AgendaAgenda
Intelligent GridIntelligent Grid Advanced Metering Advanced Metering
Infrastructure CommunicationsInfrastructure Communications AMI related applicationsAMI related applications Enterprise ApplicationsEnterprise Applications Software SelectionSoftware Selection
You’ve installed the automated You’ve installed the automated meter, now what?meter, now what?
E&O2007
Intelligent GridIntelligent Grid
An “intelligent grid” can support An “intelligent grid” can support demand response, distributed demand response, distributed generation, time-based rates, generation, time-based rates, and other programs and other programs
Potential cost savings, revenue Potential cost savings, revenue enhancement, safety and enhancement, safety and reliability improvements can be reliability improvements can be achieved through achieved through implementation of intelligent implementation of intelligent grid applications grid applications
E&O2007
Intelligent Grid (Cont’d)Intelligent Grid (Cont’d)
Broadband communication for Broadband communication for telemetry and controltelemetry and control
Intelligent electronic devices Intelligent electronic devices providing monitoring of providing monitoring of conditions, fault detection and conditions, fault detection and diagnosis, and Volt / VAR controldiagnosis, and Volt / VAR control
Event management through Event management through distributed processingdistributed processing
E&O2007
AMI and Intelligent GridAMI and Intelligent GridA
utom
ated
Met
erin
g Intelligent Grid
SubstationAutomation
DistributedProcessing
Switching and Controls
Grid Automation
Communications
Usage Collection
Outage Management
End User Interaction
DistributionAutomation
On Demand Data
Analysis
E&O2007
EPAct 2005EPAct 2005
Energy Policy Act of 2005Energy Policy Act of 2005 Demand Response policyDemand Response policy Directive to offer time-based Directive to offer time-based
selectable rates to the client selectable rates to the client More accurate metering dataMore accurate metering data Meter deployment requirementsMeter deployment requirements Impact on deployment schedulesImpact on deployment schedules
E&O2007
Advanced MeteringAdvanced Metering
Advanced metering is the Advanced metering is the integration integration of electronic of electronic communication communication into into meteringmetering technology to facilitate two-way technology to facilitate two-way communication between utility and communication between utility and customer equipment.customer equipment.
E&O2007
United States penetration of advanced metering
US AMI PenetrationUS AMI Penetration
Docket No: AD-06-2-000 August 2006
E&O2007
AMI System DiagramAMI System Diagram
Thermostat
Substation
Consumer
MDM / CIS
Electric
Operations
AMI Host
Time Based Pricing
Feeder
ConditionRestore
Commands
Operations Center
Customer
Operations
WirelessBPLPLC
Cellular
WirelessBPLPLC
Cellular Meter
Backbone
Network
IED
Meter Data / Outage Detection
E&O2007
AMI BenefitsAMI Benefits
Tamper detection, fraudTamper detection, fraud Remote disconnect / reconnectRemote disconnect / reconnect Outage restoration and Outage restoration and
notificationsnotifications Load profiling and system load Load profiling and system load
snapshotssnapshots More accurate billingMore accurate billing Demand Response (DR) Demand Response (DR)
enablingenabling
E&O2007
Application:Application: Load Management Load Management
Use AMI to reduce and manage Use AMI to reduce and manage load on the power grid.load on the power grid. Load controlling devices report Load controlling devices report
what loads are active at a given what loads are active at a given timetime
Determine whether installed peak Determine whether installed peak load generation is adequateload generation is adequate
Voltage and power qualityVoltage and power quality Faster load researchFaster load research
E&O2007
Application:Application: Demand Response Demand Response
Shift or reduce use to improve Shift or reduce use to improve electrical grid integrityelectrical grid integrity Notifies Operations when grid is Notifies Operations when grid is
near or at capacitynear or at capacity Activates on site power generation Activates on site power generation
(Distributed Generation) (Distributed Generation) Notifies customers when pricing Notifies customers when pricing
structure changesstructure changes Interacts with (Automated) Interacts with (Automated)
Demand Side ManagementDemand Side Management
E&O2007
Application:Application: Automated DSM Automated DSM
Customer can automatically Customer can automatically optimize consumption optimize consumption Similar to Demand Response (DR)Similar to Demand Response (DR) Enables the customer to better Enables the customer to better
manage finances through manage finances through decreased usagedecreased usage
Automated DSM responds to Automated DSM responds to current pricing structures current pricing structures
E&O2007
AMI Business BenefitsAMI Business Benefits
$3.79
$0.47
$0.27
$4.02
$3.25
$2.03
$- $1.00 $2.00 $3.00 $4.00
Customer
Utility
AMR Business Benefits by Stages
Basic
With Meter DataManagementImplement DemandResponse
Source: AMI/MDM Utilipoint 2005
E&O2007
Distribution Network Distribution Network ManagementManagement
Greatest benefit to AMI is better Greatest benefit to AMI is better decisions based on correct decisions based on correct assumptions about future use.assumptions about future use.
It provides information about It provides information about peak consumption to aid in peak consumption to aid in outage prevention, load outage prevention, load management, and customer management, and customer incentive programs.incentive programs.
E&O2007
Application: Application: OutageOutage ManagementManagement
AMI can be key in the analysis of AMI can be key in the analysis of a service outage.a service outage. Pinpoint where and how often an Pinpoint where and how often an
outage occursoutage occurs Faster redistribution of loads to Faster redistribution of loads to
offset excess power (DA)offset excess power (DA) Inform customer service of troubleInform customer service of trouble Better distribute repair crews in Better distribute repair crews in
the fieldthe field Tamper DetectionTamper Detection
E&O2007
Customer InteractionCustomer Interaction
AMI allows the customer to:AMI allows the customer to: View up to the hour billingView up to the hour billing Customer Service will have a Customer Service will have a
better understanding of customer better understanding of customer usageusage
Faster, easier account service Faster, easier account service activations and terminationsactivations and terminations
Enable “Time of Use” so customer Enable “Time of Use” so customer can better manage their power use can better manage their power use and lower their costand lower their cost
E&O2007
Customer Interaction (Cont’d)Customer Interaction (Cont’d)
Customers generally support the Customers generally support the integration of AMIintegration of AMI PPL: “Customers appreciate the PPL: “Customers appreciate the
better billing and look forward to better billing and look forward to more services in the future”more services in the future”
PG&E: “Very few customers don’t PG&E: “Very few customers don’t like AMI”like AMI”
E&O2007
Communication MediumCommunication Medium
Power Line Carrier / BPL Power Line Carrier / BPL Twisted Pair CopperTwisted Pair Copper Coaxial CableCoaxial Cable Fixed Wireless NetworkFixed Wireless Network Cellular Cellular Fiber OpticsFiber Optics
E&O2007
Meter CommunicationsMeter Communications
Internet Protocol <10 MbpsInternet Protocol <10 Mbps TDM <56 KbpsTDM <56 Kbps PLC / BPLPLC / BPL FiberFiber Licensed WirelessLicensed Wireless Unlicensed WirelessUnlicensed Wireless CellularCellular Leased Lines / Dial upLeased Lines / Dial up
E&O2007
BroadbandBroadband
Bandwidth limitations are a Bandwidth limitations are a thing of the past.thing of the past. True high speed data rates over True high speed data rates over
power line (BPL)power line (BPL) Better leverage existing fiber for Better leverage existing fiber for
backbone/backhaul (GigE)backbone/backhaul (GigE) Uses: meter reading, DSM, flow Uses: meter reading, DSM, flow
measurements, etc measurements, etc Tap new revenue streamsTap new revenue streams
E&O2007
Network ManagementNetwork Management
AMI system becomes a singular AMI system becomes a singular complete network management complete network management tool.tool. Overlay power and communication Overlay power and communication
networksnetworks Streamline Network Operations Streamline Network Operations
CentersCenters
E&O2007
Managing DemandManaging Demand
AMI improves the process of AMI improves the process of managing demand for natural managing demand for natural resourcesresources
Savings from selective load control, Savings from selective load control, where the utility or customer where the utility or customer schedules a time to use their utilitiesschedules a time to use their utilities
If specific capacity constraints exist, If specific capacity constraints exist, utilities can offer customers near utilities can offer customers near real-time incentives to reduce real-time incentives to reduce consumption consumption
E&O2007
Application:Application: Meter Data ManagementMeter Data Management
System for analyzing the System for analyzing the information from the metersinformation from the meters Single point to archive dataSingle point to archive data Interface with billing and legacy Interface with billing and legacy
systemssystems Allows for multi-user access of Allows for multi-user access of
meter datameter data Optimum performance of AMR Optimum performance of AMR
systemssystems
E&O2007
Variable Pricing StructuresVariable Pricing Structures
AMI allows price structures that AMI allows price structures that better reflect customer usagebetter reflect customer usage
Variable pricing encourages off-Variable pricing encourages off-peak usage with reduced rates peak usage with reduced rates to customers to customers
Utilities save resources and Utilities save resources and customers save money on their customers save money on their utility billsutility bills
A win-win situation A win-win situation
E&O2007
Time-of-Use ScheduleTime-of-Use Schedule
PERIODPERIOD RATESRATES
Off-Peak SummerOff-Peak Summer 4.88¢/kWh4.88¢/kWh
Peak SummerPeak Summer 17.83 ¢/kWh17.83 ¢/kWh
Off-Peak Winter (1Off-Peak Winter (1stst 400) 400) 6.58 ¢/kWh6.58 ¢/kWh
Off-Peak Winter (add’l)Off-Peak Winter (add’l)
Peak WinterPeak Winter
4.75 ¢/kWh4.75 ¢/kWh
7.52 ¢/kWh7.52 ¢/kWh
Source: SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-26 STANDARD PRICE PLAN FOR RESIDENTIAL TIME-OF-USE SERVICEEffective: November 1, 2006
E&O2007
Improved Data QualityImproved Data Quality
Automated, remote data Automated, remote data collection streamlines the collection streamlines the process and increases the process and increases the quality of data collected by quality of data collected by reducing the number of steps reducing the number of steps between consumer usage and between consumer usage and bill distribution. bill distribution.
Hard to reach meter access is Hard to reach meter access is no longer necessaryno longer necessary
E&O2007
Shorter Billing CycleShorter Billing Cycle
AMI shortens the billing processAMI shortens the billing process Cash flow is available earlier, Cash flow is available earlier,
decreasing daily sales decreasing daily sales outstanding (DSO)outstanding (DSO)
Improved data integrity Improved data integrity eliminates reissued, disputed eliminates reissued, disputed bills bills
AMI educes theft of servicesAMI educes theft of services
E&O2007
Efficient Call CentersEfficient Call Centers
Most incoming calls are about billing Most incoming calls are about billing errors, rescheduling meter readings errors, rescheduling meter readings and/or reporting outagesand/or reporting outages
Automated data instantly availableAutomated data instantly available Utilities are proactively telling Utilities are proactively telling
customers which areas are affected customers which areas are affected and the estimated durationand the estimated duration
Staff can provide better customer Staff can provide better customer service service
Call center costs go downCall center costs go down
E&O2007
Customer IntelligenceCustomer Intelligence
AMI enables customer behavior AMI enables customer behavior profilingprofiling
Effects of outages can now be Effects of outages can now be studiedstudied
Data can be used demand Data can be used demand management, phase load management, phase load balancing, and time-of-use databalancing, and time-of-use data
Improves quality of service and Improves quality of service and shortens response times to shortens response times to outages outages
E&O2007
Other BenefitsOther Benefits
Reduced call center volume of high Reduced call center volume of high bill complaintsbill complaints
Reduction in costs to support Reduction in costs to support estimated readings and estimated readings and turn-ons/turn-offsturn-ons/turn-offs
Reduced trouble call dispatchesReduced trouble call dispatches More timely billing and better cash More timely billing and better cash
flowflow Reduced energy theft and tamperingReduced energy theft and tampering Optimized load and distribution Optimized load and distribution
networknetwork
E&O2007
Future OfferingsFuture Offerings
AMI will interact with TOU and AMI will interact with TOU and Demand Response (DR)Demand Response (DR) Control HVAC to cool or warm Control HVAC to cool or warm
structures when power is cheapeststructures when power is cheapest Remotely start washer/dryer/ovenRemotely start washer/dryer/oven Controlled through home networkControlled through home network
BPL Triple PlayBPL Triple Play
E&O2007
New Revenue Streams New Revenue Streams
AMI provides opportunities to AMI provides opportunities to provide services for devices in provide services for devices in the home, such as home the home, such as home security and appliance security and appliance diagnosticsdiagnostics
The utility can collect a fee for The utility can collect a fee for usage of these servicesusage of these services
E&O2007
Potential ConflictsPotential Conflicts
Service reliabilityService reliability Operational efficiencyOperational efficiency Energy demand managementEnergy demand management Asset managementAsset management Strategic planningStrategic planning Capital spending prioritiesCapital spending priorities
E&O2007
Conflicts (continued)Conflicts (continued)
Meter data management (MDM) Meter data management (MDM) or SCADA data storageor SCADA data storage
Data latencies and resolutionsData latencies and resolutions Competition for capital, Competition for capital,
expertise, program expertise, program managementmanagement
E&O2007
DeploymentDeployment
AMI is a long term objectiveAMI is a long term objective Plan for next decade servicesPlan for next decade services Leverage existing communication Leverage existing communication
networknetwork Infrastructure should be robust Infrastructure should be robust
and expandableand expandable Realistic timelines setRealistic timelines set
E&O2007
11stst Speaker Speaker
Burns & McDonnell Engineering CompanyBurns & McDonnell Engineering Company9400 Ward Parkway9400 Ward Parkway
Kansas City, MO 64114Kansas City, MO [email protected]: 816-822-4285Phone: 816-822-4285
Fax: 816-822-3296Fax: 816-822-3296
Matt Klinker Matt Klinker SR Engineer, SCADA and SR Engineer, SCADA and
TelecommunicationsTelecommunications
AMI Enterprise Application AMI Enterprise Application Integration (EAI)Integration (EAI)
By Wes HardinBy Wes Hardin
APPA 2007 Engineering and APPA 2007 Engineering and Operations Technical ConferenceOperations Technical Conference
E&O2007
System DiagramSystem Diagram
HMI Management
Maintenance Algorithms
Automation Algorithms
Non-operationalData Gathering& Management
Wireless GatewayManagement
Traditional Protective
Relay Functions
Operational DataGathering
Protection Algorithms
EMS Control Actions
ControllerPC
Smart RTU
OperationalData
Non-OperationalData
Data Collection&
Management
OperationalControl(EMS)
OMSData Sharing
Data Sharing
Control Center
CorporateLAN
Fiber Optic Network
Operational Data Flow
Non-operational Data Flow
Data Sharing
Substation Data
FeederAutomation
DistributionDevices(MODs)
OtherSubstations
Radio Network
Substation WAN
Network Data Flow
Meter Data(AMI)
Meter Management
SystemCIS
DSM Data
E&O2007
AMI Data ModelAMI Data Model
AMI MDMS
Manual
AMR
Infrastructure
Data Collection
CommunicationsManagement
Network Management
Personnel Management
Data Collection
Data Collection
Systems
Customer
View Usage/Billing
TOU
Data Collection
Customer Service
Outage Management
Billing
Legacy
E&O2007
AMI EAIAMI EAI
Contact CenterContact Center Asset ManagementAsset Management WMSWMS Mobile Workforce Management Mobile Workforce Management
(MWM)(MWM) Inventory ManagementInventory Management Capital Improvement PlanningCapital Improvement Planning
E&O2007
AMI EAI (Continued)AMI EAI (Continued) DMS/OMSDMS/OMS Event ManagementEvent Management CISCIS ERPERP GISGIS SCADASCADA Master PlanningMaster Planning Engineering & DesignEngineering & Design
E&O2007
AMI EAI (Continued)AMI EAI (Continued) Financial SystemsFinancial Systems Procurement & PurchasingProcurement & Purchasing Environmental ResponseEnvironmental Response RegulatoryRegulatory
E&O2007
Business CaseBusiness Case Customer ServiceCustomer Service
Connect/DisconnectConnect/Disconnect More Service OfferingsMore Service Offerings
Service ReliabilityService Reliability Improve Outage ManagementImprove Outage Management
Operation EfficiencyOperation Efficiency Risk ManagementRisk Management Financial ForecastingFinancial Forecasting PricingPricing
Energy and Demand ManagementEnergy and Demand Management Better Load ForecastingBetter Load Forecasting Load ControlLoad Control
Asset/Resource Management Asset/Resource Management Better Asset PlanningBetter Asset Planning Workforce ManagementWorkforce Management
E&O2007
Business CaseBusiness Case
SecuritySecurity Identify Energy TheftIdentify Energy Theft
Power QualityPower Quality Measure Real-timeMeasure Real-time
EnvironmentalEnvironmental Defer GenerationDefer Generation
SafetySafety GPS and GISGPS and GIS
RegulatoryRegulatory DOE Office of Electricity Delivery & DOE Office of Electricity Delivery &
Energy Reliability (source).Energy Reliability (source).
E&O2007
EAI ObjectiveEAI Objective
Departmental silos with manual, interdepartmental coordination
Interoperable organization acting on one facility/enterprise model with each department
fulfilling its purpose and impacts rippling thru the shared, virtual facility.
E&O2007
Changes in CommunicationChanges in Communication
Buildings
Computers People
Appliances
• Multiple Connections per Person
• Networking Embedded in Household and Business Devices
• Full Time, “Always On” Connectivity, – At Home, At Work, and On the Go:
IntelligentSubscriber Devices
People to People People to Things Things to Things
Homes
TransportationVehicles & Systems
ParkingMetersVending
Machines
E&O2007
Metcalfe’s LawMetcalfe’s Law
““The value of a network grows as The value of a network grows as the square of the number of the square of the number of
users (nusers (n22).).””
Value = 4
Value = 25
Value = 144
E&O2007
Metcalfe’s Law in EAIMetcalfe’s Law in EAI
““The POTENTIAL value of an The POTENTIAL value of an ENTERPRISE network grows as the ENTERPRISE network grows as the
square of the number of square of the number of CONNECTIONS.”CONNECTIONS.”
E&O2007
Reaching the PotentialReaching the Potential
Data ReductionData Reduction VisualationVisualation Speed of ComprehensionSpeed of Comprehension Decision SupportDecision Support DON’T BLACKBOX!!!!DON’T BLACKBOX!!!!
E&O2007
United States penetration of advanced metering
US AMI PenetrationUS AMI Penetration
E&O2007
Two ConceptsTwo Concepts
DataConservationDataConservationtmtm
Facility Information ModelFacility Information Model
E&O2007
DataConservationDataConservationtmtm
Every business activity creates, Every business activity creates, maintains or uses data from a maintains or uses data from a
commonly shared virtual facility.commonly shared virtual facility.
E&O2007
Facility Information Facility Information Model (FIM)Model (FIM)
A digital representation of A digital representation of physical and functional physical and functional
characteristics of a facility. As characteristics of a facility. As such it serves as a shared such it serves as a shared knowledge resource for knowledge resource for
information about a facility information about a facility forming a reliable basis for forming a reliable basis for
decisions during its life-cycle decisions during its life-cycle from inception onward.from inception onward.
E&O2007
Influence vs Cost CurveInfluence vs Cost Curve
Eff
ort
Strategy Design Implement Operation
25% 75%
Lif
ecyc
leco
st
Cost of C
hanges
Ability to Change
E&O2007
AMI IntegrationAMI Integration
ERP/CISERP/CIS MDMSMDMS AMRAMR
E&O2007
User RequirementsUser Requirements
Option 1: Best of breed AMR, MDMS, Option 1: Best of breed AMR, MDMS, or CIP/ERP without constraints on or CIP/ERP without constraints on pricing or the company. pricing or the company.
Option 2: Emphasis on specific Option 2: Emphasis on specific features or purchasing constraints. features or purchasing constraints.
Depending on the complexity of the Depending on the complexity of the requirements, the decision matrix requirements, the decision matrix may need to be very elaborate with may need to be very elaborate with percentages tied to each category. percentages tied to each category.
E&O2007
User RequirementsUser Requirements System Architecture (10%)System Architecture (10%) GIS Integration (5%)GIS Integration (5%) Database (15%)Database (15%) Maintenance Management (10%)Maintenance Management (10%) Customer Service Request (10%)Customer Service Request (10%) Work Order (10%)Work Order (10%) Parts Inventory (5%)Parts Inventory (5%) Equipment management (5%)Equipment management (5%) Resource Allocation (15%)Resource Allocation (15%) Asset Management (15%)Asset Management (15%) Project Management (10%)Project Management (10%)
E&O2007
Feature SetsFeature Sets
Compare apples-to-apples. Compare apples-to-apples. Remove any marketing language.Remove any marketing language. Make the statements or features Make the statements or features
parallel.parallel. Assign numerical values or score to Assign numerical values or score to
each feature that makes the each feature that makes the comparison clear.comparison clear.
Summarize details within the matrix Summarize details within the matrix to make the comparisons clearer to make the comparisons clearer
E&O2007
Software Selection CriteriaSoftware Selection Criteria
Requirements (25%)Requirements (25%) Pricing Structure (20%) Pricing Structure (20%) Experience and Reliability (15%)Experience and Reliability (15%) References (15%)References (15%) Training Approach (5%)Training Approach (5%) Technical Support Approach (10%)Technical Support Approach (10%) Warranties(5%)Warranties(5%) Extended Software maintenance (5%)Extended Software maintenance (5%)
E&O2007
Implementation PlanImplementation Plan
Initiate
Pilot Diversify
Finalize
E&O2007
Get StartedGet Started
"The fellow holding the cat by the tail is learning twice as much as the fellow who is just watching."
- Mark Twain
E&O2007
22ndnd Speaker Speaker
Burns & McDonnell Engineering CompanyBurns & McDonnell Engineering Company9400 Ward Parkway9400 Ward Parkway
Kansas City, MO 64114Kansas City, MO [email protected]: 816-822-4361Phone: 816-822-4361
Fax: 816-822-4366Fax: 816-822-4366
Wes Hardin Wes Hardin Project Manager Project Manager
Information Management - Electric UtilitiesInformation Management - Electric Utilities