OPERATION & MANAGEMENT OF L.I.SCHEMES- CASE STUDY OF SLBC PUMPING SCHEME
Transcript
Page 1: Amrp

OPERATION & MANAGEMENT OF L.I.SCHEMES-CASE STUDY OF

SLBC PUMPING SCHEME

Page 2: Amrp

NALGONDA DISTRICT IS A CHRONICALLY

DROUGHT PRONE AREAWITH HIGH FLUORIDE CONTENT IN GROUND

WATER

Page 3: Amrp

TO MITIGATE THIS PROBLEM

SLBC SCHEME IS TAKEN UP

Page 4: Amrp

SLBC Scheme has 2 alternatives

1.Gravity from Srisailam Reservoir

2. Lift from NagarjunaSagar Reservoir

Lift Scheme has been taken up in 1995 and later it was renamed as AMR Project.

Page 5: Amrp

SLBC LIFT SCHEME IS

THE BIGGEST SINGLE STAGE LIFT SCHEME

IN ASIA

Page 6: Amrp

SLBC LIFT SCHEME

Aim : 1) To provide irrigation (ID) to 2.20 lakh acres2) To provide drinking water to516 villages

Page 7: Amrp

SLBC LIFT SCHEME

• COMPONENTS• APPROACH CHANNEL • APPROACH TUNNEL• SURGE POOL• PUMP HOUSE • DELIVERYMAINS• CISTERN• LINK CANAL• AKKAMPALLY BALANCING RESEVOIR • MAIN CANAL

Page 8: Amrp

APPROACH CHANNELAPPROACH CHANNEL

Length : 3.325kmBed width : 15mFSD : 4mDischarge:3000c/s

APPROACH TUNNEL

Length : 1.475kmShape : CircularDiameter : 6mLining : 300mm ThickBed Fall : 1 IN 288

INTAKE STRUCTURE

Page 9: Amrp

SURGEPOOL

Size : 20mX50mX62mBottom Level : +138.00mDraft Tube Gates : 2.60mX5.00mWeight of each gate : 8.07MT

Page 10: Amrp

PUMP HOUSE

Size : 16mX60mX65mBottom Level : +135.00mPumps : 4No.s of 18MW eachCapacity of each pump: 600 CusecHP of each Pump : 25000

Page 11: Amrp

DELIVERY MAINS

Size : 2.50m dia CircularLength : 655mNo. of rows : 4No.sSteel : IS 2002 Grade-IIIThickness of Plates : 14mm

& 16mm

Page 12: Amrp

Cistern Reservoir Bund

Length of Dam : 2.290kmCapacity : 0.28TMCFRL : +247.00mTBL : +249.00m

Page 13: Amrp

LINK CANAL

Length of Canal : 9.260 kmDischarge : 2400 CusecBed Width : 20.00 mFSD : 3.00 mBed fall : 1 in 7000

Page 14: Amrp

A.M.R.P. Main Canal From Akkampally Balancing Reservoir

Surplus EscapeMain Canal Regulator

Page 15: Amrp

H.Ps of Main CanalAt Km 25.000 (Common point)

• Discharge: 65.258 Cumec

• Bed Width: 19.10 m • FSD : 3.10 m• CBL @ starting: +230.100 m

Page 16: Amrp

PUMPS

• Type of Pump : Vertical shaft single stage Francis Type Runner

• Normal speed : 428.60 RPM• Rated Discharge : 16.85 Cumec (600 cusec)• Guide vane centre line : +142.00m• Submergence of GV

central line below min. water level : 11.00m• Allowable frequency : 50.5Hz to 47.50Hz.

Page 17: Amrp

MOTORS

• Type : Vertical shaft AC motor• Speed : 428.60 RPM• Power : 18 MW – 11 KV• Frequency : 50 Hz• Pf (leading) :0.95

Page 18: Amrp

SALIENT FEATURES

• MDDL : +155.45m• Max. Elevation to be pumped :249.00m • Maximum Static Head : 96m• Minimum Static Head :69m• Cost of the Scheme :Rs.1026 Crore• Cost of Head works

up to Cistern intake :Rs.300 Crore

Page 19: Amrp

DESIGN OF PUMPS

• Capacity of Pump = 9.81XQxHX1.25 KW » Efficiency

where Q= Discharge in cumec

H= Dynamic Head in m

Capacity of Pump = 9.81X16.85x81X1.25 / 0.92

18191KW or Say 18MW

Page 20: Amrp

• Though pumps are designed for 18MW , the input is about 15 MW only

• These pumps function from 69m static head to 96m static head• The discharge varies with reference to variation in head and

frequency• Guide vane opening is to be adjusted as per head and frequency

Page 21: Amrp

FEATURES OF PUMPS

Dynamic head

100m 81m 74m

In Put 15.02MW 15.24MW 15.10MW

Discharge in cumec

13.68 16.85 17.90

Efficiency 89.3% 87.8% 86%

Guide vane opening

60% 80% 90%

Page 22: Amrp

ENERGY CALCULATION

• Energy Required (E)= QxWXH

60X60XEfficiency

where Q= Quantum of water in million cum

W =9.81KN/m3

H= Dynamic Head in m

E= Energy in million KWH

Page 23: Amrp

ENERGY REQUIREMENT

• Energy requirement for the scheme is worked out based on the average levels of Nagarjuna Sagar Reservoir.

• The quantum of water to be lifted is 22TMC• Energy required for the scheme is 135Million KWH• Cost of Energy Charges per annum is Rs.34 Crore (Rate per

unit:Rs.2.36)• Maintenance charges including staff : Rs.3.00 Crore per annum• Cost of Maintenance & Energy Charges per Acre is Rs.1680

Page 24: Amrp

S NO FINANCIAL YEAR

WATER LIFTED

( TMC)

APPROX. ENERGY

CHARGES ( Rs in Crore)

1 2001-02 2.66 5.32

2 2002-03 0.952 1.90

3 2003-04 4.559 9.10

4 2004-05 14.58 26.24

5 2005-06 17.06 30.70

SLBC LIFT SCHEME-YEARWISE WATER LIFTED & ENERGY CHARGES

Page 25: Amrp