Amendment-1 Date: 31.08.2017 Ref: NIT No. RECPDCL/Tech/EOI/2017-18/1739 dated: 18.08.2017 1. Following clauses are amended/clarified as mentioned hereunder. S. No. Reference Existing Clause Amended clause 1 Page 4, Clause 2. Intent and Objective Considering large quantum of work to be completed in time bound manner, RECPDCL tends to bid separate proposal (4 package) for above mentioned work under the Jurisdiction of all 4 DISCOMs (PUVVNL, PVVNL, MVVNL, DVVNL) of UP detailed under Section IV & Annexure VIII. Agencies those who are interested can go through the below details and invited for bidding accordingly Considering large quantum of work to be completed in time bound manner, RECPDCL tends to invite bid in separate proposal (7 package) for above mentioned work under the Jurisdiction of all 3 DISCOMs (MVVNL, PUVVNL, DVVNL) of UP. Agencies those who are interested can go through the below details and invited for bidding accordingly 2 Section-IV , Detailed Scope of Work & Performance Evaluation, Page no. 6, Para 1 The general Scope of work includes Field Survey Work & Single Line Diagram (SLD) preparation to connect all unconnected Rural Household. The brief details of districts for which the work has to be done is as below: (Table indicating Habitation details) The general Scope of work includes Field Survey Work & Single Line Diagram (SLD) preparation to connect all unconnected Rural Household. The brief details of districts for which the work has to be done is as below: (Table indicating Habitation details has been Amended as Table A) 3 Section-IV , Detailed Scope of Work & Performance Above said numbers are tentative in nature & may decrease or increase. Actual nos. shall be conveyed at the time of award of work. Above said numbers are tentative in nature & may decrease or increase. Actual nos. shall be conveyed at the time of award. However, the no. of habitations shall be
Transcript
Page 1: Amendment-1 Date: 31.08.2017 Ref: NIT No. … · 2019-12-16 · Govt./Semi Govt./State Govt./PSU etc. per Annexure-VIII Criteria For Package 2 S. No Minimum Qualification Criteria

Amendment-1

Date: 31.08.2017

Ref: NIT No. RECPDCL/Tech/EOI/2017-18/1739 dated: 18.08.2017

1. Following clauses are amended/clarified as mentioned hereunder.

S. No. Reference Existing Clause Amended clause

1 Page 4, Clause 2. Intent

and Objective Considering large quantum of work to be

completed in time bound manner, RECPDCL

tends to bid separate proposal (4 package) for

above mentioned work under the Jurisdiction

of all 4 DISCOMs (PUVVNL, PVVNL, MVVNL,

DVVNL) of UP detailed under Section IV &

Annexure VIII. Agencies those who are

interested can go through the below details

and invited for bidding accordingly

Considering large quantum of work to be completed in

time bound manner, RECPDCL tends to invite bid in

separate proposal (7 package) for above mentioned

work under the Jurisdiction of all 3 DISCOMs (MVVNL,

PUVVNL, DVVNL) of UP. Agencies those who are

interested can go through the below details and invited

for bidding accordingly

2 Section-IV , Detailed

Scope of Work &

Performance

Evaluation, Page no. 6,

Para 1

The general Scope of work includes Field Survey

Work & Single Line Diagram (SLD) preparation to

connect all unconnected Rural Household. The

brief details of districts for which the work has

to be done is as below: (Table indicating

Habitation details)

The general Scope of work includes Field Survey Work &

Single Line Diagram (SLD) preparation to connect all

unconnected Rural Household. The brief details of districts

for which the work has to be done is as below: (Table

indicating Habitation details has been Amended as Table

A)

3 Section-IV , Detailed

Scope of Work &

Performance

Above said numbers are tentative in nature &

may decrease or increase. Actual nos. shall be

conveyed at the time of award of work.

Above said numbers are tentative in nature & may

decrease or increase. Actual nos. shall be conveyed at the

time of award. However, the no. of habitations shall be

Page 2: Amendment-1 Date: 31.08.2017 Ref: NIT No. … · 2019-12-16 · Govt./Semi Govt./State Govt./PSU etc. per Annexure-VIII Criteria For Package 2 S. No Minimum Qualification Criteria

S. No. Reference Existing Clause Amended clause

Evaluation, Page no. 7,

Para 2

Considering the large no. of Habitation to be

covered in a time bound manner. The above

work has been bifurcated in to 3 packages,

summarized as below (Detailed as Annexure -

VIII).

Considered as per data available on the website of

Ministry of Drinking Water & Sanitation

(www.indiawater.gov.in).

If, during survey any additional habitation has been

found apart from the nos. given at the time of

award/nos. of habitation on the website of Ministry of

Drinking Water & Sanitation (www.indiawater.gov.in)

then the agency shall submit following details for these

additional habitations also as applicable to already given

nos. of habitations i.e. certificate duly signed and

stamped indicating name and details such as GPS co-

ordinates of such habitation from Gram Pradhan, also

copy of BPL card/ identity card issued by Govt. of India/

State Government to the persons residing in such

habitations indicating name of person, name of tola,

panchayat etc. shall be submitted along with

photograph/ details of Government Health Centre,

Government School mentioning tola, gram panchayat

shall be submitted. Acceptance of such additional

habitation will be at the sole discretion of RECPDCL.

Considering the large no. of Habitation to be covered in a

time bound manner. The above work has been bifurcated

in to 7 packages, summarized as below (Amended as table

B) (Detailed as per Amended Annexure - VII).

Page 3: Amendment-1 Date: 31.08.2017 Ref: NIT No. … · 2019-12-16 · Govt./Semi Govt./State Govt./PSU etc. per Annexure-VIII Criteria For Package 2 S. No Minimum Qualification Criteria

S. No. Reference Existing Clause Amended clause

Note: Bidders may participate in all packages,

subject to meeting the pre-qualification Criteria

(Section VI) for particular package, but in no

case, a single bidder shall be awarded more than

two package, subject to meeting Eligibility

criteria of both packages.

Note: Bidders may participate in all packages, subject to

meeting the Eligibility Criteria for particular package, but

in no case, a single bidder shall be awarded more than

three packages subject to meeting combined Eligibility

criteria of all 3 packages.

Further, in case the bidder is found successful in 3

packages than the bidder has to make sure to complete

all the work in parallel.

4 Section-IV , Detailed

Scope of Work &

Performance

Evaluation, Page no. 7,

Para 3

The financial bids of technically qualified bidder will

be opened sequence wise i.e. Package 1 first, then

Package 2 and so on, subject to meeting Eligibility

criteria mentioned. If a bidder found successful

for first two package, then the bid submitted by

the bidder for remaining packages shall not be

opened. The rest package(s), left shall be

awarded in the same manner to the successful

qualifying bidder from remaining bids.

The financial bids of technically qualified bidder will be opened

sequence wise i.e. Package 1 first, then Package 2 and so on,

subject to meeting Eligibility criteria mentioned. If a bidder

found successful for first Three packages, then the price

bid submitted by the bidder for remaining packages shall

not be opened. The rest package(s), left shall be awarded

in the same manner to the successful qualifying bidder

from remaining bids.

5 Section-IV , Detailed

Scope of Work &

Performance

Evaluation, Page no. 8,

Clause No. xii

Creation of GPS based Single Line Diagram

(SLD)/map for the surveyed area showing

Transformers, HT/LT lines, BPL/APL connections

as per requirements of RECPDCL. A sample

format for GPS based SLD/ map is attached at

Annex-E for reference only.

Creation of GPS based Single Line Diagram (SLD)/map for

the surveyed area showing Transformers, HT/LT lines,

BPL/APL connections as per requirements of RECPDCL. A

sample format for GPS based SLD/ map is attached at

Annex-A for reference purpose only.

Page 4: Amendment-1 Date: 31.08.2017 Ref: NIT No. … · 2019-12-16 · Govt./Semi Govt./State Govt./PSU etc. per Annexure-VIII Criteria For Package 2 S. No Minimum Qualification Criteria

S. No. Reference Existing Clause Amended clause

6 Section-IV, Detailed

Scope of Work &

Performance

Evaluation, Page no. 9,

Clause No. B

Performance/ Progress

Evaluation

The Bidder is required to submit the Time

Schedule/

Plan of implementation of the assignment as a

sample case for one district with details of

manpower & equipment’s deployment as per

Annexure-VI. The Time Schedule/Plan should be

prepared in such a way that work may start

within 01 days from the date of issue of work

order and inspection of network as per scope of

work/requirement of RECPDCL in the allotted

districts including submission of reports shall be

submitted within 30 days. Agency may propose

their milestone targets to complete the work

before schedule.

The Bidder is required to submit the Time Schedule/Plan of

implementation of the assignment as a sample case for

one district with details of manpower & equipment’s

deployment as per Annexure-VI. The Time Schedule/Plan

should be prepared in such a way that work may start

within 04 days (Mobilization period) from the date of

issue of work order and inspection of network as per scope

of work/requirement of RECPDCL in the allotted districts

including submission of reports shall be submitted within

45 days including mobilization period. Agency may

propose their milestone targets to complete the work

before schedule.

7 Section-V, General

Conditions of Contract,

S.No. 3

Bidders may participate in all packages, subject

to meeting the Eligibility Criteria for particular

package, but in no case, a single bidder shall be

awarded more than two package, subject to

meeting Eligibility criteria of both packages. If a

bidder found successful for first two package,

then the bid submitted by the bidder for

remaining packages shall not be opened. The

rest package(s), left shall be awarded in the

same manner to the successful qualifying bidder

from remaining bids.

Bidders may participate in all packages, subject to meeting

the Eligibility Criteria for particular package, but in no case,

a single bidder shall be awarded more than three

packages, subject to meeting combined Eligibility criteria

of all 3 packages. If a bidder found successful for first

three packages, then the price bid submitted by the

bidder for remaining packages shall not be opened. The

rest package(s), left shall be awarded in the same manner

to the successful qualifying bidder from remaining bids.

Page 5: Amendment-1 Date: 31.08.2017 Ref: NIT No. … · 2019-12-16 · Govt./Semi Govt./State Govt./PSU etc. per Annexure-VIII Criteria For Package 2 S. No Minimum Qualification Criteria

S. No. Reference Existing Clause Amended clause

8 Section-VI, Assignment

Award Methodology &

Eligibility Criteria,

Clause No. 1-

Assignment Award

Methodology – S.No. c)

Work shall be awarded to the respective lowest

bidder of each package (each package shall be

considered a different entity of work.). But in no

case, a single bidder shall be awarded more than two

package subject to meeting Eligibility criteria of both

packages.

Work shall be awarded to the respective lowest bidder (L1) of

each package (each package shall be considered a different

entity of work.). But in no case, a single bidder shall be

awarded more than three packages subject to meeting

combined Eligibility criteria of all 3 packages.

Further, in case the bidder is found successful in 3

packages than the bidder has to make sure to complete

all the work in parallel.

9 Section-VI, Assignment

Award Methodology &

Eligibility Criteria,

Clause No. 1-

Assignment Award

Methodology – S. No.

d)

If a bidder found successful for first two

package, then the bid submitted by the bidder

for remaining packages shall not be opened. The

rest package(s), left shall be awarded in the

same manner to the successful qualifying bidder

from remaining bids.

If a bidder found successful for first three packages, then

the price bid submitted by the bidder for remaining

packages shall not be opened. The rest package(s), left

shall be awarded in the same manner to the successful

qualifying bidder from remaining bids.

10 Section-VI, Assignment Award Methodology & Eligibility Criteria, Clause No. 2, Eligibility Criteria – Amended Eligibility Criteria as below:

Criteria For Package 1

S. No Minimum Qualification Criteria Documents Required

1 The bidder shall be a private/public / LLP Company

registered under Companies Act 1956 or 2013. The

Bidder should have been in operation in India for a

period of at least for 3 years.

Certificate of Incorporation and Registration needs to be

submitted along with the bid.

Page 6: Amendment-1 Date: 31.08.2017 Ref: NIT No. … · 2019-12-16 · Govt./Semi Govt./State Govt./PSU etc. per Annexure-VIII Criteria For Package 2 S. No Minimum Qualification Criteria

S. No. Reference Existing Clause Amended clause

2 Bidder should have successfully carried out similar

assignments of GPS Based Survey work of Electrical

Networks (Power System Network) in India for any

Central/ State Government/ Semi Government/

Public Sector Undertaking/ Private Companies

during last four financial years, having minimum

contract value as below:

(i) single work order/Contract Value of Rs. 1.48

Crores, Or

(ii) Two work orders/Contract Value each of Rs.

0.93 Crores each

Bidder should submit copy of Work order (mandatory) & Any

document out of the following:

(i) Payment receipts

(ii) Proof of release of performance security after completion

of the contract

(iii) Proof of settlement/release of final payment against the

contract

(iv) Certificate for successful completion of

Work/Performance report by the client.

In addition to above, in case bidder have successfully executed

similar projects of GPS Based Survey work of Electrical

Networks (Power System Network) in India for Private

Company(ies), certificate issued by statutory Auditor in this

regard duly signed and stamped reflecting contract value,

name of client, work details etc. to be submitted.

3. Bidder’s average annual turnover of Rs. 1.3 Crores

for last four financial years (FY 2016-17, 2015- 16,

2014-15, 2013-14

Attach documentary evidence (Audited balance sheet/

certificate for chartered accountant) for confirmation

regarding turnover with summary as cover page on company’s

letterhead. The turnover refers to a company and not the

composite turnover of its subsidiaries / sister concerns etc. In

case audited balance sheet of FY 2016-17 is not available then

balance sheet of FY 2012-13 shall be submitted.

4 The bidder should not be black listed by any Undertaking regarding this should be provided by the bidder as

Page 7: Amendment-1 Date: 31.08.2017 Ref: NIT No. … · 2019-12-16 · Govt./Semi Govt./State Govt./PSU etc. per Annexure-VIII Criteria For Package 2 S. No Minimum Qualification Criteria

S. No. Reference Existing Clause Amended clause

Govt./Semi Govt./State Govt./PSU etc. per Annexure-VIII

Criteria For Package 2

S. No Minimum Qualification Criteria Documents Required

1 The bidder shall be a private/public / LLP Company

registered under Companies Act 1956 or 2013. The

Bidder should have been in operation in India for a

period of at least for 3 years.

Certificate of Incorporation and Registration needs to be

submitted along with the bid.

2 Bidder should have successfully carried out similar

assignments of GPS Based Survey work of Electrical

Networks (Power System Network) in India for any

Central/ State Government/ Semi Government/

Public Sector Undertaking/ Private Companies

during last four financial years, having minimum

contract value as below:

(i) single work order/Contract Value of Rs. 1.44

Crores or

(ii) Two work orders/Contract Value each of Rs.

0.90 Crores each

Bidder should submit copy of Work order (mandatory) & Any

document out of the following:

(i) Payment receipts

(ii) Proof of release of performance security after completion

of the contract

(iii) Proof of settlement/release of final payment against the

contract

(iv) Certificate for successful completion of

Work/Performance report by the client.

In addition to above, in case bidder have successfully executed

similar projects of GPS Based Survey work of Electrical

Networks (Power System Network) in India for Private

Company(ies), certificate issued by statutory Auditor in this

regard duly signed and stamped reflecting contract value,

name of client, work details etc. to be submitted

Page 8: Amendment-1 Date: 31.08.2017 Ref: NIT No. … · 2019-12-16 · Govt./Semi Govt./State Govt./PSU etc. per Annexure-VIII Criteria For Package 2 S. No Minimum Qualification Criteria

S. No. Reference Existing Clause Amended clause

3. Bidder’s average annual turnover of Rs. 1.26 Crores

for last four financial years (FY 2016-17, 2015- 16,

2014-15, 2013-14

Attach documentary evidence (Audited balance sheet/

certificate for chartered accountant) for confirmation

regarding turnover with summary as cover page on company’s

letterhead. The turnover refers to a company and not the

composite turnover of its subsidiaries / sister concerns etc. In

case audited balance sheet of FY 2016-17 is not available then

balance sheet of FY 2012-13 shall be submitted.

4 The bidder should not be black listed by any

Govt./Semi Govt./State Govt./PSU etc.

Undertaking regarding this should be provided by the bidder as

per Annexure-VIII

Criteria For Package 3

S. No Minimum Qualification Criteria Documents Required

1 The bidder shall be a private/public / LLP Company

registered under Companies Act 1956 or 2013. The

Bidder should have been in operation in India for a

period of at least for 3 years.

Certificate of Incorporation and Registration needs to be

submitted along with the bid.

2 Bidder should have successfully carried out similar

assignments of GPS Based Survey work of Electrical

Networks (Power System Network) in India for any

Central/ State Government/ Semi Government/

Public Sector Undertaking/ Private Companies

during last four financial years, having minimum

contract value as below:

(i) single work order/Contract Value of Rs. 1.16

Bidder should submit copy of Work order (mandatory) & Any

document out of the following:

(i) Payment receipts

(ii) Proof of release of performance security after completion

of the contract

(iii) Proof of settlement/release of final payment against the

contract

Page 9: Amendment-1 Date: 31.08.2017 Ref: NIT No. … · 2019-12-16 · Govt./Semi Govt./State Govt./PSU etc. per Annexure-VIII Criteria For Package 2 S. No Minimum Qualification Criteria

S. No. Reference Existing Clause Amended clause

Crores, Or

(ii) Two work orders/Contract Value each of Rs.

0.72 Crores each

(iv) Certificate for successful completion of

Work/Performance report by the client.

In addition to above, in case bidder have successfully executed

similar projects of GPS Based Survey work of Electrical

Networks (Power System Network) in India for Private

Company(ies), certificate issued by statutory Auditor in this

regard duly signed and stamped reflecting contract value,

name of client, work details etc. to be submitted

3. Bidder’s average annual turnover of Rs. 1.01 Crores

for last four financial years (FY 2016-17, 2015- 16,

2014-15, 2013-14

Attach documentary evidence (Audited balance sheet/

certificate for chartered accountant) for confirmation

regarding turnover with summary as cover page on company’s

letterhead. The turnover refers to a company and not the

composite turnover of its subsidiaries / sister concerns etc. In

case audited balance sheet of FY 2016-17 is not available then

balance sheet of FY 2012-13 shall be submitted.

4 The bidder should not be black listed by any

Govt./Semi Govt./State Govt./PSU etc.

Undertaking regarding this should be provided by the bidder as

per Annexure-VIII

Criteria For Package 4

S. No Minimum Qualification Criteria Documents Required

1 The bidder shall be a private/public / LLP Company

registered under Companies Act 1956 or 2013. The

Bidder should have been in operation in India for a

period of at least for 3 years.

Certificate of Incorporation and Registration needs to be

submitted along with the bid.

Page 10: Amendment-1 Date: 31.08.2017 Ref: NIT No. … · 2019-12-16 · Govt./Semi Govt./State Govt./PSU etc. per Annexure-VIII Criteria For Package 2 S. No Minimum Qualification Criteria

S. No. Reference Existing Clause Amended clause

2 Bidder should have successfully carried out similar

assignments of GPS Based Survey work of Electrical

Networks (Power System Network) in India for any

Central/ State Government/ Semi Government/

Public Sector Undertaking/ Private Companies

during last four financial years, having minimum

contract value as below:

(i) single work order/Contract Value of Rs. 1.04

Crores or

(ii) Two work orders/Contract Value each of Rs.

0.65 Crores each

Bidder should submit copy of Work order (mandatory) & Any

document out of the following:

(i) Payment receipts

(ii) Proof of release of performance security after completion

of the contract

(iii) Proof of settlement/release of final payment against the

contract

(iv) Certificate for successful completion of

Work/Performance report by the client.

In addition to above, in case bidder have successfully executed

similar projects of GPS Based Survey work of Electrical

Networks (Power System Network) in India for Private

Company(ies), certificate issued by statutory Auditor in this

regard duly signed and stamped reflecting contract value,

name of client, work details etc. to be submitted

3. Bidder’s average annual turnover of Rs. 90.62

lakhs for last four financial years (FY 2016-17, 2015-

16, 2014-15, 2013-14

Attach documentary evidence (Audited balance sheet/

certificate for chartered accountant) for confirmation

regarding turnover with summary as cover page on company’s

letterhead. The turnover refers to a company and not the

composite turnover of its subsidiaries / sister concerns etc. In

case audited balance sheet of FY 2016-17 is not available then

balance sheet of FY 2012-13 shall be submitted.

4 The bidder should not be black listed by any Undertaking regarding this should be provided by the bidder as

Page 11: Amendment-1 Date: 31.08.2017 Ref: NIT No. … · 2019-12-16 · Govt./Semi Govt./State Govt./PSU etc. per Annexure-VIII Criteria For Package 2 S. No Minimum Qualification Criteria

S. No. Reference Existing Clause Amended clause

Govt./Semi Govt./State Govt./PSU etc. per Annexure-VIII

Criteria For Package 5

S. No Minimum Qualification Criteria Documents Required

1 The bidder shall be a private/public / LLP Company

registered under Companies Act 1956 or 2013. The

Bidder should have been in operation in India for a

period of at least for 3 years.

Certificate of Incorporation and Registration needs to be

submitted along with the bid.

2 Bidder should have successfully carried out similar

assignments of GPS Based Survey work of Electrical

Networks (Power System Network) in India for any

Central/ State Government/ Semi Government/

Public Sector Undertaking/ Private Companies

during last four financial years, having minimum

contract value as below:

(i) single work order/Contract Value of Rs. 1.03

Crores, Or

(ii) Two work orders/Contract Value each of Rs.

0.64 Crores each

Bidder should submit copy of Work order (mandatory) & Any

document out of the following:

(i) Payment receipts

(ii) Proof of release of performance security after completion

of the contract

(iii) Proof of settlement/release of final payment against the

contract

(iv) Certificate for successful completion of

Work/Performance report by the client.

In addition to above, in case bidder have successfully executed

similar projects of GPS Based Survey work of Electrical

Networks (Power System Network) in India for Private

Company(ies), certificate issued by statutory Auditor in this

regard duly signed and stamped reflecting contract value,

Page 12: Amendment-1 Date: 31.08.2017 Ref: NIT No. … · 2019-12-16 · Govt./Semi Govt./State Govt./PSU etc. per Annexure-VIII Criteria For Package 2 S. No Minimum Qualification Criteria

S. No. Reference Existing Clause Amended clause

name of client, work details etc. to be submitted

3. Bidder’s average annual turnover of Rs. 89.67

Lakhs for last four financial years (FY 2016-17,

2015- 16, 2014-15, 2013-14

Attach documentary evidence (Audited balance sheet/

certificate for chartered accountant) for confirmation

regarding turnover with summary as cover page on company’s

letterhead. The turnover refers to a company and not the

composite turnover of its subsidiaries / sister concerns etc. In

case audited balance sheet of FY 2016-17 is not available then

balance sheet of FY 2012-13 shall be submitted.

4 The bidder should not be black listed by any

Govt./Semi Govt./State Govt./PSU etc.

Undertaking regarding this should be provided by the bidder as

per Annexure-VIII

Criteria For Package 6

S. No Minimum Qualification Criteria Documents Required

1 The bidder shall be a private/public / LLP Company

registered under Companies Act 1956 or 2013. The

Bidder should have been in operation in India for a

period of at least for 3 years.

Certificate of Incorporation and Registration needs to be

submitted along with the bid.

Page 13: Amendment-1 Date: 31.08.2017 Ref: NIT No. … · 2019-12-16 · Govt./Semi Govt./State Govt./PSU etc. per Annexure-VIII Criteria For Package 2 S. No Minimum Qualification Criteria

S. No. Reference Existing Clause Amended clause

2 Bidder should have successfully carried out similar

assignments of GPS Based Survey work of Electrical

Networks (Power System Network) in India for any

Central/ State Government/ Semi Government/

Public Sector Undertaking/ Private Companies

during last four financial years, having minimum

contract value as below:

(i) single work order/Contract Value of Rs. 1

Crores, OR

(ii) Two work orders/Contract Value each of Rs.

0.63 Crores each

Bidder should submit copy of Work order (mandatory) & Any

document out of the following:

(i) Payment receipts

(ii) Proof of release of performance security after completion

of the contract

(iii) Proof of settlement/release of final payment against the

contract

(iv) Certificate for successful completion of

Work/Performance report by the client.

In addition to above, in case bidder have successfully executed

similar projects of GPS Based Survey work of Electrical

Networks (Power System Network) in India for Private

Company(ies), certificate issued by statutory Auditor in this

regard duly signed and stamped reflecting contract value,

name of client, work details etc. to be submitted.

3. Bidder’s average annual turnover of Rs. 87.62

Lakhs for last four financial years (FY 2016-17,

2015- 16, 2014-15, 2013-14

Attach documentary evidence (Audited balance sheet/

certificate for chartered accountant) for confirmation

regarding turnover with summary as cover page on company’s

letterhead. The turnover refers to a company and not the

composite turnover of its subsidiaries / sister concerns etc. In

case audited balance sheet of FY 2016-17 is not available then

balance sheet of FY 2012-13 shall be submitted.

4 The bidder should not be black listed by any

Govt./Semi Govt./State Govt./PSU etc.

Undertaking regarding this should be provided by the bidder as

per Annexure-VIII

Page 14: Amendment-1 Date: 31.08.2017 Ref: NIT No. … · 2019-12-16 · Govt./Semi Govt./State Govt./PSU etc. per Annexure-VIII Criteria For Package 2 S. No Minimum Qualification Criteria

S. No. Reference Existing Clause Amended clause

Criteria For Package 7

S. No Minimum Qualification Criteria Documents Required

1 The bidder shall be a private/public / LLP Company

registered under Companies Act 1956 or 2013. The

Bidder should have been in operation in India for a

period of at least for 3 years.

Certificate of Incorporation and Registration needs to be

submitted along with the bid.

2 Bidder should have successfully carried out similar

assignments of GPS Based Survey work of Electrical

Networks (Power System Network) in India for any

Central/ State Government/ Semi Government/

Public Sector Undertaking/ Private Companies

during last four financial years, having minimum

contract value as below:

(i) single work order/Contract Value of Rs. 0.61

Crores, Or

(ii) Two work orders/Contract Value each of Rs.

0.38 Crores each

Bidder should submit copy of Work order (mandatory) & Any

document out of the following:

(i) Payment receipts

(ii) Proof of release of performance security after completion

of the contract

(iii) Proof of settlement/release of final payment against the

contract

(iv) Certificate for successful completion of

Work/Performance report by the client.

In addition to above, in case bidder have successfully executed

similar projects of GPS Based Survey work of Electrical

Networks (Power System Network) in India for Private

Company(ies), certificate issued by statutory Auditor in this

regard duly signed and stamped reflecting contract value,

name of client, work details etc. to be submitted

Page 15: Amendment-1 Date: 31.08.2017 Ref: NIT No. … · 2019-12-16 · Govt./Semi Govt./State Govt./PSU etc. per Annexure-VIII Criteria For Package 2 S. No Minimum Qualification Criteria

S. No. Reference Existing Clause Amended clause

3. Bidder’s average annual turnover of Rs. 0.53 Crores

for last four financial years (FY 2016-17, 2015- 16,

2014-15, 2013-14

Attach documentary evidence (Audited balance sheet/

certificate for chartered accountant) for confirmation

regarding turnover with summary as cover page on company’s

letterhead. The turnover refers to a company and not the

composite turnover of its subsidiaries / sister concerns etc. In

case audited balance sheet of FY 2016-17 is not available then

balance sheet of FY 2012-13 shall be submitted.

4 The bidder should not be black listed by any

Govt./Semi Govt./State Govt./PSU etc.

Undertaking regarding this should be provided by the bidder as

per Annexure-VIII

11 Section-VII, Financial

BID Evaluation

Methodology, Clause 4

c), page no. 16

Bidders may participate in all packages, subject

to meeting the Eligibility Criteria for particular

package, but in no case, a single bidder shall be

awarded more than two package, subject to

meeting Eligibility criteria of both packages. If a

bidder found successful for first two package,

then the bid submitted by the bidder for

remaining packages shall not be opened. The

rest package(s), left shall be awarded in the

same manner to the successful qualifying bidder

from remaining bids.

Bidders may participate in all packages, subject to meeting

the Eligibility Criteria for particular package, but in no case,

a single bidder shall be awarded more than three

packages, subject to meeting combined Eligibility criteria

of all 3 packages. If a bidder found successful for first

three packages, then the price bid submitted by the

bidder for remaining packages shall not be opened. The

rest package(s), left shall be awarded in the same manner

to the successful qualifying bidder from remaining bids.

Further, in case the bidder is found successful in all 3

packages than the bidder has to make sure to complete

all the work in parallel.

12 Section-VII, Financial

BID Evaluation The payment to the Bidder for the performance

of the works under the contract will be made by

RECPDCL as per the guidelines and conditions

The payment to the Bidder for the performance of the

works under the contract will be made by RECPDCL as per

the guidelines and conditions specified herein. The final

Page 16: Amendment-1 Date: 31.08.2017 Ref: NIT No. … · 2019-12-16 · Govt./Semi Govt./State Govt./PSU etc. per Annexure-VIII Criteria For Package 2 S. No Minimum Qualification Criteria

S. No. Reference Existing Clause Amended clause

Methodology, Clause 7,

page no. 17

specified herein. The final payment will be made

on completion of all the works and on fulfilment

by the agency obligations under the contract

subject to acceptance by RECPDCL.

The payment will be made to successful Bidder

after the award of work, in the following

Manner: -

a)No advance payment shall be made

b) 100% payment will be released on submission

of final deliverables subject to acceptance as per

consolidate rate approved by RECPDCL.

c)Income Tax and any other taxes etc. as may be

applicable from time to time during the currency

of contract shall be deducted at source from the

running bill(s)

payment will be made on completion of all the works and

on fulfilment by the agency obligations under the contract

subject to acceptance by RECPDCL.

The payment will be made to successful Bidder after the

award of work, in the following Manner: -

a) No advance payment shall be made.

b) 70% payment will be released on submission of final

deliverables to RECPDCL.

c) 30% within 30 days from 1st payment subject to

compliance of any observations & Final Acceptance by

RECPDCL.

d)Income Tax and any other taxes etc. as may be

applicable from time to time during the currency of

contract shall be deducted at source from the invoice(s)/

bill(s)

13 Section-VII, Financial

BID Evaluation

Methodology, Clause 8

a), Earnest Money

Deposit (EMD) page no.

17-18

The Bidder shall furnish Earnest Money Deposit in

original as mentioned in below table in the form of

Demand Draft/ Bank Guarantee (BG) from a

scheduled bank (as per Annexure‐II) drawn in favour

of REC Power Distribution Company Ltd. payable at

New Delhi

The Bidder shall furnish Earnest Money Deposit in original as

mentioned in below table in the form of Demand Draft/ Bank

Guarantee (BG) from a scheduled bank (as per Annexure‐II)

drawn in favour of REC Power Distribution Company Ltd.

payable at New Delhi.

The table has been Amended as Table B.

Page 17: Amendment-1 Date: 31.08.2017 Ref: NIT No. … · 2019-12-16 · Govt./Semi Govt./State Govt./PSU etc. per Annexure-VIII Criteria For Package 2 S. No Minimum Qualification Criteria

S. No. Reference Existing Clause Amended clause

14 Section-VII, Financial

BID Evaluation

Methodology, Clause

12, page no. 19

Duration/ Period of Contract: The contract period

will be for 30 days from the date of the award of

contract/ issuance of work order. In case duration of

the contract is required to be extended for the

reason beyond control of agency the same shall be

done on same rates, terms & conditions at the sole

discretion of RECPDCL.

The contract period will be for 45 days from the date of the

award of contract/ issuance of work order. In case duration of

the contract is required to be extended for the reason beyond

control of agency the same shall be done on same rates, terms

& conditions at the sole discretion of RECPDCL.

15 Section-VII, Financial

BID Evaluation

Methodology, Clause

18 e), page no. 21

Bidders may participate in all packages, subject to

meeting the Eligibility Criteria, but in no case, a

single bidder shall be awarded more than two

package subject to meeting Eligibility criteria of both

package. If a bidder found successful for first two

package, then the bid submitted by the bidder

for remaining packages shall not be opened. The

rest package(s), left shall be awarded in the

same manner to the successful qualifying bidder

from remaining bids.

Bidders may participate in all packages, subject to meeting

the Eligibility Criteria for particular package, but in no case,

a single bidder shall be awarded more than three

packages, subject to meeting combined Eligibility criteria

of all 3 packages. If a bidder found successful for first

three packages, then the price bid submitted by the

bidder for remaining packages shall not be opened. The

rest package(s), left shall be awarded in the same manner

to the successful qualifying bidder from remaining bids.

Further, in case the bidder is found successful in 3

packages than the bidder has to make sure to complete

all the work in parallel.

16 Form-III A, B, C, page

no. 24, 25, 26

Financial Bid format has been Amended as Form-III

A,B,C,D,E,F,G.

17 Annexure VII, page no.

37

Details of Districts/ Habitation in Respective

packages

Annexure VII has been Amended.

18 New Clause On opening of Price bid for any package if quoted rates of two

or more bidder found same (i.e. in case of Tie). The work of

Page 18: Amendment-1 Date: 31.08.2017 Ref: NIT No. … · 2019-12-16 · Govt./Semi Govt./State Govt./PSU etc. per Annexure-VIII Criteria For Package 2 S. No Minimum Qualification Criteria

S. No. Reference Existing Clause Amended clause

said package will be awarded to the agency/ bidder with

highest turnover (as per eligibility Criteria above) among them.

Note: Price bid format have been revised. Bidder to quote price as per revised price bid format, Further all agencies who had submitted their bids

before this amendment are requested to resubmit their Bids including Price Bid.

Further, The Date & Time for submission of BID is extended, as detailed here under:

Details Original Date & Time Extended/Revised Date & Time

Last date of submission of tender 04.09.2017 up to 15:00 Hrs 07.09.2017 up to 15:00 Hrs

Date of opening of Technical Bid 04.09.2017 at 16:00 Hrs 07.09.2017 at 16:00 Hrs

This is issue with the approval of Competent Authority

Please contact for further queries:

Phone: 0120-4383783/759

Email: [email protected]

Page 19: Amendment-1 Date: 31.08.2017 Ref: NIT No. … · 2019-12-16 · Govt./Semi Govt./State Govt./PSU etc. per Annexure-VIII Criteria For Package 2 S. No Minimum Qualification Criteria

Table A

List of Districts/ Nos. of Habitations

Sl No. District Discom Approx. no. of Block to be surveyed by

agency

Approx no of habitations to be

surveyed by agency

1 Etawah DVVNL 7 2188

2 Farrukhabad 7 1965

3 Kannauj 8 2172

4 Kanpur Dehat 9 1943

5 Kanpur Nagar 9 1711

6 Mainpuri 9 2699 Subtotal 49 12678

7 Kheri MVVNL 14 4449

8 Shrawasti 4 2144

9 Balrampur 8 4023

10 Gonda 14 10736

11 Sitapur 18 7008

12 Unnao 15 4113

13 Hardoi 18 4965

14 Bahraich 13 8551

15 Barabanki 14 5354

16 Ambedkar Nagar 7 3777

17 Rae Bareli 17 6111

18 Faizabad 10 5975

19 Amethi 12 4998

Sub Total 164 72204

20 Basti

PuVVNL

13 4958

21 Deoria 15 3904

22 Kushinagar 13 5808

23 Maharajganj 10 3203

24 Siddharthnagar 12 3702

25 Ballia 16 4948

26 Ghazipur 15 8347

27 Azamgarh 20 10793

28 Jaunpur 20 12860

29 Pratapgarh 16 8563

30 Allahabad 18 9447

Sub Total 168 76533

Grand Total 381 161415

Page 20: Amendment-1 Date: 31.08.2017 Ref: NIT No. … · 2019-12-16 · Govt./Semi Govt./State Govt./PSU etc. per Annexure-VIII Criteria For Package 2 S. No Minimum Qualification Criteria

Table B

Package Wise Details – EMD to be submitted

S.No. Packages Name of Discom

No. of Districts covered

No. of Habitation

EMD to be submitted (in INR)

A B C D E F 1 Package 1 PuVVNL 3 30870 2,50,000

2 Package 2 MVVNL 5 29991 2,50,000

3 Package 3 PuVVNL 3 24088 2,50,000

4 Package 4 PuVVNL 5 21575 2,50,000

5 Package 5 MVVNL 4 21352 2,50,000

6 Package 6 MVVNL 4 20861 2,50,000

7 Package 7 DVVNL 6 12678 1,00,000

Total 30 161415

Page 21: Amendment-1 Date: 31.08.2017 Ref: NIT No. … · 2019-12-16 · Govt./Semi Govt./State Govt./PSU etc. per Annexure-VIII Criteria For Package 2 S. No Minimum Qualification Criteria

Annexure-VII

DETAILS OF DISTRICTS/ HABITATIONS IN RESPECTIVE PACKAGES

Package – 1

Sl No. District

Discom Approx. no. of Block to be surveyed by

agency

Approx. no of habitations to be

surveyed by agency

1 Jaunpur

PuVVNL

20 12860

2 Pratapgarh 16 8563

3 Allahbad 18 9447

Subtotal 54 30870

Package – 2

Sl No. District

Discom Approx. no. of Block to be surveyed by

agency

Approx. no of habitations to be

surveyed by agency

1 Sitapur

MVVNL

18 7008

2 Unnao 15 4113

3 Hardoi 18 4965

4 Bahraich 13 8551

5 Barabanki 14 5354

Subtotal 78 29991

Package – 3

Sl No. District

Discom Approx. no. of Block to be surveyed by

agency

Approx. no of habitations to be

surveyed by agency

1 Balia

PuVVNL

16 4948

2 Ghazipur 15 8347

3 Azamgarh 20 10793

Subtotal 51 24088

Page 22: Amendment-1 Date: 31.08.2017 Ref: NIT No. … · 2019-12-16 · Govt./Semi Govt./State Govt./PSU etc. per Annexure-VIII Criteria For Package 2 S. No Minimum Qualification Criteria

Package – 4

Sl No. District

Discom Approx. no. of Block to be surveyed by

agency

Approx. no of habitations to be

surveyed by agency

1 Basti

PuVVNL

13 4958

2 Deoria 15 3904

3 Kushinagar 13 5808

4 Maharajganj 10 3203

5 Siddharthnagar 12 3702

Subtotal 63 21575

Package – 5

Sl No. District

Discom Approx. no. of Block to be surveyed by

agency

Approx. no of habitations to be

surveyed by agency

1 Kheri

MVVNL

14 4449

2 Shrawasti 4 2144

3 Balrampur 8 4023

4 Gonda 14 10736

Subtotal 40 21352

Package – 6

Sl No. District

Discom Approx. no. of Block to be surveyed by

agency

Approx. no of habitations to be

surveyed by agency

1 Ambedkar Nagar

MVVNL

7 3777

2 Rae Bareli 17 6111

3 Faizabad 10 5975

4 Amethi 12 4998

Subtotal 46 20861

Package – 7

Sl No. District

Discom Approx. no. of Block to be surveyed by

agency

Approx. no of habitations to be

surveyed by agency

1 Etawah

DVVNL

7 2188

2 Farrukhabad 7 1965

3 Kannauj 8 2172

4 Kanpur Dehat 9 1943

5 Kanpur Nagar 9 1711

6 Mainpuri 9 2699

Subtotal 49 12678

Page 23: Amendment-1 Date: 31.08.2017 Ref: NIT No. … · 2019-12-16 · Govt./Semi Govt./State Govt./PSU etc. per Annexure-VIII Criteria For Package 2 S. No Minimum Qualification Criteria
user
Text Box
Annex -A Sample Copy
Page 24: Amendment-1 Date: 31.08.2017 Ref: NIT No. … · 2019-12-16 · Govt./Semi Govt./State Govt./PSU etc. per Annexure-VIII Criteria For Package 2 S. No Minimum Qualification Criteria

S.No.

1

2 IN FIGURES

In Rupees (in Fig) Please offer some discount

In Rupees (in Words) #VALUE!

In Rupees (in Fig)

In Rupees (in Fig)

5 In Rupees (in Fig)

In Rupees (in Fig) #VALUE!

In Rupees (in Words) #VALUE!

FINANCIAL BID Format for Package 1

(To be submitted online)

Carry out GPS based survey and SLD Preparation under 24x7 Power for All Scheme in UP – Package 1 (PuVVNL)

NAME OF THE COMPANY

Remarks: Rates are to be quoted strictly on per Habitation basis (in 5).

Note:

1. The discount should be quoted up to two decimal place only.

2. In case of discrepancy between value indicated by the Bidder “In Figure” and “In words” at S.No. 3 above, the value indicated at “In

Figures” shall prevail.

3. Bidders have to quote as per financial bid format as above including all taxes & duties and GST. Financial bids will be evaluated based

on total price quoted. At the time of release of payment to the bidder, TDS /Labour cess will be deducted as the case may be.

4. If it is found that the tax quoted is higher than the applicable tax, in that case applicable taxes will only be paid by RECPDCL and if the

tax quoted is lower than the applicable tax, in that case only the quoted taxes will be paid by the RECPDCL.

5. Rate quoted by the bidder shall remain firm & fixed and shall be binding on the Successful Bidder till completion of work. Any variation

in rates, prices or terms during validity of the offer shall lead to forfeiture of the EMD/PBG of said bidder.

6. The offer must be kept valid for a period of 180 days from the last date of bid submission. No escalation clause would be accepted. The

validity can be further extended with mutual consent.

7. It will be the sole responsibility of the bidders to get the assessment of Habitation and various other parameters involved & its

consideration before quoting the rates.

AMOUNT (RS.)

600

3

6

DESCRIPTION

Form-III-A

Price of Survey Work & SLD Preparation per

Habitation (3+4+5) including all taxes & Duties

GST:-

IGST

4 CGST & SGST/UTGST

Other taxes & duties

Estimated Price of Survey Work & SLD Preparation

per Habitation

Discount offered on the Estimated price

Amount on the basis of percentage discount on

estimated price of survey work & SLD preparation

per habitation as mentioned at “1” above

Page 25: Amendment-1 Date: 31.08.2017 Ref: NIT No. … · 2019-12-16 · Govt./Semi Govt./State Govt./PSU etc. per Annexure-VIII Criteria For Package 2 S. No Minimum Qualification Criteria

S.No. DESCRIPTION

1

Estimated Price of Survey Work &

SLD Preparation per Habitation

2Discount offered on the Estimated

price IN FIGURES

In Rupees (in Fig) Please offer some discount

In Rupees (in Words) #VALUE!

CGST & SGST/UTGSTIn Rupees (in Fig)

IGSTIn Rupees (in Fig)

5 Other taxes & duties In Rupees (in Fig)

In Rupees (in Fig) #VALUE!

In Rupees (in Words) #VALUE!

6

Price of Survey Work & SLD

Preparation per Habitation (3+4+5)

including all taxes & Duties

Form-III-B

GST

4

FINANCIAL BID Format for Package 2

(To be submitted online)

Carry out GPS based survey and SLD Preparation under 24x7 Power for All Scheme in UP – Package 2

(MVVNL)

NAME OF THE COMPANY

Remarks: Rates are to be quoted strictly on per Habitation basis (in 5).

Note:

1. The discount should be quoted up to two decimal place only.

2. In case of discrepancy between value indicated by the Bidder “In Figure” and “In words” at S.No. 3 above,

the value indicated at “In Figures” shall prevail.

3. Bidders have to quote as per financial bid format as above including all taxes & duties and GST. Financial

bids will be evaluated based on total price quoted. At the time of release of payment to the bidder, TDS

/Labour cess will be deducted as the case may be.

4. If it is found that the tax quoted is higher than the applicable tax, in that case applicable taxes will only be

paid by RECPDCL and if the tax quoted is lower than the applicable tax, in that case only the quoted taxes

will be paid by the RECPDCL.

5. Rate quoted by the bidder shall remain firm & fixed and shall be binding on the Successful Bidder till

completion of work. Any variation in rates, prices or terms during validity of the offer shall lead to forfeiture

of the EMD/PBG of said bidder.

6. The offer must be kept valid for a period of 180 days from the last date of bid submission. No escalation

clause would be accepted. The validity can be further extended with mutual consent.

7. It will be the sole responsibility of the bidders to get the assessment of Habitation and various other

parameters involved & its consideration before quoting the rates.

AMOUNT (RS.)

600

3

Amount on the basis of percentage

discount on estimated price of

survey work & SLD preparation per

habitation as mentioned at “1”

above

Page 26: Amendment-1 Date: 31.08.2017 Ref: NIT No. … · 2019-12-16 · Govt./Semi Govt./State Govt./PSU etc. per Annexure-VIII Criteria For Package 2 S. No Minimum Qualification Criteria

S.No. DESCRIPTION

1

Estimated Price of Survey Work &

SLD Preparation per Habitation

2Discount offered on the Estimated

price IN FIGURES

In Rupees (in Fig) Please offer some discount

In Rupees (in Words) #VALUE!

CGST & SGST/UTGSTIn Rupees (in Fig)

IGSTIn Rupees (in Fig)

5 Other taxes & duties In Rupees (in Fig)

In Rupees (in Fig) #VALUE!

In Rupees (in Words) #VALUE!

3

Amount on the basis of

percentage discount on estimated

price of survey work & SLD

preparation per habitation as

mentioned at “1” above

6

Price of Survey Work & SLD

Preparation per Habitation

(3+4+5) including all taxes &

Duties

Form-III-C

GST

4

Remarks: Rates are to be quoted strictly on per Habitation basis (in 5).

Note:

1. The discount should be quoted up to two decimal place only.

2. In case of discrepancy between value indicated by the Bidder “In Figure” and “In words” at S.No. 3 above,

the value indicated at “In figures” shall prevail.

3. Bidders have to quote as per financial bid format as above including all taxes & duties and GST. Financial

bids will be evaluated based on total price quoted. At the time of release of payment to the bidder, TDS /Labour

cess will be deducted as the case may be.

4. If it is found that the tax quoted is higher than the applicable tax, in that case applicable taxes will only be

paid by RECPDCL and if the tax quoted is lower than the applicable tax, in that case only the quoted taxes will

be paid by the RECPDCL.

5. Rate quoted by the bidder shall remain firm & fixed and shall be binding on the Successful Bidder till

completion of work. Any variation in rates, prices or terms during validity of the offer shall lead to forfeiture of

the EMD/PBG of said bidder.

6. The offer must be kept valid for a period of 180 days from the last date of bid submission. No escalation

clause would be accepted. The validity can be further extended with mutual consent.

7. It will be the sole responsibility of the bidders to get the assessment of Habitation and various other

parameters involved & its consideration before quoting the rates.

FINANCIAL BID Format for Package 3

(To be submitted online)

Carry out GPS based survey and SLD Preparation under 24x7 Power for All Scheme in UP – Package 3

(PuVVNL)

NAME OF THE COMPANY

AMOUNT (RS.)

600

Page 27: Amendment-1 Date: 31.08.2017 Ref: NIT No. … · 2019-12-16 · Govt./Semi Govt./State Govt./PSU etc. per Annexure-VIII Criteria For Package 2 S. No Minimum Qualification Criteria

S.No. DESCRIPTION

1

Estimated Price of Survey Work &

SLD Preparation per Habitation

2Discount offered on the Estimated

price IN FIGURES

In Rupees (in Fig) Please offer some discount

In Rupees (in Words) #VALUE!

CGST & SGST/UTGSTIn Rupees (in Fig)

IGSTIn Rupees (in Fig)

5 Other taxes & duties In Rupees (in Fig)

In Rupees (in Fig) #VALUE!

In Rupees (in Words) #VALUE!

3

Amount on the basis of

percentage discount on estimated

price of survey work & SLD

preparation per habitation as

mentioned at “1” above

4

GST

6

Price of Survey Work & SLD

Preparation per Habitation

(3+4+5) including all taxes &

Duties

Remarks: Rates are to be quoted strictly on per Habitation basis (in 5).

Note:

1. The discount should be quoted up to two decimal place only.

2. In case of discrepancy between value indicated by the Bidder “In Figure” and “In words” at S.No. 3 above,

the value indicated at “In figures” shall prevail.

3. Bidders have to quote as per financial bid format as above including all taxes & duties and GST. Financial

bids will be evaluated based on total price quoted. At the time of release of payment to the bidder, TDS /Labour

cess will be deducted as the case may be.

4. If it is found that the tax quoted is higher than the applicable tax, in that case applicable taxes will only be

paid by RECPDCL and if the tax quoted is lower than the applicable tax, in that case only the quoted taxes will

be paid by the RECPDCL.

5. Rate quoted by the bidder shall remain firm & fixed and shall be binding on the Successful Bidder till

completion of work. Any variation in rates, prices or terms during validity of the offer shall lead to forfeiture of

the EMD/PBG of said bidder.

6. The offer must be kept valid for a period of 180 days from the last date of bid submission. No escalation

clause would be accepted. The validity can be further extended with mutual consent.

7. It will be the sole responsibility of the bidders to get the assessment of Habitation and various other

parameters involved & its consideration before quoting the rates.

Form-III-D

FINANCIAL BID Format for Package 4

(To be submitted online)

Carry out GPS based survey and SLD Preparation under 24x7 Power for All Scheme in UP – Package 4

(PuVVNL)

NAME OF THE COMPANY

AMOUNT (RS.)

600

Page 28: Amendment-1 Date: 31.08.2017 Ref: NIT No. … · 2019-12-16 · Govt./Semi Govt./State Govt./PSU etc. per Annexure-VIII Criteria For Package 2 S. No Minimum Qualification Criteria

S.No. DESCRIPTION

1

Estimated Price of Survey Work &

SLD Preparation per Habitation

2Discount offered on the Estimated

price IN FIGURES

In Rupees (in Fig) Please offer some discount

In Rupees (in Words) #VALUE!

CGST & SGST/UTGSTIn Rupees (in Fig)

IGSTIn Rupees (in Fig)

5 Other taxes & duties In Rupees (in Fig)

In Rupees (in Fig) #VALUE!

In Rupees (in Words) #VALUE!

3

Amount on the basis of

percentage discount on estimated

price of survey work & SLD

preparation per habitation as

mentioned at “1” above

4

GST

6

Price of Survey Work & SLD

Preparation per Habitation

(3+4+5) including all taxes &

Duties

Remarks: Rates are to be quoted strictly on per Habitation basis (in 5).

Note:

1. The discount should be quoted up to two decimal place only.

2. In case of discrepancy between value indicated by the Bidder “In Figure” and “In words” at S.No. 3 above,

the value indicated at “In figures” shall prevail.

3. Bidders have to quote as per financial bid format as above including all taxes & duties and GST. Financial

bids will be evaluated based on total price quoted. At the time of release of payment to the bidder, TDS /Labour

cess will be deducted as the case may be.

4. If it is found that the tax quoted is higher than the applicable tax, in that case applicable taxes will only be

paid by RECPDCL and if the tax quoted is lower than the applicable tax, in that case only the quoted taxes will

be paid by the RECPDCL.

5. Rate quoted by the bidder shall remain firm & fixed and shall be binding on the Successful Bidder till

completion of work. Any variation in rates, prices or terms during validity of the offer shall lead to forfeiture of

the EMD/PBG of said bidder.

6. The offer must be kept valid for a period of 180 days from the last date of bid submission. No escalation

clause would be accepted. The validity can be further extended with mutual consent.

7. It will be the sole responsibility of the bidders to get the assessment of Habitation and various other

parameters involved & its consideration before quoting the rates.

Form-III-E

FINANCIAL BID Format for Package 5

(To be submitted online)

Carry out GPS based survey and SLD Preparation under 24x7 Power for All Scheme in UP – Package 5

(MVVNL)

NAME OF THE COMPANY

AMOUNT (RS.)

600

Page 29: Amendment-1 Date: 31.08.2017 Ref: NIT No. … · 2019-12-16 · Govt./Semi Govt./State Govt./PSU etc. per Annexure-VIII Criteria For Package 2 S. No Minimum Qualification Criteria

S.No. DESCRIPTION

1

Estimated Price of Survey Work &

SLD Preparation per Habitation

2Discount offered on the Estimated

price IN FIGURES

In Rupees (in Fig) Please offer some discount

In Rupees (in Words) #VALUE!

CGST & SGST/UTGSTIn Rupees (in Fig)

IGSTIn Rupees (in Fig)

5 Other taxes & duties In Rupees (in Fig)

In Rupees (in Fig) #VALUE!

In Rupees (in Words) #VALUE!

3

Amount on the basis of

percentage discount on estimated

price of survey work & SLD

preparation per habitation as

mentioned at “1” above

4

GST

6

Price of Survey Work & SLD

Preparation per Habitation

(3+4+5) including all taxes &

Duties

Remarks: Rates are to be quoted strictly on per Habitation basis (in 5).

Note:

1. The discount should be quoted up to two decimal place only.

2. In case of discrepancy between value indicated by the Bidder “In Figure” and “In words” at S.No. 3 above,

the value indicated at “In figures” shall prevail.

3. Bidders have to quote as per financial bid format as above including all taxes & duties and GST. Financial

bids will be evaluated based on total price quoted. At the time of release of payment to the bidder, TDS /Labour

cess will be deducted as the case may be.

4. If it is found that the tax quoted is higher than the applicable tax, in that case applicable taxes will only be

paid by RECPDCL and if the tax quoted is lower than the applicable tax, in that case only the quoted taxes will

be paid by the RECPDCL.

5. Rate quoted by the bidder shall remain firm & fixed and shall be binding on the Successful Bidder till

completion of work. Any variation in rates, prices or terms during validity of the offer shall lead to forfeiture of

the EMD/PBG of said bidder.

6. The offer must be kept valid for a period of 180 days from the last date of bid submission. No escalation

clause would be accepted. The validity can be further extended with mutual consent.

7. It will be the sole responsibility of the bidders to get the assessment of Habitation and various other

parameters involved & its consideration before quoting the rates.

Form-III-F

FINANCIAL BID Format for Package 6

(To be submitted online)

Carry out GPS based survey and SLD Preparation under 24x7 Power for All Scheme in UP – Package 6

(MVVNL)

NAME OF THE COMPANY

AMOUNT (RS.)

600

Page 30: Amendment-1 Date: 31.08.2017 Ref: NIT No. … · 2019-12-16 · Govt./Semi Govt./State Govt./PSU etc. per Annexure-VIII Criteria For Package 2 S. No Minimum Qualification Criteria

S.No. DESCRIPTION

1

Estimated Price of Survey Work &

SLD Preparation per Habitation

2Discount offered on the Estimated

price IN FIGURES

In Rupees (in Fig) Please offer some discount

In Rupees (in Words) #VALUE!

CGST & SGST/UTGSTIn Rupees (in Fig)

IGSTIn Rupees (in Fig)

5 Other taxes & duties In Rupees (in Fig)

In Rupees (in Fig) #VALUE!

In Rupees (in Words) #VALUE!

3

Amount on the basis of

percentage discount on estimated

price of survey work & SLD

preparation per habitation as

mentioned at “1” above

4

GST

6

Price of Survey Work & SLD

Preparation per Habitation

(3+4+5) including all taxes &

Duties

Remarks: Rates are to be quoted strictly on per Habitation basis (in 5).

Note:

1. The discount should be quoted up to two decimal place only.

2. In case of discrepancy between value indicated by the Bidder “In Figure” and “In words” at S.No. 3 above,

the value indicated at “In figures” shall prevail.

3. Bidders have to quote as per financial bid format as above including all taxes & duties and GST. Financial

bids will be evaluated based on total price quoted. At the time of release of payment to the bidder, TDS /Labour

cess will be deducted as the case may be.

4. If it is found that the tax quoted is higher than the applicable tax, in that case applicable taxes will only be

paid by RECPDCL and if the tax quoted is lower than the applicable tax, in that case only the quoted taxes will

be paid by the RECPDCL.

5. Rate quoted by the bidder shall remain firm & fixed and shall be binding on the Successful Bidder till

completion of work. Any variation in rates, prices or terms during validity of the offer shall lead to forfeiture of

the EMD/PBG of said bidder.

6. The offer must be kept valid for a period of 180 days from the last date of bid submission. No escalation

clause would be accepted. The validity can be further extended with mutual consent.

7. It will be the sole responsibility of the bidders to get the assessment of Habitation and various other

parameters involved & its consideration before quoting the rates.

Form-III-G

FINANCIAL BID Format for Package 7

(To be submitted online)

Carry out GPS based survey and SLD Preparation under 24x7 Power for All Scheme in UP – Package 7

(DVVNL)

NAME OF THE COMPANY

AMOUNT (RS.)

600


Recommended