+ All Categories
Home > Documents > Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

Date post: 18-Jan-2016
Category:
Upload: jasmin-melton
View: 214 times
Download: 2 times
Share this document with a friend
Popular Tags:
56
Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1
Transcript
Page 1: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

Alton Village

School Boundary Review

April 17, 2012

FINAL REPORT

1

Page 2: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

New SchoolDue to the growth in the Alton Community the Ministry of Education has approved the new Alton Village Catholic Elementary School to be built north of Dundas Street.

2

Page 3: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

Alton Village Community

3

Page 4: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

St. Elizabeth Seton

4

St. ChristopherSchools Affected

The opening of the new Alton Village School will reduce

the current accommodation

pressures at St. Christopher and St. Elizabeth Seton

Schools

Page 5: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

SBRC Committee • Two parent representatives from each school

community

• The committee represents the interests of all involved parties – the students, families and staff

• The Committee is an Advisory Committee Only

• Principals and other Board staff are not involved in this process

5

Page 6: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

School Boundary Review Committee(SBRC)

6

St. Elizabeth SetonMary Blonde

Courtney RainvilleMargaret Lavallee – Alton Village

Diana Rodin – Alton Village

Halton Catholic District School BoardLorrie Naar – Superintendent of Education

Giacomo Corbacio – Superintendent of FacilitiesScott Bland – Administrator of Planning Services

St. ChristopherJohn KarczWendy Vallesi

Page 7: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

Committee Mandate & Process

• To develop new school boundary options for St. Christopher, St. Elizabeth Seton and the new Alton Village Catholic Elementary Schools

• To assess school boundary options based on the Halton Catholic District School Board criteria for school boundary adjustments

7

Page 8: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

Committee Mandate & Process

• To provide school boundary options to the community for review and feedback

• To review community input & report the community input to the Board

• To submit recommendations to the Board

8

Page 9: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

Criteria• Optimizing schools within enrolment capacities

• Minimizing use of portable classrooms

• Minimize future boundary adjustments

• Optimize cost-effective school transportation

• Optimize school enrolment to ensure cost-effective program delivery

• Consideration of Catholic Parish boundaries to extent possible

9

Page 10: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

SBRC Milestone Dates• December 6, 2011 – SBRC Presented its Interim

Report to Board of Trustees

• January 12, 2012 – Open House/Community Information Meeting

• January 20, 2012 – Community Input and Comments due date

• February 7, 2012 – SBRC Update to Board of Trustees

10

Page 11: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

SBRC Milestone Dates

• March 8, 2012 – 2nd Open House/Community Information Meeting

• March 22, 2012 – Additional Community Input and Comments due date

• April 17, 2012 – SBRC Presentation of Final Report to Board of Trustees

• May 1, 2012 – Public delegations to the Board and Board approves new school

boundaries 11

Page 12: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

JANUARY 12, 2012OPEN HOUSE

COMMUNITY INFORMATION MEETING

Three school boundary options were presented for community comment and input:

Option #1Option #2Option #3

12

Page 13: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

Community Consult #1• January 12th Open House/Community Information Meeting was

held at St. Elizabeth Seton School

• 100 - 125 people attended the Open House/Community Information Meeting where the SBRC reviewed the process, criteria and options

• Following the SBRC’s presentation, the floor was opened for parents to ask questions/comments

• Approximately 35 parents spoke at the Open House and a total of approximately 45 written comments were received

13

Page 14: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

Community Feedback

• All three Interim Boundary Options were perceived as essentially the same option

• Why was only one area considered for redirection and why were other areas not an option for redirection?

• Move only the students for the new Alton Village School and keep the St. Christopher and St. Elizabeth Seton School boundaries as is

• Community requested to see additional school boundary options involving the school attendance area North of Dryden Avenue and West of Orchard Road

14

Page 15: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

Community Feedback

• Option #1 was selected as the most preferred option of the three Interim Options

• To respond to the community feedback the SBRC requested an extension of time from the Board to complete its mandate

• A second Open House/Community Information Meeting was scheduled for March 8, 2012 to provide another opportunity for the community to comment and submit input

15

Page 16: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

MARCH 8, 2012

OPEN HOUSECOMMUNITY INFORMATION MEETING

School Boundary OptionsOption #1Option #4Option #5Option #6

16

Page 17: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

MARCH 8, 2012

• The area north of Dundas Street will most likely be redirected to the new Alton Village Catholic Elementary School

• This school boundary redirection will most likely be effective for September 2013

• The focus of this evenings Open House/Community Information Meeting is to present the school boundary options for St. Christopher and St. Elizabeth Seton Schools and to seek additional community comment and input

• The school attendance area boundaries for these existing two schools would most likely be effective for September 2013

17

Page 18: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

18

SCHOOL

BLDG CAP (FDK) 2011 P/EC 2012 P/EC 2013 P/EC 2014 P/EC 2015 P/EC 2016 P/EC 2017 P/EC 2018 P/EC 2019 P/EC 2020 P/EC 2021 P/EC

St. Christopher 483 652 8 678 9 696 10 709 11 700 10 707 10 677 9 663 8 658 8 640 7 637 7

St. Elizabeth Seton 460 706 11 758 14 790 15 851 18 872 19 904 20 956 23 960 23 969 23 960 23 967 23

BELOW CAPACITY

AT CAPACITY

OVER CAPACITY

BEYOND CAPACITY

Page 19: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

19

Option #1

SCHOOLBldg Cap

(FDK) 2011 P/EC 2012 P/EC 2013 P/EC 2014 P/EC 2015 P/EC 2016 P/EC 2017 P/EC 2018 P/EC 2019 P/EC 2020 P/EC 2021 P/EC

St. Christopher 483 652 8 515 2 509 2 506 2 488 1 482 0 462 0 453 -1 447 -1 435 -2 433 -2

St. Elizabeth Seton 460 706 11 516 3 530 4 540 4 535 4 541 4 518 3 500 2 485 2 463 1 469 1BELOW CAPACITY AT CAPACITY OVER CAPACITY BEYOND CAPACITY

Redirect Attendance Zone I38 to Alton Village CES, and redirect the area south of Blue Spruce Ave. and thea area south and east of Orchard Community Park to St. Elizbeth Seton

Page 20: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

20

Option #4 Redirect Attendance Zone I38 to Alton Village CES.

SCHOOLBldg Cap

(FDK) 2011 P/EC 2012 P/EC 2013 P/EC 2014 P/EC 2015 P/EC 2016 P/EC 2017 P/EC 2018 P/EC 2019 P/EC 2020 P/EC 2021 P/EC

St. Christopher 483 652 8 678 9 696 10 709 11 700 10 707 10 677 9 663 8 658 8 640 7 637 7

St. Elizabeth Seton 460 706 11 353 -4 343 -5 337 -5 323 -6 316 -6 303 -6 290 -7 274 -8 258 -8 265 -8BELOW CAPACITY AT CAPACITY OVER CAPACITY BEYOND CAPACITY

Page 21: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

21

Option #5: Redirect Attendance Zone I38 to Alton Village CES ,and redirect the area north of Dryden Ave. and west of Orchard Road (centre line), to St. Elizbeth Seton.

SCHOOLBldg Cap

(FDK) 2011 P/EC 2012 P/EC 2013 P/EC 2014 P/EC 2015 P/EC 2016 P/EC 2017 P/EC 2018 P/EC 2019 P/EC 2020 P/EC 2021 P/EC

St. Christopher 483 652 8 491 1 474 0 462 0 438 -2 425 -2 400 -3 385 -4 378 -4 364 -5 362 -5

St. Elizabeth Seton 460 706 11 540 4 565 5 584 6 585 6 598 7 580 6 568 5 554 5 534 4 540 4BELOW CAPACITY AT CAPACITY OVER CAPACITY BEYOND CAPACITY

Page 22: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

22

Option #6Attendance Zone I38 to Alton Village CES , and redirect the area south of Dryden Ave. and west of Sutton and the area north of Dryden Ave. and west of Orchard Road (centre line), south of Easton (centre line) including Ravine Cres. to St. Elizbeth Seton

SCHOOLBldg Cap

(FDK) 2011 P/EC 2012 P/EC 2013 P/EC 2014 P/EC 2015 P/EC 2016 P/EC 2017 P/EC 2018 P/EC 2019 P/EC 2020 P/EC 2021 P/EC

St. Christopher 483 652 8 575 5 576 5 571 4 545 3 540 3 505 1 488 1 480 0 467 0 466 0

St. Elizabeth Seton 460 706 11 456 0 463 1 475 1 478 1 483 2 475 1 465 1 452 0 431 -1 436 -1 BELOW CAPACITY AT CAPACITY OVER CAPACITY BEYOND CAPACITY

Page 23: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

23

Page 24: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

Community Consult #2• March 8th Open House/Community Information Meeting was held

at St. Christopher School

• 80 - 100 people attended the Open House/Community Information Meeting where the SBRC reviewed the process, criteria and options

• Following the SBRC’s presentation, the floor was opened for parents to ask questions/comments

• Approximately 25 parents spoke at the Open House and a total of approximately 60 written comments were received

24

Page 25: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

Comment Sheet Feedback

• 41 responses supported Option #1

• 16 responses supported Option #6

• 3 responses supported Option #4

• 1 response supported Option #5

• 4 responses did not support any of the Options

25

Page 26: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

Comment Sheet Feedback

• 21 comments requested some form of grandparenting for students impacted

• 10 comments were concerned with the additional walk distance as a result of Option #6

• 8 comments were concerned with breaking up or dividing up the neighbourhood in Option #6

• 6 comments expressed child care concerns due to boundary change

26

Page 27: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

Comment Sheet Feedback

• 5 comments suggested that a French Immersion Program would balance enrolment at the schools

• 3 responses stated that siblings remain together

• 3 bussing/walking concerns as a result of boundary changes

• 2 comments concerned with walking distance as a result of Option #1

27

Page 28: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

Conclusion

After much discussion and reflection, the SBRC unanimously determined to recommend Option #1 to the Trustees as it best met the School Boundary Review Criteria, would keep neighbourhoods together and provided equal distribution of the student enrolment between schools

28

Page 29: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

29

Page 30: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

30

Page 31: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

31

Page 32: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

Recommendations

RESOLUTION #1:

That, effective for the 2013/2014 school year, the Board directs the current St. Elizabeth Seton Catholic Elementary School attendance zone I38, north of Dundas Street, to the new Alton Village Catholic Elementary School

32

Page 33: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

RecommendationsRESOLUTION #2:

That, effective for the 2013/2014 school year, the Board directs the current St. Christopher Catholic Elementary School attendance area south of and including Blue Spruce Avenue and the area south of Orchard Community Park/Alexander’s Public School, west of Bronte Creek and north of Upper Middle Road, to St. Elizabeth Seton Catholic Elementary School

33

Page 34: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

Recommendations

RESOLUTION #3:

That, effective for the 2013/2014 school year, the Board directs the current St. Mark Catholic Elementary School attendance area north of Dundas Street, west of Walker’s Line and south of Highway No. 407 to the new Alton Village Catholic Elementary School

34

Page 35: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

Recommendations

RESOLUTION #4:

That, effective for the 2013/2014 school year, the school attendance area boundary for the new Alton Village Catholic Elementary School will include the area north of Dundas Street, west of Tremaine Road and south of Highway No. 407

35

Page 36: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

Recommendations

RESOLUTION #5:

That, the current Grade 6 students enrolled at St. Christopher Catholic Elementary School be allowed to remain at their existing school for their 2013/2014 graduation school year, however transportation will not be provided if applicable

36

Page 37: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

Questions

37

Page 38: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

38

Thank you!

Page 39: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

ENDOF

PRESENTATION

39

Page 40: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

40

Page 41: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

41

Page 42: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

42

CLASSROOM & TRANSPORTATION COMPARISON TABLE 4OPTION #1 Over 9 year period - Average Cost is $112,667 per year and Total Cost is $1,014,000

2013 2014 2015 2016 2017 2018 2019 2020 2021 Total

Portables 6 6 5 4 3 2 2 1 1 30

Portable Cost $120,000 $120,000 $100,000 $80,000 $60,000 $40,000 $40,000 $20,000 $20,000 $600,000

Empty Classroom 0 0 0 0 0 1 1 2 2 6

Buses 2 2 2 2 2 2 2 2 2 18

Busing Cost $46,000 $46,000 $46,000 $46,000 $46,000 $46,000 $46,000 $46,000 $46,000 $414,000

Total                   $1,014,000

OPTION #4 Over 9 year period - Average Cost is $200,77 per year and Total Cost is $1,807,000

2013 2014 2015 2016 2017 2018 2019 2020 2021 Total

Portables 10 11 10 10 9 8 8 7 7 80

Portable Cost $200,000 $220,000 $200,000 $200,000 $180,000 $160,000 $160,000 $140,000 $140,000 $1,600,000

Empty Classroom 5 5 6 6 6 7 8 8 8 59

Buses 1 1 1 1 1 1 1 1 1 9

Busing Cost $23,000 $23,000 $23,000 $23,000 $23,000 $23,000 $23,000 $23,000 $23,000 $207,000

Total Cost                   $1,807,000

OPTION #5 Over 9 year period - Average Cost is $129,667 per year and Total Cost is $1,167,000

2013 2014 2015 2016 2017 2018 2019 2020 2021 Total

Portables 5 6 6 7 6 5 5 4 4 48

Portable Cost $100,000 $120,000 $120,000 $140,000 $120,000 $100,000 $100,000 $80,000 $80,000 $960,000

Empty Classroom 0 0 2 2 3 4 4 5 5 25

Buses 1 1 1 1 1 1 1 1 1 9

Busing Cost $23,000 $23,000 $23,000 $23,000 $23,000 $23,000 $23,000 $23,000 $23,000 $207,000

Total Cost                   $1,167,000

OPTION #6 Over 9 year period - Average Cost is $76,333 per year and Total Cost is $687,000

2013 2014 2015 2016 2017 2018 2019 2020 2021 Total

Portables 6 5 4 5 2 2 0 0 0 24

Portable Cost $120,000 $100,000 $80,000 $100,000 $40,000 $40,000 $0 $0 $0 $480,000

Empty Classroom 0 0 0 0 0 0 0 1 1 2

Buses 1 1 1 1 1 1 1 1 1 9

Busing Cost $23,000 $23,000 $23,000 $23,000 $23,000 $23,000 $23,000 $23,000 $23,000 $207,000

Total Cost $687,000

Bus Cost: $23,000/bus/year Portable Cost: $20,000/portable classroom/year

Page 43: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

St. Christopher

Building Capacity - 483 Students

Number of Classrooms - 21

EnrolmentNumber of Classrooms in

UseEmpty Classrooms or Portable Classrooms Building Capacity as a %

258 11 -10 52%

280.5 12 -9 57%

303 13 -8 62%

325.5 14 -7 67%

348 15 -6 71%

370.5 16 -5 76%

393 17 -4 81%

415.5 18 -3 86%

438 19 -2 90%

460.5 20 -1 95%

483 21 0 100%

505.5 22 1 105%

528 23 2 109%

550.5 24 3 114%

573 25 4 119%

595.5 26 5 124%

618 27 6 129%

640.5 28 7 133%

663 29 8 138%

685.5 30 9 143%

708 31 10 148%

730.5 32 11 152%

753 33 12 157%43

Page 44: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

St. Elizabeth Seton

Building Capacity - 460 Students

Number of Classrooms - 20

EnrolmentNumber of Classrooms in

UseEmpty Classrooms or Portable Classrooms Building Capacity as a %

235 10 -10 50%

257.5 11 -9 55%

280 12 -8 60%

302.5 13 -7 65%

325 14 -6 70%

347.5 15 -5 75%

370 16 -4 80%

392.5 17 -3 85%

415 18 -2 90%

437.5 19 -1 95%

460 20 0 100%

482.5 21 1 105%

505 22 2 110%

527.5 23 3 115%

550 24 4 120%

572.5 25 5 125%

595 26 6 130%

617.5 27 7 135%

640 28 8 140%

662.5 29 9 145%

685 30 10 150%

707.5 31 11 155%

730 32 12 160% 44

Page 45: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

45

Page 46: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

46

Page 47: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

47

Students Currently Attending St. Elizabeth Seton(Living within St. Elizabeth Boundary Excluding Alton Village)

Students Currently Attending St. Elizabeth Seton(Living within the Alton Village Boundary)

Current Grade

JK SK 1 2 3 4 5 6 7 8 Total

Number of Students

54 50 54 43 42 24 31 33 22 30 383

Students Currently Attending St. Elizabeth Seton(Living Outside of the School Boundary)

Current Grade

JK SK 1 2 3 4 5 6 7 8 Total

Number of Students

1 1 3 2 0 4 6 4 3 8 32

 Total Students

                    737

Current Grade

JK SK 1 2 3 4 5 6 7 8 Total

Number of Students

23 23 36 36 45 33 32 34 36 24 322

Page 48: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

48

Current Grade

JK SK 1 2 3 4 5 6 7 8 Total

Number of Students

28 47 66 55 75 87 56 70 56 52 592

Students Currently Attending St. Christopher(Living within St. Christopher Boundary)

Students Currently Attending St. Christopher(Living within the Alton Village Boundary (Cross Boundary))

Current Grade

JK SK 1 2 3 4 5 6 7 8 Total

Number of Students

0 8 5 8 2 2 4 3 3 2 37

Students Currently Attending St. Christopher(As Cross Boundary From Areas Other Than Alton Village)

Current Grade

JK SK 1 2 3 4 5 6 7 8 Total

Number of Students

0 0 2 2 1 1 1 2 0 0 9

 Total Students

                    638

Page 49: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

49

Current Grade

JK SK 1 2 3 4 5 6 7 8 Total

Number of Students

8 8 11 10 21 22 10 19 16 12 137

Students Currently with our BoardLiving within Option #1 Boundary

Page 50: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

50

Current Grade

JK SK 1 2 3 4 5 6 7 8 Total

Number of Students

4 14 15 16 18 27 10 15 14 6 139

Students Currently with our BoardLiving within Option #5 Boundary

Page 51: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

51

Current Grade

JK SK 1 2 3 4 5 6 7 8 Total

Number of Students

4 11 9 11 16 10 11 7 5 11 95

Students Currently with our BoardLiving within Option #6 Boundary

 

Students Currently with our BoardLiving within Option #6 Area A Boundary

  Current Grade

JK SK 1 2 3 4 5 6 7 8 Total

Number of Students

2 8 5 8 7 8 4 4 1 4 51

Students Currently with our BoardLiving within Option #6 Area B Boundary

Current Grade

JK SK 1 2 3 4 5 6 7 8 Total

Number of Students

2 3 4 3 9 2 7 3 4 7 44

Page 52: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

52

SCHOOL

BLDG CAP (FDK) 2011 P/EC 2012 P/EC 2013 P/EC 2014 P/EC 2015 P/EC 2016 P/EC 2017 P/EC 2018 P/EC 2019 P/EC 2020 P/EC 2021 P/EC

St. Christopher 483 652 8 678 9 696 10 709 11 700 10 707 10 677 9 663 8 658 8 640 7 637 7

St. Elizabeth Seton 460 706 11 758 14 790 15 851 18 872 19 904 20 956 23 960 23 969 23 960 23 967 23

BELOW CAPACITY

AT CAPACITY

OVER CAPACITY

BEYOND CAPACITY

Page 53: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

53

Scenario #2

SCHOOLBLDG

CAP(FDK) 2011 P/EC 2012 P/EC 2013 P/EC 2014 P/EC 2015 P/EC 2016 P/EC 2017 P/EC 2018 P/EC 2019 P/EC 2020 P/EC 2021 P/EC

St. Christopher 483 652 8 515 2 509 2 506 2 488 1 482 0 462 0 453 -1 447 -1 435 -2 433 -2St. Elizabeth Seton 460 706 11 516 3 530 4 540 4 535 4 541 4 518 3 500 2 485 2 463 1 469 1

Alton Village CES 612 0 0 405 -9 447 -7 514 -4 549 -2 588 -1 653 2 670 3 695 4 702 4 702 4

BELOW CAPACITY AT CAPACITY OVER CAPACITY BEYOND CAPACITY

Page 54: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

54

(Scenario #3)

SCHOOLBLDG

CAP(FDK) 2011 P/EC 2012 P/EC 2013 P/EC 2014 P/EC 2015 P/EC 2016 P/EC 2017 P/EC 2018 P/EC 2019 P/EC 2020 P/EC 2021 P/EC

St. Christopher 483 652 8 495 1 485 1 479 0 458 -1 449 -1 425 -2 416 -2 408 -3 396 -3 394 -3St. Elizabeth Seton 460 706 11 536 4 554 5 567 5 565 5 574 6 555 5 537 4 524 3 502 2 508 3Alton Village CES 612 0 0 405 -9 447 -7 514 -4 549 -2 588 -1 653 2 670 3 695 4 702 4 702 4

BELOW CAPACITY AT CAPACITY OVER CAPACITY BEYOND CAPACITY

Page 55: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

55

(Scenario #4A)

SCHOOLBLDG

CAP(FDK) 2011 P/EC 2012 P/EC 2013 P/EC 2014 P/EC 2015 P/EC 2016 P/EC 2017 P/EC 2018 P/EC 2019 P/EC 2020 P/EC 2021 P/EC

St. Christopher 483 652 8 469 0 452 -1 438 -2 414 -3 406 -3 378 -4 362 -5 358 -5 353 -5 352 -5St. Elizabeth Seton 460 706 11 562 5 587 6 608 7 609 7 617 7 602 7 591 6 574 6 545 4 550 4Alton Village CES 612 0 0 405 -9 447 -7 514 -4 549 -2 588 -1 653 2 670 3 695 4 702 4 702 4

BELOW CAPACITY AT CAPACITY OVER CAPACITY BEYOND CAPACITY

Page 56: Alton Village School Boundary Review April 17, 2012 FINAL REPORT 1.

56


Recommended