EXPERIENCE IN SEISMIC ENGINEERING.
14 LOAD BALANCE:.1 MEASURE PHASE CURRENT TO PANELBOARDS WITH NORMAL LOADS (LIGHTING) OPERATING AT TIME
OF ACCEPTANCE. ADJUST BRANCH CIRCUIT CONNECTIONS AS REQUIRED TO OBTAIN BEST BALANCEOF CURRENT BETWEEN PHASES AND RECORD CHANGES.
.2 SUBMIT, AT COMPLETION OF WORK, REPORT LISTING PHASE AND NEUTRAL CURRENTS ON PANELBOARDS, OPERATING UNDER NORMAL LOAD. STATE HOUR AND DATE ON WHICH EACH LOADWAS MEASURED, AND VOLTAGE AT TIME OF TEST.
15 HAZARDOUS LOCATIONS AND OTHER SPECIAL CASES:.1 THE GARAGE AREA, AND ADJACENT ROOMS, UP TO A LEVEL OF 50mm ABOVE THE FLOOR SHALL BE
CONSIDERED A CLASS I (FLAMMABLE GASES OR VAPOURS) ZONE 2 LOCATION..2 ALL ELECTRICAL EQUIPMENT USED WITHIN THE AREA SHALL BE APPROVED FOR THE CLASSIFICATION..3 ALL WIRING PRACTISES SHALL BE DONE IN ACCORDANCE WITH THE ONTARIO ELECTRICAL SAFETY
CODE FOR THE ABOVE CLASSIFICATION.
16 EQUIPMENT SUPPORT:.1 ALL ELECTRICAL EQUIPMENT, CONDUIT, WIRING, LIGHTING, DEVICES, AND RELATED ITEMS SHALL BE
SECURELY SUPPORTED, ATTACHED AND FASTENED TO BUILDING STRUCTURE..2 HANGERS AND SUPPORTS SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH MSS
STANDARD SP-58, PIPE HANGERS AND SUPPORTS - MATERIALS, DESIGN, MANUFACTURE,SELECTION, APPLICATION, AND INSTALLATION.
.3 PLATFORMS SHALL BE FABRICATED FROM STRUCTURAL GRADE STEEL MEETING THEREQUIREMENTS OF THE ONTARIO BUILDING CODE, INCLUDING CSA STANDARD W59 WELDED STEELCONSTRUCTION, AND THE REQUIREMENTS OF THE CANADIAN WELDING BUREAU.
.4 SUPPLY AND INSTALL ALL EQUIPMENT MOUNTING SUPPORTS FOR ALL ELECTRICAL EQUIPMENT ANDDEVICES. ALL SUPPORTS SHALL BE FABRICATED FROM GALVANIZED STRUCTURAL GRADE STEELMEETING THE REQUIREMENTS OF CSA STANDARD W59 WELDED STEEL CONSTRUCTION AND THEREQUIREMENTS OF THE CANADIAN WELDING BUREAU. SHOP DRAWINGS FOR ALL EQUIPMENTMOUNTING SUPPORTS, INCLUDING ATTACHMENT DETAILS, SHALL BE SUBMITTED FOR REVIEW. THESE SHOP DRAWINGS SHALL BE DESIGNED AND SEALED BY A PROFESSIONAL ENGINEER IN THEPROVINCE OF ONTARIO.
17 COORDINATION:.1 INFORMATION INVOLVING ACCURATE DIMENSIONING OF THE BUILDING SHALL BE TAKEN FROM SITE
BY CONTRACTOR..2 DRAWINGS ARE IN DIAGRAMMATIC FORM, INTENDED TO CONVEY THE SCOPE OF WORK AND
GENERAL ARRANGEMENT FOR EQUIPMENT. COORDINATE PHYSICAL LOCATION OF ALL EQUIPMENTWITH OTHER TRADES AND ALLOW FOR ANY ADDITIONAL CONDUIT, WIRING, FITTINGS, SUPPORTS,ETC., IN ORDER TO AVOID INTERFERENCE AND FACILITATE THE WORK.
.3 CONTRACTOR TO MAKE ANY NECESSARY MODIFICATIONS OR ADDITIONS, WITHOUT CHARGE, TOACCOMMODATE SITE CONDITIONS AND COORDINATION.
.4 COORDINATE AND VERIFY ALL ELECTRICAL BRANCH CIRCUIT REQUIREMENTS FOR EQUIPMENTSUPPLIED BY OTHERS, PRIOR TO MATERIAL PROCUREMENT OR INSTALLATION.
.5 PROVIDE ALL WIRING TO ALL MECHANICAL EQUIPMENT, INCLUDING WIRING BELOW 50V.COORDINATE ALL MECHANICAL EQUIPMENT WIRING WITH MECHANICAL TRADES.
.6 ALL DEVICE AND OUTLET LOCATIONS SHALL BE CAREFULLY COORDINATED WITH THE GENERALCONTRACTOR OR OWNER, TO ACCOMMODATE ALL FEATURES, INCLUDING PLUMBING FIXTURES,EQUIPMENT AND MILLWORK.
18 START-UP, COMMISSIONING AND TRAINING:.1 START-UP AND COMMISSION THE FOLLOWING SYSTEMS:
.1 MAIN ELECTRICAL SERVICE EQUIPMENT;
.2 GENERAL LIGHTING;
.3 EXIT AND EMERGENCY LIGHTING;
.4 ELECTRIC HEATING UNITS..2 PERFORM SYSTEMATIC TESTS, PROCEDURES AND CHECKS ON SYSTEMS, AS FOLLOWS:
.1 TO VERIFY OPERATION IN ACCORDANCE WITH CONTRACT DOCUMENTS, DESIGN CRITERIA ANDINTENT,
AND MANUFACTURER'S REQUIREMENTS;.2 TO ENSURE APPROPRIATE DOCUMENTATION IS PROVIDED;.3 TO EFFECTIVELY TRAIN BUILDING OPERATIONAL STAFF.
.3 SYSTEMS ARE TO BE OPERATED AT FULL CAPACITY, WITH CORRECTION OF ALL DEFICIENCIES ANDADJUSTMENTS TO MEET OPTIMUM PERFORMANCE.
.4 PROVIDE WRITTEN REPORT AT END OF COMMISSIONING OUTLINING EQUIPMENT OPERATIONALCONDITIONS AND PARAMETERS.
REV DATE:
Drawing No.:
12/3/2020
ELECTRICALNOTES & LEGENDS
MM
MM
MP
2020-04-27
AS SHOWN
-E1
Project Title:
Township of South Glengarry
MUNICIPAL GARAGEFACILITY
A DRAWIN S, SPE IFI ATIONS AND RE ATED DO UMENTS ARE THE OP RI HTPROPERT OF THE EN INEER AND MUST BE RETURNED UPON RE UEST.
REPRODU TION OF DRAWIN S, SPE IFI ATIONS, AND RE ATED DO UMENTS INPART OR WHO E IS FORBIDDEN WITHOUT THE EN INEERS WRITTEN PERMISSION.
THE ONTRA TOR MUST HE AND VERIF A DIMENSIONS ON THE OB PRIORTO START OF ONSTRU TION.
DRAWIN S ARE NOT TO BE S A ED
RevisionsDateByNo.
Telephone: (613) 499-207768 William St. Suite 200Brockville, Ont.
0 MP 2020-12-01 FOR REVIEW
1 MP 2020-12-03 ISSUED FOR TENDER
OPEN TO BELOW
FUTURE MEZZANINE
FUTURE OFFICE / STORAGE AREA
DOWN - FUTURE STAIR DOWN - FUTURE STAIR
PROVIDE PRE-FRAMING
F1
3
SCALE: 18" = 1'-0"
MEZZANINE FLOOR PLAN - ELECTRICAL
10
M
PNL.'P1'200A120/240V1PH,3W
MANUALTRANSFERSWITCH600A120/240V1PH, 3W
METER
DISCONNECTMAIN SERVICE600A120/240V1PH, 3W
200A 125A
COMPRESSOR
ELECTRICAL CONTRACTOR SHALL ASSUME FULLRESPONSIBILITY FOR COORDINATION OF NEWELECTRICAL SERVICE WITH SUPPLY AUTHORITY.
PRIMARY CABLE INSTALLATION:- BY HYDRO ONE
SECONDARY CABLE INSTALLATION:- BY ELECTRICAL CONTRACTOR- OESC DIAGRAM D11
MAIN SERVICE SHORT CIRCUIT CURRENT RATING (SCCR):- 25 kA (TO BE VERIFIED BASED ON FINAL CABLE LENGHT)
SECONDARY CONDUCTOR SIZING:- OESC TABLE 2: 75 deg.C
350 MCM COPPERTWO CABLES PER PHASEALLOWABLE AMP 620A
- OESC TABLE D11A: 350 MCM COPPERTWO CABLES PER PHASEALLOWABLE AMP 714A
600A3P
ELECTRICAL - SINGLE LINE DIAGRAM
GENERAL NOTES:
PNL.'P2'400A120/240V1PH,3W
600A - TWO CABLES PER PHASEEACH 3 x 350 MCM COPPER IN CONDUIT WITHCONCRETE ENCASEMENT(SIZE IS SUBJECT TO FINAL CABLE LENGTHAND VOLTAGE DROP)
POLEMOUNTTRANSFORMERPRIMARY: TBDSECONDARY: 120/240VPHASE: 1
400A
12.0000 (150mm)
12.0000 (150mm)
1'0" (100mm)
2'6" (760mm)
TIMECLOCK&PHOTOCELLCONTROL
SPLITTER600A120/240V1PH, 3W
CLEAN BACKFILL MATERIAL
TELE/DATA CONDUIT2 x 4" (100mm) CONDUIT WITH FISHROPE MARKING TAPE TO OESC 12-012(11)
UNDERGROUND ELECTRICALSECONDARY CONDUCTORS
CLEAN SAND
UNDISTURBED SOIL
TRENCH DETAIL - UNDERGROUND PRIMARY
UNDISTURBED SOILCLEAN SAND
UNDERGROUND ELECTRICALSECONDARY CONDUCTORS
CLEAN BACKFILL MATERIAL
TELE/DATA CONDUIT 2x4" (100mm)CONDUIT WITH FISHROPE MARKING TAPE TO OESC 12-012(11)
TRENCH DETAIL - UNDERGROUND SECONDARYEXTERIOR LIGHTING CONTROL SCHEMATIC
120V, CCT. P-1- CCT 4
TC
PHOTOCELLC
CELL
CCT. P-1 - 6LIGHTING
CONTACTOR
TIMECLOCK
SPARE
SPARE
CCT. P-1 - 8
REV DATE:
Drawing No.:
12/3/2020
ELECTRICALSCHEDULES & DETAILS
MEZZANINE FLOOR PLAN
MM
MM
MP
2020-04-27
AS SHOWN
-E2
Project Title:
Township of South Glengarry
MUNICIPAL GARAGEFACILITY
ALL DRAWINGS, SPECIFICATIONS AND RELATED DOCUMENTS ARE THE COPYRIGHTPROPERTY OF THE ENGINEER AND MUST BE RETURNED UPON RE UEST.
REPRODUCTION OF DRAWINGS, SPECIFICATIONS, AND RELATED DOCUMENTS INPART OR WHOLE IS FORBIDDEN WITHOUT THE ENGINEERS' WRITTEN PERMISSION.
THE CONTRACTOR MUST CHECK AND VERIFY ALL DIMENSIONS ON THE JOB PRIORTO START OF CONSTRUCTION.
DRAWINGS ARE NOT TO BE SCALED
RevisionsDateByNo.
Telephone: (613) 499-207768 William St. Suite 200Brockville, Ont.
0 MP 2020-12-01 FOR REVIEW
1 MP 2020-12-03 ISSUED FOR TENDER
UP - FUTURE STAIR
PROVIDE PRE-FRAMING SW2SW1-SW4
SW1
SW3
SW4
F2
F2
F2
M
L1
EX2
WPGFI
GFIEL1
F-1FURNACE