+ All Categories
Home > Documents > AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT · PDF fileAMENDMENT OF...

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT · PDF fileAMENDMENT OF...

Date post: 31-Jan-2018
Category:
Upload: truongthuy
View: 218 times
Download: 0 times
Share this document with a friend
14
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE 2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble) 7. ADMINISTERED BY (If other than Item 6) CODE STANDARD FORM 30 (REV. 10-83) Prescribed by GSA FAR (48 CFR) 53.243 FACILITY CODE 9A. AMENDMENT OF SOLICIATION NO. 9B. DATED (SEE ITEM 11) 10A. MODIFICATION OF CONTRACT/ORDER NO. 10B. DATED (SEE ITEM 11) 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 12. ACCOUNTING AND APPROPIRATION DATA (If required) 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A. B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b). C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: D. OTHER (Specify type of modification and authority) E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office. Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect. 15C. DATE SIGNED 15A. NAME AND TITLE OF SIGNER (Type or print) 16C. DATE SIGNED 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) 14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.) PAGE OF PAGES 6. ISSUED BY CODE 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) CODE 15B. CONTRACTOR/OFFEROR (Signature of person authorized to sign) 16B. UNITED STATES OF AMERICA (Signature of Contracting Officer) NSN 7540-01-152-8070 Previous edition unusable 1 14 AMENDMENT NO. 0003 08/23/17 17-0022 ROICCF1 ROICC Camp Lejeune 1005 Michael Road Camp Lejeune, NC 28547-2521 See Item 6 N40085-17-R-3104 08/04/17 Project 17-0022 Interior and Exterior Repairs, BEQ HP503 This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal. ~CONTINUED~
Transcript
Page 1: AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT · PDF fileAMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. ... Answer: Provide a cable ... bends in accordance with the allowable

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THEPLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendmentyour desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and thisamendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDERNO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070Previous edition unusable

1 14

AMENDMENT NO. 0003 08/23/17 17-0022

ROICCF1

ROICC Camp Lejeune1005 Michael RoadCamp Lejeune, NC 28547-2521

See Item 6

✘ N40085-17-R-3104

08/04/17

✘ ✘

Project 17-0022 Interior and Exterior Repairs, BEQ HP503

This amendment should be acknowledged when your proposal is submitted. Failure to acknowledgethe amendment may constitute grounds for rejection of a proposal.

~CONTINUED~

Page 2: AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT · PDF fileAMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. ... Answer: Provide a cable ... bends in accordance with the allowable

Amendment 0003 Solicitation N4008517R3104 Page 2

1. The deadline for receipt of proposals is hereby changed to 28 August 2017 at 1430 EDT.

2. Sheet AD-103 Stored Furniture Requirement Notes: Delete the second Note #6 Furniture - Base Bid and Delete the second Note #7 Furniture - Deduct Line Item. Contractor shall provide furniture storage as outlined in the Stored Furniture Requirement Notes on Sheet AD-103 and include this furniture storage in Priced Line Item 0002. Prior to completion of the renovation the contractor shall place the stored furniture items back into the sleeping rooms (two sets per room) or as directed by the ROICC.

3. To clarify the commissioning plan requirements: The commissioning authority will be retained by the Government. The contractor’s price shall include costs associated with vendor and subcontractor support for the commissioning process. Contractor shall assume a 10 day duration for the Testing Phase once TAB is complete.

4. On Sheet A-607 delete requirement for one sleeping room door sign that incorporates

Room Number, USMC logo and 8.5" x 11" sheet of paper. Replace with the following: provide two separate sleeping room door signs. One door sign shall have the Room Number and the USMC Eagle, Globe and Anchor logo and the other sign shall be an acrylic sign holder sized to hold an 8.5" x 11" sheet of paper. See attached Revised Sign Type 'F'.

5. Delete drawings CD101, CS101, and MS102 issued with solicitation N4008517R3104, and replace with the attached drawings CD101, CS101, and MS102.

6. Question: Plan sheet A201 detail 2 A-101 - South Elevation has a note regarding the installation of an OSHA compliant fall protection system. No further details are included and there is no mention of this system in the specifications. Can you please provide further detail including the type and quantity of anchorages to be installed?

Answer: Provide a cable lifeline system structural fall restraint and fall arrest system capable of withstanding loads and stresses within limits and under conditions specified in OSHA and other applicable safety codes. Provide fall protection anchors permanently attached to roof structure. Provide cable lifeline system to allow continuous travel past intermediate anchors.

Design Requirements: Anchors and accessories comprising system of following types:

a. Roof anchors, spaced as indicated by manufacturer, for safety snap connection by

individual workers capable of withstanding a safety factor of 2 meeting the requirements of OSHA 1926.502(d)(8).

b. Continuous stainless steel cable lifeline restrained by swaged terminations at anchor points, suitable for multiple safety snap connections along cable between anchors.

c. Tensioning system.

Page 3: AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT · PDF fileAMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. ... Answer: Provide a cable ... bends in accordance with the allowable

Amendment 0003 Solicitation N4008517R3104 Page 3

d. Pass-thru technology allowing cable shuttle to run freely past intermediate anchors without the need to disconnect from the fall protection system.

Shop Drawings: Show layout, profiles, and anchorage details. Shop drawings and calculations to be stamped by a Professional Engineer.

The general contractor shall ensure that the fall protection manufacturer and the truss manufacturer coordinate connection locations, details, and loads to be resisted by the trusses, etc. Acceptable manufacturers who provide OSHA compliant fall protection systems include but are not limited to:

Guardian Fall Protection Peak Fall Protection, Inc. Diversified Fall Protection Flexible Lifeline Systems Honeywell Miller

7. Question: Note 1 under the Core Air Handling Unit schedule on M-601 specifies direct

drive plenum fans with variable speed fans. Due to the low CFM and space requirements, will ECM motors that modulate with a 0-10VDC signal be acceptable?

Answer: Provide direct drive plenum fans with variable speed fans as indicated on drawings.

8. Question: The 399 MBH boilers are scheduled as fire-tube style with at least an 8:1

turndown. However, almost all available boilers at that size are water-tube and offer a 5:1 turndown. Also, almost all of the boilers installed at the base over the past few years during steam decentralization are also water-tube with a 5:1 turndown. Will it be acceptable to keep the boiler types (and parts) consistent as well as for availability?

Answer: Provide fire-tube type boilers as indicated on drawings.

9. Question: Section 23 73 33, paragraph 2.3.6 "Access Doors" tell us to "provide for

access to volume dampers, fire dampers, plenum chambers, and where indicated." Will duct mounted access doors be required for volume dampers?

Answer: No duct mounted access doors are required for manual volume dampers and control dampers.

10. Question: Drawings A-402, details 2 & 3, 2nd & 3rd Floor Core Reflected Ceiling Plans,

have 5 each per floor square symbols in the sheetrock ceilings. These scale out to be 12" x 12". They appear to be access panels to serve the volume dampers for the ductwork above but do not match the access panel symbol in the Reflective Ceiling Plan

Page 4: AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT · PDF fileAMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. ... Answer: Provide a cable ... bends in accordance with the allowable

Amendment 0003 Solicitation N4008517R3104 Page 4

Legend. Specification section 05 50 13, paragraph 2.3 says to "provide access doors with a minimum of 14 by 20 inches...". Are these access panels and if so, what size access panels will have to be provided? Answer: Provide six (6) 14"x20"access panels in the 2nd Floor Lounge and provide seven (7) 14"x20"access panels in the 3rd Floor Lounge.

11. Question: There is a mixing valve shown on the Mechanical Building New Work

Domestic Plan on detail 3, drawing P-104. It is also shown on detail 1 on drawing P-502 and labeled MV-1. There is no schedule for this mixing valve. Please provide sizing schedule so that our suppliers can provide pricing.

Answer: Mixing valve shall be sized per Specification Section 22 00 00.

12. Question: Section 23 73 33, paragraph 2.4.4 calls for heating hot water to have

prefabricated fittings. Historically on Camp Lejeune projects, we have provided field supplied fittings that are field insulated with Factory supplied fitting insulation kits. Will prefabricated fittings be required?

Answer: Prefabricated direct buried piping can have field applied fitting insulation.

13. Question: Does specification section 23 73 33, paragraph 2.4.4 also apply to the direct

buried chilled water piping as well? Answer: Specification Section 23 73 33, paragraph 2.4.4 applies to both heating and chilled water piping.

14. Question: There are no specifications for the underground domestic heating hot water,

underground domestic heating hot water return, and underground domestic cold water to be pre-insulated? Will these services be pre-insulated? If so, what types of materials are we to use?

Answer: Yes, provide and install factory installed pre-insulated piping for domestic hot water and domestic hot water return piping. Underground pre-insulated piping for heating hot water and chilled water, size 4" and under to be type L copper.

For buried domestic hot water supply and return piping provide expansion loops and expansion bends (Z- and L- type) factory fabricated of casing, insulation, and carrier piping identical to that furnished for straight runs. Properly design expansion loops and bends in accordance with the allowable stress limits indicated in ASME B31.1 for the type of pipe used, and size to accommodate pipe movement. Ship expansion loops and bends to the jobsite in the maximum size sections feasible to minimize the number of field joints. Make field joints in straight runs of the expansion loops and bends, keeping the number to a minimum. For steel pipe, cold springing is not allowed when sizing the

Page 5: AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT · PDF fileAMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. ... Answer: Provide a cable ... bends in accordance with the allowable

Amendment 0003 Solicitation N4008517R3104 Page 5

expansion loops and bends. Cold spring piping one-half the calculated maximum operational expansion during field assembly is allowed. Stresses shall be less than the maximum allowable stress from the ASME B31.1. Submit pipe-stress and system-expansion calculations for each expansion compensation elbow using a finite element computer generated 3-dimensional analysis, not later than 14 days after notice to proceed. Demonstrate with calculations that pipe stresses from temperature changes are within the allowable requirements in ASME B31.1 and that the anchors and the guides will withstand the resultant forces. Detailed design layout drawings shall include all analysis node points. As a minimum, computer analysis results shall include node stresses, forces, moments and displacements. Calculations shall be stamped by a registered Professional Engineer in the employ of the UHDS manufacturer. Detailed design layout drawings and stress and anchor force calculations shall be provided for all loops and bends. Locations of all anchors, guides and supports shall be shown. The calculations shall be based on design characteristics (pressures and temperatures) specified for both the supply and return lines.

Provide buried preinsulated water piping in conduit complete and ready for operation. Install in accordance with fabricator's published literature. Provide copper tubing for carrier piping. Minimum depth of cover shall be 2 feet.

a. Factory-applied insulation: Provide polyurethane or polyisocyanate insulation, rated

for not less than 250 degrees F service, completely filling the space between carrier pipe and conduit.

b. Factory-applied conduit: Provide each section of carrier pipe with insulation and conduit complete with waterproof conduit caps at both ends. Mark each section of conduit with fabricator's name, product identification, and publications to which the items conform. Provide same type of insulation and conduit material over field-insulated joints and fittings; provide waterproof shrink sleeves over field-insulated joints to overlap not less than 6 inches of each conduit section.

c. Bedding: Accurately grade trench bedding with minimum of 6 inches of sand. Backfill sand to minimum of 6 inches above and below conduit. Lay bedding to firmly support conduit along entire length.

d. Buried utility warning tape: Provide detectable tape for warning of buried piping. 15. Question: The detail on sheet A501 shows thin set wall application but the

specifications notes mud set, which are we to apply? Answer: Utilize TCNA Handbook, Method W223 thin set wall tile installation.

16. Question: Specification 28 31 76, 3.6.2.1 states to provide 1 day of onsite training and 5 days if technical (FA/MNS) training at the manufacturing facility for 3 Government personnel. Will 5 days of technical (FA/MNS) training at the manufacturing facility be required for this project?  

Page 6: AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT · PDF fileAMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. ... Answer: Provide a cable ... bends in accordance with the allowable

Amendment 0003 Solicitation N4008517R3104 Page 6

Answer: Specification Section 28 31 76, Paragraph 3.6 INSTRUCTION OF GOVERNMENT EMPLOYEES – Replace with the following: Equipment manufacturer or experienced training representative shall provide 2 days on-site and 5 days of technical training at MCB Camp Lejeune to the government. Specification Section 28 31 76, Paragraph 3.6.2.1 Technical Training – Revise the first sentence to read: Equipment manufacturer or a factory representative shall provide 2 days of on site and 5 days of technical training to the Government at Camp Lejeune for three government personnel.

17. Question: Drawing FA101 indicated speaker/strobe devices in each sleeping unit but this is not a requirement on the UFC or NFPA. Can we install a speaker only device in place of the speaker/strobe devices in the sleeping rooms?

Answer: No. Provide as indicated on Sheet FA101.

18. Question: Are sounder bases required for the smoke detectors in the sleeping units.

There is no mention of sounder bases in the bid documents.

Answer: All notification in sleeping units is provided by the speaker/strobes in each unit. Sounder bases are not required.

19. Question: Spec section 07 31 13 - Asphalt Shingles paragraph 2.1.1 states that the architectural shingles must weigh not less than 250 pounds per 100 square feet. Can a shingle of a lesser weight be used if the product meets the remaining requirements including warranty?

Answer: Yes, a shingle of a lesser weight can be used if the product meets the remaining requirements including warranty.

20. Question: Regarding the exterior windows and the ATFP requirements on them. It appears by Plan Page A-605 window type B does not have an ATFP requirement. Yet on AT101 ATFP Summary, the building clearly has an 80’ standoff around the entire perimeter, putting window type B inside that perimeter. My interpretation of this shows that they are also blast resistant windows. Please confirm whether Window type B is a blast window or not. Answer: Reference HP503 sheet A-101. Revise WINDOW TYPES A and B floor plan designations as follows:

TRUE NORTH is the bottom of the sheet; references to follow are TRUE NORTH. ALL windows on the HP503 NORTHEAST elevation are TYPE A windows. Windows on the HP503 SOUTHWEST elevation are TYPE B except rooms 101, 201 and 301. Windows at rooms 101, 201 and 301 are TYPE A.

Page 7: AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT · PDF fileAMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. ... Answer: Provide a cable ... bends in accordance with the allowable

Amendment 0003 Solicitation N4008517R3104 Page 7

21. Specification Section 08 33 23 Paragraph 2.2.1.4 calls for vision panels, but none appear to be shown on the drawings. Are vision panels required on this project, and if so, what is extent of glazing?

Answer: Vision panels are not required.

22. Question: Specification Section 08 33 23 Paragraph 2.2.1.7 calls for slide bolt locks and then goes on to call for cylinder locks. Which is required?

Answer: Provide slide bolt for locking by government-provided padlock.

23. Question: The textured ceiling finish that is called to be removed down to the existing concrete substrate, upon site inspection appears to be very thin. Is the paint contractor expected to remove this or is the material ACM?

Answer: Remove texture as scheduled. Refer to Asbestos Survey Report for identified ACM.

24. Question: Please review the transom panel elevations because the door schedule says transom and the exterior elevations on page A-201 show standard 3 sided frames. The only three doors I can see show transoms are 133, 233, and 333 that receive a louver.

Answer: Bid per the Door Schedule on Sheet A-602.

25. Replace Specification Section 08 71 00 Revise Paragraph 2.3.2.2 Card Key System with the following:

The lock system shall be compatible with VingCard Signature RFID electronic lock system with SFIC key override, and a deadbolt. Provide alkaline battery powered, Signature RFID keycard locksets that are ANSI/BHMA A156.13, Series 1000, Grade 1, mortise locks, tamper resistant, UL listed with 1" throw deadbolt and 3/4" throw latch bolt, auxiliary deadlocking latch. The latch bolt and the deadbolt shall be operated simultaneously by rotating the inside lever.

Provide an SFIC key over-ride cylinder to allow opening of the lock with a hard key in case of electronics failure. Use of a newly issued card key automatically re-keys the lock and voids the previous card key. The lock shall re-lock immediately after the outside lever is rotated and the latch retracted. Locks shall have an interrogatable memory that is capable of recording a minimum of 600 events, identification of the key card used to pass the lock, and the date and time of each entry. Interrogation information can be extracted at the lock by a dedicated Service Terminal and Contact Card unit that can be downloaded to the Front Desk Computer for review. Other components that are required for this system, in addition to the front desk PC are an RFID Encoder to program each key card.

Page 8: AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT · PDF fileAMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. ... Answer: Provide a cable ... bends in accordance with the allowable

Amendment 0003 Solicitation N4008517R3104 Page 8

System shall be capable of accepting a minimum of 12 key card access levels, security auditing and computer interfacing with the existing installation management system.

Provide the following: a. One Front Desk System (Computer/Monitor/Ving Vision Software/RFID Encoder).

The computer shall be loaded with the operating system and shall be incorporated with the minimum hardware/performance requirements necessary to run the card reader software and the RFID encoder hardware.

b. Four Spare RFID locksets. c. Two Service Terminals and Two RFID Contact Cards. d. 1500 1K RFID Cards (Resident Cards) Included and 100 4K Cards (Staff Cards). e. 3-Day Training and System Setup. (Train Staff, Build Room Data Base, Setup

Computer and Encoder). Ensure training is coordinated with the pertinent base maintenance (EMI) personnel at (910)934-0429 prior to scheduling the training. Training location, time and other persons involved shall be coordinated with the government.

f. One year warranty and One year 24 phone support agreement.

26. Sheet P-502, DHW Mixing Valve Detail 1: Add a ball type valve to vent/relieve water between the expansion tank and the expansion tank service valve. Pipe to a floor drain with an air gap.

27. Sheet M-503, Typical Expansion Tank/Dirt and Air Separator Detail 3: Add ball type service valve to expansion tank. Add a ball type valve to vent/relieve water between the expansion tank and the expansion tank service valve. Pipe to a floor drain.

28. Sheet MI101, Sleeping Room Air Handling Unit Sequence of Operation/Override

modes/Dehumidification Mode – Delete the word “supply” and replace with “return” throughout the paragraph.

29. Sheet MI105, ERV Controls Diagram 1: Add air flow measuring station downstream of

the exhaust fan. 30. Sheet E-403, Enlarged Electrical New Work Plan 1: Add note to extend circuit M1-9 to

room 133 to power DDC controls for AHU-1C. 31. Sheet E-403, Enlarged Electrical New Work Plan 3: Add note to extend circuit M2-9 to

room 233 to power DDC controls for AHU-2C. 32. Sheet E-403, Enlarged Electrical New Work Plan 5: Add note to extend circuit M3-9 to

room 333 to power DDC controls for AHU-3C. 33. See attached revised floor drain design for the new mechanical building. The

mechanical building plumbing vent system was redesigned as a combination waste vent

Page 9: AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT · PDF fileAMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. ... Answer: Provide a cable ... bends in accordance with the allowable

Amendment 0003 Solicitation N4008517R3104 Page 9

system covered by the IPC 2015 section 915. This is a combined waste vent design, and the contractor shall not exceed the slope requirements for the combined waste vent pipe as specified in section 915.

34. Sheet E-401: Connect type F2 fixture located outside of central stairs 132, 232, 332 and

type F2 fixture located on landing of central stairs 232, 332 (total of 5 fixtures) to circuit C-31. Connect circuit through ceiling mounted occupancy sensors located outside of central stairs 132, 232, and 332 (total of 3 sensors).

35. Sheet E-601: Provide 20amp-1pole circuit breaker in panel ‘C’, space 31, to feed central

stair lighting circuit.

36. Sheet E-403, Enlarged Electrical New Work Plan 1: Add note to extend circuit M1-9 to room 131 to power DDC controls for AHU-1C.

37. Sheet E-403, Enlarged Electrical New Work Plan 3: Add note to extend circuit M2-9 to

room 231 to power DDC controls for AHU-2C.

38. Sheet E-403, Enlarged Electrical New Work Plan 5: Add note to extend circuit M3-9 to room 331 to power DDC controls for AHU-3C.

39. Sheet E-604, detail 2: Remove #1/0G from feeder from service transformer to panel

‘H1’.

40. Sheet E-501: Fixture type ‘G’ shall be 16watt, 3500K, LED, 120-277volt, with LED emergency battery backup. Fixture shall be high abuse with pearlescent lens and 10 year warranty.

41. All other terms and conditions remain unchanged.

Page 10: AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT · PDF fileAMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. ... Answer: Provide a cable ... bends in accordance with the allowable

Revised Sign Type F:

Page 11: AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT · PDF fileAMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. ... Answer: Provide a cable ... bends in accordance with the allowable

CH-1

BT-1

ET-3

AS-2

SWM

ET-2

ET-1

CONTRACTOR TO COORDINATE ACTUAL CONNECTION LOCATION OF SS WITH OTHER TRADES.

GWH-2

GWH-1

BFP1" CS

3/4" CS

3/4" CS

P27

1" CS

4" SS

P27

2" V

4" SS

4" SS

4" SS

1" CS

FD/CO

FD/CO

FD/CO

1" CS

P28

GWH-1

GWH-2

B-3

B-2

B-1

1" CS

3/4" CS

1" CS

SEE SHEET MS102 FOR CONTINUATION

3/4" CS

3/4" CS

2" VTR

1" CS

4" SS

4" SS

4" SS

1" CS

FD/CO

FD/CO

FD/CO

320-C Midland Parkway, Summerville, SC, 29485

ENGINEERING | ARCHITECTURE

CEMS Project No: Project Manager: R. Alvar

DR.

DES.

CHK.

SUBMITTED BY:

DESIGN DIR.

APPROVED: PWO OR OICC

SATISFACTORY TO:

DATE

DATE

DEPARTMENT OF THE NAVY

MARINE CORPS BASECAMP LEJEUNE, NORTH CAROLINA

NAVAL FACILITIES ENGINEERING COMMAND

SIZE CODE IDENT NO. NAVFAC DRAWING NO.

SCALE: SPEC. SHEET OF

E1 80091

300 N. 3rd St., Suite 110, Wilmington, NC, 28401 843.875.3637910.363.1640

CONSTR. CONTR. NO.:

ISSUE DATE:

CONTRACTOR SHALL COMPLY AS FOLLOWS:

A. THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF MEDIUM (E.G., FILM, TAPE, DOCUMENT), PERTAINING TO ANY PART OF THE CONTRACT OR ANY PROGRAM RELATED TO THIS CONTRACT, UNLESS-

1. THE CONTRACTING OFFICE HAS GIVEN PRIOR WRITTEN APPROVAL; OR2. THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF RELEASE.

B. REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE FOR THE RELEASE. THE CONTRACTOR SHALL SUBMIT ITS REQUEST TO THE CONTRACTING OFFICER AT LEAST 45 DAYS BEFORE PROPOSED DATE FOR RELEASE.

C. THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER THIS CONTRACT. SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION TO RELEASE THROUGH THE PRIME CONTRACTOR TO THE CONTRACTING OFFICER.

DISCLOSURE OF INFORMATION

AS NOTED

Author

Designer

Checker

INTERIOR & EXTERIOR REPAIRS AT BEQsHP475, HP145, HP503 and HP513

Unnamed

P-XXX

14524 JULY 2017

15153L

SCALE: 1/4" = 1'-0"1MECHANICAL BUILDING NEW WORK SANITARY PLAN

SCALE: NOT TO SCALE

SANITARY PLUMBING RISER2

NEW WORK KEYNOTES:

NO. DESCRIPTION

P27 PROVIDE SEPARATE CONDENSATENEUTRALIZATION TANK FOR DHW AND HHWBOILERS. PROVIDE TANK WITH A MINIMUMHOLDING CAPACITY OF 0.5 CUBIC FEET OFLIMESTONE AND EACH TANK SHALL HAVE AREMOVABLE LID FOR INSPECTION ANDMAINTENANCE WITHOUT TAKING THE TANK OUTOF SERVICE OR DISCONNECTING PIPE. PROVIDE ACOMMON CPVC INLET PIPE TO EACHNEUTRALIZATION TANK FROM THE HHW BOILERSOR DHW BOILERS. ROUTE CPVC DISCHARGE PIPETO FLOOR DRAIN SUCH THAT CONDENSATE DOESNOT DRAIN ON CONCRETE FLOOR.

P28 DO NOT EXCEED 1/2” FALL PER 12” OF HORIZONTALDISTANCE FOR COMBINATION WASTE AND VENTPIPE. SEE IPC 2015 SECTION 915.

Page 12: AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT · PDF fileAMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. ... Answer: Provide a cable ... bends in accordance with the allowable

T

R

N

#

9

3

5

0

N

:

3

3

3

8

2

1

.

5

3

E

:

2

4

9

9

3

6

0

.

7

3

E

L

E

V

.

:

2

1

.

0

0

2

1

7

"

O

A

K

ST

D

AT

UR

ST

D

AT

UR

ST

D

AT

UR

ST

D

AT

UR

ST

D

AT

UR

ST

D

AT

UR

ST

D

AT

UR

4"

4"

(

B

)

(

A

)

(

C

)

D

R

O

P

I

N

L

E

T

R

I

M

:

2

1

.

0

6

'

I

N

V

I

N

:

N

/

A

I

N

V

O

U

T

:

N

/

A

D

R

O

P

I

N

L

E

T

R

I

M

:

2

0

.

3

5

'

I

N

V

I

N

:

N

/

A

I

N

V

O

U

T

:

N

/

A

15"R

CP

15"RCP

1

2

"

R

C

P

18

"R

CP

1

5

"

R

C

P

8"

SS DATUR SS DATUR SS DATUR SS DATUR SS DATUR SS DATUR

8"SERVICE

8"

8"

8"

D

R

O

P

I

N

L

E

T

R

I

M

:

2

0

.

4

6

'

I

N

V

O

U

T

:

1

7

.

4

3

'

D

R

O

P

I

N

L

E

T

R

I

M

:

2

0

.

5

9

'

I

N

V

I

N

(

A

)

:

1

6

.

0

8

'

I

N

V

I

N

(

B

)

:

1

6

.

7

5

'

I

N

V

O

U

T

(

C

)

:

1

5

.

9

1

'

D

R

O

P

I

N

L

E

T

R

I

M

:

1

9

.

1

7

'

I

N

V

I

N

:

1

3

.

6

7

'

I

N

V

O

U

T

:

N

/

A

21

21

21

2

1

2

2

2

0

1

9

2

0

1

8

2

0

21

2

1

1

0

"

M

A

P

L

E

T

R

N

#

9

3

5

7

N

:

3

3

4

0

9

4

.

5

5

E

:

2

4

9

8

9

6

6

.

5

5

E

L

E

V

.

:

2

1

.

7

9

3

EXISTING BUILDING

(HP 503)

Tx

28 LF OF TREE

PROTECTION

28 LF OF TREE

PROTECTION

25 LF OF TREE

PROTECTION

24 LF OF TREE

PROTECTION

28 LF OF TREE

PROTECTION

REMOVE CONCRETE

SIDEWALK

DROP INLET

PROTECTION

(TYP)

LIMITS OF

DISTURBANCE

REMOVE UNDERGROUND

ELECTRICAL LINES

(SEE ELECTRICAL)

REMOVE CONCRETE

SIDEWALK

DROP INLET

PROTECTION

(TYP)

REMOVE STORM

DRAIN LINE

REMOVE CONCRETE

SIDEWALK

REMOVE CONCRETE

SIDEWALK

REMOVE CONCRETE

SIDEWALK

REMOVE CONCRETE

SIDEWALK

REMOVE CONCRETE

SIDEWALK

REMOVE CONCRETE

SIDEWALK

REMOVE CONCRETE

SIDEWALK

220 LF OF

SILT FENCE

162 LF OF

SILT FENCE

LIMITS OF

DISTURBANCE

LIMITS OF

DISTURBANCE

LIMITS OF

DISTURBANCE

LIMITS OF

DISTURBANCE

254 LF OF

SILT FENCE

66 LF OF

SILT FENCE

47 LF OF

SILT FENCE

47 LF OF

SILT FENCE

LIMITS OF

DISTURBANCE

REMOVE PIPING

(SEE MECHANICAL)

REMOVE SANITARY

SEWER SERVICE LINE

LIMITS OF

DISTURBANCE

REMOVE CONCRETE

SIDEWALK

REMOVE CONCRETE

SIDEWALK

TEMPORARY GRAVEL

CONSTRUCTION

ENTRANCE

LIMITS OF

DISTURBANCE

REMOVE PIPING

(SEE MECHANICAL)

REMOVE CONCRETE

SIDEWALK

REMOVE UNDERGROUND

ELECTRICAL LINES

(SEE ELECTRICAL)

236 LF OF

SILT FENCE

320-C Midland Parkway, Summerville, SC, 29485

ENGINEERING | ARCHITECTURE

CEMS Project No: 15153K

DR.

DES.

CHK.

SUBMITTED BY:

DESIGN DIR.

APPROVED: PWO OR OICC

SATISFACTORY TO:

DATE

DATE

DEPARTMENT OF THE NAVY

MARINE CORPS BASE

CAMP LEJEUNE, NORTH CAROLINA

NAVAL FACILITIES ENGINEERING COMMAND

SIZE CODE IDENT NO. NAVFAC DRAWING NO.

SCALE: SHEET OF

E1 80091

300 N. 3rd St., Suite 110, Wilmington, NC, 28401

ISSUE DATE: 22 AUG 2017

Project Manager: Randy Alvar

843.875.3637

252.649.0334

CONTRACTOR SHALL COMPLY AS FOLLOWS:

A. THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY

UNCLASSIFIED INFORMATION, REGARDLESS OF MEDIUM (E.G., FILM, TAPE, DOCUMENT), PERTAINING TO ANY PART OF

THE CONTRACT OR ANY PROGRAM RELATED TO THIS CONTRACT, UNLESS-

1. THE CONTRACTING OFFICE HAS GIVEN PRIOR WRITTEN APPROVAL; OR

2. THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF RELEASE.

B. REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED,

AND THE PURPOSE FOR THE RELEASE. THE CONTRACTOR SHALL SUBMIT ITS REQUEST TO THE CONTRACTING OFFICER

AT LEAST 45 DAYS BEFORE PROPOSED DATE FOR RELEASE.

C. THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER THIS CONTRACT.

SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION TO RELEASE THROUGH THE PRIME CONTRACTOR

TO THE CONTRACTING OFFICER.

DISCLOSURE OF INFORMATION

SPEC. 05-17-0022

CONSTR. CONTR. NO.: N40085-17-B-0022

INTERIOR & EXTERIOR REPAIRS TO BEQ

HP503

146

S. THOMAS

C. MOORING

J. BARNES

7

GRAPHIC SCALE

AS NOTED

SCALE: 1" = 20'-0"

20' 0 20' 40'

CD101

CIVIL DEMOLITION & EROSION CONTROL PLAN

LAND DISTURBANCE NOTES:

1. THE PROJECT AREA IS APPROXIMATELY 1.72 ACRES AS SHOWN BY THE LIMITS OF CONSTRUCTION.

DISTURBED AREA IS APPROXIMATELY 0.98 ACRES AS SHOWN BY SILT FENCE UNLESS OTHERWISE

SHOWN BY THE LIMITS OF DISTURBANCE.

2. ALL AREAS DISTURBED BY CONSTRUCTION OPERATIONS AND NOT PAVED SHALL BE

SODDED/GRASSED. PROVIDE PERMANENT SODDING PER SHEET CP101. PROVIDE TEMPORARY

SEEDING PER NCDEQ COVERAGE REQUIREMENTS, SEE SHEET C-501.

3. THE PROPERTY IS LOCATED WITHIN ONSLOW COUNTY, NORTH CAROLINA AND PART OF THE WHITE

OAK RIVER BASIN. LOCATED ON CAMP LEJEUNE USGS QUAD SHEET AND OUTFALLS TO THE NEW

RIVER, CLASS-SC; NSW.

4. THIS DEVELOPED PROPERTY LIES IN ZONE X PER FIRM COMMUNITY NO.370178, PANEL 4382, DATED

EFFECTIVE DATE NOVEMBER 3, 2005.

5. THE DISTURBED ACREAGE IS 0.98 ACRES, OF WHICH 1,546 SF IS NEW IMPERVIOUS AREA OR BUILT

UPON AREA (BUA); THEREFORE, DOES NOT REQUIRE NORTH CAROLINA STATE PERMITTING FOR

SEDIMENT & EROSION CONTROL, STORM WATER, OR A COASTAL AREA MANAGEMENT ACT (CAMA)

MAJOR DEVELOPMENT PERMIT.

CIVIL DEMOLITION & EROSION CONTROL PLAN

SCALE: 1" = 20'-0"

LEGEND

EXISTING

CONCRETE

BUILDING OUTLINE

CONTOUR

WATER LINE (REC DRAWING)

W DATUR

EDGE OF PAVEMENT

25

LIGHT POLE

SANITARY SEWER (REC DRAWING)

SS DATUR

SANITARY SEWER MANHOLE

TREE

STORM DRAIN

UNDERGROUND ELECTRICAL

(REC DRAWING)

UE DATUR

UNDERGROUND COMMUNICATIONS

(REC DRAWING)

TU DATUR TU DATUR

ELECTRICAL MANHOLE

CLEANOUT

TP

PIV

WV

TELEPHONE PEDESTAL

DROP INLET

POST INDICATOR VALVE

WATER VALVE

HYDRANT

STEAM LINE (REC DRAWING)

ST DATUR

WATER LINE

SANITARY SEWER

UNDERGROUND COMMUNICATIONS

UNDERGROUND ELECTRICAL

BENCHMARK

SCO

DUAL TEMPERATURE SUPPLY

DUAL TEMPERATURE RETURN

NEW

GAS SERVICE LINE

(NOT IN CONTRACT)

SILT FENCE

INLET PROTECTION

TREE PROTECTION

TO BE DEMOLISHED

LIMITS OF CONSTRUCTION

CONSTRUCTION ENTRANCE

LIMITS OF DISTURBANCE

CONSTRUCTION SEQUENCE:

1. A LAND DISTURBANCE PRE-CONSTRUCTION CONFERENCE IS REQUIRED PRIOR TO ANY DISTURBANCE

ACTIVITIES ON THE SITE. THE CONTRACTOR SHALL SCHEDULE THE MEETING TO OCCUR AT LEAST 48

HOURS PRIOR TO ANY DISTURBANCE ON THE SITE.

2. INSTALL SILT FENCE AND TEMPORARY GRAVEL CONSTRUCTION ENTRANCE WHERE INDICATED ON THE

PLANS.

3. REMOVE ALL CONCRETE SIDEWALKS AND ANY SITE STRUCTURES/FEATURES SPECIFIED TO BE

REMOVED ON THE PLANS.

4. TRENCHING AND INSTALLATION OF MECHANICAL PIPING/WELLS, WATER LINES, STORM DRAINAGE,

SEWER LINES, AND ELECTRICAL LINES MAY BEGIN. SEQUENCE SHALL BE DICTATED BY WHETHER

PRODUCTS/SUBMITTALS HAVE BEEN APPROVED. SEE MECHANICAL, PLUMBING, AND ELECTRICAL PLANS

FOR MORE DETAILS AND IMPROVEMENTS WITHIN 5 FEET OF BUILDINGS.

5. FILL AND COMPACT ALL TRENCHES.

6. INSTALL ALL NEW CONCRETE SIDEWALK.

7. TEMPORARILY SEED ALL DISTURBED AREAS WITH GOOD GRASS PER GROUND COVER REQUIREMENTS

IN NCDEQ EROSION CONTROL DESIGN MANUAL (SEE SHEET C-501).

8. PERMANENTLY SEED ALL DISTURBED AREAS WITH SOD PER SHEET CP101, ONCE ALL WORK IS

COMPLETE.

9. MAINTAIN SEDIMENT TRAPPING DEVICES UNTIL SITE HAS BEEN STABILIZED. CONTRACTOR SHALL BE

RESPONSIBLE FOR MAINTENANCE INSPECTIONS OF ALL CONTROL MEASURES ON A WEEKLY BASIS AND

AFTER PERIODS OF RAINFALL. CONTRACTOR RESPONSIBLE FOR REPAIRING CONTROL MEASURES

IMMEDIATELY UPON DISCOVERY.

10. WHEN CONSTRUCTION IS COMPLETE AND THE GROUND COVER IS ESTABLISHED, CALL FOR INSPECTION.

11. WHEN SITE IS APPROVED BY CONTRACTING OFFICER (ROICC) REMOVE SILT FENCE PER THE SILT FENCE

MAINTENANCE NOTES ON DETAILS SHEET C-501.

GENERAL NOTES:

1. SEE SHEET C-501 THROUGH C-503 FOR CIVIL DETAILS.

2. ALL DISTURBED AREAS TO BE GRADED FOR POSITIVE DRAINAGE TO EXISTING STORM INLETS.

3. ALL AREAS WHERE EXISTING CONCRETE SLABS, SITE FEATURES, AND FOUNDATIONS ARE REMOVED

SHALL BE FILLED TO EXISTING GRADE AND SLOPED FOR POSITIVE DRAINAGE.

4. ALL DISTURBED AREAS TO BE SODDED (PERMANENT) /GRASSED (TEMPORARY) AFTER GRADING

ACTIVITY HAS BEEN COMPLETED. SEE SHEET CP101.

5. ALL DEMOLITION DEBRIS SHALL BE HAULED OFFSITE.

6. SAW CUT AND REMOVE ALL EXISTING CONCRETE SIDEWALK NOTED ON PLANS. PROVIDE NEAT AND

CLEAN JOINTS AT SIDEWALK TO REMAIN.

7. CONTRACTOR WILL BE RESPONSIBLE FOR ADDITIONAL REMOVAL AND REPLACEMENT OF CONCRETE

SIDEWALK AS NECESSARY TO CONSTRUCT THE PROJECT. SIDEWALK REMOVAL AND REPLACEMENT

SHOWN IS THE MINIMUM AMOUNT REQUIRED TO CONSTRUCT THE PROJECT.

8. THE LOCATION, SIZES, AND DEPTHS OF EXISTING UTILITIES, INCLUDING SERVICE LATERALS, AND

DRAINAGE STRUCTURES SHOWN ON THE PLANS ARE APPROXIMATE ONLY. THE CONTRACTOR SHALL

VERIFY THE EXACT LOCATION, SIZES, AND DEPTHS OF UNDERGROUND UTILITIES AT LEAST 48 HOURS

PRIOR TO CONSTRUCTION WHETHER SHOWN ON PLANS OR NOT, AND TO PROTECT THE SAME

DURING CONSTRUCTION.

9. THE CONTRACTOR IS HEREBY CAUTIONED THAT ALL SITE FEATURES SHOWN HEREON ARE BASED ON

FIELD OBSERVATIONS BY THE SURVEYOR AND BY INFORMATION PROVIDED BY OTHERS. THE

INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE.

10. CONTRACTOR TO COORDINATE LOCATION/MARKING OF EXISTING SITE UTILITIES IN AREAS WHERE

WORK IS CONDUCTED, AND ENSURE THEY ARE TURNED OFF PROPERLY BEFORE BEGINNING

CONSTRUCTION.

11. THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR THE REPAIR OF ANY DAMAGE DONE TO ANY

NEW AND EXISTING SITE ITEMS IN THE EXECUTION OF HIS WORK UNDER THIS SECTION.

12. THE CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH THE EXISTING CONDITIONS AND BE PREPARED

TO ADEQUATELY CARE FOR AND SAFEGUARD HIMSELF AND THE GOVERNMENT FROM DAMAGE.

DEMOLITION NOTES:

1. BUILDING HP503 CONSISTS OF MULTIPLE DOWNSPOUTS EXITING

BUILDING. THIS NETWORK IS TO BE REMOVED / ABANDONED IN

THIS SCOPE OF WORK.

2. CONTRACTOR SHALL VERIFY THE EXACT LOCATION THROUGH

AS-BUILTS OR SITE INVESTIGATION PRIOR TO DEMOLITION WORK.

3. THE EXISTING DOWNSPOUTS EXITING BUILDING HP503 SHALL BE

ABANDONED AND CAPPED ONE (1') FOOT BEYOND THE EDGE OF

SIDEWALK.

1

N

60019610

SEAL

1

1

8/22/2017 - REVISED SIDEWALK DEMO

AutoCAD SHX Text
WV
AutoCAD SHX Text
TP
AutoCAD SHX Text
T
AutoCAD SHX Text
TP
AutoCAD SHX Text
TP
AutoCAD SHX Text
TP
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
41438
Page 13: AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT · PDF fileAMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. ... Answer: Provide a cable ... bends in accordance with the allowable

T

R

N

#

9

3

5

0

N

:

3

3

3

8

2

1

.

5

3

E

:

2

4

9

9

3

6

0

.

7

3

E

L

E

V

.

:

2

1

.

0

0

2

ST

D

AT

UR

ST

D

AT

UR

ST

D

AT

UR

ST

D

AT

UR

ST

D

AT

UR

ST

D

AT

UR

ST

D

AT

UR

4"

4"

(

A

)

(

C

)

D

R

O

P

I

N

L

E

T

R

I

M

:

2

1

.

0

6

'

I

N

V

I

N

:

N

/

A

I

N

V

O

U

T

:

N

/

A

D

R

O

P

I

N

L

E

T

R

I

M

:

2

0

.

3

5

'

I

N

V

I

N

:

N

/

A

I

N

V

O

U

T

:

N

/

A

15"R

CP

15"RCP

1

2

"

R

C

P

18

"R

CP

1

5

"

R

C

P

SS DATUR SS DATUR SS DATUR SS DATUR SS DATUR SS DATUR

8"SERVICE

8"

8"

8"

D

R

O

P

I

N

L

E

T

R

I

M

:

2

0

.

4

6

'

I

N

V

O

U

T

:

1

7

.

4

3

'

D

R

O

P

I

N

L

E

T

R

I

M

:

2

0

.

5

9

'

I

N

V

I

N

(

A

)

:

1

6

.

0

8

'

I

N

V

I

N

(

B

)

:

1

6

.

7

5

'

I

N

V

O

U

T

(

C

)

:

1

5

.

9

1

'

D

R

O

P

I

N

L

E

T

R

I

M

:

1

9

.

1

7

'

I

N

V

I

N

:

1

3

.

6

7

'

I

N

V

O

U

T

:

N

/

A

21

21

21

2

1

2

2

2

0

1

9

2

0

1

8

2

0

21

2

1

ME

CH

B

LD

G

FF

E =

22

.00'

T

R

N

#

9

3

5

7

N

:

3

3

4

0

9

4

.

5

5

E

:

2

4

9

8

9

6

6

.

5

5

E

L

E

V

.

:

2

1

.

7

9

3

EXISTING BUILDING

(HP 503)

T

Tx

LIMITS OF

DISTURBANCE

I.E.: 18.46'

I.E. IN: 17.92'

I.E. OUT: 17.92'

I.E.: 17.43'

LIMITS OF

DISTURBANCE

LIMITS OF

DISTURBANCE

LIMITS OF

DISTURBANCE

LIMITS OF

DISTURBANCE

I.E.: 18.02'

I.E.: 17.25'

I.E. IN: 16.00'

I.E. OUT: 16.00'

I.E.: 17.78'

I.E.: 19.00'

I.E.: 17.75'

I.E. IN: 16.16'

I.E. OUT: 16.16'

I.E. IN: 17.66'

I.E. OUT: 17.66'

JUNCTION BOX (SEE SHEET C-503)

I.E. IN-NE / NW: 14.85'

I.E. IN-W: MATCH EX. PIPING I.E.

I.E. OUT-E: MATCH EX. PIPING I.E.

I.E. IN: 17.48'

I.E. OUT: 17.48'

I.E. IN: 16.88'

I.E. OUT: 16.88'

LIMITS OF

DISTURBANCE

T

LIMITS OF

DISTURBANCE

I.E.: 15.54'

LIMITS OF

DISTURBANCE

S

320-C Midland Parkway, Summerville, SC, 29485

ENGINEERING | ARCHITECTURE

CEMS Project No: 15153K

DR.

DES.

CHK.

SUBMITTED BY:

DESIGN DIR.

APPROVED: PWO OR OICC

SATISFACTORY TO:

DATE

DATE

DEPARTMENT OF THE NAVY

MARINE CORPS BASE

CAMP LEJEUNE, NORTH CAROLINA

NAVAL FACILITIES ENGINEERING COMMAND

SIZE CODE IDENT NO. NAVFAC DRAWING NO.

SCALE: SHEET OF

E1 80091

300 N. 3rd St., Suite 110, Wilmington, NC, 28401

ISSUE DATE: 22 AUG 2017

Project Manager: Randy Alvar

843.875.3637

252.649.0334

CONTRACTOR SHALL COMPLY AS FOLLOWS:

A. THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY

UNCLASSIFIED INFORMATION, REGARDLESS OF MEDIUM (E.G., FILM, TAPE, DOCUMENT), PERTAINING TO ANY PART OF

THE CONTRACT OR ANY PROGRAM RELATED TO THIS CONTRACT, UNLESS-

1. THE CONTRACTING OFFICE HAS GIVEN PRIOR WRITTEN APPROVAL; OR

2. THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF RELEASE.

B. REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED,

AND THE PURPOSE FOR THE RELEASE. THE CONTRACTOR SHALL SUBMIT ITS REQUEST TO THE CONTRACTING OFFICER

AT LEAST 45 DAYS BEFORE PROPOSED DATE FOR RELEASE.

C. THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER THIS CONTRACT.

SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION TO RELEASE THROUGH THE PRIME CONTRACTOR

TO THE CONTRACTING OFFICER.

DISCLOSURE OF INFORMATION

SPEC. 05-17-0022

CONSTR. CONTR. NO.: N40085-17-B-0022

INTERIOR & EXTERIOR REPAIRS TO BEQ

HP503

146

CS101

S. THOMAS

C. MOORING

J. BARNES

8

GRAPHIC SCALE

AS NOTED

SCALE: 1" = 20'-0"

20' 0 20' 40'

CIVIL SITE PLAN

LEGEND

EXISTING

CONCRETE

BUILDING OUTLINE

CONTOUR

WATER LINE (REC DRAWING)

W DATUR

EDGE OF PAVEMENT

25

LIGHT POLE

SANITARY SEWER (REC DRAWING)

SS DATUR

SANITARY SEWER MANHOLE

TREE

STORM DRAIN

UNDERGROUND ELECTRICAL

(REC DRAWING)

UE DATUR

UNDERGROUND COMMUNICATIONS

(REC DRAWING)

TU DATUR TU DATUR

ELECTRICAL MANHOLE

CLEANOUT

TP

PIV

WV

TELEPHONE PEDESTAL

DROP INLET

POST INDICATOR VALVE

WATER VALVE

HYDRANT

STEAM LINE (REC DRAWING)

ST DATUR

WATER LINE

SANITARY SEWER

UNDERGROUND COMMUNICATIONS

UNDERGROUND ELECTRICAL

BENCHMARK

SCO

DUAL TEMPERATURE SUPPLY

DUAL TEMPERATURE RETURN

SILT FENCE

LIMITS OF CONSTRUCTION

NEW

LIMITS OF DISTURBANCE

DOWNSPOUT

WV

PIV

POST INDICATOR VALVE

DRAIN BASIN / JUNCTION BOX

GAS SERVICE LINE

(NOT IN CONTRACT)

GENERAL NOTES:

1. SEE SHEET C-501 THROUGH C-503 FOR CIVIL DETAILS.

2. ALL DISTURBED AREAS TO BE GRADED FOR POSITIVE DRAINAGE TO EXISTING STORM INLETS.

3. ALL AREAS WHERE EXISTING CONCRETE SLABS, SITE FEATURES, AND FOUNDATIONS ARE REMOVED SHALL BE

FILLED TO EXISTING GRADE AND SLOPED FOR POSITIVE DRAINAGE.

4. ALL DISTURBED AREAS TO BE SODDED (PERMANENT) /GRASSED (TEMPORARY) AFTER GRADING ACTIVITY HAS BEEN

COMPLETED. SEE SHEET CP101.

5. ALL DEMOLITION DEBRIS SHALL BE HAULED OFFSITE.

6. SAW CUT AND REMOVE ALL EXISTING CONCRETE SIDEWALK NOTED ON PLANS. PROVIDE NEAT AND CLEAN JOINTS AT

SIDEWALK TO REMAIN.

7. CONTRACTOR WILL BE RESPONSIBLE FOR ADDITIONAL REMOVAL AND REPLACEMENT OF CONCRETE SIDEWALK AS

NECESSARY TO CONSTRUCT THE PROJECT. SIDEWALK REMOVAL AND REPLACEMENT SHOWN IS THE MINIMUM

AMOUNT REQUIRED TO CONSTRUCT THE PROJECT.

8. THE LOCATION, SIZES, AND DEPTHS OF EXISTING UTILITIES, INCLUDING SERVICE LATERALS, AND DRAINAGE

STRUCTURES SHOWN ON THE PLANS ARE APPROXIMATE ONLY. THE CONTRACTOR SHALL VERIFY THE EXACT

LOCATION, SIZES, AND DEPTHS OF UNDERGROUND UTILITIES AT LEAST 48 HOURS PRIOR TO CONSTRUCTION

WHETHER SHOWN ON PLANS OR NOT, AND TO PROTECT THE SAME DURING CONSTRUCTION.

9. THE CONTRACTOR IS HEREBY CAUTIONED THAT ALL SITE FEATURES SHOWN HEREON ARE BASED ON FIELD

OBSERVATIONS BY THE SURVEYOR AND BY INFORMATION PROVIDED BY OTHERS. THE INFORMATION IS NOT TO BE

RELIED ON AS BEING EXACT OR COMPLETE.

10. CONTRACTOR TO COORDINATE LOCATION/MARKING OF EXISTING SITE UTILITIES IN AREAS WHERE WORK IS

CONDUCTED, AND ENSURE THEY ARE TURNED OFF PROPERLY BEFORE BEGINNING CONSTRUCTION.

11. THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR THE REPAIR OF ANY DAMAGE DONE TO ANY NEW AND EXISTING

SITE ITEMS IN THE EXECUTION OF HIS WORK UNDER THIS SECTION.

12. THE CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH THE EXISTING CONDITIONS AND BE PREPARED TO

ADEQUATELY CARE FOR AND SAFEGUARD HIMSELF AND THE GOVERNMENT FROM DAMAGE.

13. CONTRACTOR TO VERIFY EXISTING UTILITY (STORM DRAIN, WATER LINE, ETC...) LINE SIZES AND NOTIFY THE

ENGINEER OF RECORD OF ANY DISCREPANCIES BEFORE ORDERING MATERIALS.

14. ALL WATER LINES TO BE RESTRAINED JOINT (RJ) DIP WITH MEGA-LUGS MECHANICAL JOINTS AND THRUST BLOCKING.

15. PRIOR TO STORM DRAIN LINE INSTALLATION, THE CONTRACTOR MUST VERIFY ELEVATIONS OF ALL THE EXISTING

UTILITIES AT ALL UTILITY CROSSINGS. IF CONFLICT EXISTS, CONTRACTOR SHALL RELOCATE UTILITIES AS

NECESSARY AND NOTIFY THE CONTRACTING OFFICER (ROICC). CONTRACTOR TO TAKE EVERY MEASURE TO

LOCALIZE OUTAGES TO BUILDING HP503. COORDINATE ALL NECESSARY OUTAGES WITH ROICC.

CIVIL SITE PLAN

SCALE: 1" = 20'-0"

NEW WORK KEYNOTES:

NO. DESCRIPTION

C1

CONNECT DRAINAGE TO ROOF DRAIN DOWNSPOUT (SEE ARCHITECTURAL FOR DOWNSPOUT LOCATIONS AND DETAIL 4/A-302 & 5/A-302)

C2

STORM DRAIN BASIN - RIM ELEVATION TO MATCH EXISTING GRADE (SEE SHEET C-503 FOR DETAILS)

C3

STORM DRAIN CLEANOUTS (SEE SHEET C-503 FOR DETAILS)

C4

REMOVE & REPLACE CONCRETE SIDEWALK TO MATCH EXISTING (SEE SHEET C-502 FOR DETAILS)

C5

ELECTRICAL LINES & EQUIPMENT (SEE ELECTRICAL)

C6

MECHANICAL PIPING (SEE MECHANICAL)

C7

MECHANICAL BUILDING (SEE ARCHITECTURAL & STRUCTURAL)

C8

MECHANICAL YARD - CONCRETE PAD & FENCE ENCLOSURE (SEE ARCHITECTURAL & MECHANICAL)

C9

6 LF OF 6" HDPE @ MIN. 1% (STORM DRAINAGE PIPING, SEE SHEET C-503 FOR DETAILS)

C10

12 LF OF 6" HDPE @ MIN. 1% (STORM DRAINAGE PIPING, SEE SHEET C-503 FOR DETAILS)

C11

18 LF OF 6" HDPE @ MIN. 1% (STORM DRAINAGE PIPING, SEE SHEET C-503 FOR DETAILS)

C12

19 LF OF 6" HDPE @ MIN. 1% (STORM DRAINAGE PIPING, SEE SHEET C-503 FOR DETAILS)

C13

87 LF OF 10" HDPE @ 1% (STORM DRAINAGE PIPING, SEE SHEET C-503 FOR DETAILS)

C14

72 LF OF 10" HDPE @ 1% (STORM DRAINAGE PIPING, SEE SHEET C-503 FOR DETAILS)

C15

131 LF OF 10" HDPE @ 1% - TIE TO NEW DROP INLET (STORM DRAINAGE PIPING, SEE SHEET C-503 FOR DETAILS)

C16

72 LF OF 10" HDPE @ 1.75% (STORM DRAINAGE PIPING, SEE SHEET C-503 FOR DETAILS)

C17

76 LF OF 10" HDPE @ 1.50% - TIE TO NEW DROP INLET (STORM DRAINAGE PIPING, SEE SHEET C-503 FOR DETAILS)

C18

107 LF OF 10" HDPE @ 0.50% (STORM DRAINAGE PIPING, SEE SHEET C-503 FOR DETAILS)

C19

88 LF OF 10" HDPE @ 0.50% (STORM DRAINAGE PIPING, SEE SHEET C-503 FOR DETAILS)

C20

72 LF OF 10" HDPE @ 0.50% (STORM DRAINAGE PIPING, SEE SHEET C-503 FOR DETAILS)

C21

36 LF OF 10" HDPE @ 0.50% (STORM DRAINAGE PIPING, SEE SHEET C-503 FOR DETAILS)

C22

23 LF OF 10" HDPE @ 0.25% - TIE TO EXISTING DROP INLET (STORM DRAINAGE PIPING, SEE SHEET C-503 FOR DETAILS)

C23

CONNECT TO EXISTING 8" WATER MAIN W/ 8"x4" RJ TAPPING SLEEVE & VALVE (DOMESTIC)

C24

58 LF OF 4" RJ DUCTILE IRON PIPE (DIP) - DOMESTIC WATER SERVICE LINE (SEE SHEET C-502 FOR DETAILS & SEE GENERAL NOTE 14)

C25

4" RJ (DIP) 90 DEG BEND

C26

INSTALL UNDER SANITARY SEWER PIPING & EX. WATER MAIN W/ MIN. 18" SEPARATION (NO BENDS)

C27

CONNECT TO EXISTING 8" WATER MAIN W/ 8"x6" RJ TAPPING SLEEVE & POST INDICATOR VALVE (FIRE PROTECTION)

C28

66 LF OF 6" RJ DUCTILE IRON PIPE (DIP) - FIRE SERVICE LINE (SEE SHEET C-502 FOR DETAILS & SEE GENERAL NOTE 14)

C29 CONNECT TO EXISTING SANITARY SEWER SERIVCE LINE W/ 8"x4" PVC TEE

C30

170 LF OF 4" PVC @ MIN. 0.71% - SANITARY SEWER SERVICE LINE (SEE SHEET C-502 FOR DETAILS)

C31

SEWER CLEANOUTS (SEE SHEET C-502 FOR DETAILS)

C32 CONNECT TO EXISTING SANITARY SEWER SERIVCE LINE

C33

10 LF OF 8" PVC @ MIN. 2% - SANITARY SEWER SERVICE LINE (SEE SHEET C-502 FOR DETAILS)

C34 REMOVE & REPLACE CONCRETE SIDEWALK DAMAGED DURING CONSTRUCTION AS NEEDED TO RESTORE TO ORIGINAL EXISTING CONDITIONS

C35

INSTALL PERMANENT HYDRANT ADAPTER [FH TAG 5-283-12] - 5" STORZ x 4.5" NST THREAD W/ CAP

N

1

60019611

C12

C1TYP.

C2

TYP.C1

C10

TYP.C1

INSTALL NEW STRIPING TO DESIGNATE

"THRU TRAFFIC ONLY - NO PARKING" AREA

(PER ATFP, SEE SHEET C-502)

C2

C9 C9 C9

C9 C9

C10

C11

C11

C4

C13

C4

C3

C14

C4

C15

C4

C4

C16

C17

C4C4

TYP.C1

C31

C8

C6

C20C19

C22

C4

C21

C4

C4

C5

C5

C6

C3

C29

C5

C5

C7

C23

C25

C4

C24

C27

C28

C30

INSTALL NEW STRIPING TO DESIGNATE

"THRU TRAFFIC ONLY - NO PARKING" AREA

(PER ATFP, SEE SHEET C-502)

C34

C34

C5

C5

C1TYP.

C25

C9

TYP.

C3TYP.

C3TYP.

TYP.C2

TYP.

TYP.

C18

C4

C35

C32

C33

C4

C4

C4

TYP.

C4

C31

SEAL

C26

TYP.

TYP.

1

1

1

1

1

8/22/2017 - REVISED SEWER & WATER SERVICE, SIDEWALK, & UPDATED CHART

AutoCAD SHX Text
WV
AutoCAD SHX Text
TP
AutoCAD SHX Text
T
AutoCAD SHX Text
TP
AutoCAD SHX Text
TP
AutoCAD SHX Text
TP
AutoCAD SHX Text
PIV
AutoCAD SHX Text
WV
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
41438
Page 14: AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT · PDF fileAMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. ... Answer: Provide a cable ... bends in accordance with the allowable

ST

D

AT

UR

ST

D

AT

UR

ST

D

AT

UR

ST

D

AT

UR

ST

D

AT

UR

ST

D

AT

UR

ST

D

AT

UR

SS DATUR SS DATUR SS DATUR SS DATUR SS DATUR SS DATUR

ME

CH

B

LD

G

FF

E =

22.00'

EXISTING BUILDING

(HP 503)

T

Tx

T

S

320-C Midland Parkway, Summerville, SC, 29485

ENGINEERING | ARCHITECTURE

CEMS Project No: 15153K

DR.

DES.

CHK.

SUBMITTED BY:

DESIGN DIR.

APPROVED: PWO OR OICC

SATISFACTORY TO:

DATE

DATE

DEPARTMENT OF THE NAVY

MARINE CORPS BASE

CAMP LEJEUNE, NORTH CAROLINA

NAVAL FACILITIES ENGINEERING COMMAND

SIZE CODE IDENT NO. NAVFAC DRAWING NO.

SCALE: SHEET OF

E1 80091

300 N. 3rd St., Suite 110, Wilmington, NC, 28401

ISSUE DATE: 22 AUG 2017

Project Manager: Randy Alvar

843.875.3637

252.649.0334

CONTRACTOR SHALL COMPLY AS FOLLOWS:

A. THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY

UNCLASSIFIED INFORMATION, REGARDLESS OF MEDIUM (E.G., FILM, TAPE, DOCUMENT), PERTAINING TO ANY PART OF

THE CONTRACT OR ANY PROGRAM RELATED TO THIS CONTRACT, UNLESS-

1. THE CONTRACTING OFFICE HAS GIVEN PRIOR WRITTEN APPROVAL; OR

2. THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF RELEASE.

B. REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED,

AND THE PURPOSE FOR THE RELEASE. THE CONTRACTOR SHALL SUBMIT ITS REQUEST TO THE CONTRACTING OFFICER

AT LEAST 45 DAYS BEFORE PROPOSED DATE FOR RELEASE.

C. THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER THIS CONTRACT.

SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION TO RELEASE THROUGH THE PRIME CONTRACTOR

TO THE CONTRACTING OFFICER.

DISCLOSURE OF INFORMATION

SPEC. 05-17-0022

CONSTR. CONTR. NO.: N40085-17-B-0022

INTERIOR & EXTERIOR REPAIRS TO BEQ

HP503

146

GRAPHIC SCALE

SCALE: 1" = 20'

20' 0 20' 40'

GRAPHIC SCALE

SCALE: 1" = 20'

20' 0 20' 40'

MS102

60019691

B. TURKALL

T. DUTTERA

J. BARNES

88AS NOTED

SITE MECHANICAL PIPING NEW WORK PLAN

DESCRIPTION

NO.

NEW WORK KEYNOTES:

M1 PROVIDE AND INSTALL NEW HEATING HOT WATER

SUPPLY/RETURN (HHWS/HHWR), CHILLED WATER

SUPPLY/RETURN (CHWS/CHWR), DOMESTIC HOT

WATER (DHW), DOMESTIC COLD WATER (DCW), AND

DOMESTIC HOT WATER RECIRCULATION (DHWR)

PIPING AS SHOWN. SEE ENLARGED PLAN SHEET

M-101 FOR FURTHER DETAIL.

CONNECT NEW 4" DOMESTIC COLD WATER (DCW)

SERVICE TO EXISTING DCW PIPING AT POINT

INDICATED.

PROVIDE 4' SANITARY SEWER (SS) SERVICE TO

EXISTING SANITARY SEWER (SS) PIPING AT THE

POINT INDICATED.

CONNECT NEW 6” SANITARY SEWER (SS) SERVICE TO

EXISTING SANITARY SEWER (SS) PIPING AT POINT

INDICATED. SEE PLUMBING PLANS FOR THE

REPLACEMENT OF SANITARY SEWER PIPING WITHIN

BUILDING.

TOP OF PIPING ENTERING BUILDING WILL NEED TO BE

A 4' MINIMUM BELOW GRADE TO AVOID EXISTING

CONCRETE GRADE BEAM (BOTTOM OF CONCRETE IS

3'10" BELOW FINISHED FLOOR PER AS-BUILTS).

M2

M4

SITE MECHANICAL PIPING NEW WORK PLAN

SCALE: 1" = 20'-0"

4"DCW

3"DHW

4"HHWS

1 1/2"DHWR

4"CHWR

4"CHWS

4"HHWR

4"CHWS

4"CHWR

3"HHWS

3"HHWR

GCO

GCO

GCO

4"DCW

4"SS

4"SS

GCO

6"SS

GCO

M3

M1 M1

M2

M1

M1

M1

M1

M4

M1

4"CHWS

4"CHWR

3"HHWS

3"HHWR

M1

M1

M5

M5M5

1. MARK ALL EXISTING SITE UTILITIES IN AREAS WHERE NEW

WORK IS CONDUCTED.

2. NO PARKING OF VEHICLES OR STORAGE OF MATERIALS,

EQUIPMENT, AND SUPPLIES SHALL OCCUR UNDER, WITHIN,

OR AROUND ANY TREE CANOPIES. IF THESE SPACES MUST

BE USED, TREES IN THE LAYDOWN AREAS MUST BE

PROTECTED.

3. CONTRACTOR TO ROUTE PIPING AROUND TREES AND

BUSHES.

4. PIPING IS DIAGRAMMATIC IN NATURE.

GENERAL NOTES:

M3

N

1

1

8/22/2017 - REVISED SEWER (4"SS) & WATER (4"DCW) SERVICE TO MECH. BLDG

AutoCAD SHX Text
WV
AutoCAD SHX Text
TP
AutoCAD SHX Text
T
AutoCAD SHX Text
TX
AutoCAD SHX Text
TP
AutoCAD SHX Text
TP
AutoCAD SHX Text
TP
AutoCAD SHX Text
WV
AutoCAD SHX Text
P
AutoCAD SHX Text
A
AutoCAD SHX Text
U
AutoCAD SHX Text
L
AutoCAD SHX Text
C
AutoCAD SHX Text
.
AutoCAD SHX Text
M
AutoCAD SHX Text
A
AutoCAD SHX Text
H
AutoCAD SHX Text
A
AutoCAD SHX Text
F
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
Y
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
T
AutoCAD SHX Text
H
AutoCAD SHX Text
C
AutoCAD SHX Text
A
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
G
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
32273

Recommended