MISSION CRITICAL PORTFOLIO // 1 MISSION CRITICAL PORTFOLIO // TORONTO ALLIED PROPERTIES REIT
Transcript
Page 1: Allied REIT Mission Critical Portfolio // Toronto

MISSIon crItIcal portfolIo // 1

MISSIon crItIcal portfolIo // toronto

ALLIED PROPERTIES REIT

Page 2: Allied REIT Mission Critical Portfolio // Toronto

2 // allIED propErtIES

overview // 1

toronto Market Information // 2

connectivity // 4

151 front Street West // 9

35 John Street / 250 front Street West // 11

905 King Street West // 19

contact Information // Bc

Page 3: Allied REIT Mission Critical Portfolio // Toronto

MISSIon crItIcal portfolIo // 1

oVErVIEW

allied properties rEIt (allied) is proud to present canada’s premier data centre portfolio.

comprised of 151 front Street West, 35 John Street/250 front Street West and 905 King Street West, the portfolio

offers highly-redundant and flexible solutions to organizations seeking mission critical infrastructure with unparalleled

connectivity. With a 20 year history of ownership and redevelopment of urban real estate assets, allied is uniquely

positioned within the marketplace to repurpose existing assets within the central Business District for users that

require access (physically and logically) to the Greater toronto area’s 6 million + residents, 150 million Sf of office

space and the globally invaluable internet connection point that is 151front Street West.

In short, tenants within the portfolio can depend on best-in-class reliability with unrivaled access to the populations

of canada, north america and the world.

Page 4: Allied REIT Mission Critical Portfolio // Toronto

2 // allIED propErtIES

Toronto is now North America’s fourth most populous city.

Page 5: Allied REIT Mission Critical Portfolio // Toronto

MISSIon crItIcal portfolIo // 3

toronto // By thE nuMBErS

POPULATION STATISTICS1

34,880,500canaDa / 2012

2,791,140cIty of toronto / 2012

5,941,488GrEatEr toronto arEa / 2012

NUmber Of bUSINeSSeS4

86,754cIty of toronto / 2012

182,623GrEatEr toronto arEa / 2012

SAmPLINg Of LArgeST emPLOyerS3

TOP INdUSTrIeS by %gdP2

non-coMMErcIal SErVIcES conStructIon

puBlIc aDMInIStratIon & DEfEnSE utIlItIES

fInancE, InSurancE & rEal EStatE ManufacturInG

WholESalE & rEtaIl traDE coMMErcIal SErVIcES

tranSportatIon, StoraGE & coMM

1,099,541canaDa / 2012

royal BanK of canaDa

canaDIan IMpErIal BanK of coMMErcE

toronto-DoMInIon BanK

BanK of noVa ScotIa

BanK of MontrEal

roGErS

tEluS

KpMG

Sun lIfE fInancIal

ErnSt anD younG

9%

4%

9%

29%

1%

15%

13%

15%

10%

1 Source: Statistics canada, 2 Source: city of toronto Econometric Model, 2011, 3 Source: www.theglobeandmail.com, 4 city of toronto Economic Indicators april 2013 report,

Page 6: Allied REIT Mission Critical Portfolio // Toronto

4 // allIED propErtIES

Average Latency by City // Milliseconds

aMStErDaM / 79.27

aShBurn, Va / 13.95

chIcaGo / 10.26

franKfurt / 79.56 honG KonG / 186.17

lonDon / 75.34

MahWah, nJ / 10.44

MontrEal / 9.32

nEW yorK / 9.80

parIS / 78.82

SInGaporE / 203.77

VancouVEr / 64.38

toronto // thE MISSIon crItIcal portfolIo

connEctIVIty // arounD thE WorlD

Page 7: Allied REIT Mission Critical Portfolio // Toronto

Average Latency by City // Milliseconds

aMStErDaM / 79.27

aShBurn, Va / 13.95

chIcaGo / 10.26

franKfurt / 79.56 honG KonG / 186.17

lonDon / 75.34

MahWah, nJ / 10.44

MontrEal / 9.32

nEW yorK / 9.80

parIS / 78.82

SInGaporE / 203.77

VancouVEr / 64.38

toronto // thE MISSIon crItIcal portfolIo

MISSIon crItIcal portfolIo // 5

Page 8: Allied REIT Mission Critical Portfolio // Toronto

6 // allIED propErtIES

connEctIVIty // arounD thE portfolIo

– the portfolio provides local access (physical and logical) to over 20% of canada’s businesses

– access to dozens of telecommunications providers

– Direct connections (shown in black) from 15 John/250 front West and 905 King West to 151 front West

905 King Street West

Page 9: Allied REIT Mission Critical Portfolio // Toronto

MISSIon crItIcal portfolIo // 7

35 John/250 Front West

151 Front Street West

Page 10: Allied REIT Mission Critical Portfolio // Toronto

8 // allIED propErtIES

Page 11: Allied REIT Mission Critical Portfolio // Toronto

MISSIon crItIcal portfolIo // 9

– canada’s premier internet connectivity hub

– 300,000 square feet

– 100% leased

– 9 unique fibreoptic networks (150 carriers accessible)

– More than 7,000 strands of fibre

– 25 diverse fibre entrances

151 front Street West

Page 12: Allied REIT Mission Critical Portfolio // Toronto

10 // allIED propErtIES

Page 13: Allied REIT Mission Critical Portfolio // Toronto

MISSIon crItIcal portfolIo // 11

35 John Street // 250 front Street West

– 1.4 million Sf building

– Dedicated entrance and elevator for mission critical use only

– 110,000 Sf of powered shell space

– 20MVa, 2 pilot wire feed from ontario hydro (Winsor Substation), additional feed from Bremner Substation planned for 2016

– 12MW of critical power available

– n+1 backup power generation plant

– 2n chilled water production

– Enwave primary service

– chiller plant back-up

– redundant power and chilled water distribution

– Suites as small as 2,000 Sf available

– 14’ clear heights

– average cost of power $0.08-0.10/kWh

– Industry leading security and environmental monitoring standards

connEctIVIty

– carriers available on site: Bell, Beanfield, cogeco, rogers and telus

– Direct connection (3.15 microseconds) to 151 front via diverse fibrepaths

Page 14: Allied REIT Mission Critical Portfolio // Toronto

12 // allIED propErtIES

35 John Street // 250 front Street West Stacking plan

1 enwave deep water cooling incoming feed 7 chiller plant

2 high density fibre back to 151 front street west 8 generator plant

3 meet me room 9 security lobby

4 toronto hydro power feed 10 cooling towers

5 16’ X 33’ freight elevator 11 generator remote radiators

6 service shaft

Page 15: Allied REIT Mission Critical Portfolio // Toronto

MISSIon crItIcal portfolIo // 13

1 enwave deep water cooling incoming feed 7 chiller plant

2 high density fibre back to 151 front street west 8 generator plant

3 meet me room 9 security lobby

4 toronto hydro power feed 10 cooling towers

5 16’ X 33’ freight elevator 11 generator remote radiators

6 service shaft

Page 16: Allied REIT Mission Critical Portfolio // Toronto

14 // allIED propErtIES

JULY 19, 2013

racks

raISED accESS floorInG

frEIGht ElEVator

fIBEr rISEr

coMputEr rooM aIr conDItIonInG

fIBEr & ElEc rooMS

MEch & ElEc rooMS

35 John Street // 250 front Street West level 8 Data centre rendering

Page 17: Allied REIT Mission Critical Portfolio // Toronto

MISSIon crItIcal portfolIo // 15

CRAC

CRACCRAC

CRAC

CRAC CRAC

CRACCRAC

CRAC

CRAC

CRAC CRAC

CRAC CRAC

SEC

UR

E H

ALLW

AY

SEC

UR

E H

ALLW

AYSE

CU

RE

HAL

LWAY

SUIT

E A

51

169

.5 S

F

UP

UP

UP

UP

UP

UP

UP

UP

UP

FIBE

R R

ISER

NEW

ELE

CTR

ICAL

RO

OM

NEW

MEC

HAN

ICAL

RO

OM

NEW

FIB

ERR

OO

M

NEW

ELE

CTR

ICAL

RO

OM

Scal

e

Proj

ect n

umbe

r

Dat

e

77 mowat avenue . suite112toronto . ontario . m6k 3e3

tel. 416 850 4443

A2.0

2Le

vel 8

Dat

a C

ente

r Pla

n13

-021

19/0

7/20

13

No.

Des

crip

tion

Dat

e1

IS

SUED

FO

R C

LIEN

T R

EVIE

W19

/07/

2013

ALLI

ED D

ATA

CEN

TER

15 J

ohn

St.,

Toro

nto,

ON

35 John Street // 250 front Street West level 8 floor plan (Similar to level 3)

Page 18: Allied REIT Mission Critical Portfolio // Toronto

16 // allIED propErtIES

UP

UP

UP

UP

UP

UP

81' - 3"

61' -

10"

61' -

5"

80' -

9"

96' -

5"

Scal

e

Proj

ect n

umbe

r

Dat

e

77 mowat avenue . suite112toronto . ontario . m6k 3e3

tel. 416 850 4443

A2.0

1Le

vel 9

Dat

a C

ente

r Pla

n13

-021

ALLI

ED D

ATA

CEN

TER

15 J

ohn

St.,

Toro

nto,

ON

19/0

7/20

13

1

ISSU

ED F

OR

CLI

EN

T R

EVI

EW

19/

07/2

013

STO

RAG

E SP

ACE

UTI

LITY

RM

CRACCRAC

CRAC

CRAC CRAC

CRAC

CRAC

CRAC CRAC

SUIT

E A

4801

.6 S

FSU

ITE

B48

72.5

SF

SUIT

E C

9737

SF

SUIT

E D

4172

.1 S

F

No.

Des

crip

tion

Dat

e

/// P

REL

IMIN

AR

Y //

/FO

R C

LIEN

T R

EVIE

W

SEC

UR

E H

ALLW

AY

35 John Street // 250 front Street West level 9 floor plan

Page 19: Allied REIT Mission Critical Portfolio // Toronto

MISSIon crItIcal portfolIo // 17

LEVEL 9 D

ATA CENT

ER

ALLIED DATA CENTERJULY 19, 201335 JOHN STREET

Raised Access Flooring

New Demising Wall

Data Storage Racks

Computer Room Air Conditioning

raISED accESS floorInG

racKS

coMputEr rooM aIr conDItIonInG

nEW DEMISInG Wall

35 John Street // 250 front Street West level 9 Data centre rendering

Page 20: Allied REIT Mission Critical Portfolio // Toronto

18 // allIED propErtIES

Page 21: Allied REIT Mission Critical Portfolio // Toronto

MISSIon crItIcal portfolIo // 19

905 King Street West

– 60,000 Sf of powered shell space

– 10MVa feed from Exhibition Substation

– 7.7MW of critical power available

– n+1 backup power generation plant

– n+1 chilled water plant backup with 2n cooling towers (with 2 hour makeup water storage)

– n+1 chilled water power and chilled water distribution

– average cost of power $0.08-0.10/kWh

– Industry leading security and environmental monitoring standards

connEctIVIty

– carriers on site: Bell, Beanfield, cogeco, MtS allstream and rogers

– Direct connection to 151 front (12.25 microseconds) and 250 front via diverse fiber

Page 22: Allied REIT Mission Critical Portfolio // Toronto

20 // allIED propErtIES

905 King Street West Stacking plan

1 high density fibre back to 151 front street west

2 meet me rooms a & b

3 high density fibre back to 151 front street west

4 chiller plant

5 security lobby

6 generators

7 cooling towers

Page 23: Allied REIT Mission Critical Portfolio // Toronto

MISSIon crItIcal portfolIo // 21

905 King Street West typical floor plan

33' - 9"94' - 10"

46' -

8"

43' -

7"

50' -

7"

141'

- 4"

Scale

Project number

Date

77 m

owat

ave

nue

. s

uite

112

toro

nto

. o

ntar

io .

m6k

3e3

tel.

416

850

4443

A2.01Level 2 Data Center Plan

13-08ALLIED DATA CENTER905 King St. E., Toronto, ON

19/07/2013

CRAC

No. Description Date

CRAC

CRACCRAC

CRAC CRAC

CRAC

SUITE A4185 SF

SUITE B5670 SF

SUITE C4555 SF

1:200

/// PRELIMINARY ///FOR CLIENT REVIEW

1 ISSUED FOR CLIENT REVIEW 19/07/2013

Page 24: Allied REIT Mission Critical Portfolio // Toronto

22 // allIED propErtIES

905 King Street West level 2 Data centre rendering

ALLIED DATA CENTER905 KING STREET

LEVEL 2 D

ATA CENT

ER

JULY 19, 2013

racks

raISED accESS floorInG

coMputEr rooM aIr conDItIonInG

nEW DEMISInG Wall

Page 25: Allied REIT Mission Critical Portfolio // Toronto

MISSIon crItIcal portfolIo // 23

Page 26: Allied REIT Mission Critical Portfolio // Toronto

24 // allIED propErtIES

rOberT SweeNey // Sales representative [email protected]+1 416 847 3265

Jeffrey frIedmAN // Sales representativeExecutive Vice [email protected]+1 416 815 2363

cBrE limited 145 King Street West, Suite 600 toronto, on M5h 1J8

for more information about the portfolio, please contact:

ChAd freeSe [email protected]+1 312 935 1451

AArON [email protected]+1 312 416 3078

311 South Wacker Drive, Suite 500 chicago, Il 60606

LUKe deNmON [email protected]+1 602 735 5279

2415 East camelback road phoenix, aZ 85016

www.alliedreit.comwww.cbre.com

This disclaimer shall apply to CBRE Limited, Brokerage, and to all other divisions of the Corporation (“CBRE”). The information set out herein (the “Information”) has not been verified by CBRE, and CBRE does not represent, warrant or guarantee the accuracy, correctness and completeness of the Information. CBRE does not accept or assume any responsibility or liability, direct or consequential, for the Information or the recipient’s reliance upon the Information. The recipient of the Information should take such steps as the recipient may deem necessary to verify the Information prior to placing any reliance upon the Information. The Information may change and any property described in the Information may be withdrawn from the market at any time without notice or obligation to the recipient from CBRE.


Recommended