AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT SECTION 2.0: ENGAGEMENT SUMMARY
August 2018 Project No. 1899726
APPENDIX 2.4C Continued Stakeholder Engagement
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 1
2.4C1.0 INTRODUCTION
This Engagement Summary Report presents the engagement efforts and results of Continued Engagement with stakeholders on the Project. Continued Engagement is defined as engagement occurring from from October 21, 2017 up to May 31, 2018. The objectives of the engagement activities during Continued Engagement are as follows:
deliver electronic or hard copies of the Final EA Report to relevant stakeholders;
meet with stakeholders who previously did not engage in community meetings, if possible; and
meeting with stakeholders to resolve any outstanding issues or comments on the Final EA Report.
2.4C2.0 IDENTIFICATION OF PARTICIPANTS
A stakeholder participant list was developed based on engagement efforts to date, review of publicly available government agency contacts, community websites, and experience with other projects within the same geographic region. Representatives of government agencies and relevant politicians will be made aware of all engagement activities conducted with the participating stakeholders. The following categories of stakeholders were identified:
General Public
landowners and residents within the 2-km-wide corridors;
businesses within the 2-km-wide corridors and in Pickle Lake, Ignace, Sioux Lookout and Dryden (e.g., tourism operators);
Crown land tenure and claim holders within the 2-km-wide corridors; and
self-identified members of the public.
Non-Governmental Organizations (NGOs)
environmental groups; and
community-based organizations.
Government Agencies
Government Review Team (GRT);
federal government: local and area Members of Parliament (MPs), departmental and agency staff;
provincial government: local and area Members of Provincial Parliament (MPPs), ministry and agency staff; and
local municipal and district councils, agencies and staff.
The current stakeholder participant list can be found in its entirety in the Stakeholder Engagement Plan (Appendix 2.4B).
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 2
2.4C3.0 ENGAGEMENT METHODS
2.4C3.1 Meetings Wataynikaneyap completed additional meetings with key regulatory agencies, based on their level of interest and comments received on the Final EA Report. At these meetings, the Project team provided a presentation, summarizing proposed responses to comments provided. Discussion on the proposed responses followed and was used to finalize responses for submission. These meetings are described in further detail in Section 2.4C6.0.
2.4C4.0 RECORD OF ENGAGEMENT: LOCAL GOVERNMENT
2.4C4.1 Engagement Activities Table 2.4C6-1 provides a summary of engagement activities with other local government stakeholders. On November 3, 2017, the Project team emailed the Notice of Submission of the Final EA Report to local government representatives. The notice stated that the Final EA Report has been submitted to the MOECC for review and approval and was available for public review and comment from November 3 to December 22, 2017. The notice included details on how the Final EA Report could be accessed. Following the emailed Notice of Submission, a CD copy of the Final EA Report was also sent to local governments between November 6, 2017 and November 8, 2017.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 3
Table 2.4C4-1: Engagement with Stakeholders Reivew of Final EA Report – Local Government
Date Contact Team Members Involved
Communication Method Communication Summary
City of Dryden November 3, 2017
Bob Cunningham, Craig Nutall, Debra Kincaid, Martin MacKinnon
Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
November 3, 2017
Bob Cunningham, Craig Nutall, Debra Kincaid, Martin MacKinnon
Callum Squires Email The Project team emailed the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available. The Project team also provided an acknowledgement of receipt form.
November 6, 2017
City of Dryden, General Delivery
Callum Squires Document Delivery
The Project team provided the Notice of Submission of the Final EA Report information package. The information package included a CD copy of the Final EA Report and a memo from the MOECC. The memo stated that the Final EA Report has been submitted to the MOECC for review and approval and requested that the CD be available for public review upon request from November 3 to December 22, 2017. The Project team also requested that the Notice of Submission also be made available with the document.
November 6, 2017
Bob Cunningham, Craig Nutall, Debra Kincaid, Martin MacKinnon
Callum Squires Document Delivery
The Project team couriered the Notice of Submission of the Final EA Report information package. The information package stated that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment for November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available, an acknowledgement of receipt form, and a CD copy of the Final EA Report.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 4
Table 2.4C4-1: Engagement with Stakeholders Reivew of Final EA Report – Local Government
Date Contact Team Members Involved
Communication Method Communication Summary
City of Dryden November 8, 2017
City of Dryden, General Delivery
Callum Squires Document Delivery
The Project team provided the Notice of Submission of the Final EA Report information package. The information package included a copy of the Final EA Report and a memo from the MOECC. The memo stated that the Final EA Report has been submitted to the MOECC for review and approval and requested that the hard copy report be available for public review upon request from November 3 to December 22, 2017. The Project team also requested that the Notice of Submission also be made available with the document.
Municipality of Sioux Lookout November 3, 2017
Ann Mitchell, Cal Southall, Colleen Carroll, Doug Lawrance, John Bath, Mary L. MacKenzie, Jody Brinkman, Vicki Blanchard
Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
November 3, 2017
Ann Mitchell, Cal Southall, Colleen Carroll, Doug Lawrance, John Bath, Mary L. MacKenzie, Jody Brinkman, Vicki Blanchard
Callum Squires Email The Project team emailed the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available. The Project team also provided an acknowledgement of receipt form.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 5
Table 2.4C4-1: Engagement with Stakeholders Reivew of Final EA Report – Local Government
Date Contact Team Members Involved
Communication Method Communication Summary
Municipality of Sioux Lookout November 7, 2017
Ann Mitchell, Cal Southall, Colleen Carroll, Doug Lawrance, John Bath, Mary L. MacKenzie, Jody Brinkman, Vicki Blanchard
Callum Squires Document Delivery
The Project team couriered the Notice of Submission of the Final EA Report information package. The information package stated that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment from November 3 to December 22, 2017. The Project team listed the locations and Project website where the Final EA Report is available. The information package also included an acknowledgement of receipt form and a CD copy of the Final EA Report.
Township of Ignace November 3, 2017
Christy McIntomney, Lee Kennard, Chantelle Gascon
Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
November 3, 2017
Christy McIntomney, Lee Kennard, Chantelle Gascon
Callum Squires Email The Project team emailed the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available. The Project team also provided an acknowledgement of receipt form.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 6
Table 2.4C4-1: Engagement with Stakeholders Reivew of Final EA Report – Local Government
Date Contact Team Members Involved
Communication Method Communication Summary
Township of Ignace November 6, 2017
Township of Ignace, General Delivery
Callum Squires Document Delivery
The Project team provided the Notice of Submission of the Final EA Report information package. The information package included a CD copy of the Final EA Report and a memo from the MOECC. The memo stated that the Final EA Report has been submitted to the MOECC for review and approval and requested that the CD be available for public review upon request from November 3 to December 22, 2017. The Project team also requested that the Notice of Submission also be made available with the document.
November 7, 2017
Christy McIntomney, Lee Kennard, Chantelle Gascon
Callum Squires Document Delivery
The Project team couriered the Notice of Submission of the Final EA Report information package. The information package stated that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment from November 3 to December 22, 2017. The Project team listed the locations and Project website where the Final EA Report is available. The information package also included an acknowledgement of receipt form and a CD copy of the Final EA Report.
November 8, 2017
Township of Ignace, General Delivery
Callum Squires Document Delivery
The Project team provided the Notice of Submission of the Final EA Report information package. The information package included a copy of the Final EA Report and a memo from the MOECC. The memo stated that the Final EA Report has been submitted to the MOECC for review and approval and requested that the hard copy report be available for public review upon request from November 3 to December 22, 2017. The Project team also requested that the Notice of Submission also be made available with the document.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 7
Table 2.4C4-1: Engagement with Stakeholders Reivew of Final EA Report – Local Government
Date Contact Team Members Involved
Communication Method Communication Summary
Township of Pickle Lake November 3, 2017
Mayor Karl Hopf, Christine Stamatopoulos, Manuela Batovanja
Callum Squires Letter The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project Team provided the locations and Project website where the Final EA Report is available.
November 3, 2017
Mayor Karl Hopf, Christine Stamatopoulos, Manuela Batovanja
Callum Squires Email The Project team emailed the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available. The Project team also provided an acknowledgement of receipt form.
November 3, 2017
Erkki Pohjolainen Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
November 6, 2017
Erkki Pohjolainen Callum Squires Document Delivery
The Project team provided the Notice of Submission of the Final EA Report information package. The information package included a CD copy of the Final EA Report and a memo from the MOECC. The memo stated that the Final EA Report has been submitted to the MOECC for review and approval and requested that the CD be available for public review upon request from November 3 to December 22, 2017. The Project team also requested that the Notice of Submission also be made available with the document.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 8
Table 2.4C4-1: Engagement with Stakeholders Reivew of Final EA Report – Local Government
Date Contact Team Members Involved
Communication Method Communication Summary
Township of Pickle Lake November 7, 2017
Mayor Karl Hopf, Christine Stamatopoulos, Manuela Batovanja
Callum Squires Document Delivery
The Project team couriered the Notice of Submission of the Final EA Report information package. The information package stated that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment from November 3 to December 22, 2017. The Project team listed the locations and Project website where the Final EA Report is available. The information package also included an acknowledgement of receipt form and a CD copy of the Final EA Report.
November 8, 2017
Erkki Pohjolainen Callum Squires Document Delivery
The Project team provided the Notice of Submission of the Final EA Report information package. The information package included a copy of the Final EA Report and a memo from the MOECC. The memo stated that the Final EA Report has been submitted to the MOECC for review and approval and requested that the hard copy report be available for public review upon request from November 3 to December 22, 2017. The Project team also requested that the Notice of Submission also be made available with the document.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 9
2.4C5.0 RECORD OF ENGAGEMENT: REGULATORY AGENCIES
2.4C5.1 Engagement Activities The Project team emailed and mailed stakeholders the Notice of Submission of the Final EA Report. The notice stated that the Final EA Report has been submitted to the MOECC for review and approval and was available for public review and comment from November 3 to December 22, 2017. The Project team listed the locations where the Final EA Report was available, including the Project website. The Project team also provided hard or electronic copies of the Final EA Report to members of the Government Review Team (GRT).
The Project Team received comments from regulatory agencies on the Final EA Report and subsequently met with them to discuss. Seventeen separate meetings occurred between January 30, 2018 and April 20, 2018. Table 2.4C5-1 presents the meetings that occurred and Final EA Report topics that were discussed. Table 2.4C5-2 provides a summary of engagement activities with other regulatory agency stakeholders.
Table 2.4C5-1: Summary of Agency Meetings and Topics Discussed
Regulatory Agencies Topic Date
Individual Agency Meetings
Ministry of the Environment and Climate Change (MOECC)
Air quality and noise January 30, 2018
Surface water; January 31, 2018
Greenhouse gases January 31, 2018
Environmental assessment February 22, 2018
Groundwater February 23, 2018
Noise March 26, 2018
Ministry of Natural Resources and Forestry (MNRF)
Vegetation and Wetlands February 26, 2018
Fire Protection March 1, 2018
Environmental Management Plans
March 2, 2018
Joint Agency Meetings
Ministry of Natural Resources and Forestry
Ministry of the Environment and Climate Change
Ministry of Energy
Wildlife February 28, 2018 March 1, 2018 March 14, 2018 March 27, 2018
Fish and Fish Habitat March 15, 2018
Ministry of Natural Resources and Forestry
Ministry of the Environment and Climate Change
Critical landform/vegetation association (CLVA) areas
February 26, 2018
Wildlife, Fish and Fish Habitat and other general EA comments
April 13, 2018
Remaining wildlife comments April 20, 2018
Ministry of Tourism, Culture and Sport Ministry of the Environment and
Climate Change
Archaeology Cultural Heritage
February 1, 2018
Tourism March 13, 2018
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 10
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Canadian Environmental Assessment Agency November 3, 2017
Anjala Puvananathan
Callum Squires Email The Project team emailed stakeholders the Notice of Submission of the Final EA Report. The notice stated that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment from November 3 to December 22, 2017. The Project team listed the locations and Project website where the Final EA Report is available. The information package also included a memo from the MOECC, and comments table template.
November 3, 2017
Carl Johannsson, Heather Smith, Darla Cameron
Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Employment and Social Development Canada November 3, 2017
Jean-Yves Duclos Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Environment and Climate Change Canada November 3, 2017
Catherine McKenna, Denise Fell, Krista Locs, Sheila Allan
Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 11
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Environment and Climate Change Canada November 3, 2017
Rob Dobos, Claudia Dias
Callum Squires Email The Project team emailed stakeholders the Notice of Submission of the Final EA Report. The notice stated that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment from November 3 to December 22, 2017. The Project team listed the locations and Project website where the Final EA Report is available. The information package also included a memo from the MOECC, and comments table template.
December 20, 2017
Claudia Dias Callum Squires Email The Project team received an email from the ECCC via MOECC that provided the ECCC's comments on the Final EA Report.
March 23, 2018
Denise Fell Callum Squires Email The Project team emailed ECCC via the MOECC, providing draft comment responses for distribution to agencies for their review, including responses to comments from ECCC relating to surface water, waste water.
March 26, 2018
Denise Fell Callum Squires Email The Project team received an email from ECCC via the MOECC that provided the ECCC's review of the Project team's draft responses to their comments. The MOECC noted that the ECCC has an additional comment and requested that Wataynikaneyap provide a final response and submit the updated comment response table by April 3, 2018.
April 24, 2018
Denise Fell Callum Squires Email The Project team emailed the MOECC, providing the ECCC follow-up comment responses for review by the ECCC.
ECCC via the MOECC responded by email to the Project team, indicating that the ECCC is satisfied with the response and that ECCC comments can now be closed.
April 26, 2018
Denise Fell Callum Squires Email The Project team emailed the MOECC providing the final ECCC comment response documents.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 12
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Department of Indigenous Services Canada November 3, 2017
Aaron Dorland Callum Squires Email The Project team emailed stakeholders the Notice of Submission of the Final EA Report. The notice stated that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment from November 3 to December 22, 2017. The Project team listed the locations and Project website where the Final EA Report is available. The information package also included a memo from the MOECC, and comments table template.
November 3, 2017
Allison Berman, Carolyn Ann Bennett, Cheyenne Loon, Joanne Wilkinson, Leea Litzgus, Linda Churchley, Pam Simpson, Sean Stuckless, Sophie Radecki
Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
November 6, 2017
Aaron Dorland Callum Squires Document Delivery
The Project team couriered the Notice of Submission of the Final EA Report information package. The information package stated that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment from November 3 to December 22, 2017. The Project team listed the locations and Project website where the Final EA Report is available. The information package also included a memo from the MOECC, comments table template, and a CD copy of the Final EA Report.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 13
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Fisheries and Oceans Canada November 3, 2017
Fisheries and Oceans Canada, General Delivery
Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Health Canada November 3, 2017
Aurelia Thevenot, Kitty Ma
Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Infrastructure Canada November 3, 2017
Linda Lepage Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 14
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Infrastructure Ontario/ Ministry of Infrastructure November 3, 2017
Lisa Myslicki Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
December 8, 2017
Joe Vecchiolla Callum Squires Email The MOI informed the Project team via the MOECC that they have no comments on the Final EA Report.
April 19, 2018
Joe Vecchiolla Callum Squires Email The Project team received an email from the MOI via the MOECC that provided the MOI’s comments regarding the Transformer Station Amendment memo. The MOI stated that given that MOI lands are not required to support the Project, the MOI does not have any concerns. The MOECC requested that Wataynikaneyap acknowledge this comment.
Innovation, Science and Economic Development Canada November 3, 2017
Navdeep Bains Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Major Project Management Office November 3, 2017
Jim Clarke Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 15
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of Aboriginal Affairs November 3, 2017
David Zimmer Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Ministry of Economic Development, Trade and Employment November 3, 2017
John Bullen, Michael Helfinger
Callum Squires Email The Project team emailed stakeholders the Notice of Submission of the Final EA Report. The notice stated that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment from November 3 to December 22, 2017. The Project team listed the locations and Project website where the Final EA Report is available. The information package also included a memo from the MOECC, and comments table template.
November 3, 2017
Steve Romanyshyn Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 16
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of Energy November 3, 2017
Andrea Pastori, Morgan Owen
Callum Squires Email The Project team emailed stakeholders the Notice of Submission of the Final EA Report. The notice stated that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment from November 3 to December 22, 2017. The Project team listed the locations and Project website where the Final EA Report is available. The information package also included a memo from the MOECC, and comments table template.
November 3, 2017
Cisca McInnis, Amy Gibson, Ken Nakahara, Andrea Stoiko, Glenn Thibeault, Brett Smith, Michael Reid, Rick Jennings, Samir Adkar
Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
November 3, 2017
Emma Sharkey Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 17
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of Energy November 6, 2017
Morgan Owen Callum Squires Document Delivery
The Project team couriered the Notice of Submission of the Final EA Report information package. The information package stated that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment from November 3 to December 22, 2017. The Project team listed the locations and Project website where the Final EA Report is available. The information package also included a memo from the MOECC, comments table template, and a CD copy of the Final EA Report.
November 8, 2017
Morgan Owen Callum Squires Document Delivery
The Project team couriered the Notice of Submission of the Final EA Report information package. The information package stated that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment for November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available, a memo from the MOECC, and a hard copy of the Final EA Report.
January 16, 2018
Morgan Owen Callum Squires, Nancy O’Neill
Email The Ministry of Energy emailed the Project team the Ministry of Energy’s comments on the Final EA Report. The MOECC was copied on this email.
February 28, 2018
Elena Murray Allen Eade, Callum Squires, John Virgl, Christine Robichaud, Lynnette Dagenais, Mary Bea Kenny, Donna Brunton, Breann Morgan, Juan Anderson, Nancy O'Neill
Teleconference The Project team had a teleconference with the MNRF, MOECC and Ministry of Energy to discuss the Wataynikaneyap’s proposed responses to MNRF comments on the Final EA Report relating to caribou and other wildlife species. Following the meeting, Wataynikaneyap will finish the comment responses and provide them to the MNRF as draft for review and comment. If there are any significant comments on the draft responses, Wataynikaneyap committed to meeting with MNRF again to resolve their concerns.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 18
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of Energy March 1, 2018
Elena Murray Allen Eade, Callum Squires John Virgl, Lynnette Dagenais, Christine Robichaud, Donna Brunton, Juan Anderson, Nancy O'Neill
Teleconference The Project team had a teleconference with the MNRF, MOECC and Ministry of Energy to discuss Wataynikaneyap’s proposed responses to MNRF comments on the Final EA Report relating to caribou and bald eagle activity restriction buffers and timing. Following the meeting, Wataynikaneyap will finish the comment responses and provide them to the MNRF as draft for review and comment. If there are any significant comments on the draft responses, Wataynikaneyap committed to meeting with MNRF again to resolve their concerns.
March 14, 2018
Elena Murray Allen Eade, Alyson Beal, Callum Squires, John Virgl, Lynnette Dagenais, Christine Robichaud, John Reid, Donna Brunton, Mary Bea Kenny, Juan Anderson, Nancy O'Neill,
Teleconference The Project team had a teleconference with the MNRF, MOECC and the Ministry of Energy to discuss Wataynikaneyap’s proposed responses to MNRF comments on the Final EA Report relating to caribou and other wildlife species. Following the meeting, Wataynikaneyap will finish the comment responses and provide them to the MNRF as draft for review and comment. If there are any significant comments on the draft responses, Wataynikaneyap committed to meeting with MNRF again to resolve their concerns.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 19
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of Energy March 15, 2018
Elena Murray Allen Eade, Alyson Beal, Callum Squires, Ashley Morton, Kristine Mason, John Reid, Mary Bea Kenny, Breann Morgan, Juan Anderson, Nancy O'Neill
Teleconference Wataynikaneyap and the Project team had a teleconference with the MNRF, MOE and MOECC to discuss Wataynikaneyap’s proposed responses to MNRF comments on the Final EA Report relating to fish and fish habitat. Following the meeting, Wataynikaneyap will finish the comment responses and provide them to the MNRF as draft for review and comment. If there are any significant comments on the draft responses, Wataynikaneyap committed to meeting with MNRF again to resolve their concerns.
March 23, 2018
Morgan Owen Callum Squires Email The Project team emailed the Ministry of Energy via the MOECC, providing draft comment responses for distribution to agencies for their review.
March 27, 2018
Elena Murray Alyson Beal, Callum Squires John Virgl, Lynnette Dagenais, Christine Robichaud, John Reid, Mary Bea Kenny, Breann Brunton, Juan Anderson, Nancy O'Neill
Teleconference The Project team had a teleconference with the MNRF, MOECC and the Ministry of Energy to discuss Wataynikaneyap’s proposed responses to MNRF comments on the Final EA Report relating to caribou and other wildlife species. Following the meeting, Wataynikaneyap will finish the comment responses and provide them to the MNRF as draft for review and comment. If there are any significant comments on the draft responses, Wataynikaneyap committed to meeting with MNRF again to resolve their concerns.
March 29, 2018
Morgan Owen Callum Squires Email The Project team received an email from the Ministry of Energy via the MOECC indicating that the Ministry of Energy has no further comments and that the comments received from the Ministry of Energy on the Final EA Report are now closed.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 20
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of Energy April 26, 2018
Morgan Owen Callum Squires Email The Project team emailed the the MOECC, providing the final Ministry of Energy comment response documents.
Ministry of Finance November 3, 2017
Sandy Roberts Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Ministry of Indigenous Relations and Reconciliation November 3, 2017
Rachel Mason-Smith
Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Ministry of Municipal Affairs and Housing November 3, 2017
Luke Fraser, Sylvie Oulton
Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 21
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of Municipal Affairs and Housing November 3, 2017
Victor Doyle, Victoria Kosny
Callum Squires Email The Project team emailed stakeholders the Notice of Submission of the Final EA Report. The notice stated that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment from November 3 to December 22, 2017. The Project team listed the locations and Project website where the Final EA Report is available. The information package also included a memo from the MOECC, and comments table template.
Ministry of Natural Resources and Forestry November 3, 2017
Aaron Parsons, Kathryn McGarry, Bob David, Danielle Tarrant, Londa Mortson, Fritz Fischer, Glen Hooper, John Carnochan, Julie Berard, Kelvin Davenport, Melody Kiss, Michelle Schott, Ray Schott, Scott Ellery, Shawn Burke
Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 22
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of Natural Resources and Forestry November 3, 2017
Jason Suprovich, Dave Lyle, Danielle Tarrant, Londa Mortson, Elaine Hardy
Callum Squires Email The Project team emailed stakeholders the Notice of Submission of the Final EA Report. The notice stated that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment from November 3 to December 22, 2017. The Project team listed the locations and Project website where the Final EA Report is available. The information package also included a memo from the MOECC, and comments table template.
November 6, 2017
Danielle Tarrant, Dave Lyle, Elaine Hardy, Jason Suprovich, Jennifer Chikoski, Virginia Thompson
Callum Squires Document Delivery
The Project team couriered the Notice of Submission of the Final EA Report information package. The information package stated that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment from November 3 to December 22, 2017. The Project team listed the locations and Project website where the Final EA Report is available. The information package also included a memo from the MOECC, comments table template, and a CD copy of the Final EA Report.
November 8, 2017
Jason Suprovich, Dave Lyle, Danielle Tarrant, Elaine Hardy, Jennifer Chikoski
Callum Squires Document Delivery
The Project team couriered the Notice of Submission of the Final EA Report information package. The information package stated that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment for November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available, a memo from the MOECC, and a hard copy of the Final EA Report.
November 16, 2017
Danielle Tarrant Callum Squires Email The Project team received an email from the MNRF providing additional clarification about the shapefiles requested by the MNRF for their review of the Final EA.
The Project team responded by email to the MNRF, stating that they will provide this information soon.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 23
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of Natural Resources and Forestry November 22, 2017
Danielle Tarrant Callum Squires Email The Project team emailed the MNRF and provided the requested shapefiles. The Project team also provided additional details on the shapefile contents in relation to the Final EA.
The Project team emailed the MNRF, providing a shapefile for linear feature data as requested.
December 22, 2017
Londa Mortson Callum Squires Email The Project team received an email from the MNRF via the MOECC that provided the Final EA Report comments from the Ministry of Natural Resources and Forestry. The MOECC stated that they only had a cursory review of these comments before forwarding them to the Project team and anticipated that they may need a discussion between the Project team, MNRF, and MOECC as there are a number of significant concerns.
February 26, 2018
Danielle Tarrant, Steve Kingston
Allen Eade, Callum Squires, Jennifer Braun, John Reid, Nancy O’Neill, Juan Anderson
Teleconference The Project team had a teleconference call with the MNRF and MOECC to discuss the proposed response to a comment provided from the MNRF on the Final EA Report regarding critical landform/vegetation association (CLVA) areas. Following the meeting, Wataynikaneyap will finish the comment responses and provide them to the MNRF as draft for review and comment. If there are any significant comments on the draft responses, Wataynikaneyap committed to meeting with MNRF again to resolve their concerns.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 24
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of Natural Resources and Forestry February 28, 2018
April Mitchell, Danielle Tarrant
Allen Eade, Callum Squires, John Virgl, Christine Robichaud, Lynnette Dagenais, Mary Bea Kenny, Donna Brunton, Breann Morgan, Juan Anderson, Nancy O'Neill
Teleconference The Project team had a teleconference with the MNRF, MOECC and Ministry of Energy to discuss the Wataynikaneyap’s proposed responses to MNRF comments on the Final EA Report relating to caribou and other wildlife species. Following the meeting, Wataynikaneyap will finish the comment responses and provide them to the MNRF as draft for review and comment. If there are any significant comments on the draft responses, Wataynikaneyap committed to meeting with MNRF again to resolve their concerns.
March 1, 2018
April Mitchell, Danielle Tarrant
Allen Eade, Callum Squires John Virgl, Lynnette Dagenais, Christine Robichaud, Donna Brunton, Juan Anderson, Nancy O'Neill
Teleconference The Project team had a teleconference with the MNRF, MOECC and Ministry of Energy to discuss Wataynikaneyap’s proposed responses to MNRF comments on the Final EA Report relating to caribou and bald eagle activity restriction buffers and timing. Following the meeting, Wataynikaneyap will finish the comment responses and provide them to the MNRF as draft for review and comment. If there are any significant comments on the draft responses, Wataynikaneyap committed to meeting with MNRF again to resolve their concerns.
March 1, 2018
Matt Corbett, Danielle Tarrant
Donna Brunton, Allen Eade, John Virgl, Jennifer Braun, Lynnette Dagenais, John Reid, Mary Bea Kenny, Breann Morgan, Juan Anderson, Nancy O'Neill
Teleconference The Project team had a teleconference with the MNRF to discuss the Project team's proposed response to MNRF Comment 49554 (related to Fire Protection) on the Final EA Report. Following the meeting, Wataynikaneyap will finish the comment response and provide to the MNRF as draft for review and comment. If there are any significant comments on the draft response, Wataynikaneyap is committed to meeting with MNRF again to resolve their concerns.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 25
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of Natural Resources and Forestry March 2, 2018
Kevin Pruys, Danielle Tarrant
Donna Brunton, Allen Eade, Callum Squires, John Virgl, Jennifer Braun, Lynnette Dagenais, John Reid, Mary Bea Kenny, Breann Morgan, Donna Brunton, Juan Anderson, Nancy O'Neill
Teleconference The Project team had a teleconference with the MNRF to discuss the Project team's proposed response to MNRF Comment 49431 (related to Section 9.0 ESMP and Section 14.0) on the Final EA Report. Following the meeting, Wataynikaneyap will finish the comment response and provide to the MNRF as draft for review and comment. If there are any significant comments on the draft response, Wataynikaneyap is committed to meeting with MNRF again to resolve their concerns.
March 14, 2018
Danielle Tarrant, Michelle Schott, Ray Schott
Allen Eade, Alyson Beal, Callum Squires, John Virgl, Lynnette Dagenais, Christine Robichaud, John Reid, Donna Brunton, Mary Bea Kenny, Juan Anderson, Nancy O'Neill
Teleconference The Project team had a teleconference with the MNRF, MOECC and the Ministry of Energy to discuss Wataynikaneyap’s proposed responses to MNRF comments on the Final EA Report relating to caribou and other wildlife species. Following the meeting, Wataynikaneyap will finish the comment responses and provide them to the MNRF as draft for review and comment. If there are any significant comments on the draft responses, Wataynikaneyap committed to meeting with MNRF again to resolve their concerns.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 26
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of Natural Resources and Forestry March 15, 2018
Danielle Tarrant, Michelle Schott, Ray Schott
Allen Eade, Alyson Beal, Callum Squires, Ashley Morton, Kristine Mason, John Reid, Mary Bea Kenny, Breann Morgan, Juan Anderson, Nancy O'Neill
Teleconference Wataynikaneyap and the Project team had a teleconference with the MNRF, MOE and MOECC to discuss Wataynikaneyap’s proposed responses to MNRF comments on the Final EA Report relating to fish and fish habitat. Following the meeting, Wataynikaneyap will finish the comment responses and provide them to the MNRF as draft for review and comment. If there are any significant comments on the draft responses, Wataynikaneyap committed to meeting with MNRF again to resolve their concerns.
March 23, 2018
Danielle Tarrant Callum Squires Email The Project team emailed the MNRF, providing their draft responses to MNRF comments on the following Final EA Report sections: Section 4.0 (EA Methods); Section 5.1 (Surface Water); Section 6.1 (Vegetation); and Section 7.4 (Non-Aboriginal Land and Resource Use).
March 27, 2018
Danielle Tarrant, Virginia Thompson
Alyson Beal, Callum Squires John Virgl, Lynnette Dagenais, Christine Robichaud, John Reid, Mary Bea Kenny, Breann Brunton, Juan Anderson, Nancy O'Neill
Teleconference The Project team had a teleconference with the MNRF, MOECC and the Ministry of Energy to discuss Wataynikaneyap’s proposed responses to MNRF comments on the Final EA Report relating to caribou and other wildlife species. Following the meeting, Wataynikaneyap will finish the comment responses and provide them to the MNRF as draft for review and comment. If there are any significant comments on the draft responses, Wataynikaneyap committed to meeting with MNRF again to resolve their concerns.
March 29, 2018
Danielle Tarrant Callum Squires Email The Project team emailed the MNRF providing Part 1 of their draft responses to MNRF comments provided by an MNRF reviewer (April Mitchell) relating to wildlife.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 27
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of Natural Resources and Forestry April 5, 2018 Danielle Tarrant Callum Squires Email The Project team received an email from the MNRF in response to the
Project team's March 23, 2018 email containing responses to MNRF comments. The MNRF requested an alternative file format for the documents.
April 10, 2018
Danielle Tarrant Callum Squires Email The Project team emailed the MNRF, providing word versions of their draft comment responses submitted to date.
April 13, 2018
Danielle Tarrant Callum Squires Email The Project team emailed the MNRF, providing their draft responses to MNRF comments on the Final EA Report relating to Section 2.0 (Engagement).
April 13, 2018
Danielle Tarrant Callum Squires Email The Project team emailed the MNRF providing their draft responses to MNRF comments on the Final EA Report relating to Section 8.0 (Traditional Land and Resource Use).
April 13, 2018
Danielle Tarrant, John Carnochan, Londa Mortson
Allen Eade, Alyson Beal, Callum Squires, John Virgl, Christine Robichaud, Lynnette Dagenais, Kristine Mason, Ashley Morton, Margaret Kenequanash, Mary Bea Kenny, Lucie Edwards, Juan Anderson, Nancy O'Neill
Meeting/ Teleconference
The Project team met with the MNRF and MOECC to discuss the Project team's proposed responses to MNRF comments on the Final EA Report related to wildlife, fish and other general comments. Following the meeting, Wataynikaneyap will finish the comment responses and provide them to the MNRF as draft for review and comment. If there are any significant comments on the draft responses, Wataynikaneyap committed to meeting with MNRF again to resolve their concerns.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 28
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of Natural Resources and Forestry April 16, 2018
Danielle Tarrant Callum Squires Email The Project team received an email from the MNRF via the MOECC that provided the MNRF’s review of the Project team’s responses to comments on the Final EA Report relating to the following sections: Section 4.0 (EA Methods); Section 5.1 (Surface Water); and Section 6.1 (Vegetation). The MNRF was satisfied with the responses provided and these comments can now be closed.
April 18, 2018
Danielle Tarrant Callum Squires Email The Project team emailed the MNRF providing Part 2 of their draft responses to comments provided by an MNRF reviewer (April Mitchell) relating to wildlife and draft responses to MNRF comments relating to fish and fish habitat.
April 20, 2018
Danielle Tarrant, John Carnochan, Londa Mortson
Allen Eade, Callum Squires John Virgl, Christine Robichaud, Margaret Kenequanash, Mary Bea Kenny, Breann Morgan, Lucie Edwards, Juan Anderson, Nancy O'Neill
Teleconference The Project team had a teleconference with the MNRF and MOECC to discuss the Project team's remaining proposed responses relating to wildlife. Following the meeting, Wataynikaneyap will finish the comment responses and provide them to the MNRF as draft for review and comment. If there are any significant comments on the draft responses, Wataynikaneyap committed to meeting with MNRF again to resolve their concerns.
April 24, 2018
Danielle Tarrant Callum Squires Email The Project team emailed the MNRF to provide draft comment responses to MNRF comments received on the Final EA Report relating to Section 1.0 (Introduction), Section 3.0 (Project Description) Section 9.0 (Environment and Social Management Plan) and to a comment received from the MNRF Cover Letter.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 29
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of Natural Resources and Forestry April 24, 2018
Danielle Tarrant Callum Squires Email The Project team received an email from the MNRF via the MOECC indicating that the MNRF has reviewed the draft responses relating to engagement (Section 2.0) and traditional land and resource use (Section 8.0) and that those comments can now be closed.
April 27, 2018
Danielle Tarrant Callum Squires Email The Project team emailed the MNRF, providing their draft responses to comments raised on the Final EA Report relating to: Wildlife
April 30, 2018
Danielle Tarrant Callum Squires Email The Project team emailed the MNRF, providing their draft responses to comments raised on the Final EA Report relating to: Engineering and Design (various EA sections); Appendix 3.10A - Routing through Provincial Parks; and Section 6.3 - Wildlife (Part 3).
May 2, 2018 Danielle Tarrant Callum Squires Email The Project Team received an email from the MNRF via the MOECC in response to the Project Team's May 2, 2018 email. The MOECC stated that the MNRF is satisfied with three IRs pending review of the updated Section 9.0 and 12.0.
May 8, 2018 Danielle Tarrant Callum Squires Email The Project Team received an email from the MNRF via the MOECC that provided the MNRF's responses to all but nine of the IRs for 'the file Caribou/Wildlife April Mitchell Part 1' and all of the file 'Caribou/Wildlife April Mitchell Part 2'.
May 14, 2018
Danielle Tarrant Callum Squires Email The Project team received an email from the MNRF via the MOECC providing comments on the Transformer Station Amendment
May 15, 2018
Danielle Tarrant Callum Squires Email The Project Team emailed the MNRF and provided the remaining draft IR responses for the Final EA Report.
May 25, 2018
Danielle Tarrant Callum Squires Nancy O’Neill
Email The Project team received an email from the MNRF via the MOECC providing follow up comments to Provincial Parks, Engineering Design and Fish and Fish Habitat
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 30
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of Natural Resources and Forestry May 31, 2018
Danielle Tarrant Callum Squires Email The Project Team emailed the MNRF and provided an updated version of Section 9 (Environmental and Social Management Plan) and Section 12 (Monitoring and Commitments). The Project Team noted that they have provided the internal track change versions of these documents to the MOECC today. The Project Team provided updates on wildlife timing restriction windows, IR responses to MNRF comments, and mitigation language. The Project Team provided a table with that shows the changes to mitigation languages in four of the MNRF comment responses.
Ministry of Northern Development and Mines November 2, 2017
Rob Purdon Nancy O'Neill Email The Project team received an email from the MNDM providing the draft site plan showing the locations of the MNDM's test pits, boreholes and monitoring wells. The MNDM noted that the plans are not final but should give an approximate idea of the locations.
The Project team responded by email to the MNDM thanking them for the information and indicating that it appears that none of the MNDM's sampling sites fall within the alternative footprints for the Pickle Lake TS but confirmation is still pending.
November 3, 2017
Alan Rishworth, Jennifer Paetz, Jonathan Barrett, Priya Tandon
Callum Squires Email The Project team emailed stakeholders the Notice of Submission of the Final EA Report. The notice stated that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment from November 3 to December 22, 2017. The Project team listed the locations and Project website where the Final EA Report is available. The information package also included a memo from the MOECC, and comments table template.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 31
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of Northern Development and Mines November 3, 2017
Natalie Dumont, Michael Gravelle, Lisette Prudhomme, Brian Laine
Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
December 8, 2017
Jennifer Paetz Callum Squires Email The MNDM informed the Project team via MOECC that they have no comments on the Final EA Report.
May 14, 2018
Jennifer Paetz Callum Squires Email The MNDM provided comments to the Project team via MOECC on the Transformer Station Amendment.
Ministry of the Environment and Climate Change November 3, 2017
Barbara Slattery, Carrie Hutchison, Freduah Agyemang, Guowang Qiu, Jacinth Gilliam-Price, Jason Tittlemier, Joe Tyance, Justin Hugh, Madhi Ramadoss, Paula Allen, Shannon Innis, Yuefeng Zhang
Callum Squires Email The Project team emailed stakeholders the Notice of Submission of the Final EA Report. The notice stated that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment from November 3 to December 22, 2017. The Project team listed the locations and Project website where the Final EA Report is available. The information package also included a memo from the MOECC, and comments table template.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 32
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of the Environment and Climate Change November 3, 2017
Brian Cameron, Dan Dobrin, Frank Miklas, Kevin Ride
Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
November 6, 2017
Ministry of the Environment and Climate Change, General Delivery
Callum Squires Document Delivery
The Project team provided the Notice of Submission of the Final EA Report information package. The information package included a CD copy of the Final EA Report and a memo from the MOECC. The memo stated that the Final EA Report has been submitted to the MOECC for review and approval and requested that the CD be available for public review upon request from November 3 to December 22, 2017. The Project team also requested that the Notice of Submission also be made available with the document.
November 6, 2017
Barbara Slattery, Freduah Agyemang, Guowang Qiu, Jacinth Gilliam-Price, Jason Tittlemier, Joe Tyance, Justin Hugh, Madhi Ramadoss, Yuefeng Zhang
Callum Squires Document Delivery
The Project team couriered the Notice of Submission of the Final EA Report information package. The information package stated that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment from November 3 to December 22, 2017. The Project team listed the locations and Project website where the Final EA Report is available. The information package also included a memo from the MOECC, comments table template, and a CD copy of the Final EA Report.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 33
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of the Environment and Climate Change November 8, 2017
Ministry of the Environment and Climate Change, General Delivery
Callum Squires Document Delivery
The Project team provided the Notice of Submission of the Final EA Report information package. The information package included a copy of the Final EA Report and a memo from the MOECC. The memo stated that the Final EA Report has been submitted to the MOECC for review and approval and requested that the hard copy report be available for public review upon request from November 3 to December 22, 2017. The Project team also requested that the Notice of Submission also be made available with the document.
November 8, 2017
Joe Tyance Callum Squires Document Delivery
The Project team couriered the Notice of Submission of the Final EA Report information package. The information package stated that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment for November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available, a memo from the MOECC, and a hard copy of the Final EA Report.
December 8, 2017
Jason Tittlemier, Barbara Slattery, Yuefeng Zhang
Callum Squires Email The Project team received an email from the MOECC that provided the MOECC's comments (from the Kenora District, West Central Region, and relating to wastewater and groundwater) on the Final EA Report.
December 14, 2017
Guowang Qiu, Pierre J.R. Godbout
Callum Squires Email The Project team received an email from the MOECC that provided the MOECC's noise and air quality comments on the Final EA Report.
December 19. 2017
Madhi Ramadoss Callum Squires Email The MOECC informed project team that they have no additional comments related to pesticides beyond those submitted on the draft EA, which apply to the project implementation phase
January 12, 2018
Jacinth Gilliam-Price Callum Squires Email The Project team received an email from the MOECC that provided the surface water comments on the Final EA Report from the MOECC.
January 19, 2018
Sasha McLeod Callum Squires Email The Project team received an email from the MOECC that provided the Final EA Report comments from the MOECC.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 34
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of the Environment and Climate Change March 9, 2018
Guowang Qiu Callum Squires Email The Project team emailed the MOECC, providing their draft responses to the MOECC's comments on the Final EA Report relating to Section 5.3 (Air Quality). The Project team requested to be notified if there are any comments on the responses and noted that they can meet with the reviewer if there are any significant concerns.
March 21, 2018
Pierre J.R. Godbout Stefan Cicak Email The Project team emailed the MOECC, requesting availability for a conference call to discuss proposed methodology to predict noise levels from the transmission line operation prior to completing a response to a comment on the Final EA Report. The MOECC and Project team exchanged emails to determine a meeting time.
March 23, 2018
Sasha McLeod Callum Squires Email The Project team emailed the MOECC, providing draft comment responses for distribution to agencies for their review, including responses to comments from the MOECC comments relating to surface water, waste water and comments from MOECC West Central Region.
The MOECC responded by email to the Project team, stating that they will notify the Project team if there are additional comments. The MOECC stated that the wastewater reviewer has already responded and is satisfied with the response to their comments. The MOECC requested that the Project team send an updated response table noting that the MOECC is satisfied to close off the wastewater comment.
March 26, 2018
Sasha McLeod Callum Squires Email The Project team received an email from the MOECC in response to their draft response on comments relating to air quality. The MOECC provided one additional comment and requested action. The MOECC requested that the Project team respond to the additional comments using the comment response table by April 3, 2018.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 35
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of the Environment and Climate Change March 26, 2018
Sasha McLeod Callum Squires Email The Project team received an email from the MOECC that indicated the MOECC is satisfied with the draft responses to the comments from MOECC West Central Region, and the comment is now closed. The MOECC requested that the Project team provide the final response table with the two columns added.
March 26, 2018
Pierre J.R. Godbout Sasha McLeod
Stefan Cicak, Shira Daltrop, Joe Tomaselli
Teleconference The Project team and the MOECC had a conference call to discuss proposed methodology to predict noise levels from the transmission line operation prior to responding to an MOECC comment on the Final EA Report.
March 27, 2018
Pierre J.R. Godbout Stefan Cicak Email The Project team provided reference to the publication the Project team put forward during the conference call on March 26th as being the basis of the proposed desktop noise assessment for the transmission line operations.
April 6, 2018 Pierre J.R. Godbout Stefan Cicak Email The Project team provided an overall summary of the proposed approach to address the comment received from the MOECC on the Final EA Report to assess sound levels for the transmission line at representative worst-case Points of Reception locations for the project.
April 10, 2018
Pierre J.R. Godbout Stefan Cicak Email The MOECC confirmed that they are not for or against our proposed methodology presented on April 6, 2018 and upon the Project team’s submission of the response to comment on the Final EA Report, will determine if any additional information is required.
April 10, 2018
Sasha McLeod Callum Squires Email The Project team received an email from the MOECC indicating that the MOECC"s surface water reviewer is satisfied with the responses provided on the surface water comments on the Final EA Report and these comments can now be closed.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 36
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of the Environment and Climate Change April 18, 2018
Sasha McLeod Callum Squires Email The Project Team emailed the MOECC and provided their responses to the IRs from the MOECC Kenora District office.
The MOECC responded by email to the Project stating that the Kenora DIstrict reviewer has reviewed the responses and have requested an additional commitment. The MOECC requested that the Project Team finalize the response table and provide it to the MOECC by April 25, 2018. The MOECC provided a list of completed IRs and final responses tables left outstanding.
April 18, 2018
Sasha McLeod Callum Squires Email The Project team emailed the MOECC, providing their draft responses to the MOECC Kenora District's comments on the Final EA Report for distribution and review.
April 24, 2018
Sasha McLeod Callum Squires Email The Project team emailed the MOECC, providing their follow-up comment responses for review by the following agencies: MOECC (Air Quality) and the MOECC Kenora District.
April 24, 2018
Sasha McLeod Callum Squires Email The Project Team emailed the MOECC, providing their draft responses to the MOECC's comments on the Final EA Report relating to groundwater for MOECC review.
April 26, 2018
Sasha McLeod Callum Squires Email The Project team emailed the MOECC, providing the updated response to the MOECC's Kenora District in response to the MOECC's April 18, 2018 email.
April 26, 2018
Sasha McLeod Callum Squires Email The Project team emailed the MOECC, providing the final comment response documents to address the following agencies: MOECC (Surface Water, Wastewater, and West Central Region); Ministry of Energy; and ECCC.
April 27, 2018
Sasha McLeod Callum Squires Email The Project team received an email from the MOECC, providing additional comments on groundwater.
April 30, 2018
Sasha McLeod Callum Squires Email The Project team emailed the MOECC, providing the draft responses to comments received from the MOECC's EA Services Section.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 37
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of the Environment and Climate Change May 1, 2018 Sasha McLeod Callum Squires Email The Project Team emailed the MOECC providing the draft responses
to the MOECC’s noise comments on the Final EA Report. May 8, 2018 Barbara Slattery Allen Eade Email The Project Team emailed the MOECC regarding a MOECC comment
regarding extending the groundwater well monitoring from 250 m to 500 m during blasting. The Project Team requested a document or rationale for this request, indicating that the Phase 1 Project identified a 250 m distance which was reviewed and accepted by the MOECC through review of the Final EA Report.
The MOECC responded by email to the Project Team at 9:50 am stating that they have requested the hydrogeologist provide more details about the 500 m radius. The MOECC provided an excerpt of the hydrogeologist's technical memo.
The Project Team responded by email to the MOECC at 10:36 am noting that the 500 m radius is the requested point of clarification at this time.
May 16, 2018
Pierre J.R. Godbout Stefan Cicak Phone Call The MOECC telephoned the Project Team to ask three questions related to the methodology presented in Golder’s response on May 1, 2018 to responses to comments from the MOECC on the Final EA Report.
May 23, 2018
Pierre J.R. Godbout Stefan Cicak Email The Project Team emailed the MOECC to provide responses to the MOECC questions discussed on May 16, 2018.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 38
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of the Environment and Climate Change, Environmental Approvals Branch November 3, 2017
Kathleen O'Neill, Annamaria Cross, Glen Murray, Solange Desautels
Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
November 3, 2017
Sasha McLeod Callum Squires Email The Project team emailed stakeholders the Notice of Submission of the Final EA Report. The notice stated that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment from November 3 to December 22, 2017. The Project team listed the locations and Project website where the Final EA Report is available. The information package also included a memo from the MOECC, and comments table template.
November 6, 2017
Sasha McLeod Callum Squires Document Delivery
The Project team couriered the Notice of Submission of the Final EA Report information package. The information package stated that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment from November 3 to December 22, 2017. The Project team listed the locations and Project website where the Final EA Report is available. The information package also included a memo from the MOECC, comments table template, and a CD copy of the Final EA Report.
November 8, 2017
Sasha McLeod Callum Squires Document Delivery
The Project team couriered the Notice of Submission of the Final EA Report information package. The information package stated that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment for November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available, a memo from the MOECC, and a hard copy of the Final EA Report.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 39
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of the Environment and Climate Change, Environmental Approvals Branch January 30, 2018
Guowang Qiu, Laura Manners, Pierre Godbout, Sasha McLeod
Allen Eade, Callum Squires, Katherine Armstrong, Sean Capstick, Stefan Cicak, Joe Tomaselli, Shira Daltrop, John Reid, Donna Brunton, Breann Morgan, Juan Anderson, Nancy O'Neill
Teleconference The Project team had a teleconference with the MOECC to discuss the Project team's proposed responses to MOECC comments on the Final EA Report relating to air quality and noise. Following the meeting, Wataynikaneyap will finish the comment responses and provide them to the MOECC as draft for review and comment. If there are any significant comments on the draft responses, Wataynikaneyap committed to meeting with MOECC again to resolve their concerns.
January 31, 2018
Laura Manners, Sasha McLeod, Jacinth Gilliam-Price
Allen Eade, Callum Squires, Andrew Forbes, Luis Vasquez, Sharon Wood, Phyllis McCrindle, John Reid, Mary Bea Kenny Donna Brunton, Breann Morgan, Juan Anderson, Nancy O'Neill
Teleconference Wataynikaneyap and the Project team had a teleconference with the MOECC to discuss the Project team's proposed responses to MOECC comments on the Final EA Report relating to surface water. Following the meeting, Wataynikaneyap will finish the comment responses and provide them to the MOECC as draft for review and comment. If there are any significant comments on the draft responses, Wataynikaneyap committed to meeting with MOECC again to resolve their concerns.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 40
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of the Environment and Climate Change, Environmental Approvals Branch January 31, 2018
Laura Manners, Sasha McLeod
Allen Eade, Callum Squires, Christine Robichaud, Janya Kelly, Sean Capstick, John Reid, Mary Bea Kenny Donna Brunton, Breann Morgan, Juan Anderson, Nancy O'Neill
Teleconference Wataynikaneyap and the Project team had a teleconference with the MOECC to discuss the Project team's proposed responses to the letter from the Wildlife Conservation Society of Canada, which included comments on the Final EA Report relating to greenhouse gases and caribou. Following the meeting, Wataynikaneyap will finish the comment responses and provide them to the MOECC as draft for review and comment.
February 1, 2018
Laura Manners, Sasha McLeod
Callum Squires, Brad Drouin, Henry Cary, John Reid, Mary Bea Kenny Donna Brunton, Breann Morgan, Juan Anderson, Nancy O'Neill
Teleconference The Project team had a teleconference with the MOECC and the MTCS to discuss the Project team's proposed responses to MTCS comments on the Final EA Report relating to archaeology and heritage.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 41
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of the Environment and Climate Change, Environmental Approvals Branch February 22, 2018
Sasha McLeod, Solange Desautels
Allen Eade Callum Squires, Jean-Marc Crew, Sandra Witt, Sean Capstick, Janya Kelly, John Reid, Donna Brunton, Mary Bea Kenny, Breann Morgan, Lucie Edwards, Lydia Big George, Juan Anderson, Nancy O'Neill
Teleconference The Project team had a teleconference with the MOECC to discuss the Project team's proposed responses to comments provided on the Final EA Report by the Environmental Assessment Services Section of the MOECC. Following the meeting, Wataynikaneyap will finish the comment responses and provide them to the MOECC as draft for review and comment.
February 23, 2018
Sasha McLeod, Solange Desautels, Freduah Agyemang
Allen Eade, Callum Squires, Sharon Wood, Phyllis McCrindle, John Reid, Donna Brunton, Nancy O’Neill, Juan Anderson, Lucie Edwards, Lydia Big George
Teleconference The Project team had a teleconference with the MOECC to discuss the Project team's proposed responses to comments provided on the Final EA Report relating to groundwater. Following the meeting, Wataynikaneyap will finish the comment responses and provide them to the MOECC as draft for review and comment.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 42
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of the Environment and Climate Change, Environmental Approvals Branch February 26, 2018
Sasha McLeod Allen Eade, Callum Squires, Jennifer Braun, John Reid, Nancy O’Neill, Juan Anderson
Teleconference The Project team had a teleconference call with the MNRF and MOECC to discuss the proposed response to a comment provided from the MNRF on the Final EA Report regarding critical landform/vegetation association (CLVA) areas. Following the meeting, Wataynikaneyap will finish the comment responses and provide them to the MNRF as draft for review and comment. If there are any significant comments on the draft responses, Wataynikaneyap committed to meeting with MNRF again to resolve their concerns.
February 28, 2018
Sasha McLeod Allen Eade, Callum Squires, John Virgl, Christine Robichaud, Lynnette Dagenais, Mary Bea Kenny, Donna Brunton, Breann Morgan, Juan Anderson, Nancy O'Neill
Teleconference The Project team had a teleconference with the MNRF, MOECC and Ministry of Energy to discuss the Wataynikaneyap’s proposed responses to MNRF comments on the Final EA Report relating to caribou and other wildlife species. Following the meeting, Wataynikaneyap will finish the comment responses and provide them to the MNRF as draft for review and comment. If there are any significant comments on the draft responses, Wataynikaneyap committed to meeting with MNRF again to resolve their concerns.
March 1, 2018
Sasha McLeod Allen Eade, Callum Squires John Virgl, Lynnette Dagenais, Christine Robichaud, Donna Brunton, Juan Anderson, Nancy O'Neill
Teleconference The Project team had a teleconference with the MNRF, MOECC and Ministry of Energy to discuss Wataynikaneyap’s proposed responses to MNRF comments on the Final EA Report relating to caribou and bald eagle activity restriction buffers and timing. Following the meeting, Wataynikaneyap will finish the comment responses and provide them to the MNRF as draft for review and comment. If there are any significant comments on the draft responses, Wataynikaneyap committed to meeting with MNRF again to resolve their concerns.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 43
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of the Environment and Climate Change, Environmental Approvals Branch March 9, 2018
Sasha McLeod Callum Squires Email The Project team emailed the MOECC, providing their draft responses to the MOECC's comments on the Final EA Report relating to Section 5.3 (Air Quality). The Project team requested to be notified if there are any comments on the responses and noted that they can meet with the reviewer if there are any significant concerns.
March 13, 2018
Sasha McLeod Callum Squires, Conor Grieve, Sara Jarrett, Donna Brunton John Reid Mary Bea Kenny Juan Anderson Nancy O'Neill Breann Morgan
Teleconference The Project team had a teleconference with the MTCS and MOECC to discuss the Project team's proposed responses to comments provided by MTCS on the Final EA Report relating to tourism. Following the meeting, Wataynikaneyap will finish the comment responses and provide them to MTCS as draft for review and comment. If there are any significant comments on the draft responses, Wataynikaneyap committed to meeting with MTCS again to resolve their concerns.
March 14, 2018
Sasha McLeod Allen Eade, Alyson Beal, Callum Squires, John Virgl, Lynnette Dagenais, Christine Robichaud, John Reid, Donna Brunton, Mary Bea Kenny, Juan Anderson, Nancy O'Neill,
Teleconference The Project team had a teleconference with the MNRF, MOECC and the Ministry of Energy to discuss Wataynikaneyap’s proposed responses to MNRF comments on the Final EA Report relating to caribou and other wildlife species. Following the meeting, Wataynikaneyap will finish the comment responses and provide them to the MNRF as draft for review and comment. If there are any significant comments on the draft responses, Wataynikaneyap committed to meeting with MNRF again to resolve their concerns.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 44
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of the Environment and Climate Change, Environmental Approvals Branch March 15, 2018
Sasha McLeod Allen Eade, Alyson Beal, Callum Squires, Ashley Morton, Kristine Mason, John Reid, Mary Bea Kenny, Breann Morgan, Juan Anderson, Nancy O'Neill
Teleconference Wataynikaneyap and the Project team had a teleconference with the MNRF, MOE and MOECC to discuss Wataynikaneyap’s proposed responses to MNRF comments on the Final EA Report relating to fish and fish habitat. Following the meeting, Wataynikaneyap will finish the comment responses and provide them to the MNRF as draft for review and comment. If there are any significant comments on the draft responses, Wataynikaneyap committed to meeting with MNRF again to resolve their concerns.
March 27, 2018
Sasha McLeod Alyson Beal, Callum Squires John Virgl, Lynnette Dagenais, Christine Robichaud, John Reid, Mary Bea Kenny, Breann Brunton, Juan Anderson, Nancy O'Neill
Teleconference The Project team had a teleconference with the MNRF, MOECC and the Ministry of Energy to discuss Wataynikaneyap’s proposed responses to MNRF comments on the Final EA Report relating to caribou and other wildlife species. Following the meeting, Wataynikaneyap will finish the comment responses and provide them to the MNRF as draft for review and comment. If there are any significant comments on the draft responses, Wataynikaneyap committed to meeting with MNRF again to resolve their concerns.
April 13, 2018
Sasha McLeod Alyson Beal Document Delivery
The Project team provided the Transformer Station Amendment Memorandum to the MOECC for their distribution and review.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 45
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of the Environment and Climate Change, Environmental Approvals Branch April 13, 2018
Sasha McLeod, Annamaria Cross
Allen Eade, Alyson Beal, Callum Squires, John Virgl, Christine Robichaud, Lynnette Dagenais, Kristine Mason, Ashley Morton, Margaret Kenequanash, Mary Bea Kenny, Lucie Edwards, Juan Anderson, Nancy O'Neill
Meeting/ Teleconference
The Project team met with the MNRF and MOECC to discuss the Project team's proposed responses to MNRF comments on the Final EA Report related to wildlife, fish and other general comments. Following the meeting, Wataynikaneyap will finish the comment responses and provide them to the MNRF as draft for review and comment. If there are any significant comments on the draft responses, Wataynikaneyap committed to meeting with MNRF again to resolve their concerns.
April 20, 2018
Sasha McLeod, Annamaria Cross
Allen Eade, Callum Squires John Virgl, Christine Robichaud, Margaret Kenequanash, Mary Bea Kenny, Breann Morgan, Lucie Edwards, Juan Anderson, Nancy O'Neill
Teleconference The Project team had a teleconference with the MNRF and MOECC to discuss the Project team's remaining proposed responses relating to wildlife. Following the meeting, Wataynikaneyap will finish the comment responses and provide them to the MNRF as draft for review and comment. If there are any significant comments on the draft responses, Wataynikaneyap committed to meeting with MNRF again to resolve their concerns.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 46
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of the Environment and Climate Change, Environmental Approvals Branch May 1, 2018 Sasha McLeod Callum Squires Email The Project Team received an email from the MOECC stating that the
MOECC will be emailing letters to the Group 1 Aboriginal communities and the public/other comment groups today. The MOECC outlined the purpose of the letters (i.e. provide a summary of the proposed Transformer Station amendment, notification of the revised documents that will be available on the Wataynikaneyap website, and a copy of Wataynikaneyap responses to the Mishkeegogamang and Ojibway Nation of Saugeen). The MOECC stated that the letters will list the commenting period. The MOECC requested that the Project Team confirm that the Project website will contain the relevant materials discussed in the letter before the Ministry Review is published. The MOECC also provided a list of the Aboriginal communities and stakeholder groups the letter will be sent to.
May 2, 2018 Sasha McLeod Callum Squires Email The Project Team emailed the MOECC to summarize their telephone conversation from May 1, 2018. The Project Team reiterated the option of an internal agency review of Section 9.0 and 12.0 ahead of public review. The Project Team stated that once reviewed, they will address any comments and provide a final version for public review. The Project Team stated they will provide an internal draft of these sections to the MOECC by the end of the week and agencies would have four weeks to review the sections along with any outstanding IR responses. The Project Team noted that Wataynikaneyap will take 1-2 weeks to address any comments and finalize the sections which will be published along with Ministry Review.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 47
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of the Environment and Climate Change, Environmental Approvals Branch May 4, 2018 Sasha McLeod Callum Squires Email The Project Team received an email from the MOECC in response to
the Project Team's May 2, 2018 email. The MOECC confirmed that some reviewers would like to view the updated chapters before providing final signoff. The MOECC agreed with the Project Team's approach and timing ad indicated that they will work with the Project Team if the timing changes. The MOECC stated that it is possible that the MOECC would need responses sooner than two weeks, but they will keep each other updated. The MOECC requested confirmation that the Project Team will be providing Sections 9.0 and 12.0 today.
May 17, 2018
Sasha McLeod
Callum Squires Document Delivery
The Project Team couriered the MOECC a hard copy of the Transformer Station EA Amendment Memo.
May 17, 2018
Sasha McLeod
Callum Squires Email The MOECC provided comments to the Project team from the MOECC on the EA method, wastewater, groundwater and surface water for the Transformer Station Amendment.
May 31, 2018
Dave J. Bell Callum Squires Email The Project Team emailed the MOECC providing the updated versions (track change and clean versions) of Section 9.0 (Environmental and Social Management Plan) and Section 12.0 (Monitoring and Commitments) for internal review and comment before their release to the public. The Project Team requested that the MOECC provide two weeks to agencies for review. The Project Team noted that they have notified the MNRF as well.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 48
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of Tourism, Culture and Sport November 3, 2017
Joseph Muller Callum Squires Email The Project team emailed stakeholders the Notice of Submission of the Final EA Report. The notice stated that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment from November 3 to December 22, 2017. The Project team listed the locations and Project website where the Final EA Report is available. The information package also included a memo from the MOECC, and comments table template.
December 21, 2017
Joseph Muller Callum Squires Email The Project team received an email from the MTCS via MOECC that provided the cultural heritage comments on the Final EA Report from the MTCS.
January 19, 2018
Northern Policy and Planning Unit
Callum Squires Email The Project team received an email from the MTCS NPPU via the MOECC that provided the Final EA Report comments from the MTCS.
February 1, 2018
Joseph Muller Callum Squires, Brad Drouin, Henry Cary, John Reid, Mary Bea Kenny Donna Brunton, Breann Morgan, Juan Anderson, Nancy O'Neill
Teleconference The Project team had a teleconference with the MOECC and the MTCS to discuss the Project team's proposed responses to MTCS comments on the Final EA Report relating to archaeology and heritage.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 49
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of Tourism, Culture and Sport March 13, 2018
Jim Antler, Laurie Brownlee
Callum Squires, Conor Grieve, Sara Jarrett, Donna Brunton John Reid Mary Bea Kenny Juan Anderson Nancy O'Neill Breann Morgan
Teleconference The Project team had a teleconference with the MTCS and MOECC to discuss the Project team's proposed responses to comments provided by MTCS on the Final EA Report relating to tourism. Following the meeting, Wataynikaneyap will finish the comment responses and provide them to MTCS as draft for review and comment. If there are any significant comments on the draft responses, Wataynikaneyap committed to meeting with MTCS again to resolve their concerns.
April 13, 2018
Joseph Muller Callum Squires Email The Project team emailed the MTCS via the MOECC to provide their responses to the MTCS' comments on the Final EA Report relating to archaeology and heritage resources. The Project team also provided the updated version of the Archaeology Management Plan (Section 9.3.1.18) and Cultural Heritage Management Plan (Section 9.3.1.19) as reference documents. The Project team noted that they will still provide these two plans as part of the fully revised Section 9.0 (Environmental and Social Management Plan).
April 20, 2018
Northern Policy and Planning Unit
Callum Squires Email The Project team received an email from the MTCS via the MOECC that provided the MTCS’s comments regarding the Transformer Station Amendment memo. The MTCS has no concerns from a tourism perspective regarding the revised transformer station location and transmission line realignment.
April 23, 2018
Northern Policy and Planning Unit
Callum Squires Email The Project team emailed the MTCS via the MOECC, providing the draft responses for distribution and review to comments provided by MTCS on the Final EA Report relating to tourism.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 50
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of Tourism, Culture and Sport April 26, 2018
Joseph Muller Callum Squires Email The Project team received an email from the MTCS via the MOECC in response to the Project Team's April 23, 2018 email. The MOECC stated that the MTCS has reviewed the Project Team's responses to their comments on the Final EA Report and has provided follow-up comments. The MOECC requested that the Project Team provide written responses in the table format and send them to the MOECC by May 2, 2018.
May 8, 2018 Northern Policy and Planning Unit
Callum Squires Email The Project Team received an email from the MTCS via the MOECC in response to the Project Team's April 23, 2018 email regarding MTCS Tourism IR responses. The MOECC provided the MTCS tourism department's response to Wataynikaneyap's responses. The MOECC indicated that as the MTCS is satisfied with the draft responses, the tourism IRs can be closed. The MOECC requested that the Project Team provide the final comment-response table, indicating agency satisfaction.
May 9, 2018 Joseph Muller Callum Squires Email The MTCS indicated to the Project team via the MOECC that they have no comments on the Transformer Station Amendment.
May 31, 2018
Joseph Muller Callum Squires Email The Project Team emailed the MTCS via the MOECC providing Wataynikaneyap's response to the follow-up comment from MTCS on comment MTCS-CH-02. The Project Team noted that their response refers to changes the Project Team made to Section 9.0, therefore MTCS will also need that file to complete the review.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 51
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ministry of Transportation November 3, 2017
Dawn Irish, Iain Galloway, Cindy Brown
Callum Squires Email The Project team emailed stakeholders the Notice of Submission of the Final EA Report. The notice stated that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment from November 3 to December 22, 2017. The Project team listed the locations and Project website where the Final EA Report is available. The information package also included a memo from the MOECC, and comments table template.
November 3, 2017
Greg Tokarz, Cindy Brown
Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
December 21, 2017
Cindy Brown Callum Squires Email The Project team received an email from the MTO via the MOECC that provided the MTO’s comments on the Final EA Report.
May 3, 2018 Cindy Brown Callum Squires Email The Project Team emailed the MTO via the MOECC providing draft IR responses to the MTO's comments on the Final EA Report.
Natural Resources Canada November 3, 2017
Jim Carr Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 52
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Ontario Ministry of Agriculture, Food and Rural Affairs (OMAFRA) November 3, 2017
Jocelyn Beatty Callum Squires Email The Project team emailed stakeholders the Notice of Submission of the Final EA Report. The notice stated that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment from November 3 to December 22, 2017. The Project team listed the locations and Project website where the Final EA Report is available. The information package also included a memo from the MOECC, and comments table template.
Ontario Provincial Police November 3, 2017
Denver Poole Callum Squires Email The Project team emailed stakeholders the Notice of Submission of the Final EA Report. The notice stated that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment from November 3 to December 22, 2017. The Project team listed the locations and Project website where the Final EA Report is available. The information package also included a memo from the MOECC, and comments table template.
Transport Canada November 3, 2017
Michael Keenan, Monique Mousseau
Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 53
Table 2.4C5-2: Engagement with Stakeholders Reivew of Final EA Report – Regulatory Agencies
Date Contact Team Members Involved Method Communication Summary
Treasury Board of Canada November 3, 2017
Scott Brison Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 54
2.4C6.0 RECORD OF ENGAGEMENT: OTHER STAKEHOLDERS
2.4C6.1 Engagement Activities Table 2.4C6-1 provides a summary of engagement activities with other stakeholders. This round of engagement commenced with sending a Notice of Submission of the Final EA on November 3, 2017. In addition, the Project Team resolved outstanding issues with a tourism operator via email and discussed connection to HONI lines and the Pickle Lake Substation with Hydro One. An extension to the comment period was requested by both Sagatay Transmission L.P. and Wildlands League and on December 12, 2017, for which the MOECC greanted these stakeholders an extension until February 10, 2018.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 55
Table 2.4C6-1: Engagement with Stakeholders Reivew of Final EA Report – Other Stakeholders
Date Contact Team Members Involved Method Communication Summary
Canadian Boreal Initiative November 3, 2017
Alan Young Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Canadian Environmental Law Association November 3, 2017
Dominic Ali Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Chiefs of Ontario November 3, 2017
Kathleen Padulo Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
CN Rail November 3, 2017
Stefan Linder Callum Squires Email The Project team emailed stakeholders the Notice of Submission of the Final EA Report. The notice stated that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment from November 3 to December 22, 2017. The Project team listed the locations and Project website where the Final EA Report is available. The information package also included a memo from the MOECC, and comments table template.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 56
Table 2.4C6-1: Engagement with Stakeholders Reivew of Final EA Report – Other Stakeholders
Date Contact Team Members Involved Method Communication Summary
Common Voice Northwest Ontario Energy Taskforce November 3, 2017
Iain Angus Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Cozy Camp November 3, 2017
-- Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
CPAWS Wildlands League November 3, 2017
Anna Baggio, Janet Sumner, Trevor Hesselink
Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
December 13, 2017
Anna Baggio, Trevor Hesselink
Callum Squires Email The Project team received an email from CPAWS Wildlands League via the MOECC that provided the extension request letter (dated December 12, 2017) to CPAWS Wildlands League. The letters indicated that the MOECC has granted their requests and will accept and consider any comments provided by February 10, 2018.
February 8, 2018
Anna Baggio Nancy O'Neill Phone Call/Email The Project team telephoned CPAWS Wildlands League requesting a call-in response to CPAWS Wildlands League's request for a meeting.
CPAWS Wildlands League responded by email to Wataynikaneyap stating that they will call either tomorrow or February 12, 2018.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 57
Table 2.4C6-1: Engagement with Stakeholders Reivew of Final EA Report – Other Stakeholders
Date Contact Team Members Involved Method Communication Summary
CPAWS Wildlands League February 12, 2018
Anna Baggio Nancy O’Neill Email The Project team received an email from CPAWS Wildlands League inquiring about Wataynikaneyap's availability for a technical meeting next week.
February 12, 2018
Anna Baggio, Trevor Hesselink
Callum Squires Email The Project team received an email from CPAWS Wildlands League via the MOECC that provided the Final EA Report comments from Wildlands League.
February 13, 2018
Anna Baggio Nancy O’Neill Email The Project team emailed CPAWS Wildlands League in response to CPAWS Wildland League's February 12, 2018 email. The Project team stated that they will follow-up with the other team members regarding meeting availability and requested logistical details.
CPAWS Wildlands League responded by email to Wataynikaneyap indicating that they would like an in-person meeting in Toronto to discuss EA comments.
February 15, 2018
Anna Baggio Nancy O’Neill Email The Project team emailed CPAWS Wildlands League requesting to have their technical meeting in two weeks.
CPAWS Wildlands League responded by email requesting meeting dates.
February 27, 2018
Anna Baggio Nancy O’Neill Email The Project team emailed CPAWS Wildlands League indicating that they were unable to coordinate a meeting last week due to scheduling. The Project team stated that they have received CPAWS Wildlands League's submission through the MOECC and are preparing responses to their comments and will submit directly to the MOECC as per process requirements.
May 24, 2018 Sasha McLeod Callum Squires Email The Project Team emailed the MOECC and provided Wataynikaneyap's proposed responses to the comments from CPAWS.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 58
Table 2.4C6-1: Engagement with Stakeholders Reivew of Final EA Report – Other Stakeholders
Date Contact Team Members Involved Method Communication Summary
Domtar, SFL Holders for the Wabigoon Forest October 27, 2017
Jack Harrison Sarah Orchard Email Wataynikaneyap emailed Domtar in response to Domtar's September 13, 2017 email regarding the Overlapping Forest Resource Licence. Wataynikaneyap provided a layer file for the 40 m corridor routing for comment and noted that the route has not been finalized and requested that Domtar not share it or issue the Overlapping Forest Resource Licence until Wataynikaneyap is at 100% design. Wataynikaneyap requested Domtar's comments on the routing.
November 3, 2017
Jack Harrison Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Dougall Media November 3, 2017
-- Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Dryden Forest Management Company, SFL Holders for the Dryden Forest November 3, 2017
Dave Legg Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 59
Table 2.4C6-1: Engagement with Stakeholders Reivew of Final EA Report – Other Stakeholders
Date Contact Team Members Involved Method Communication Summary
Dryden Ghost Riders Mountain Bike Club November 3, 2017
Jamie Cran Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Dryden Power Toboggan Club November 3, 2017
-- Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 60
Table 2.4C6-1: Engagement with Stakeholders Reivew of Final EA Report – Other Stakeholders
Date Contact Team Members Involved Method Communication Summary
Dryden Public Library November 6, 2017
Dayna DeBenedet Callum Squires Document Delivery
The Project team provided the Notice of Submission of the Final EA Report information package. The information package included a CD copy of the Final EA Report and a memo from the MOECC. The memo stated that the Final EA Report has been submitted to the MOECC for review and approval and requested that the CD be available for public review upon request from November 3 to December 22, 2017. The Project team also requested that the Notice of Submission also be made available with the document.
November 8, 2017
Dayna DeBenedet Callum Squires Document Delivery
The Project team provided the Notice of Submission of the Final EA Report information package. The information package included a copy of the Final EA Report and a memo from the MOECC. The memo stated that the Final EA Report has been submitted to the MOECC for review and approval and requested that the hard copy report be available for public review upon request from November 3 to December 22, 2017. The Project team also requested that the Notice of Submission also be made available with the document.
Dryden Saddle Club November 3, 2017
Erin Watt Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 61
Table 2.4C6-1: Engagement with Stakeholders Reivew of Final EA Report – Other Stakeholders
Date Contact Team Members Involved Method Communication Summary
Dryden Ski Club November 3, 2017
Kurt Schmidt Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Dryden Trappers Council November 3, 2017
Erik Treftlin Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Dryden Yacht Club November 3, 2017
Brook Latimer Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
November 3, 2017
Marg Saville Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 62
Table 2.4C6-1: Engagement with Stakeholders Reivew of Final EA Report – Other Stakeholders
Date Contact Team Members Involved Method Communication Summary
Ducks Unlimited Canada November 3, 2017
Lynette Mader Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Environment Probe November 3, 2017
Elizabeth Brubaker Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Federal Electoral District - Kenora November 3, 2017
Robert Nault Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
First Mining Finance Group November 3, 2017
Keith Neumeyer Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 63
Table 2.4C6-1: Engagement with Stakeholders Reivew of Final EA Report – Other Stakeholders
Date Contact Team Members Involved Method Communication Summary
ForestEthics Canada November 3, 2017
Karen Mahon Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Ghost River Lodges November 3, 2017
Darrell Kartinen Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
March 23, 2018
Tena Kartinen Donna Brunton Email The Project team emailed Ghost River Lodges regarding previous concerns expressed by Ghost River Lodges and commitments made by Wataynikaneyap. The Project team noted that while they cannot currently confirm which access roads in the Final EA Report are permanent or temporary, but Wataynikaneyap will continue to engage and discuss any site-specific concerns through the decision-making process. The Project team requested confirmation from Ghost River Lodges that the concerns listed, and the commitment stated, are correct.
March 24, 2018
Tena Kartinen Donna Brunton Email The Project team received an email from Ghost River Lodges in response to their March 23, 2018 email. Ghost River Lodges thanked the Project team for the Project update and confirmed that they would like to continue to be informed.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 64
Table 2.4C6-1: Engagement with Stakeholders Reivew of Final EA Report – Other Stakeholders
Date Contact Team Members Involved Method Communication Summary
Great Slave Helicopters November 3, 2017
Michael Moriarty Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Greenpeace Canada November 3, 2017
Joanna Kerr Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Hidden Bay November 3, 2017
Tim Reinke Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 65
Table 2.4C6-1: Engagement with Stakeholders Reivew of Final EA Report – Other Stakeholders
Date Contact Team Members Involved Method Communication Summary
Hydro One November 3, 2017
Brian McCormick, Mayo Schmidt, Jane Zhang, Kevin Bros, Roman Dorfman
Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
November 3, 2017
Rosella Fazio Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
November 3, 2017
Sarah Cohanim Callum Squires Email The Project team emailed stakeholders the Notice of Submission of the Final EA Report. The notice stated that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment from November 3 to December 22, 2017. The Project team listed the locations and Project website where the Final EA Report is available. The information package also included a memo from the MOECC, and comments table template.
November 6, 2017
Sarah Cohanim Callum Squires Document Delivery
The Project team couriered the Notice of Submission of the Final EA Report information package. The information package stated that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment from November 3 to December 22, 2017. The Project team listed the locations and Project website where the Final EA Report is available. The information package also included a memo from the MOECC, comments table template, and a CD copy of the Final EA Report.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 66
Table 2.4C6-1: Engagement with Stakeholders Reivew of Final EA Report – Other Stakeholders
Date Contact Team Members Involved Method Communication Summary
Hydro One February 23, 2018
Ali Afshar, Arnold Brakel, Hamid Hamadanizadeh, Kevin Bros, Matey Matev, Sarah Cohanim
Callum Squires, Kevin Kilfoil, Nancy O'Neill
Teleconference The Project team had a teleconference with Hydro One to discuss the Pickle Lake substation and the approach on the HONI connection lines.
Ignace Cross Country Ski Club November 3, 2017
John Carson Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Ignace Driftwood November 3, 2017
Dennis Smyk Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Independent Electricity System Operator November 3, 2017
Barbara Constantinescu, Mike Falvo, Silviu Motoc
Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 67
Table 2.4C6-1: Engagement with Stakeholders Reivew of Final EA Report – Other Stakeholders
Date Contact Team Members Involved Method Communication Summary
Interested Stakeholders November 3, 2017
Allyne Gliddon Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Kenora & District Chamber of Commerce November 3, 2017
Wes Romaniuk Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Kenora District Camp Owners Association November 3, 2017
Jacqui Haukness Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 68
Table 2.4C6-1: Engagement with Stakeholders Reivew of Final EA Report – Other Stakeholders
Date Contact Team Members Involved Method Communication Summary
Kenora District Services Board November 3, 2017
Dan McNeil Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
November 3, 2017
Dan McNeil Callum Squires Email The Project team emailed the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available. The Project team also provided an acknowledgement of receipt form.
November 7, 2017
Dan McNeil Callum Squires Document Delivery
The Project team couriered the Notice of Submission of the Final EA Report information package. The information package stated that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment from November 3 to December 22, 2017. The Project team listed the locations and Project website where the Final EA Report is available. The information package also included an acknowledgement of receipt form and a CD copy of the Final EA Report.
Lakehead University November 3, 2017
Ashley Thomson Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 69
Table 2.4C6-1: Engagement with Stakeholders Reivew of Final EA Report – Other Stakeholders
Date Contact Team Members Involved Method Communication Summary
McAuley and Partners November 3, 2017
Peter Burns Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Northern Iron Ore Corp. November 3, 2017
Basil Botha Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Northern Ontario Tourist Outfitters Association/Nature and Outdoor Tourism Ontario November 3, 2017
Laurie Marcil Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Northwest Ontario Windsurfing Club November 3, 2017
Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 70
Table 2.4C6-1: Engagement with Stakeholders Reivew of Final EA Report – Other Stakeholders
Date Contact Team Members Involved Method Communication Summary
Northwestern Ontario Associated Chambers of Commerce November 3, 2017
Nathan Lawrence Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Northwestern Ontario Snowmobile Trails Association November 3, 2017
Chris Oakes Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Obishikokaang Resources Corporation October 27, 2017
Steve Yeung Sarah Orchard Email Wataynikaneyap emailed Obishikokaang Resources Corporation to follow-up on their September 19, 2017 email inquiring if Obishikokaang Resources Corporation had reviewed the shapefile.
Obishikokaang Resources Corporation responded by email at 2:21 pm stating that they have not reviewed the shapefile and that silv forester has other priorities at the moment.
November 3, 2017
Bert Hennessey, Steve Yeung
Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 71
Table 2.4C6-1: Engagement with Stakeholders Reivew of Final EA Report – Other Stakeholders
Date Contact Team Members Involved Method Communication Summary
Obishikokaang Resources Corporation April 05, 2018 Steve Yeung Nancy O'Neill Email The Project team emailed Obishikokaang Resources Corporation
requesting additional files that may contain further information on planned roads and associated timing/availability. The Project team informed Obishikokaang Resources Corporation that Wataynikaneyap will be in Lac Seul First Nation on April 11, 2018 and asked if they would be interested in a meeting.
April 08, 2018 Steve Yeung Nancy O'Neill Email The Project team received an email from Obishikokaang Resources Corporation in response to Wataynikaneyap's email on April 5, 2018. Obishikokaang Resources Corporation stated that they have just begun working on their next 10-year plan (2021-2031) and have not discussed future harvest areas. Obishikokaang Resources Corporation indicated that they are not available to meet on April 11, 2018 and referred the Project team to their colleague for future assistance for work outside of Forest Management.
April 10, 2018 Barry King, Steve Yeung
Nancy O'Neill Email The Project team emailed Obishikokaang Resources Corporation in response to Obishikokaang Resources Corporation's April 5, 2018 email. The Project team noted that they are available to meet with the Obishikokaang Resources Corporation representative and requested their full contact information.
Ojibway Power Toboggan Association November 3, 2017
Gail Sayers Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 72
Table 2.4C6-1: Engagement with Stakeholders Reivew of Final EA Report – Other Stakeholders
Date Contact Team Members Involved Method Communication Summary
Ontario Energy Board November 3, 2017
David Richmond, Laurie Reid, Peter Fraser
Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Ontario Federation of Anglers and Hunters (Zone A) November 3, 2017
Roy DeCorte Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Ontario Federation of ATV Clubs November 3, 2017
-- Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Ontario Forest Industries Association November 3, 2017
Jamie Lim Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 73
Table 2.4C6-1: Engagement with Stakeholders Reivew of Final EA Report – Other Stakeholders
Date Contact Team Members Involved Method Communication Summary
Ontario Nature November 3, 2017
Caroline Schultz
Callum Squires Email The Project team emailed stakeholders the Notice of Submission of the Final EA Report. The notice stated that the Final EA Report has been submitted to the MOECC for review and approval and is available for public review and comment from November 3 to December 22, 2017. The Project team listed the locations and Project website where the Final EA Report is available. The information package also included a memo from the MOECC, and comments table template.
Ontario New Democratic Party November 3, 2017
Andrea Horwath Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Ontario Power Generation November 3, 2017
Tammy Wong Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Ontario Provincial Police November 3, 2017
Joy Fishpool Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 74
Table 2.4C6-1: Engagement with Stakeholders Reivew of Final EA Report – Other Stakeholders
Date Contact Team Members Involved Method Communication Summary
Ontario Waterpower Association November 3, 2017
Paul Norris Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Opiikapawiin Services LP November 6, 2017
Opiikapawiin Services LP, General Delivery
Callum Squires Document Delivery
The Project team provided the Notice of Submission of the Final EA Report information package. The information package included a CD copy of the Final EA Report and a memo from the MOECC. The memo stated that the Final EA Report has been submitted to the MOECC for review and approval and requested that the CD be available for public review upon request from November 3 to December 22, 2017. The Project team also requested that the Notice of Submission also be made available with the document.
November 8, 2017
Opiikapawiin Services LP, General Delivery
Callum Squires Document Delivery
The Project team provided the Notice of Submission of the Final EA Report information package. The information package included a copy of the Final EA Report and a memo from the MOECC. The memo stated that the Final EA Report has been submitted to the MOECC for review and approval and requested that the hard copy report be available for public review upon request from November 3 to December 22, 2017. The Project team also requested that the Notice of Submission also be made available with the document.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 75
Table 2.4C6-1: Engagement with Stakeholders Reivew of Final EA Report – Other Stakeholders
Date Contact Team Members Involved Method Communication Summary
Patricia Area Community Endeavours (P.A.C.E.) November 3, 2017
Graeme Mackechnie Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Progressive Conservative Party of Ontario November 3, 2017
Patrick Brown Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Provincial Electoral District - Kenora – Rainy River November 3, 2017
Sarah Campbell Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Public-Private Partnerships Canada November 3, 2017
Dale Booth Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 76
Table 2.4C6-1: Engagement with Stakeholders Reivew of Final EA Report – Other Stakeholders
Date Contact Team Members Involved Method Communication Summary
Queens University November 3, 2017
Stuart Bacon Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Resolute Forest Products (SFL Holders for the English River and Caribou Forests) November 3, 2017
Steve Watson Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Rockex Mining November 3, 2017
Armando Plastino Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 77
Table 2.4C6-1: Engagement with Stakeholders Reivew of Final EA Report – Other Stakeholders
Date Contact Team Members Involved Method Communication Summary
Sagatay Transmission LP December 13, 2017
Riley Griffin Callum Squires Email The Project team received an email from Sagatay Transmission LP via the MOECC that provided the extension request letter (dated December 12, 2017) to Sagatay Transmission LP. The letters indicated that the MOECC has granted their requests and will accept and consider any comments provided by February 10, 2018.
February 12, 2018
Riley Griffin Callum Squires Email The Project team received an email from Sagatay Transmission LP via the MOECC that provided the Final EA Report comments from Sagatay Transmission LP.
May 24, 2018 Sasha McLeod Callum Squires Email The Project Team emailed the MOECC and provided Wataynikaneyap's responses to the comments from Sagatay Transmission LP.
Sierra Club of Canada - Ontario Chapter November 3, 2017
Dan McDermott Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Sioux Air November 3, 2017
Kim Clark Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 78
Table 2.4C6-1: Engagement with Stakeholders Reivew of Final EA Report – Other Stakeholders
Date Contact Team Members Involved Method Communication Summary
Sioux Lookout Eco Bio Regional Wilderness Council November 3, 2017
Remi Lorteau Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Sioux Lookout Library November 3, 2017
Michael Laverty Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
November 6, 2017
Michael Laverty Callum Squires Document Delivery
The Project team provided the Notice of Submission of the Final EA Report information package. The information package included a CD copy of the Final EA Report and a memo from the MOECC. The memo stated that the Final EA Report has been submitted to the MOECC for review and approval and requested that the CD be available for public review upon request from November 3 to December 22, 2017. The Project team also requested that the Notice of Submission also be made available with the document.
November 8, 2017
Sioux Lookout Library Callum Squires Document Delivery
The Project team provided the Notice of Submission of the Final EA Report information package. The information package included a copy of the Final EA Report and a memo from the MOECC. The memo stated that the Final EA Report has been submitted to the MOECC for review and approval and requested that the hard copy report be available for public review upon request from November 3 to December 22, 2017. The Project team also requested that the Notice of Submission also be made available with the document.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 79
Table 2.4C6-1: Engagement with Stakeholders Reivew of Final EA Report – Other Stakeholders
Date Contact Team Members Involved Method Communication Summary
Sioux Lookout Nordic Nomads November 3, 2017
Ron Laverty Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Slate Falls Outposts November 3, 2017
Verne Hollett Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Sunset Trail Riders November 3, 2017
Richard Wilkening Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Sysco Food Services November 3, 2017
Jason Kirouac Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 80
Table 2.4C6-1: Engagement with Stakeholders Reivew of Final EA Report – Other Stakeholders
Date Contact Team Members Involved Method Communication Summary
Thunder Bay Community Economic Development Commission November 3, 2017
John Mason Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Wasaya Air November 3, 2017
Harvey Sainnawap Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
Wildlife Conservation Society Canada November 3, 2017
Cheryl Chetkiewicz Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
November 23, 2017
Cheryl Chetkiewicz Callum Squires Email The Project team received an email from Wildlife Conservation Society Canada in response to the Project team's November 3, 2017 email regarding the Notice of Submission of the Final EA Report. Wildlife Conservation Society Canada requested a link to the complete report for download.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 81
Table 2.4C6-1: Engagement with Stakeholders Reivew of Final EA Report – Other Stakeholders
Date Contact Team Members Involved Method Communication Summary
Wildlife Conservation Society Canada November 24, 2017
Cheryl Chetkiewicz Callum Squires Email The Project team emailed Wildlife Conservation Society Canada in response to Wildlife Conservation Society Canada's November 23, 2017 email requesting a download link to the complete Final EA Report. The Project team noted that they cannot provide a link to one single PDF document given the large size of the files and proposed sending a copy of the Final EA Report on a CD or USB.
Wildlife Conservation Society Canada responded by email to the Project team, stating that they would prefer a copy of the report on USB and provided their mailing address. The Project team responded by email to Wildlife Conservation Society Canada, confirming that they will send the USB today and Wildlife Conservation Society Canada should receive it on November 27, 2017.
The Project team mailed the USB containing the Final EA Report to Wildlife Conservation Society Canada.
December 22, 2017
Cheryl Chetkiewicz Callum Squires Email The Project team received an email from Widllife Conservation Society Canada via the MOECC that provided the Final EA Report comments from the Wildlife Conservation Society of Canada.
April 30, 2018 Sasha McLeod Callum Squires Email The Project Team emailed the MOECC and provided the draft responses to comments received from the Wildlife Conservation Society on the Final EA Report.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 82
Table 2.4C6-1: Engagement with Stakeholders Reivew of Final EA Report – Other Stakeholders
Date Contact Team Members Involved Method Communication Summary
Windigo First Nations Council November 6, 2017
-- Callum Squires Document Delivery
The Project team provided the Notice of Submission of the Final EA Report information package. The information package included a CD copy of the Final EA Report and a memo from the MOECC. The memo stated that the Final EA Report has been submitted to the MOECC for review and approval and requested that the CD be available for public review upon request from November 3 to December 22, 2017. The Project team also requested that the Notice of Submission also be made available with the document.
Windigo First Nations Council November 8, 2017
-- Callum Squires Document Delivery
The Project team provided the Notice of Submission of the Final EA Report information package. The information package included a copy of the Final EA Report and a memo from the MOECC. The memo stated that the Final EA Report has been submitted to the MOECC for review and approval and requested that the hard copy report be available for public review upon request from November 3 to December 22, 2017. The Project team also requested that the Notice of Submission also be made available with the document.
Winoga Lodge November 3, 2017
Dick Mansfield Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 83
Table 2.4C6-1: Engagement with Stakeholders Reivew of Final EA Report – Other Stakeholders
Date Contact Team Members Involved Method Communication Summary
World Wildlife Fund Canada November 3, 2017
Shawn Mitchell Callum Squires Email The Project team provided the Notice of Submission of the Final EA Report, indicating that the Final EA Report has been submitted to the MOECC for review and approval. The Project team stated that the Final EA Report is available for public review and comment from November 3 to December 22, 2017. The Project team provided the locations and Project website where the Final EA Report is available.
AMENDED ENVIRONMENTAL ASSESSMENT REPORT FOR THE PHASE 1 NEW TRANSMISSION LINE TO PICKLE LAKE PROJECT APPENDIX 2.4C: CONTINUED STAKEHOLDER ENGAGEMENT SUMMARY REPORT (OCTOBER 2017 TO MAY 2018
August 2018 Project No. 1899726 84