    Offshore

    Wind

    Clean Energyfor the

    South Fork

  • 7/26/2019 An Offshore Wind Farm for the South Fork (by Clint Plummer)

    2/29

  • 7/26/2019 An Offshore Wind Farm for the South Fork (by Clint Plummer)

    3/29

  • 7/26/2019 An Offshore Wind Farm for the South Fork (by Clint Plummer)

    4/29

  • 7/26/2019 An Offshore Wind Farm for the South Fork (by Clint Plummer)

    5/29

    Cost EffectiveAdvances in technology

    allow utility-scale offshorewind to be cost-competitive

    with a new fossil plant

    New turbines, such as

    the Siemens 6.0-154

    shown here, produce

    much more energy than

    turbines made only afew years ago.

  • 7/26/2019 An Offshore Wind Farm for the South Fork (by Clint Plummer)

    6/29

    6

    First Offshore Wind Farm in Europe Vindeby, Denmark

    Installed 1991

    Still in Operation

  • 7/26/2019 An Offshore Wind Farm for the South Fork (by Clint Plummer)

    7/29

    First Offshore Wind Farm in China Installed in 2007

  • 7/26/2019 An Offshore Wind Farm for the South Fork (by Clint Plummer)

    8/29

    First Offshore Wind

    Farm in Japan Installed 2013

    Designed to replace

    Fukushima

  • 7/26/2019 An Offshore Wind Farm for the South Fork (by Clint Plummer)

    9/29

    First Offshore Wind Farm in America Installed 2015

    Block Island, RI

  • 7/26/2019 An Offshore Wind Farm for the South Fork (by Clint Plummer)

    10/29

    {make this Slide #8 from the DGS Ins. Deck.}

    E t i

  • 7/26/2019 An Offshore Wind Farm for the South Fork (by Clint Plummer)

    11/29

    Native American Tribes Commercial Fishing

    Environmental Groups

    ExtensiveStakeholder

    Engagement

  • 7/26/2019 An Offshore Wind Farm for the South Fork (by Clint Plummer)

    12/29

    -

    Extensive permit andenvironmental compliance

    plans

    - No deviations from approved

    plans in 2015- Expectation is zero

    deviation in 2016

    - Third Party environmental

    compliance monitor in place

    Protected Species Observer (PSO)Block Island Wind Farm Foundation Installation

    Perfect

    Environmental

    ComplianceRecord

    Number of PSOs: 10

    Hours worked: 2,311

    Precedent-setting

    Offshore Species

    Mitigation Program

  • 7/26/2019 An Offshore Wind Farm for the South Fork (by Clint Plummer)

    13/29

    300Local firms and workers involved

    in every phase of project

    Design and development

    Fabrication

    InstallationService

    Four RI ports used

    LocalJobs

  • 7/26/2019 An Offshore Wind Farm for the South Fork (by Clint Plummer)

    14/29

    Excellent

    Safety

    Record- Total man hours on project to date: 571,107

    - No serious injuries

    - BIWF HSE Plan

    - BIWF Emergency Response Plan

    - Offshore Minimum PPE Requirements

    - Offshore Minimum Training Requirements

    - HSE Bridging Plan between all Major Contractors

    - Major Contractor HSE Plans

    - Major Contractor Emergency Response Plans

    Total Project Recordable Incident Rate2.05

    3.60 U.S. Construction Average Rate

    Detailed project plans:

    4.80

    Fabricated Metal Manufacturing Average Rate

  • 7/26/2019 An Offshore Wind Farm for the South Fork (by Clint Plummer)

    15/29

    All

    Foundations

    Installed

    - Each foundation placed within 0.5 meters of

    planned location

    - All welds 100% tested and confirmed

    - All repairs completed and verified

    - Inspections confirm that all work performed

    according to design criteria

  • 7/26/2019 An Offshore Wind Farm for the South Fork (by Clint Plummer)

    16/29

    1. Lift and set jacket on sea bed

    2. Insert and drive piles into foundation

    legs

    3. Lift and set transition deck on jacket

    and weld the two pieces together

    U.S. Vessels and

    Workers Completed

    Installation

    1 2 3

  • 7/26/2019 An Offshore Wind Farm for the South Fork (by Clint Plummer)

    17/29

    Cable Installation

    in Process

    - Horizontal directional drills for cable landing

    on Block Island and mainland completed

    - First turbine connected to Block Island

    - Cable connecting Block Island to mainland

    now being laid

  • 7/26/2019 An Offshore Wind Farm for the South Fork (by Clint Plummer)

    18/29

    Cable

    Installation

    Vessel- Big Max arrived in RI in February

    - Final outfitting work in Quonset

    - Offshore installation began in April

  • 7/26/2019 An Offshore Wind Farm for the South Fork (by Clint Plummer)

    19/29

    Turbine

    Manufacturing on

    Schedule

  • 7/26/2019 An Offshore Wind Farm for the South Fork (by Clint Plummer)

    20/29

    GE Turbine

    Manufacturing

    Facility in ProvPort GE assembling turbine components

    in ProvPort

    Three levels of electrical and

    mechanical equipment in each tower

  • 7/26/2019 An Offshore Wind Farm for the South Fork (by Clint Plummer)

    21/29

    Offshore

    Service Vessel

    Built in RI

    Deepwater contracted with Rhode Island Fast Ferry (Quonset, Rhode Island) to build

    a state of the art crew transfer vessel

    Rhode Island Fast Ferry contracted with Blount Boats (Warren, Rhode Island) to

    build the vessel

    The crew transfer vessel is a 70 catamaran with a tier 3 engine and custom bow to

    safety and efficiently transport workers from the Quonset to the Block Island Wind

    Farm

  • 7/26/2019 An Offshore Wind Farm for the South Fork (by Clint Plummer)

    22/29

    Heavy Lift

    Vessels for

    Turbine

    Installation

    No U.S. Vessel has the capacity to install the 6MW GE Haliade turbines

    DWW contracted with Fred Olsen (Norway) to use the Bold Tern to

    install turbines at the Block Island Wind Farm site

    DWW contracted with Montco Offshore (Houston, Texas) to use two

    jack-up vessels to shuttle components from the Logistic Hub in ProvPort

    to the offshore site.

  • 7/26/2019 An Offshore Wind Farm for the South Fork (by Clint Plummer)

    23/29

    Approximately 30days in ~August

    2016

    Wind Turbine

    Installation

  • 7/26/2019 An Offshore Wind Farm for the South Fork (by Clint Plummer)

    24/29

    The OpportunityThe Block Island Wind Farm

    is the first step to largerregional projects.

  • 7/26/2019 An Offshore Wind Farm for the South Fork (by Clint Plummer)

    25/29

    90 MWOffshore

    Wind Farm

  • 7/26/2019 An Offshore Wind Farm for the South Fork (by Clint Plummer)

    26/29

    0

    20

    40

    60

    80100

    120

    140

    160

    180200

    0

    500

    1,000

    1,500

    2,0002,500

    3,000

    3,500

    4,000

    4,5005,000

    0 4 8 12 16 20 24Est.DeepwaterONEProduction

    (MW

    )

    Zon

    eKLoad(MW)

    Hour

    Zone K (MW) Offshore LI (MW)

    Deepwater ONE delivers Energy when its Needed

  • 7/26/2019 An Offshore Wind Farm for the South Fork (by Clint Plummer)

    27/29

    0

    0.05

    0.1

    0.15

    0.2

    0.25

    Consolidate EdisonCo-NY Inc.

    Orange andRockland Utils Inc.

    Central HudsonGas and Elec.

    Corp.

    Niagra MohawkPower Corp.

    Rochester Gas andElectric Corp.

    PriceinCents/kWh

    z

    Wind energy will reduceemissions and energy prices

    This effect, called pricesuppression has been welldocumented by NYSERDA for

    wind farms upstate

    Because Long Island has higheremissions and energy prices,offshore wind will have an evengreater benefit than wind farmsupstate

    Heat Map of New York State Energy Prices

    Upstate gets more Price Suppression than Downstate

    Upstate Avg.

    Downstate

    Lowers Emissions and Power Prices

  • 7/26/2019 An Offshore Wind Farm for the South Fork (by Clint Plummer)

    28/29

    63%

    Strongly

    4% Strongly

    22%

    Smwht

    7% Smwht

    0

    1020

    30

    40

    50

    60

    70

    80

    90

    A majority of voters statewide and on Long Island strongly support the

    development of offshore wind power at least 12 to 15 miles off the coast of

    Long Island

    Would you support or oppose the development of offshore wind power in the ocean at least 12 to 15 miles

    off the coast of Long Island?

    61%

    Strongly

    4% Strongly

    21%

    Smwht

    8% Smwht

    0

    1020

    30

    40

    50

    6070

    80

    90

    11% Oppose

    85% Support

    Long IslandNew York

    82% Support

    12% Oppose

    Methodology: Public Policy Polling (PPP) conducted a phone poll of registered voters in New York from September 18-20, 2012. The

    survey reached a representative sample of 601 voters statewide, plus an additional representative sample of 383 voters on Long Island.At the 95% confidence level, the margin of error is +/-6.0% points for statewide results and +/-5.0% points for Long Island results.

    Q.

  • 7/26/2019 An Offshore Wind Farm for the South Fork (by Clint Plummer)

    29/29


Recommended