AMBIT ARCHITECTURE 412 S. 2 nd Street Philadelphia, PA 19147 October 1, 2020 Philadelphia Historical Commission 1515 Arch Street Philadelphia, PA 19102 To whom it may concern, Please find the enclosed documents regarding the proposed new building 232-36 Walnut Street (Southeast corner of 3 rd and Walnut). The owner of the property is Marie F. Cerone at the same address. The proposed project also includes the air rights to 220A-30 Walnut Street which is owned by the same owners and is listed as premise “B” on the deed. The current single family residence on the site was built in 1999 and we are proposing its complete demolition. The proposed project encompasses 1 new 8 story, 100’ tall building that will house a hotel and include an event space on the 8 th floor and hotel entry/office and a commercial space on the ground floor. The building’s design takes cues from surrounding building on and around Walnut Street. The proposed design uses Flemish bond brick as the main exterior material. The exterior is broken up into tall sections of stacked windows that are topped with an Ogee three centered arch. Each of the window bays contains muntined windows with brick sill pieces. The building has a 2’- 0” deep stone cornice that sits at the top of the 7 th floor at a height of 89’-0”. There is a second, non-protruding, cornice that sits at the top of the first floor.
Transcript
Page 1: AMBIT ARCHITECTURE 412 S. 2nd Street

AMBIT ARCHITECTURE�

412 S. 2nd Street

Philadelphia, PA 19147

October 1, 2020

Philadelphia Historical Commission

1515 Arch Street

Philadelphia, PA 19102

To whom it may concern,

Please find the enclosed documents regarding the proposed new building 232-36 Walnut

Street (Southeast corner of 3rd and Walnut). The owner of the property is Marie F. Cerone at the

same address. The proposed project also includes the air rights to 220A-30 Walnut Street which

is owned by the same owners and is listed as premise “B” on the deed.

The current single family residence on the site was built in 1999 and we are proposing its

complete demolition. The proposed project encompasses 1 new 8 story, 100’ tall building that will

house a hotel and include an event space on the 8th floor and hotel entry/office and a commercial

space on the ground floor.

The building’s design takes cues from surrounding building on and around Walnut Street.

The proposed design uses Flemish bond brick as the main exterior material. The exterior is

broken up into tall sections of stacked windows that are topped with an Ogee three centered arch.

Each of the window bays contains muntined windows with brick sill pieces. The building has a 2’-

0” deep stone cornice that sits at the top of the 7th floor at a height of 89’-0”. There is a second,

non-protruding, cornice that sits at the top of the first floor.

Page 2: AMBIT ARCHITECTURE 412 S. 2nd Street

The buildings mass sits 29’-6” away from the Walnut Street property line, creating a plaza

at the North side public entry. The plaza is contained by new stone posts and new decorative iron

fencing. The 2nd -7th floors utilize the air rights of the adjacent property at 222 Walnut.

The revisions made after the most recent Architectural Committee meeting are:

1.� Windows are smaller and there are more vertical “bays”

2.� Horizontal brick bands are placed at all floor lines

3.� Horizontal brick band at the 7th floor is deeper to create a pronounced shadow line

4.� Window color is now dark

5.� The north stair tower no longer goes to roof.

This application seeks final approval.

I look forward to the Committee’s interaction.

Thank You,

Rich Villa

Partner, Ambit Architecture

Page 3: AMBIT ARCHITECTURE 412 S. 2nd Street

UPUP

UPUP

ZONING: CMX-3LOT AREA: 9,154.29 SF

FLOOR: USE: 232-36 Walnut SF: 222A-30 Walnut SF:

BASEMENT - BACK OF HOUSE 6098 (not counted as FAR)GROUND FLOOR - VISITOR ACCOMOD. ENTRY / VACANT COMMERCIAL / BACK OF HOUSE 6190 1951.812ND FLOOR - VISITOR ACCOMODATIONS 6190 1741.23RD FLOOR - VISITOR ACCOMODATIONS 6190 1741.24TH FLOOR - VISITOR ACCOMODATIONS 6190 1741.25TH FLOOR - VISITOR ACCOMODATIONS 6190 1741.26TH FLOOR - VISITOR ACCOMODATIONS 6190 1741.27TH FLOOR - VISITOR ACCOMODATIONS 6190 1741.28TH FLOOR - ASSEMBLY ACCESSORY TO VISITOR ACCOMODATIONS 2441 675

Gross FAR SF: 45,771.45 SF Gross FAR SF: 13,074.00 SF

ALLOWED PROPOSEDACCOMODATION UNITS - 90

DIMENSIONAL STANDARDSREQUIRED / ALLOWED PROPOSED

LOT SIZE 9154.29 SF Existing (232-36 Walnut)3224 SF Existing (222A-30 Walnut)

OCCUPIED AREA 7248.53 SF (80.00%) 6190.00 SF (67.6%) (232-36 Walnut)FRONT (Walnut St.) SETBACK 0'-0" 29'-6" Setback Per Section 14-502(3)(g)SIDE (East) SETBACK 0'-0" 0'-0"SIDE (West) SETBACK 0'-0" (with no dwelling units) 3'-6"REAR (Thomas Paine Pl.)YARD 0'-0" 2'-0"HEIGHT NA 111'-0" to top of Mech. Shafts

100'-0" to top of Roof91'-6" to top of Rail88'- 0" to top of Cornice

FAR: 232-36 Walnut: 9154.29 SF 45,771.45sf = 5 FAR222A-30 Walnut: 3224 SF 13,074.00 = 4.05 FAR

PROJECT SUMMARY: 232-36 Walnut Streetand Air Rights to 222A-30 Walnut Street

����%ORFN�RI�6

RXWK��UG�6WUHHW

Lega

lly op

en on

city

plans

60' R

ight o

f Way

[12'-3

6'-12

']

�������:DOQXW�6WUHHWLot Size: 9154.29

North

����%ORFN�RI�7KRPDV�3DLQH�3ODFH

����%ORFN�RI�:DOQXW�6WUHHWLegally open on city plans

60' Right of Way[12'-26'-12']

Legally open on city plans60' Right of Way

[12'-36'-12']

13' -

0"15

0' - 6

"

15' - 0" 26' - 0" 15' - 0" 37' - 2 1/2"Propsed Curb Cut

22' - 10" 5' - 4 1/2"

15' - 0"

Fron

t Set b

ack P

er S

ectio

n 14-

502(

3 )(g

)29

' - 6"

Build

ing D

i men

sion

106'

- 9 1/

2"2'

- 2 1/

2"

3' - 6"Building Dimension

55' - 0" 7' - 4 3/4"

8th F

l . Se

t back

31' -

11 1/

4"8th

Floo

r Bui l

di ng D

imen

s i on

51' -

0 3/ 4"

18' -

0 3/ 4"

Rail S

et bac

k7'

- 11 1

/ 4"

Open Plaza at Grade of Walnut Street

Stone Post and 50% open decorative fence

17' - 8" 30' - 1"

9' - 6

"11

' - 2"

8' - 1

0"

32' - 2 1/2" 18' - 10"

Spot Elevation: +13.60'Spot Elevation: +15.65'

Spot Elevation: +18.44'

Spot Elevation: +18.67'

Proposed Spot Elevation: +16.75'

Spot Elevation: +16.75'

AIR

RIGH

TS 7.

00' A

BOVE

GRO

UND

BEIN

GDE

SCRI

BED

AS P

REMI

SES

'B'. P

REMI

SES

'C' A

SDE

SCRI

BED

PERT

AINS

TO

GROU

ND S

UPPO

RTS

FOR

PREM

ISES

'B', S

EE D

EED

DOCU

MENT

ID#4

9058

081,R

ECOR

DED

ON 4/

14/19

99.

LOT

SIZE

: 3,22

4 sf

Visitor Accomodation Building

North Property Line - 68.896'

Wes

t Pro

perty

Line

-13

8.50'

East

Prop

erty

Line -

98.50

8'Ea

st Pr

oper

ty Lin

e -39

.958'

Property Line - 1.114'

South Property Line - 65.417'

44' - 10"

East

Prop

erty

Line -

98.53

7'

South Property Line - 32.851'

North Property Line - 32.271'

3' - 7"

3' - 7"

1' - 9

1/4"

Line of Cornice AbovePer Section 11-603(5)(g)

Line of Cornice Above

Line of Cornice AbovePer Section 11-603(5)(g)

Line of Entry Canopy

Furn

. Zon

e3'

- 0"

Ped.

Zone

6' - 0

"Bl

d. Z o

ne4'

- 0"

Furn. Zone3' - 0"

Ped. Zone8' - 0"

Bld. Zone4' - 0"

Bld.

Z one

4' - 0

"Pe

d. Zo

ne5'

- 0"

Furn

. Zon

e3'

- 1"

32' - 2 1/2" 18' - 10 3/4"

Proposed Height100'-0"

Proposed Height at Stair Tower111'-0"

Proposed Roof Height100'-0"

Proposed Deck Height88'-0"

Proposed Cornice Height174'-0"

Proposed Deck Height88'-0"

Bld. Dim. 1st Fl.65' - 5"

8th Fl. Setback8' - 3"

Line of Ornamental ProjectionsPer Section 11-603(5)(c)

Line of Ornamental ProjectionsPer Section 11-603(5)(c)

First Floor Open Space at loading Area

Ex. Tree Pit

Ex. Tree Pit

Ex. Tree Pit

Ex. Tree Pit

Ex. Tree Pit

Ex. Tree Pit

Ex. Street Light

Prop.New ADA Ramp

Ex.TraffcSignal

Ex. Signal Box

Prop.New ADA Ramp

Line of Ornamental ProjectionsPer Section 11-603(5)(c)

Stone Post and 50% open decorative fence

Stone Post and 50% open decorative fence

���$����:DOQXW�6WUHHW

Proposed Screening at Mech.

Proposed Screening at Mech.

Proposed Screening at Mech.

22' -

1 3/4"

3' - 7

"

29' -

6"26

' - 8"

20' -

5"35

' - 3"

24' -

5 1/2"

40' - 11 1/4" 6' - 2 1/2"

6' - 9 1/2"

Proposed Lot Coverage at 2nd Floor only

Rail S

et bac

k7'

- 7" 53' - 11 3/4"

Proposed Height at Stair Tower111'-0"

Proposed Height at Stair Tower111'-0"

Proposed Roof Height100'-0"

50' - 5"Proposed Loading Zone

30' - 0"

Prop

osed

Load

ing Z

one

8' - 6

"

34' - 10 1/2" 6' - 0 3/4"

10 Class 1A Bicycle Parking Spaceson Ground Floor

AM

BIT

����6287+��QG�675((7

3+,/$'(/3+,$��3$������

������������

:::�$0%,7$5&+,7(&785(�&

20

AR

CH

ITE

CTU

RE

Walnut Street HotelHotel and Event Space:

232-36 Walnut Street Philadelphia, PA 19125

Z1

Hot

el a

nd E

vent

Sp

ace:

232-

36 W

alnu

t Str

eet

����� �����=�� =21,1*�3/$1

All im

ages

and d

esign

© 20

20 A

mbit,

Inc

#DA

TERE

VISI

ON1

6/29/2

0Zo

ning

210

/ 1/20

His to

ri c C

ommi

s sion

39/3

0/20

Zonin

g Rev

.1

Page 4: AMBIT ARCHITECTURE 412 S. 2nd Street

7+,5'�)/225���� ��

���� )2857+�)/225���� ��

*UDGH�� :DOQXW�6W����� ��

'HFN�5DLO���� ��

����� ��%2�)227,1*

6/$%����� ��

6(&21'�)/225���� ��

)LUVW�)ORRU���� �������

���� 522)����� ��

���� 723�2)�6KDIW����� ��

*UDGH�� 7KRPDV�3DLQH�3O���� ������

���� ),)7+�)/225���� ��

=21,1*�6(7%$&.���� ��

���� 6,;7+�)/225���� ��

���� 6(9(17+�)/225���� ��

���� (,*+7+�)/225���� ��

�$���

Spot Elevation: 15.65'Proposed Spot Elevation: 16.75' Spot Elevation: 18.76'

7RS�RI�&RUQLFH���� ��

Setba

ck H

eight

Per S

ect i o

n 14-

502 (

3)(g

)45

' - 0"

Setback Per Section 14-502(3)(g)25' - 0"

1' - 0

"11

' - 6 3

/ 4"

3' - 9

1/4"

4' - 0

"

18' - 0 3/4" 51' - 0 3/4"

$9(5$*(�*5$'(�2)%/*�

��

8' - 6

"

7+,5'�)/225���� ��

���� )2857+�)/225���� ��

*UDGH�� :DOQXW�6W����� ��

'HFN�5DLO���� ��

����� ��%2�)227,1*

6/$%����� ��

6(&21'�)/225���� ��

)LUVW�)ORRU���� �������

���� 522)����� ��

���� 723�2)�6KDIW����� ��

*UDGH�� 7KRPDV�3DLQH�3O���� ������

���� ),)7+�)/225���� ��

=21,1*�6(7%$&.���� ��

���� 6,;7+�)/225���� ��

���� 6(9(17+�)/225���� ��

���� (,*+7+�)/225���� ��

�$���

7RS�RI�&RUQLFH���� ��

53' - 8"

$9(5$*(�*5$'(�2)%/*�

��

8' - 6

"

AM

BIT

����6287+��QG�675((7

3+,/$'(/3+,$��3$������

������������

:::�$0%,7$5&+,7(&785(�&

20

AR

CH

ITE

CTU

RE

Z2

Hot

el a

nd E

vent

Sp

ace:

232-

36 W

alnu

t Str

eet

����� �����=�� =RQLQJ�(OHYDWLRQ�� :HVW��6RXWK��UG�6WUHHW�

����� �����=�� =RQLQJ�(OHYDWLRQ�� 1RUWK��:DOQXW�6WUHHW�

All im

ages

and d

esign

© 20

20 A

mbit,

Inc

#DA

TERE

VISI

ON1

6/29/2

0Zo

ning

210

/ 1/20

His to

ri c C

ommi

s sion

39/3

0/20

Zonin

g Rev

.1

Page 5: AMBIT ARCHITECTURE 412 S. 2nd Street

AM

BIT

����6287+��QG�675((7

3+,/$'(/3+,$��3$������

������������

:::�$0%,7$5&+,7(&785(�&

20

AR

CH

ITE

CTU

RE

Z3

Hot

el a

nd E

vent

Sp

ace:

232-

36 W

alnu

t Str

eet

232 Walnut Street

232 Walnut Street (1996)

220 Walnut Street attached Air Rights

Existing Single Family House - Built in 1999Photo: 5.15.20

Historic Photos - Prior to site being a parking lot in 1954

#DA

TERE

VISI

ON2

10/1/

20Hi

s t oric

Com

mis s

ion

Page 6: AMBIT ARCHITECTURE 412 S. 2nd Street

AM

BIT

����6287+��QG�675((7

3+,/$'(/3+,$��3$������

������������

:::�$0%,7$5&+,7(&785(�&

20

AR

CH

ITE

CTU

RE

Z4

Hot

el a

nd E

vent

Sp

ace:

232-

36 W

alnu

t Str

eet

Context - Quoine Conrner from Former Building on Site

Context - 3 Window Bays at 304 Walnut Street

Context - Walnut Place is 87' to the top of its Pediment232-36 Walnut has a proposed cornice height of 89'

Context - Tall Arched bays from Walnut Place

Context - Arch Window decoration from 5th and Chestnut

Context - Keystone Detail from former bulding on site

#DA

TERE

VISI

ON2

10/1/

20Hi

s t oric

Com

mis s

ion

Page 7: AMBIT ARCHITECTURE 412 S. 2nd Street

UP

UP

�$���

�$���

�$���

�$���

�=�

�=�

�$���

�$���

Building Utilities

AM

BIT

����6287+��QG�675((7

3+,/$'(/3+,$��3$������

������������

:::�$0%,7$5&+,7(&785(�&

20

AR

CH

ITE

CTU

RE

A10

0H

otel

and

Eve

nt S

pac

e:23

2-36

Wal

nut S

tree

t

����� �����$���� %$6(0(17�3/$1

#DA

TERE

VISI

ON1

6/29/2

0Zo

ning

Page 8: AMBIT ARCHITECTURE 412 S. 2nd Street

UP

UPUP

UP UP

UP

�$���

�$���

�$���

�$���

�=�

�=�

�$���

�$���

Hotel Lobby

Restaurant2,100 sf

Hotel Offices

Line of Entry Canopy Above

Outdoor Soace500 sf

8' - 0"

Back of House

Hotel Storage

Restaurant Kitchen

Existing 8 Parking Spaces at 222A Walnut Street per Deed

32' - 5 1/4"

�$���

�$���

�$���

�=�

�=�

�$���

�$���

Loading Area

Hotel Offices

AM

BIT

����6287+��QG�675((7

3+,/$'(/3+,$��3$������

������������

:::�$0%,7$5&+,7(&785(�&

20

AR

CH

ITE

CTU

RE

A10

1H

otel

and

Eve

nt S

pac

e:23

2-36

Wal

nut S

tree

t

����� �����$���� ),567�)/225�3/$1 ����� �����$���

� 5($5�),567�)/225�3/$1

#DA

TERE

VISI

ON1

6/29/2

0Zo

ning

210

/ 1/20

His to

ri c C

ommi

s sion

Page 9: AMBIT ARCHITECTURE 412 S. 2nd Street

UP

UP

UP

UP

�$���

�$���

�$���

�$���

4' - 0" 54' - 0" 6"

18' -

0 3/4"

�=�

�=�

�$���

�$���

30' -

0" EQ EQ EQ

17' - 9 1/4" 17' - 9 1/4"

26' -

2"

5' - 6

"

5' - 0"

23' -

8"

EQ EQ

55' - 0"

106'

- 9 1/

2"

59' -

5"

+RWHO�5RRP

+RWHO�5RRP +RWHO�

5RRP

+RWHO�5RRP

+RWHO�5RRP

+RWHO�5RRP

+RWHO�5RRP

+RWHO�5RRP

+RWHO�5RRP+RWHO�

5RRP

+RWHO�5RRP

+RWHO�5RRP+RWHO�

5RRP

+RWHO�5RRP

525 sf

360 sf525 sf

525 sf

525 sf

340 sf

525 sf525 sf 440 sf

340 sf525 sf

350 sf

450 sf425 sf

�$���

�$���

�$���

�$���

�=�

�=�

�$���

�$���

7' - 7

"22

' - 1 3

/4"51

' - 0 3

/4"18

' - 0 3

/4"7'

- 11 1

/4"

11' - 7" 33' - 2 1/4"

11' - 9" 53' - 11 1/2" 20' - 10 3/4"

Event Space #11,050 SF

Outdoor Event Space

19' - 9 1/2"

4' - 1

0 3/4"

Event Space #21,500 SF

Outdoor Event Space

6' - 7" AM

BIT

����6287+��QG�675((7

3+,/$'(/3+,$��3$������

������������

:::�$0%,7$5&+,7(&785(�&

20

AR

CH

ITE

CTU

RE

A10

2H

otel

and

Eve

nt S

pac

e:23

2-36

Wal

nut S

tree

t

����� �����$���� 6(&21'�� 6(9(17+�)/225�3/$1

����� �����$���� ���� (,*+7+�)/225

#DA

TERE

VISI

ON2

10/1/

20Hi

s t oric

Com

mis s

ion

Page 10: AMBIT ARCHITECTURE 412 S. 2nd Street

7+,5'�)/225���� ��

���� )2857+�)/225���� ��

*UDGH�� :DOQXW�6W����� ��

'HFN�5DLO���� ��

����� ��%2�)227,1*

6/$%����� ��

6(&21'�)/225���� ��

)LUVW�)ORRU���� �������

���� 522)����� ��

���� 723�2)�6KDIW����� ��

Typ. Premanufactured Panelized Wall Construction:See XXXX

Typ. Metal Panel Wall Construction:See XXXX

Ground Floor Hotel Offices

Setback 15th Floor Event Space

*UDGH�� 7KRPDV�3DLQH�3O���� ������

���� ),)7+�)/225���� ��

=21,1*�6(7%$&.���� ��

���� 6,;7+�)/225���� ��

���� 6(9(17+�)/225���� ��

���� (,*+7+�)/225���� ��

�$���

Metal Entrance Overhang

7RS�RI�&RUQLFH���� ��3'

- 6"

$9(5$*(�*5$'(�2)%/*�

��

Typ. Premanufactured Panelized Cornice Construction:See XXXX

Typ. Metal Panel Wall Construction:See XXXX

16' -

11 1/

4"11

' - 8"

11' -

8"11

' - 8"

11' -

8"11

' - 8"

14' -

8"12

' - 0"

3' - 7"

4' - 0"

AM

BIT

����6287+��QG�675((7

3+,/$'(/3+,$��3$������

������������

:::�$0%,7$5&+,7(&785(�&

20

AR

CH

ITE

CTU

RE

A20

0H

otel

and

Eve

nt S

pac

e:23

2-36

Wal

nut S

tree

tRE

V 1

5/6/1

9

����� �����$���� 1RUWK��:DOQXW�6WUHHW��(OHYDWLRQ

#DA

TERE

VISI

ON1

6/29/2

0Zo

ning

210

/ 1/20

His to

ri c C

ommi

s sion

Page 11: AMBIT ARCHITECTURE 412 S. 2nd Street

7+,5'�)/225���� ��

���� )2857+�)/225���� ��

*UDGH�� :DOQXW�6W����� ��

'HFN�5DLO���� ��

����� ��%2�)227,1*

6/$%����� ��

6(&21'�)/225���� ��

)LUVW�)ORRU���� �������

���� 522)����� ��

���� 723�2)�6KDIW����� ��

Typ. Metal Panel Wall Construction:See A303

*UDGH�� 7KRPDV�3DLQH�3O���� ������

���� ),)7+�)/225���� ��

=21,1*�6(7%$&.���� ��

���� 6,;7+�)/225���� ��

���� 6(9(17+�)/225���� ��

���� (,*+7+�)/225���� ��

�$���

12' -

0"14

' - 8"

11' -

8"11

' - 8"

11' -

8"11

' - 8"

11' -

8"

7RS�RI�&RUQLFH���� ��

$9(5$*(�*5$'(�2)%/*�

��

Typ. Premanufactured Panelized Wall Construction:See XXXX

Typ. Premanufactured Panelized Cornice Construction:See XXXX

Typ. Metal Panel Wall Construction:See A303

17' -

0"

EQ EQ

6' - 0"

10' -

11 1/

4"

AM

BIT

����6287+��QG�675((7

3+,/$'(/3+,$��3$������

������������

:::�$0%,7$5&+,7(&785(�&

20

AR

CH

ITE

CTU

RE

A20

1H

otel

and

Eve

nt S

pac

e:23

2-36

Wal

nut S

tree

tRE

V 1

5/6/1

9

����� �����$���� :HVW��6RXWK��UG�6WUHHW��(OHYDWLRQ

#DA

TERE

VISI

ON1

6/29/2

0Zo

ning

210

/ 1/20

His to

ri c C

ommi

s sion

Page 12: AMBIT ARCHITECTURE 412 S. 2nd Street

7+,5'�)/225���� ��

���� )2857+�)/225���� ��

*UDGH�� :DOQXW�6W����� ��

'HFN�5DLO���� ��

6(&21'�)/225���� ��

)LUVW�)ORRU���� �������

���� 522)����� ��

���� 723�2)�6KDIW����� ��

*UDGH�� 7KRPDV�3DLQH�3O���� ������

���� ),)7+�)/225���� ��

=21,1*�6(7%$&.���� ��

���� 6,;7+�)/225���� ��

���� 6(9(17+�)/225���� ��

���� (,*+7+�)/225���� ��

�$���

7RS�RI�&RUQLFH���� ��

$9(5$*(�*5$'(�2)%/*�

��

Typ. Premanufactured Panelized Wall Construction:See XXXX

RollUp Loading Door

Typ. Metal Panel Wall Construction:See XXXX

AM

BIT

����6287+��QG�675((7

3+,/$'(/3+,$��3$������

������������

:::�$0%,7$5&+,7(&785(�&

20

AR

CH

ITE

CTU

RE

A20

2H

otel

and

Eve

nt S

pac

e:23

2-36

Wal

nut S

tree

t

����� �����$���� 6RXWK��7KRPV�3DLQH�3O���(OHYDWLRQ

#DA

TERE

VISI

ON2

10/1/

20Hi

s t oric

Com

mis s

ion

Page 13: AMBIT ARCHITECTURE 412 S. 2nd Street

7+,5'�)/225���� ��

���� )2857+�)/225���� ��

*UDGH�� :DOQXW�6W����� ��

'HFN�5DLO���� ��

6/$%����� ��

6(&21'�)/225���� ��

)LUVW�)ORRU���� �������

���� 522)����� ��

���� 723�2)�6KDIW����� ��

*UDGH�� 7KRPDV�3DLQH�3O���� ������

���� ),)7+�)/225���� ��

=21,1*�6(7%$&.���� ��

���� 6,;7+�)/225���� ��

���� 6(9(17+�)/225���� ��

���� (,*+7+�)/225���� ��

�$���

7RS�RI�&RUQLFH���� ��

$9(5$*(�*5$'(�2)%/*�

��

AM

BIT

����6287+��QG�675((7

3+,/$'(/3+,$��3$������

������������

:::�$0%,7$5&+,7(&785(�&

20

AR

CH

ITE

CTU

RE

A20

3H

otel

and

Eve

nt S

pac

e:23

2-36

Wal

nut S

tree

t

����� �����$���� (DVW�(OHYDWLRQ

#DA

TERE

VISI

ON2

10/1/

20Hi

s t oric

Com

mis s

ion

Page 14: AMBIT ARCHITECTURE 412 S. 2nd Street

AM

BIT

����6287+��QG�675((7

3+,/$'(/3+,$��3$������

������������

:::�$0%,7$5&+,7(&785(�&

20

AR

CH

ITE

CTU

RE

A20

4H

otel

and

Eve

nt S

pac

e:23

2-36

Wal

nut S

tree

t#

DATE

REVI

SION

210

/1/20

His t o

ric C

ommi

s sion

Page 15: AMBIT ARCHITECTURE 412 S. 2nd Street

AM

BIT

����6287+��QG�675((7

3+,/$'(/3+,$��3$������

������������

:::�$0%,7$5&+,7(&785(�&

20

AR

CH

ITE

CTU

RE

A20

5H

otel

and

Eve

nt S

pac

e:23

2-36

Wal

nut S

tree

t

View From Walnut Street Looking South View From 3rd Street Looking to Walnut Street

#DA

TERE

VISI

ON2

10/1/

20Hi

s t oric

Com

mis s

ion

Page 16: AMBIT ARCHITECTURE 412 S. 2nd Street

AM

BIT

����6287+��QG�675((7

3+,/$'(/3+,$��3$������

������������

:::�$0%,7$5&+,7(&785(�&

20

AR

CH

ITE

CTU

RE

A20

6H

otel

and

Eve

nt S

pac

e:23

2-36

Wal

nut S

tree

t

View From 3rd Street Looking South View From 3rd Street Looking North

#DA

TERE

VISI

ON2

10/1/

20Hi

s t oric

Com

mis s

ion

Page 17: AMBIT ARCHITECTURE 412 S. 2nd Street

AM

BIT

����6287+��QG�675((7

3+,/$'(/3+,$��3$������

������������

:::�$0%,7$5&+,7(&785(�&

20

AR

CH

ITE

CTU

RE

A20

7H

otel

and

Eve

nt S

pac

e:23

2-36

Wal

nut S

tree

t

View From Dock Street Looking Southwest View From Walnut Street Looking East

#DA

TERE

VISI

ON2

10/1/

20Hi

s t oric

Com

mis s

ion

Page 18: AMBIT ARCHITECTURE 412 S. 2nd Street

AM

BIT

����6287+��QG�675((7

3+,/$'(/3+,$��3$������

������������

:::�$0%,7$5&+,7(&785(�&

20

AR

CH

ITE

CTU

RE

A20

8H

otel

and

Eve

nt S

pac

e:23

2-36

Wal

nut S

tree

t

Sun Study on June 21st

Sun Study on December 21st

#DA

TERE

VISI

ON

Page 19: AMBIT ARCHITECTURE 412 S. 2nd Street

7+,5'�)/225���� ��

���� )2857+�)/225���� ��

*UDGH�� :DOQXW�6W����� ��

'HFN�5DLO���� ��

����� ��%2�)227,1*

6/$%����� ��

6(&21'�)/225���� ��

)LUVW�)ORRU���� �������

���� 522)����� ��

���� 723�2)�6KDIW����� ��

*UDGH�� 7KRPDV�3DLQH�3O���� ������

���� ),)7+�)/225���� ��

=21,1*�6(7%$&.���� ��

���� 6,;7+�)/225���� ��

���� 6(9(17+�)/225���� ��

���� (,*+7+�)/225���� ��

�$���

7RS�RI�&RUQLFH���� ��

$9(5$*(�*5$'(�2)%/*�

��

AM

BIT

����6287+��QG�675((7

3+,/$'(/3+,$��3$������

������������

:::�$0%,7$5&+,7(&785(�&

20

AR

CH

ITE

CTU

RE

A30

0H

otel

and

Eve

nt S

pac

e:23

2-36

Wal

nut S

tree

t

������ �����$���� %XLOGLQJ�6HFWLRQ�DW�1RUWK�6WDLU�7RZHU

#DA

TERE

VISI

ON1

6/29/2

0Zo

ning

210

/ 1/20

His to

ri c C

ommi

s sion


Recommended