Date post: | 06-Mar-2016 |
Category: |
Documents |
Upload: | allied-properties-reit |
View: | 218 times |
Download: | 1 times |
MISSIon crItIcal portfolIo // 1
MISSIon crItIcal portfolIo // toronto
ALLIED PROPERTIES REIT
2 // allIED propErtIES
overview // 1
toronto Market Information // 2
connectivity // 4
151 front Street West // 9
35 John Street / 250 front Street West // 11
905 King Street West // 19
contact Information // Bc
MISSIon crItIcal portfolIo // 1
oVErVIEW
allied properties rEIt (allied) is proud to present canada’s premier data centre portfolio.
comprised of 151 front Street West, 35 John Street/250 front Street West and 905 King Street West, the portfolio
offers highly-redundant and flexible solutions to organizations seeking mission critical infrastructure with unparalleled
connectivity. With a 20 year history of ownership and redevelopment of urban real estate assets, allied is uniquely
positioned within the marketplace to repurpose existing assets within the central Business District for users that
require access (physically and logically) to the Greater toronto area’s 6 million + residents, 150 million Sf of office
space and the globally invaluable internet connection point that is 151front Street West.
In short, tenants within the portfolio can depend on best-in-class reliability with unrivaled access to the populations
of canada, north america and the world.
2 // allIED propErtIES
Toronto is now North America’s fourth most populous city.
MISSIon crItIcal portfolIo // 3
toronto // By thE nuMBErS
POPULATION STATISTICS1
34,880,500canaDa / 2012
2,791,140cIty of toronto / 2012
5,941,488GrEatEr toronto arEa / 2012
NUmber Of bUSINeSSeS4
86,754cIty of toronto / 2012
182,623GrEatEr toronto arEa / 2012
SAmPLINg Of LArgeST emPLOyerS3
TOP INdUSTrIeS by %gdP2
non-coMMErcIal SErVIcES conStructIon
puBlIc aDMInIStratIon & DEfEnSE utIlItIES
fInancE, InSurancE & rEal EStatE ManufacturInG
WholESalE & rEtaIl traDE coMMErcIal SErVIcES
tranSportatIon, StoraGE & coMM
1,099,541canaDa / 2012
royal BanK of canaDa
canaDIan IMpErIal BanK of coMMErcE
toronto-DoMInIon BanK
BanK of noVa ScotIa
BanK of MontrEal
roGErS
tEluS
KpMG
Sun lIfE fInancIal
ErnSt anD younG
9%
4%
9%
29%
1%
15%
13%
15%
10%
1 Source: Statistics canada, 2 Source: city of toronto Econometric Model, 2011, 3 Source: www.theglobeandmail.com, 4 city of toronto Economic Indicators april 2013 report,
4 // allIED propErtIES
Average Latency by City // Milliseconds
aMStErDaM / 79.27
aShBurn, Va / 13.95
chIcaGo / 10.26
franKfurt / 79.56 honG KonG / 186.17
lonDon / 75.34
MahWah, nJ / 10.44
MontrEal / 9.32
nEW yorK / 9.80
parIS / 78.82
SInGaporE / 203.77
VancouVEr / 64.38
toronto // thE MISSIon crItIcal portfolIo
connEctIVIty // arounD thE WorlD
Average Latency by City // Milliseconds
aMStErDaM / 79.27
aShBurn, Va / 13.95
chIcaGo / 10.26
franKfurt / 79.56 honG KonG / 186.17
lonDon / 75.34
MahWah, nJ / 10.44
MontrEal / 9.32
nEW yorK / 9.80
parIS / 78.82
SInGaporE / 203.77
VancouVEr / 64.38
toronto // thE MISSIon crItIcal portfolIo
MISSIon crItIcal portfolIo // 5
6 // allIED propErtIES
connEctIVIty // arounD thE portfolIo
– the portfolio provides local access (physical and logical) to over 20% of canada’s businesses
– access to dozens of telecommunications providers
– Direct connections (shown in black) from 15 John/250 front West and 905 King West to 151 front West
905 King Street West
MISSIon crItIcal portfolIo // 7
35 John/250 Front West
151 Front Street West
8 // allIED propErtIES
MISSIon crItIcal portfolIo // 9
– canada’s premier internet connectivity hub
– 300,000 square feet
– 100% leased
– 9 unique fibreoptic networks (150 carriers accessible)
– More than 7,000 strands of fibre
– 25 diverse fibre entrances
151 front Street West
10 // allIED propErtIES
MISSIon crItIcal portfolIo // 11
35 John Street // 250 front Street West
– 1.4 million Sf building
– Dedicated entrance and elevator for mission critical use only
– 110,000 Sf of powered shell space
– 20MVa, 2 pilot wire feed from ontario hydro (Winsor Substation), additional feed from Bremner Substation planned for 2016
– 12MW of critical power available
– n+1 backup power generation plant
– 2n chilled water production
– Enwave primary service
– chiller plant back-up
– redundant power and chilled water distribution
– Suites as small as 2,000 Sf available
– 14’ clear heights
– average cost of power $0.08-0.10/kWh
– Industry leading security and environmental monitoring standards
connEctIVIty
– carriers available on site: Bell, Beanfield, cogeco, rogers and telus
– Direct connection (3.15 microseconds) to 151 front via diverse fibrepaths
12 // allIED propErtIES
35 John Street // 250 front Street West Stacking plan
1 enwave deep water cooling incoming feed 7 chiller plant
2 high density fibre back to 151 front street west 8 generator plant
3 meet me room 9 security lobby
4 toronto hydro power feed 10 cooling towers
5 16’ X 33’ freight elevator 11 generator remote radiators
6 service shaft
MISSIon crItIcal portfolIo // 13
1 enwave deep water cooling incoming feed 7 chiller plant
2 high density fibre back to 151 front street west 8 generator plant
3 meet me room 9 security lobby
4 toronto hydro power feed 10 cooling towers
5 16’ X 33’ freight elevator 11 generator remote radiators
6 service shaft
14 // allIED propErtIES
JULY 19, 2013
racks
raISED accESS floorInG
frEIGht ElEVator
fIBEr rISEr
coMputEr rooM aIr conDItIonInG
fIBEr & ElEc rooMS
MEch & ElEc rooMS
35 John Street // 250 front Street West level 8 Data centre rendering
MISSIon crItIcal portfolIo // 15
CRAC
CRACCRAC
CRAC
CRAC CRAC
CRACCRAC
CRAC
CRAC
CRAC CRAC
CRAC CRAC
SEC
UR
E H
ALLW
AY
SEC
UR
E H
ALLW
AYSE
CU
RE
HAL
LWAY
SUIT
E A
51
169
.5 S
F
UP
UP
UP
UP
UP
UP
UP
UP
UP
FIBE
R R
ISER
NEW
ELE
CTR
ICAL
RO
OM
NEW
MEC
HAN
ICAL
RO
OM
NEW
FIB
ERR
OO
M
NEW
ELE
CTR
ICAL
RO
OM
Scal
e
Proj
ect n
umbe
r
Dat
e
77 mowat avenue . suite112toronto . ontario . m6k 3e3
tel. 416 850 4443
A2.0
2Le
vel 8
Dat
a C
ente
r Pla
n13
-021
19/0
7/20
13
No.
Des
crip
tion
Dat
e1
IS
SUED
FO
R C
LIEN
T R
EVIE
W19
/07/
2013
ALLI
ED D
ATA
CEN
TER
15 J
ohn
St.,
Toro
nto,
ON
35 John Street // 250 front Street West level 8 floor plan (Similar to level 3)
16 // allIED propErtIES
UP
UP
UP
UP
UP
UP
81' - 3"
61' -
10"
61' -
5"
80' -
9"
96' -
5"
Scal
e
Proj
ect n
umbe
r
Dat
e
77 mowat avenue . suite112toronto . ontario . m6k 3e3
tel. 416 850 4443
A2.0
1Le
vel 9
Dat
a C
ente
r Pla
n13
-021
ALLI
ED D
ATA
CEN
TER
15 J
ohn
St.,
Toro
nto,
ON
19/0
7/20
13
1
ISSU
ED F
OR
CLI
EN
T R
EVI
EW
19/
07/2
013
STO
RAG
E SP
ACE
UTI
LITY
RM
CRACCRAC
CRAC
CRAC CRAC
CRAC
CRAC
CRAC CRAC
SUIT
E A
4801
.6 S
FSU
ITE
B48
72.5
SF
SUIT
E C
9737
SF
SUIT
E D
4172
.1 S
F
No.
Des
crip
tion
Dat
e
/// P
REL
IMIN
AR
Y //
/FO
R C
LIEN
T R
EVIE
W
SEC
UR
E H
ALLW
AY
35 John Street // 250 front Street West level 9 floor plan
MISSIon crItIcal portfolIo // 17
LEVEL 9 D
ATA CENT
ER
ALLIED DATA CENTERJULY 19, 201335 JOHN STREET
Raised Access Flooring
New Demising Wall
Data Storage Racks
Computer Room Air Conditioning
raISED accESS floorInG
racKS
coMputEr rooM aIr conDItIonInG
nEW DEMISInG Wall
35 John Street // 250 front Street West level 9 Data centre rendering
18 // allIED propErtIES
MISSIon crItIcal portfolIo // 19
905 King Street West
– 60,000 Sf of powered shell space
– 10MVa feed from Exhibition Substation
– 7.7MW of critical power available
– n+1 backup power generation plant
– n+1 chilled water plant backup with 2n cooling towers (with 2 hour makeup water storage)
– n+1 chilled water power and chilled water distribution
– average cost of power $0.08-0.10/kWh
– Industry leading security and environmental monitoring standards
connEctIVIty
– carriers on site: Bell, Beanfield, cogeco, MtS allstream and rogers
– Direct connection to 151 front (12.25 microseconds) and 250 front via diverse fiber
20 // allIED propErtIES
905 King Street West Stacking plan
1 high density fibre back to 151 front street west
2 meet me rooms a & b
3 high density fibre back to 151 front street west
4 chiller plant
5 security lobby
6 generators
7 cooling towers
MISSIon crItIcal portfolIo // 21
905 King Street West typical floor plan
33' - 9"94' - 10"
46' -
8"
43' -
7"
50' -
7"
141'
- 4"
Scale
Project number
Date
77 m
owat
ave
nue
. s
uite
112
toro
nto
. o
ntar
io .
m6k
3e3
tel.
416
850
4443
A2.01Level 2 Data Center Plan
13-08ALLIED DATA CENTER905 King St. E., Toronto, ON
19/07/2013
CRAC
No. Description Date
CRAC
CRACCRAC
CRAC CRAC
CRAC
SUITE A4185 SF
SUITE B5670 SF
SUITE C4555 SF
1:200
/// PRELIMINARY ///FOR CLIENT REVIEW
1 ISSUED FOR CLIENT REVIEW 19/07/2013
22 // allIED propErtIES
905 King Street West level 2 Data centre rendering
ALLIED DATA CENTER905 KING STREET
LEVEL 2 D
ATA CENT
ER
JULY 19, 2013
racks
raISED accESS floorInG
coMputEr rooM aIr conDItIonInG
nEW DEMISInG Wall
MISSIon crItIcal portfolIo // 23
24 // allIED propErtIES
rOberT SweeNey // Sales representative [email protected]+1 416 847 3265
Jeffrey frIedmAN // Sales representativeExecutive Vice [email protected]+1 416 815 2363
cBrE limited 145 King Street West, Suite 600 toronto, on M5h 1J8
for more information about the portfolio, please contact:
ChAd freeSe [email protected]+1 312 935 1451
AArON [email protected]+1 312 416 3078
311 South Wacker Drive, Suite 500 chicago, Il 60606
LUKe deNmON [email protected]+1 602 735 5279
2415 East camelback road phoenix, aZ 85016
www.alliedreit.comwww.cbre.com
This disclaimer shall apply to CBRE Limited, Brokerage, and to all other divisions of the Corporation (“CBRE”). The information set out herein (the “Information”) has not been verified by CBRE, and CBRE does not represent, warrant or guarantee the accuracy, correctness and completeness of the Information. CBRE does not accept or assume any responsibility or liability, direct or consequential, for the Information or the recipient’s reliance upon the Information. The recipient of the Information should take such steps as the recipient may deem necessary to verify the Information prior to placing any reliance upon the Information. The Information may change and any property described in the Information may be withdrawn from the market at any time without notice or obligation to the recipient from CBRE.