AMPS SERVICES INC. INCORPORATED 2007 AMPS POWERLINE INC. INCORPORATED 2012
Transcript
Page 1: AMPS SERVICES INC. INCORPORATED AMPS POWERLINE INC. I …ampsservices.ca/AMPS_Services_Powerline_Information... · • Contractor Bid Specifications Construction: • High Voltage

AMPS SERVICES INC.

INCORPORATED 2007

AMPS POWERLINE INC.

INCORPORATED 2012

Page 2: AMPS SERVICES INC. INCORPORATED AMPS POWERLINE INC. I …ampsservices.ca/AMPS_Services_Powerline_Information... · • Contractor Bid Specifications Construction: • High Voltage

AMPS Services Inc. is a consulting

engineering firm, specializing in

providing a full compliment of

electrical, instrumentation &

automation engineering services to

heavy industrial mining and utility

clients. Our staff is comprised of

engineers and technical experts with

industrial plant experience, as well as

specializing in high voltage design.

AMPS Powerline Inc. is a high

voltage electrical service provider of

choice for new high voltage electrical

construction, as well as offering

maintenance, repair and testing of

existing electrical services. Our staff

consists of project management

specialists, interprovincial power line

technicians as well as industrial and

commercial electricians.

AMPS SERVICES & POWERLINE INC.

Page 3: AMPS SERVICES INC. INCORPORATED AMPS POWERLINE INC. I …ampsservices.ca/AMPS_Services_Powerline_Information... · • Contractor Bid Specifications Construction: • High Voltage

AMPS Services Inc.

Conrad Asmundson, President, Head Engineer, P.Eng is a Senior E/I & C Engineer with

20 years of experience in a large variety of industrial, utility and municipal projects. He has

acted in the capacity of Senior Engineer in detailed design, project management, supervision,

superintendent, and as a principal electrical project engineer. His experience includes

detailed design/management for industrial and high voltage electrical distribution systems

and industrial plant control systems, distributed control systems (DCS), programmable logic

controls (PLC), design/management, industrial maintenance practices, maintenance

crew/department supervision, construction site management and project start

up/commissioning.

Daniel Roberts, P. Eng., is an Intermediate E/I&C Engineer with 7 years experience in arc

flash analysis, distribution maintenance, and protective device coordination studies. He has

been involved in testing and commissioning of high voltage distribution equipment in

dozens of industrial facilities in Canada. Dan has also been involved in the design,

procurement, and project management of multiple projects since joining AMPS (2010). His

more recent experience includes PLC and HMI programming, instrumentation, and project

commissioning.

AMPS SERVICES INC.

Page 4: AMPS SERVICES INC. INCORPORATED AMPS POWERLINE INC. I …ampsservices.ca/AMPS_Services_Powerline_Information... · • Contractor Bid Specifications Construction: • High Voltage

AMPS Powerline Inc.

Kent Newman, President, is a Journeyman Powerline Technician with 2 3 years of electrical

experience at Manitoba Hydro in a large variety of positions. He has acted in the capacity of Key

Account Officer, Energy Service Advisor and other supervisory roles within Manitoba Hydro

before joining AMPS in June of 2012. Kent’s experience includes thorough knowledge of

Manitoba’s electrical infrastructure as well as products, services, policies and rate structure. For

12 years he was the Key Business negotiator with large commercial and industrial customers for

Manitoba Hydro. He was also involved in the installation of many large energy management

projects through Manitoba Hydro’s Performance Optimization Program (Power Smart) and also

completed Manitoba Hydro’s Distribution Engineering Technician training.

Scott Penner, Project Manager, BSME has extensive trades, construction, maintenance and

project management experience. Scott has worked in the capacities of Facilities and Maintenance

Manager for a large Manitoba steel producer as well as Operations and Procurement for a High

Voltage Construction and Maintenance company. He has 6 years of experience in High Voltage

apparatus, construction, maintenance, project management and emergency repairs. Scott has also

worked closely with and is familiar with Manitoba Hydro districts, design, codes and standards,

construction and key/major accounts departments.

AMPS POWERLINE INC.

Page 5: AMPS SERVICES INC. INCORPORATED AMPS POWERLINE INC. I …ampsservices.ca/AMPS_Services_Powerline_Information... · • Contractor Bid Specifications Construction: • High Voltage

AMPS SERVICES & POWERLINE INC. AMPS has the experience and resources to complete your project from conception to start-up.

Engineering Design:

• Detailed Scoping Studies, Feasibility Studies and Cost Estimates

• Detailed Electrical and Instrumentation Design

• Power Systems Studies

• Ground Grid Design

• Protective Relaying and Controls

• Unit Substation Design

• DCS Configuration, DCS & HMI Graphics

• Contractor Bid Specifications

Construction:

• High Voltage Substation Construction

• Overhead and Underground High Voltage Construction

• Equipment Specification and Procurement

• Project Planning and Construction Site Management

• Testing, Commissioning and Start-up Support

Inspection and Maintenance

• Substation and Overhead pole line inspections and maintenance

• Switchgear inspection, testing and maintenance

• Maintenance planning

Page 6: AMPS SERVICES INC. INCORPORATED AMPS POWERLINE INC. I …ampsservices.ca/AMPS_Services_Powerline_Information... · • Contractor Bid Specifications Construction: • High Voltage

AMPS Services – Major Projects

(Design, Engineering, Procurement, Project Management and Commissioning)

San Gold Corporation, Bisset, MB

New 66kV switchyard. Two new 66kV MPOD’s, two 10MVA 66-12.47kV DSC’s with secondary voltage regulators, new 15kV electrical building and switchgear. $3.5 M (2010)

Hinge FAR electrical distribution upgrade of the 12.47/2.4kV 1500kVA transformer to a new 12.47/4.16kV 5000kVA transformer. $200k (2010)

Shaft “007” Portal 12.47kV overhead transmission line installation. $600k (2010)

Crusher electrical distribution installation of a new 2.4kV:600V 1250kVA transformer along with a new 600 switchboard, 1200A switchboard. $100k (2011)

Compressor electrical distribution replacement of the existing 600V, 1200A switchboard to a new 600V, 1600A switchboard to accommodate two new 300HP compressors. $80k (2011)

One new 12.47kV:600V, 600kVA skid and six new 4.16kV:600V 500kVA skids to accommodate new mining loads required for 2011 dates. $600k (2011)

Three new 12.47kV overhead transmission line installations have been completed OH1, OH2, and OH3. $500k (2011)

AMPS SERVICES INC.

Page 7: AMPS SERVICES INC. INCORPORATED AMPS POWERLINE INC. I …ampsservices.ca/AMPS_Services_Powerline_Information... · • Contractor Bid Specifications Construction: • High Voltage

San Gold Corporation, Bisset, MB (continuted)

Power Factor Correction

Compressor plant, two power factor correction capacitor units installed (fed by

MB Hydro Line 77), one on each compressor 600V switchboard lineup. Result

is approximately 2400HP of induction compressor load operating at near unity

power factor. (2008, 2009)

New de-tuned power factor correction unit,12.47kV, 4 stage, 2.4 MVAR bank,

(fed by MB Hydro Line 48) powering the “Hinge” and “007” operations. (2011)

Power Smart Initiatives

Heat recovery study for salvaging the waste heat from equipment to heat other

buildings

Various other power smart initiatives as recently documented and televised by

Manitoba Hydro including main hoist motor speed control upgrades.

Controls Design and Upgrades

PLC and HMI design and programming for the dust collector addition to the

crushing operation (2013, 2014)

AMPS SERVICES INC.

Page 8: AMPS SERVICES INC. INCORPORATED AMPS POWERLINE INC. I …ampsservices.ca/AMPS_Services_Powerline_Information... · • Contractor Bid Specifications Construction: • High Voltage

Vista Switchgear Programming, Testing and Commissioning

Border Chemicals, Winnipeg MB

CG Power Canada, Winnipeg MB

Stoney Mountain Correctional Facility, Stoney Mountain MB

Atomic Energy of Canada Limited, Pinawa MB

Power System/Harmonic Studies and Design

Algonquin Power 35 kV Sub Station, St. Leon MB

Hylife Foods, Neepawa MB

Diageo Canada, Gimli MB

Graymont Mine, Faulkner MB

Vale Inco Mine, Thompson MB

St. Vital Shopping Mall, Winnipeg MB

Engineering Overflow Services

Vale Inco Mine, Thompson MB - Design and Engineering of above and under ground controls, electrical distribution and powerline refurbishment (2013, 2014)

AMPS SERVICES INC.

Page 9: AMPS SERVICES INC. INCORPORATED AMPS POWERLINE INC. I …ampsservices.ca/AMPS_Services_Powerline_Information... · • Contractor Bid Specifications Construction: • High Voltage
Page 10: AMPS SERVICES INC. INCORPORATED AMPS POWERLINE INC. I …ampsservices.ca/AMPS_Services_Powerline_Information... · • Contractor Bid Specifications Construction: • High Voltage
Page 11: AMPS SERVICES INC. INCORPORATED AMPS POWERLINE INC. I …ampsservices.ca/AMPS_Services_Powerline_Information... · • Contractor Bid Specifications Construction: • High Voltage
Page 12: AMPS SERVICES INC. INCORPORATED AMPS POWERLINE INC. I …ampsservices.ca/AMPS_Services_Powerline_Information... · • Contractor Bid Specifications Construction: • High Voltage

AMPS Powerline – Major Projects

(Design/Build, Construction, Inspection, Maintenance)

VALE INCO Mine, Thompson, MB

High Voltage Insulator replacement (2013)

Overhead line inspection and Recommendations (2013)

13.8 kV Road Crossing Pole Line Clearance Increases

AMPS POWERLINE INC.

Page 13: AMPS SERVICES INC. INCORPORATED AMPS POWERLINE INC. I …ampsservices.ca/AMPS_Services_Powerline_Information... · • Contractor Bid Specifications Construction: • High Voltage

HUDBAY Minerals, Snow Lake, MB

Design / Build Overhead 12 kV distribution line replacement

Five year service contract to provide full time Powerline Technician

to site.

Supply full time underground industrial electricians to new Lalor

Mine Project

Salvage overhead line to Snow Lake airport

Decommission Chisel 115 kV Substation

115 kV Substation Switch Replacement and Station Retrofit

AMPS POWERLINE INC.

Page 14: AMPS SERVICES INC. INCORPORATED AMPS POWERLINE INC. I …ampsservices.ca/AMPS_Services_Powerline_Information... · • Contractor Bid Specifications Construction: • High Voltage

Tolko, The Pas, MB

Overhead line extension for Super Dumper Project

Omnitrax, The Pas, MB

Three phase bank upgrade for Hudbay Rail yard.

QMX Gold Mine, Snow Lake, MB

115 kV emergency station transformer repairs, assist in oil spill

containment and cleanup.

AMPS POWERLINE INC.

Page 15: AMPS SERVICES INC. INCORPORATED AMPS POWERLINE INC. I …ampsservices.ca/AMPS_Services_Powerline_Information... · • Contractor Bid Specifications Construction: • High Voltage
Page 16: AMPS SERVICES INC. INCORPORATED AMPS POWERLINE INC. I …ampsservices.ca/AMPS_Services_Powerline_Information... · • Contractor Bid Specifications Construction: • High Voltage

We look forward to working with you on your next project.

Contact us if you have further questions regarding our companies or their services.

AMPS SERVICES & POWERLINE INC.

1035 Logan Ave. Winnipeg, MB R3E 1P6 (204) 775-7290 www.ampsservices.ca

AMPS Services Inc.

Conrad Asmundson

[email protected]

Cell: (204) 612-9936

Daniel Roberts

[email protected]

Cell: (204) 612-4963

AMPS Powerline Inc.

Kent Newman

[email protected]

Cell: (204) 620-2462

Scott Penner

[email protected]