+ All Categories
Home > Documents > ALTERATIONS & ADDITIONS TO ST AGNES COLLEGE

ALTERATIONS & ADDITIONS TO ST AGNES COLLEGE

Date post: 07-Apr-2022
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
1
GSPublisherVersion 204.54.71.26 Drawing No. DA13 Amend't No. of sheets Job No. 18036 Drawn: CC Scale: As shown @ A1 Project: Dwg Name: Address: Nominated Architects CAD File: U:\2018\18036.St Agnes.Admin Refurb\3.Design\3.2 DA\18036.DA_Issue_St Agnes.New Admin & Carpark.pln Project North: CEO Parramatta NSW Architects Registration Board No. Daniel Donai 9068 13 of 20 ALTERATIONS & ADDITIONS TO ST AGNES COLLEGE Lot 2, D.P.579138 24 Evans Rd Rooty Hill NSW 2766 BLOCK A - FIRST FLOOR PLAN MAY 19 Date: Client: Issue Amendment P1 Drwn Date Chk'd 11.12.18 CC BA Issue for client review A C 1. DO NOT SCALE FROM DRAWINGS. USE WRITTEN DIMENSIONS ONLY. 2. BUILDER TO CHECK & VERIFY ALL DIMENSIONS & LEVELS PRIOR TO COMMENCEMENT OF WORK. 3. IT IS THE OWNERS RESPONSIBILITY TO ENSURE THAT THE ENGINEER HAS INVESTIGATED SUBSOIL CONDITIONS & DESIGNED ALL STRUCTURAL ELEMENTS TO SUIT. 4. THE DESIGN & DETAILS CONTAINED ON THIS DRAWING IS SUPPLIED IN CONFIDENCE & IS NOT TO BE USED FOR ANY OTHER PURPOSE, EXCEPT THAT AUTHORISED BY DTA ARCHITECTS COPYRIGHT - DTA ARCHITECTS 88 bathurst street liverpool nsw 2170 | po box 68 liverpool bc nsw 1871 ARCHITECTS THINK ARCHITECTURE THINK COLLABORATION THINK DTA ARCHITECTS w: www.dta.net.au | e: [email protected] | t: +612 9601 1011 A 27.05.18 CC BA Issue for DA 247° 52' 20 " 5.485 157° 52' 20" 9.755 5.485 67° 52' 20" 34 .855 68 ° 42 ' 00 " 157° 52' 20" 32.095 110.0 m² TEACHERS 041 8.6 m² STAIR 040 5.9 m² STAIR 042 103.8 m² 107 33.7 m² staff study 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 UP Custom Text 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 UP Custom Text 106.15 m 2 109.31 m 2 #DrgID #LayID 2 DA19 1 DA19 14,472 4,910 400 150 13,940 150 5,385 20,215 10,000 Existing roof structure to remain. Patch and repair existing roof finishes as required, make good to all surfaces, junctions, flashings as required. EXISTING ROOF EXISTING ROOF All existing painted surfaces both internally and externally to be repainted and repaired as required. Confirm ceiling heights , ridge heights, existing column locations and existing wall lengths on site prior to works. TV HDB 06 HDB 05 HDB 06 HDB 05 HDB 06 HDB 05 HDB 06 BLOCK A EXISTING 21,300 950 8,500 1,590 293.40 m 2 New gutters,downpipes, fascias, to match existing, gutters & downpipes to be colorbond finish, facsia to be timber with paint finish. Provide flashing & seal junction as required to ensure water tightness, make good to surrounds where disturbed by new works. New Klip lok roof sheeting to suite new roof, finish to match existing roof, flash & seal junction as required to ensure water tightness, make good to surrounds where disturbed by new works. Existing gutters,downpipes, fascias, make good to existing as required.. Existing roof sheeting, make good to existing as required, including repairs to all junctions and flashing as required. Existing gutters,downpipes, fascias, make good to existing as required.. Existing gutters,downpipes, fascias, make good to existing as required.. Existing roof sheeting, make good to existing as required, including repairs to all junctions and flashing as required. Existing gutters,downpipes, fascias, make good to existing as required.. Existing chimney, restore and resurface as required, make good to existing as required. Existing chimney, restore and resurface as required, make good to existing as required. Existing chimney, restore and resurface as required, make good to existing as required. New Cola, with solid and translucent roof sheeting, profile to match existing building, flash & seal junction as required to ensure water tightness, make good to surrounds where disturbed by new works. Paint finish fascias,barge boards and capping. To match existing. Colorbond finish gutters and downpipes to match existing. New stud walls with CFC external cladding, paint finished. Lined with plasterboard to inside face, paint finish, provide insulation as per section J requirements, flash & seal junctions as required to ensure water tightness, make good to surrounds where disturbed by new works. New windows, to match existing, make good to surrounds where disturbed by new works. Line of roof over shown dotted. Line of building under shown dotted. bench team table TV TV TV TV WB team table team table team table team table team table team table team table team table team table STAFF STUDY ROOM STAFF STUDY ROOM HDB 06 HDB 05 55" TV MH5 55" TV MH5 HDB 06 HDB 05 55" TV MH5 55" TV MH5 HDB 06 HDB 05 55" TV MH5 55" TV MH5 HDB 06 55" TV MH5 DPS DPS DPS DP DP DP DP DP ext-DPS ext-DPS SHEET METAL ROOFING SMR 6.5 degree fall 25 degree fall WB 6.5 degree fall 6.5 degree fall 25 degree fall 25 degree fall 25 degree fall 3.0 degree fall 30 degree fall 30 degree fall 30 degree fall 30 degree fall 30 degree fall 30 degree fall 30 degree fall DP WB 60 lockers 30 lockers WB C 6610mm x 18850mm C 21085mm x 13910mm EXISTING ROOF FALL EXISTING ROOF FALL EXISTING ROOF FALL EXISTING ROOF FALL EXISTING ROOF FALL EXISTING ROOF FALL EXISTING ROOF FALL EXISTING ROOF FALL EXISTING ROOF FALL 25 deg fall 25 deg fall EXISTING ROOF FALL EXISTING ROOF FALL TN MN WT01 LEGEND - PLAN Existing walls to remain. repair & reinstate to damage caused during new works. Existing walls to be removed, repair & reinstate to all surfaces damaged during new works. Nom. New brick wall, face brick finish to both internal & external faces. Coloured Concrete finish. Refer to finishes schedule B Bollards, located as shown, to eng's details. Refer to finishes schedule Proposed levels. Refer also to drainage drawing. RL 9.100+ Carpet / vinyl floor finish. Refer to finishes schedule Stud framed wall, c/w 13mm plasterboard / FC lining both sides of framing, set ready for selected paint finish. Wall type. Refer to wall type schedule Carpet / vinyl floor finish. Refer to finishes schedule Extent of proposed new building work shown in colour. Non-slip ceramic floor tiles. Refer to finishes schedule Ceramic floor tiles. Refer to finishes schedule Stud framed wall, c/w 13mm plasterboard / FC lining on furring channells to FC lining to external face, set ready for selected paint finish. Nom. New brick wall, rendered finish to both internal & external faces, pain finish. Extent of existing building shown in colour. Extent of proposed new building shown in colour. SWP Stormwater pit. Refer also to drainage drawing. General notes: Verify on site all survey information including all existing services & levels prior to construction. Demolish existing structures & clear all vegetation as required and/or as shown on drawings, ready for new works. Dispose of demolished building materials and asbestos material encountered during demolition, except those items specifically identified for reuse. Terminate, cap off or divert of all existing services where so require and/or as necessary to carry out new works. Perform all works in best tradesman-like manner and to the satisfaction of relevant authorities. Refer to structural eng's documents for details of conc. Slabs, steps, footings including sizes of structural members. All timber framing sizes shall comply with the timber framing code. Comply with landscaping requirements as required by the council conditions and/or as detailed by landscape architect . Refer to hydraulic eng's details for location and levels of all storm water pits. Uno. Connect all downpipes into nearest existing storm water system as required and/or to hyd. Eng's details. Uno. Provide fall in ground finishes ensuring all storm water falls away from building. Lay paving with sufficient fall to pit to avoid ponding. Refer to hydraulic eng's details for details of sewer connection . Comply with relevant authorities requirements. Supply & install all electrical services including but not limited to, power, exit signs, emergency lifting & telephone supply to relevant aust standards & authorities requirements. Supply & install all mechanical ventilation including but not limited to, mechanical exhaust fans & ducts, air conditioning units & ducts to relevant aust standards & authorities requirements. Remove all redundant vehicle crossings & replaced with kerb & gutter to council's requirements. repair & reinstate to surrounds where disturbed by new works to council engineer's specification. Provide physical termite treatment in accordance with as 3660.1 WC with inward swinging doors closer than 1200mm to the pan shall be fitted with lift off hinges as required by BCA. Uno. Provide 50mm set down in floor slab to all wet areas. Lay paving with sufficient fall to floor waste to avoid ponding. repair & reinstate to all surfaces, damaged / effected during new works At completion clean up the site prior to hand over. repair & reinstate to surrounds where disturbed during new works. LEGEND B BOLLARD B-1 VANITY BASIN - SEMI RECESSED B-2 WALL HUNG BASIN - DISABLE COMPLIANT BFC BROOM FINISHED CONCRETE C CARPET AS SPECIFIED CC COVE FINISHED CONCRETE CAP CEILING ACCESS PANEL CH CLOTHES HOOK CLR CLEANERS SINK CONC CONCRETE CR CEMENT RENDERED FINISH CP1 CONCRETE PAINT 1 CT CERAMIC TILES C/W COMPLETE WITH DP DOWNPIPE DPS DOWNPIPE & SPREADER DW DISHWASHER AS SPEC. EDB ELECT. DISTRIBUTION BOARD, REFER TO ELECT. DOCUMENTS EW EYE WASH EX EXISTING EXC EXISTING CONCRETE COLUMN ex-CR EXISTING CEMENT RENDERED FINISH ex-DP EXISTING DOWNPIPE ex-SMR EXISTING SHEET METAL ROOF ex-COL EXISTING COLUMN F FRIDGE AS SPEC. FB FACE BRICK FINISH FCPF1 CFC PAINT FINISH 1 FG FIXED GLASS FHR FIRE HOSE REEL FW FLOOR WASTE GD GRATED DRAIN GPO-S SINGLE GENERAL PURPOSE OUTLET GPO-D DOUBLE GENERAL PURPOSE OUTLET GR GRAB RAIL GMWB GLASS MAGNETIC WHITE BOARD HWU HOT WATER UNIT HD HAND DRYER LM LAMINATED BENCH TOP & CUPBOARDS M1 MIRROR M2 MIRROR - DISABLE COMPLIANT MF1 METAL FENCE 1 MF2 METAL FENCE 2 MH1 MOUNTING HEIGHT 1 - AS PER STAGE MIN. MW MICROWAVE OVEN AS SPEC. NS-CT NON-SLIP CERAMIC TILE PB PLASTERBOARD LINING PTD PAPER TOWEL DISPENSER RCC REINFORCED CONCRETE COLUMN RH RANGE HOOD RM RECESSED ENTRY MAT RW1 RETAINING WALL 1 SCR SHOWER CURTAIN RAIL SMR SHEET METAL ROOF SC STEEL COLUMN SD SOAP DISPENSER SH WALL SHELF SK-1 STAINLESS STEEL SINK SK-2 CLEANER SINK SS STAINLESS STEEL FINISH ST STOVE STF STEEL TROWEL FINISHED CONCRETE TGSI TACTILE INDICATOR TIM TIMBER FLOORING TP TOILET PARTITIONS TPH TOILET PAPER HOLDER TS TRANSLUCENT ROOF SHEETING US MOP & BROOM SHELF V VINYL VP VENT PIPE REFER TO HYDRAULIC DOCUMENTS VTY VANITY UNIT WB1 GLASS MAGNETIC WHITE BOARD 1 WB2 GLASS MAGNETIC WHITE BOARD 2 WB3 GLASS MAGNETIC WHITE BOARD 3 WB4 GLASS MAGNETIC WHITE BOARD 4 WC-1 TOILET PAN / SUITE WC-2 TOILET PAN / SUIT DISABLE COMPLIANT Building Element Proposed Building Roof and Ceiling Total R3.5 – New Metal Roof Roof Colour (Solar Absorptance) Any colour Total R2.8 – New Brick Cavity Wall Total R2.8 – New FC Clad Wall External Walls (Solar Absorptance) Any colour Internal Walls No insulation required No insulation required – Concrete Slab on Ground No insulation required – Suspended Concrete Slab U-Value 4.5, SHGC 0.47 (Timber Framed Single Glazed Low E Clear) U-Value 5.0, SHGC 0.55 (Aluminium Framed Single Glazed Low E Clear) U-Value 3.4 , SHGC 0.34 (Double Glazed Fixed Skylights) Note: U-Value must be less than or equal to the above and SHGC must be within ±10% Services DTS compliant systems External Walls Floor Glazing SECTION J / JV3 REQUIREMENTS 1 - FIRST FLOOR PLAN - NEW 1:100
Transcript

GSPublisherVersion 204.54.71.26

Drawing No.

DA13Amend'tNo. of sheets

Job No.

18036Drawn:

CC

Scale:

As shown @ A1

Project:

Dwg Name:

Address:

Nominated ArchitectsCAD File: U:\2018\18036.St Agnes.Admin Refurb\3.Design\3.2 DA\18036.DA_Issue_St Agnes.New Admin & Carpark.pln

Project North:

CEO Parramatta

NSW Architects Registration Board No.Daniel Donai 9068 13 of 20

ALTERATIONS & ADDITIONS TO ST AGNES COLLEGELot 2, D.P.57913824 Evans Rd Rooty Hill NSW 2766BLOCK A - FIRST FLOOR PLAN

MAY 19

Date:

Client:Issue Amendment

P1

DrwnDate Chk'd

11.12.18 CC BAIssue for client review

AC

1. DO NOT SCALE FROM DRAWINGS. USE WRITTEN DIMENSIONS ONLY.2. BUILDER TO CHECK & VERIFY ALL DIMENSIONS & LEVELS PRIOR TO COMMENCEMENT OF WORK.3. IT IS THE OWNERS RESPONSIBILITY TO ENSURE THAT THE ENGINEER HAS INVESTIGATED SUBSOIL CONDITIONS & DESIGNED ALL STRUCTURAL ELEMENTS TO SUIT.4. THE DESIGN & DETAILS CONTAINED ON THIS DRAWING IS SUPPLIED IN CONFIDENCE & IS NOT TO BE USED FOR ANY OTHER PURPOSE, EXCEPT THAT AUTHORISED BY DTA ARCHITECTS

COPYRIGHT - DTA ARCHITECTS88 bathurst street liverpool nsw 2170 | po box 68 liverpool bc nsw 1871

A RCHITECTS

THINK ARCHITECTURETHINK COLLABORATIONTHINK DTA ARCHITECTS

w: www.dta.net.au | e: [email protected] | t: +612 9601 1011

A 27.05.18 CC BAIssue for DA

247°

52'

20"

5.48

5

157° 52' 20"9.755

5.48

567

° 52

' 20

"

34.8

5568

° 42

' 00

"

157° 52' 20"32.095

110.0 m²

TEACHERS

041

8.6 m²

STAIR040

5.9 m²

STAIR042

103.8 m²107 33.7 m²

108

staff study

1

2

3

4

5

6789101112131415161718192021

UP

Cus

tom

Tex

t

12345678910111213141516171819

20

21

UPCustom Text

106.15 m2

109.31 m2

#Drg

ID#L

ayID

2DA19

1D

A19

14,4

72

4,91

040

015

013

,940

150

5,38

520

,215

10,0

00

Existing roof structure to remain. Patchand repair existing roof finishes as

required, make good to all surfaces,junctions, flashings as required.

EXISTING ROOF

EXIS

TIN

G R

OO

F

All existing painted surfaces bothinternally and externally to be repainted

and repaired as required.

Confirm ceiling heights, ridge heights, existingcolumn locations and existing wall lengths on site

prior to works.

TV

HDB06

HDB05

HDB06

HDB05

HDB06

HDB05

HD

B06

BLOCK A

EXISTING 21,300 950 8,500 1,590

293.40 m2

New gutters,downpipes,fascias, to match existing,gutters & downpipes to becolorbond finish, facsia to betimber with paint finish.

Provide flashing & sealjunction as required to ensurewater tightness, make good tosurrounds where disturbed bynew works.

New Klip lok roof sheeting tosuite new roof, finish to matchexisting roof, flash & sealjunction as required to ensurewater tightness, make good tosurrounds where disturbed bynew works.

Existing gutters,downpipes,fascias, make good to existing

as required..

Existing roof sheeting, makegood to existing as required,

including repairs to alljunctions and flashing as

required.

Existing gutters,downpipes,fascias, make good to existing

as required..

Existing gutters,downpipes,fascias, make good to existing

as required..

Existing roof sheeting, makegood to existing as required,

including repairs to alljunctions and flashing as

required.

Existing gutters,downpipes,fascias, make good to existing

as required..

Existing chimney, restore andresurface as required, makegood to existing as required.

Existing chimney, restore andresurface as required, makegood to existing as required.

Existing chimney, restore andresurface as required, makegood to existing as required.

New Cola, with solid andtranslucent roof sheeting,profile to match existingbuilding, flash & seal junctionas required to ensure watertightness, make good tosurrounds where disturbed bynew works.

Paint finish fascias,bargeboards and capping.

To match existing.

Colorbond finish gutters anddownpipes to match existing.

New stud walls with CFC externalcladding, paint finished. Lined withplasterboard to inside face, paintfinish, provide insulation as persection J requirements, flash &seal junctions as required toensure water tightness, make goodto surrounds where disturbed bynew works.

New windows, to matchexisting, make good tosurrounds where disturbed bynew works.

Line of roof overshown dotted.

Line of building undershown dotted.

bench

team table

TV

TV

TV

TV WB

team

tabl

e

team

tabl

e

team table

team

tabl

e

team table

team tableteam table

team table

team

tabl

eSTAFFSTUDYROOM

STAFFSTUDYROOM

HDB06

HDB05

55" TVMH5

55" TVMH5

HDB06

HDB05

55" TVMH5

55" TVMH5

HDB06

HDB05

55" TVMH5

55" TVMH5

HD

B06

55" T

VM

H5

DPSDPS

DPS

DP

DPDPDPDP

ext-DPS

ext-DPS

SHEET METALROOFING

SMR

6.5

degr

ee fa

ll

25 degree fall

WB

6.5 degree fall

6.5 degree fall

25 d

egre

e fa

ll25

deg

ree

fall

25 d

egre

e fa

ll

3.0 degree fall

30 d

egre

e fa

ll30

deg

ree

fall

30 d

egre

e fa

ll

30 degree fall 30 degree fall

30 degree fall 30 degree fall

DP

WB

60 lockers

30 lockers

WB

C6610mm x 18850mm

C21085mm x 13910mm

EXIS

TIN

GRO

OF

FALL

EXIS

TIN

GRO

OF

FALL

EXIS

TIN

GRO

OF

FALL

EXISTINGROOF FALL

EXISTINGROOF FALL

EXISTINGROOF FALL

EXISTINGROOF FALL

EXISTINGROOF FALL

EXISTINGROOF FALL

25 deg fall25 deg fallEXISTINGROOF FALL

EXISTINGROOF FALL

N

TN

MN

WT01

LEGEND - PLAN

Existing walls to remain. repair & reinstate to damagecaused during new works.

Existing walls to be removed, repair & reinstate to allsurfaces damaged during new works.

Nom. New brick wall, face brick finish to both internal &external faces.

Coloured Concrete finish. Refer to finishes schedule

B Bollards, located as shown, to eng's details. Refer tofinishes scheduleProposed levels. Refer also to drainage drawing.RL 9.100+

Carpet / vinyl floor finish. Refer to finishes schedule

Stud framed wall, c/w 13mm plasterboard / FC lining bothsides of framing, set ready for selected paint finish.

Wall type. Refer to wall type schedule

Carpet / vinyl floor finish. Refer to finishes schedule

Extent of proposed new building work shown in colour.

Non-slip ceramic floor tiles. Refer to finishes schedule

Ceramic floor tiles. Refer to finishes schedule

Stud framed wall, c/w 13mm plasterboard / FC lining onfurring channells to FC lining to external face, set ready forselected paint finish.

Nom. New brick wall, rendered finish to both internal &external faces, pain finish.

Extent of existing building shown in colour.

Extent of proposed new building shown in colour.

SWP

Stormwater pit. Refer also to drainage drawing.

General notes:Verify on site all survey information including all existing services & levels prior toconstruction.

Demolish existing structures & clear all vegetation as required and/or as shown ondrawings, ready for new works. Dispose of demolished building materials andasbestos material encountered during demolition, except those items specificallyidentified for reuse.

Terminate, cap off or divert of all existing services where so require and/or asnecessary to carry out new works. Perform all works in best tradesman-like mannerand to the satisfaction of relevant authorities.

Refer to structural eng's documents for details of conc. Slabs, steps, footingsincluding sizes of structural members. All timber framing sizes shall comply with thetimber framing code.

Comply with landscaping requirements as required by the council conditions and/oras detailed by landscape architect .

Refer to hydraulic eng's details for location and levels of all storm water pits. Uno.Connect all downpipes into nearest existing storm water system as required and/or tohyd. Eng's details. Uno. Provide fall in ground finishes ensuring all storm water fallsaway from building. Lay paving with sufficient fall to pit to avoid ponding.

Refer to hydraulic eng's details for details of sewer connection . Comply with relevantauthorities requirements.

Supply & install all electrical services including but not limited to, power, exit signs,emergency lifting & telephone supply to relevant aust standards & authoritiesrequirements.

Supply & install all mechanical ventilation including but not limited to, mechanicalexhaust fans & ducts, air conditioning units & ducts to relevant aust standards &authorities requirements.

Remove all redundant vehicle crossings & replaced with kerb & gutter to council'srequirements. repair & reinstate to surrounds where disturbed by new works tocouncil engineer's specification.

Provide physical termite treatment in accordance with as 3660.1

WC with inward swinging doors closer than 1200mm to the pan shall be fitted with liftoff hinges as required by BCA.

Uno. Provide 50mm set down in floor slab to all wet areas. Lay paving with sufficientfall to floor waste to avoid ponding.

repair & reinstate to all surfaces, damaged / effected during new works

At completion clean up the site prior to hand over. repair & reinstate to surroundswhere disturbed during new works.

LEGEND

B BOLLARDB-1 VANITY BASIN - SEMI RECESSEDB-2 WALL HUNG BASIN - DISABLE COMPLIANTBFC BROOM FINISHED CONCRETEC CARPET AS SPECIFIEDCC COVE FINISHED CONCRETECAP CEILING ACCESS PANELCH CLOTHES HOOKCLR CLEANERS SINKCONC CONCRETECR CEMENT RENDERED FINISHCP1 CONCRETE PAINT 1CT CERAMIC TILESC/W COMPLETE WITHDP DOWNPIPEDPS DOWNPIPE & SPREADERDW DISHWASHER AS SPEC.EDB ELECT. DISTRIBUTION BOARD, REFER TO ELECT. DOCUMENTSEW EYE WASHEX EXISTINGEXC EXISTING CONCRETE COLUMNex-CR EXISTING CEMENT RENDERED FINISHex-DP EXISTING DOWNPIPEex-SMR EXISTING SHEET METAL ROOFex-COL EXISTING COLUMNF FRIDGE AS SPEC.FB FACE BRICK FINISHFCPF1 CFC PAINT FINISH 1FG FIXED GLASSFHR FIRE HOSE REELFW FLOOR WASTEGD GRATED DRAINGPO-S SINGLE GENERAL PURPOSE OUTLETGPO-D DOUBLE GENERAL PURPOSE OUTLETGR GRAB RAILGMWB GLASS MAGNETIC WHITE BOARDHWU HOT WATER UNITHD HAND DRYERLM LAMINATED BENCH TOP & CUPBOARDSM1 MIRRORM2 MIRROR - DISABLE COMPLIANTMF1 METAL FENCE 1MF2 METAL FENCE 2MH1 MOUNTING HEIGHT 1 - AS PER STAGE MIN.MW MICROWAVE OVEN AS SPEC.NS-CT NON-SLIP CERAMIC TILEPB PLASTERBOARD LININGPTD PAPER TOWEL DISPENSERRCC REINFORCED CONCRETE COLUMNRH RANGE HOODRM RECESSED ENTRY MATRW1 RETAINING WALL 1SCR SHOWER CURTAIN RAILSMR SHEET METAL ROOFSC STEEL COLUMNSD SOAP DISPENSERSH WALL SHELFSK-1 STAINLESS STEEL SINKSK-2 CLEANER SINKSS STAINLESS STEEL FINISHST STOVESTF STEEL TROWEL FINISHED CONCRETETGSI TACTILE INDICATORTIM TIMBER FLOORINGTP TOILET PARTITIONSTPH TOILET PAPER HOLDERTS TRANSLUCENT ROOF SHEETINGUS MOP & BROOM SHELFV VINYLVP VENT PIPE REFER TO HYDRAULIC DOCUMENTSVTY VANITY UNITWB1 GLASS MAGNETIC WHITE BOARD 1WB2 GLASS MAGNETIC WHITE BOARD 2WB3 GLASS MAGNETIC WHITE BOARD 3WB4 GLASS MAGNETIC WHITE BOARD 4WC-1 TOILET PAN / SUITEWC-2 TOILET PAN / SUIT DISABLE COMPLIANTWT WASH TROUGHWU-1 WALL HUNG URINALXP EXPOXY FLOORING

Building Element Proposed Building

Roof and Ceiling Total R3.5 – New Metal Roof

Roof Colour (Solar Absorptance) Any colour

Total R2.8 – New Brick Cavity Wall

Total R2.8 – New FC Clad Wall

External Walls (Solar Absorptance) Any colour

Internal Walls No insulation required

No insulation required – Concrete Slab on Ground

No insulation required – Suspended Concrete Slab

U-Value 4.5, SHGC 0.47 (Timber Framed Single Glazed Low E Clear)

U-Value 5.0, SHGC 0.55 (Aluminium Framed Single Glazed Low E Clear)

U-Value 3.4 , SHGC 0.34 (Double Glazed Fixed Skylights)

Note: U-Value must be less than or equal to the above and SHGC must be

within ±10%

Services DTS compliant systems

External Walls

Floor

Glazing

SECTION J / JV3 REQUIREMENTS

1-

FIRST FLOOR PLAN - NEW1:100

Recommended