+ All Categories
Home > Marketing > Amec 2015 Integrated PR Measurement workshop

Amec 2015 Integrated PR Measurement workshop

Date post: 12-Aug-2015
Category:
Upload: marion-mcdonald
View: 76 times
Download: 1 times
Share this document with a friend
Popular Tags:
7
WiFi Access User name: Password:
Transcript
Page 1: Amec 2015    Integrated PR Measurement workshop

WiFi AccessUser name: Password:

Page 2: Amec 2015    Integrated PR Measurement workshop

Winning in Integrated Measurement

Page 3: Amec 2015    Integrated PR Measurement workshop

Leader vs Follower

Page 4: Amec 2015    Integrated PR Measurement workshop

Spot the Signs of Integration

• Change in client internal org structure • Diverse agency types briefed on same project• Client blending agency teams on projects

Page 5: Amec 2015    Integrated PR Measurement workshop

Leading the Integration Shift

• Thought leadership – visibly advocating change• Packaging case studies of integrated measurement• An appointed leader – the passionate internal champion • Internal training workshops• For agencies – develop an integrated client target list• For clients – integrated agencies you want to partner with• Membership of AMEC!

Page 6: Amec 2015    Integrated PR Measurement workshop

Talent Implications

Page 7: Amec 2015    Integrated PR Measurement workshop

Product Implications


Recommended