ANAHITA ESTATESMAURITIUS
PROJECT NAME: Anahita Estates - Waterfront Residences
YEAR OF CONSTRUCTION: 2007
ARCHITECT: Wimberley Allison Tong & Goo
BUILDING CONTRACTOR: Rehm Grinaker Construction Co Ltd
M&E ENGINEER: Capita Symond Ltd.
NATURE OF PROJECT: IRS Appartments
PROJECT CHALLENGES:i. Fast track Project - we had to incorporate major chages by Client.
EME’S SCOPE OF WORKS:
i. Main LV Distribution networkii. Lighting Systemsiii. Early Warning addressable fire detection and alarm system
electrical • mechanical • networks • industrial • maintenance
PROJECT FIGURES:i. 86 Km of electrical Wiring installedii. More than 500 Detectors Installed
BANK OF MAURITIUSMAURITIUS
PROJECT NAME: Bank of Mauritius
YEAR OF CONSTRUCTION: 2004
ARCHITECT: Lampotang & Siew Architects
BUILDING CONTRACTOR: General Construction ltd
M&E ENGINEER: WSP Mauritius ltd.
NATURE OF PROJECT: Bank
PROJECT CHALLENGES:i. No particular Challenges on this project
EME’S SCOPE OF WORKS:i. Air Conditioning & Ventilation Systems ii. Building Management Systemiii. Automated controls, PLC’s and Drivesiv. Data Center Mechanical Installations.
electrical • mechanical • networks • industrial • maintenance
PROJECT FIGURES:i. More than 40,000 SqM of Sheet Metal Ducting Installedii. More than 4Km of Chilled Water Pipe worksiii. 24 Air Handling Unitsiv. 450 VAVs installedv. 750 Points Johnson Control BMS System installed.
BARCLAYS BANKMAURITIUS
PROJECT NAME: Barclays head offices at Ebene
YEAR OF CONSTRUCTION: 2008
ARCHITECT: Francis Wong Architect
BUILDING CONTRACTOR: Gamma Civic Construction Co Ltd
M&E ENGINEER: WSP Mauritius ltd.
NATURE OF PROJECT: Bank
PROJECT CHALLENGES:i. Fast Track Project - six monthsii. Installed and comissioned adaptive control lighting system and
sophisticated LON based BMS Systemiii. Form IV MLV panel installed
EME’S SCOPE OF WORKS:i. Main LV Distribution Panels and networkii. Lighting Systems -UPS Networkiii. Early Warning addressable fire detection and alarm system iv. Lightning Protection Systemv. Building Management Systemvi. Public Health Servicesvii. Fire Protection Installationsviii. Ventilation and Air Conditioning systemix. Data Center Electrical and Mechanical Installations.
electrical • mechanical • networks • industrial • maintenance
PROJECT FIGURES:i. 1MW Electrical power supplyii. xx KM of Power cables installed - xx KM
BELLE MARE WATER PARKMAURITIUS
PROJECT NAME: Belle Mare Water Park
YEAR OF CONSTRUCTION: 2000
ARCHITECT: Francis Wong Architect
BUILDING CONTRACTOR: Bhunjun & Sons Co Ltd
M&E ENGINEER: Profive ltd.
NATURE OF PROJECT: Amusement Centre
PROJECT CHALLENGES:i. Site Logistics involved in working on a widespread development
of 120,000 SqM
EME’S SCOPE OF WORKS:i. Electrical installationsii. Main LV Distribution Panels and networkiii. Lighting Systemsiv. Early Warning addressable fire detection and alarm system v. Lightning Protection Systemvi. Public Health Servicesvii. Fire Protection Installationsviii. Ventilation and Air Conditioning systemix. Pools and water features
electrical • mechanical • networks • industrial • maintenance
PROJECT FIGURES:i. 1 MW of Installed Electrical Powerii. 10 Km of Power cablesiii. 50 Km of Wiring installediv. 2,000 Electrical outlets installedv. 50 Adressable devices on the fire alarm systemvi. 5 Pool Plantrooms, filtration and treatment systems spread over
30 Acres of Land.
PROJECT CHALLENGES:i. No particular Challenges on this project
EME’S SCOPE OF WORKS:i. Electrical Installations including: Standby Generator setii. HV Substationiii. Power Transformersiv. Main LV Distribution Panels and networkv. Lighting Systemsvi. UPS Networkvii. IP telephony and Data networkviii. Early Warning addressable fire detection and alarm system ix. Lightning Protection Systemx. Building Management System xi. Public Health Servicesxii. Fire Protection Installationsxiii. Ventilation and Air Conditioning systemxiv. Cold Rooms
electrical • mechanical • networks • industrial • maintenance
PROJECT FIGURES:i. 1.6 MW of Installed Electrical Powerii. 10 Km of Power cablesiii. 20 Km of Wiring installediv. 2,000 Electrical outlets installed v. 50 Adressable devices on the fire alarm systemvi. 1300 m2 Cold Room Panelsvii. Rooftops Units of 900 Kw Total Coolingviii. DX Split units of 350 Kw Total Coolingix. GRP water storage tank 240 m3
CARREFOURSEYCHELLES
PROJECT NAME: Carrefour – Seychelles
YEAR OF CONSTRUCTION: 2000
ARCHITECT: Quadra Architecture
BUILDING CONTRACTOR: EME Overseas ltd.
M&E ENGINEER: EME Overseas ltd.
NATURE OF PROJECT: Hypermarket
PROJECT CHALLENGES:i. Site Logistics involved in working on a widespread development
incorporating 65,000 SqM of gardens
EME’S SCOPE OF WORKS:i. Electrical Installations including:Standby Generator setsii. HV Substation iii. Power Transformersiv. Main LV Distribution Panels and networkv. Lighting Systemsvi. UPS Networkvii. Lightning protection systemviii. Early Warning addressable fire detection and alarm system. ix. Telephone and Data wiring systems.x. Public Health Installations including: Pumping stationsxi. Cold water distribution networkxii. Hot water storage and distribution networkxiii. Waste and sewerage collection networkxiv. Fire protection installations.
electrical • mechanical • networks • industrial • maintenance
PROJECT FIGURES:i. 2.4 MVA of Installed Electrical power supply ii. 20 Km of Power cablesiii. 400 Km of Wiring installed iv. 12,000 Electrical outlets installed v. 400 Adressable devices on the fire alarm system. vi. 20Km of Internal plumbing piping vii. 15 Km of pre-insulated PEX pipes installedviii. 10Km of UPVC External underground piping Installedix. 10 Sewerage lifting stations.
CLUB MED HOTELMAURITIUS
PROJECT NAME: Club Med Hotel at Albion
YEAR OF CONSTRUCTION: 2008
ARCHITECT: Jean Michel D’Unienville Architects
BUILDING CONTRACTOR: General Construction Co Ltd
M&E ENGINEER: ATEC
NATURE OF PROJECT: Hotel Resort
PROJECT CHALLENGES:i. Generator Sets had to be lifted and installed on the Roof of the
Building.
EME’S SCOPE OF WORKS:i. Electrical Installations including: Standby Generator setsii. HV Substationiii. Power Transformers iv. Main LV Distribution Panels and network v. Lighting Systemsvi. Early Warning addressable fire detection and alarm system.vii. Telephone and Data wiring systemsviii. CCTV Installationsix. Public Health Installations including: Pumping stationsx. Cold water distribution networkxi. Waste and sewerage collection networkxii. Fire protection installations.
electrical • mechanical • networks • industrial • maintenance
PROJECT FIGURES:i. 2.0 MVA of Installed Electrical Power supplyii. 2 Generator Sets of 800 KVA Each iii. 8 Km of Power cablesiv. 20 Km of Wiring installedv. 7,000 Electrical outlets installedvi. Over 200 Adressable devices on the fire alarm system. vii. 5Km of Internal plumbing piping viii. 2Km of UPVC piping Installed
CMC MEDINE MEWS MAURITIUS
PROJECT NAME: CMC Medine Mews
YEAR OF CONSTRUCTION: 2007
ARCHITECT: Phillippe Choo Associates
BUILDING CONTRACTOR: Rehm Grinaker Construction Co Ltd
M&E ENGINEER: WSP Mauritius LTD
NATURE OF PROJECT: Retail and Commercial Development
PROJECT CHALLENGES:i. ...
EME’S SCOPE OF WORKS:i. Plumbing, Fire Fighting & Steam Installations
electrical • mechanical • networks • industrial • maintenance
PROJECT FIGURES:i.
OBEROI FLIGHT CATERING MAURITIUS
PROJECT NAME: Oberoi Flight Catering Facility at SSR International Airport
YEAR OF CONSTRUCTION: 2010
ARCHITECT: ...
BUILDING CONTRACTOR: Rehm Grinaker Construction Co Ltd
M&E ENGINEER: Hooloomann & Associates
NATURE OF PROJECT: Food Production
PROJECT CHALLENGES:i. ...
EME’S SCOPE OF WORKS:i. Electrical Works
electrical • mechanical • networks • industrial • maintenance
PROJECT FIGURES:i.
GARDEN TOWER MAURITIUS
PROJECT NAME: Garden Tower at Port Louis
YEAR OF CONSTRUCTION: 2008
ARCHITECT: Lampotang & Siew Architects
BUILDING CONTRACTOR: Gamma Civic Construction Co Ltd
M&E ENGINEER: WSP Mauritius Ltd
NATURE OF PROJECT: Retail, Commercial Development & Offices Complex
PROJECT CHALLENGES:i. ...
EME’S SCOPE OF WORKS:i. Electrical and Mechanical Installations
electrical • mechanical • networks • industrial • maintenance
PROJECT FIGURES:i.
IFS LTD MAURITIUS
PROJECT NAME: International Financial Services Ltd
YEAR OF CONSTRUCTION: 2008
ARCHITECT: Carlynn Wynch Architect
BUILDING CONTRACTOR: PAD & Co Ltd
M&E ENGINEER: Design II Engineering Ltd
NATURE OF PROJECT: New Offices Building
PROJECT CHALLENGES:i. ...
EME’S SCOPE OF WORKS:i. Design and Buildii. Air-conditioning – chilled water system iii. Hot water production & distribution- heat recovery iv. Cold water & distribution v. Irrigation Fire fighting installationvi. Electrical Installation (2x1MVA) including fire alarms.vii. SCS and Telephonyviii. Generators Plantix. Swimming Pools
electrical • mechanical • networks • industrial • maintenance
PROJECT FIGURES:i.
LE PRESKIL RESORT AND SPAMAURITIUS
PROJECT NAME: Le Preskil Resort and Spa
YEAR OF CONSTRUCTION: 2002
ARCHITECT: Jean Michel D’Unienville Architects
BUILDING CONTRACTOR: Rehm Grinaker Construction Co Ltd
M&E ENGINEER: EME Engineering Ltd.
NATURE OF PROJECT: Hotel Resort
PROJECT CHALLENGES:i. ...
EME’S SCOPE OF WORKS:i. Plumbing, Drainage and Fire Fighting Services
electrical • mechanical • networks • industrial • maintenance
PROJECT FIGURES:i.
MALL OF MAURITIUSMAURITIUS
PROJECT NAME: Mall of Mauritius at Bagatelle
YEAR OF CONSTRUCTION: 2011
ARCHITECT: Boogertman Partners & Architects’ Studio Ltd.
BUILDING CONTRACTOR: Rehm Grinaker Construction Co Ltd.
M&E ENGINEER: WSP Mauritius Ltd.
NATURE OF PROJECT: Retail and Commercial Development
PROJECT CHALLENGES:i. Systems were re-designed during construction due to Project
alterations ii. 3000 Light fittings were delivered late and had to be installed in
2weeks iii. Project was a fast track one
EME’S SCOPE OF WORKS:i. HV Substationii. Power Transformersiii. Main LV Distribution Panels and network iv. Lighting Systems v. UPS Network vi. Early Warning addressable fire detection and alarm system.
electrical • mechanical • networks • industrial • maintenance
PROJECT FIGURES:i. 2 Mw of Installed Powerii. 15Km of Power Cables installediii. 500Km of electrical wiring installediv. 25,000 Electrical connecttion outlets installedv. 600 Adressable devices installed on the fire alarm system
MOVENPICK HOTELMAURITIUS
PROJECT NAME: Movenpick Hotel
YEAR OF CONSTRUCTION: 2005
ARCHITECT: Jean Francois Koenig Architects
BUILDING CONTRACTOR: Bhunjun & Sons Co Ltd
M&E ENGINEER: WSP Mauritius Ltd.
NATURE OF PROJECT: Hotel Resort
PROJECT CHALLENGES:i. ...
EME’S SCOPE OF WORKS:i. Electrical, Plumbing, Fire Fighting & Air Conditioning
electrical • mechanical • networks • industrial • maintenance
PROJECT FIGURES:i. ...
STATE HOUSEMAURITIUS
PROJECT NAME: State House at Reduit
YEAR OF CONSTRUCTION: 2005
ARCHITECT: ...
BUILDING CONTRACTOR: General Construction Co Ltd
M&E ENGINEER: ...
NATURE OF PROJECT: Building Renovation
PROJECT CHALLENGES:i. ...
EME’S SCOPE OF WORKS:i. Plumbing and Drainage Installations
electrical • mechanical • networks • industrial • maintenance
PROJECT FIGURES:i. ...
SUFREN HOTELMAURITIUS
PROJECT NAME: Sufren Hotel Project at Port Louis
YEAR OF CONSTRUCTION: 2004
ARCHITECT: Jean Francois Adam Architects
BUILDING CONTRACTOR: General Construction Co Ltd / Cogir JV
M&E ENGINEER: RPW Consultants Engineers
NATURE OF PROJECT: Hotel
PROJECT CHALLENGES:i. ...
EME’S SCOPE OF WORKS:i. Design & Buildii. Electrical Installationsiii. Fire detection and alarmiv. Plumbing installationsv. Fire fighting installationsvi. Fire Suppression installations
electrical • mechanical • networks • industrial • maintenance
PROJECT FIGURES:i. ...
TAJ EXOTICA RESORTS & SPAMAURITIUS
PROJECT NAME: Taj Exotica Resorts & Spa
YEAR OF CONSTRUCTION: 2004
ARCHITECT: Maurice Giraud Architects
BUILDING CONTRACTOR: General Construction ltd
M&E ENGINEER: Proburo ltd.
NATURE OF PROJECT: Hotel Resort
PROJECT CHALLENGES:i. ...
EME’S SCOPE OF WORKS:i. Electrical Installationsii. Air-conditioning and Ventilation systems
electrical • mechanical • networks • industrial • maintenance
PROJECT FIGURES:i. 4500 kW Total Cooling Capacityii. 2200 Indoor Evaporator Unitsiii. 400 Condensing Unitsiv. 15 Km of Refrigerant pipeworks
EDEN ISLAND SEYCHELLES
PROJECT NAME: Eden Island – Seychelles
YEAR OF CONSTRUCTION: 2011
ARCHITECT: DMP Architects
BUILDING CONTRACTOR: Vijay Construction Pty ltd.
M&E ENGINEER: WSP South Africa
NATURE OF PROJECT: Island Village Development
PROJECT CHALLENGES:i. Site Logistics involved in working on a remote island development
at 45 mins flight distance from Mahe. ii. Housing and feeding our labour on site as well.
EME’S SCOPE OF WORKS:i. Electrical Installations including:connection to Base load
Generator setsii. HV Substationiii. Power Transformersiv. Main LV Distribution Panels and networkv. Lighting Systems vi. Fire Protection Installations vii. Public health Installationsviii. Sewerage Collection and Treatmentix. Pools and Pondsx. Air-conditioning and ventilation systems xi. Irrigation
electrical • mechanical • networks • industrial • maintenance
PROJECT FIGURES:i. 800 KW of installed electrical power supplyii. 120 DX Split units 800 kW total cooling iii. 10 Km Internal Plumbing pipe worksiv. 1200 Pop up Irrigation sprinklerv. 1400 m3 of Pools
DESROCHES VILLAS SEYCHELLES
PROJECT NAME: Desroches Villas – Seychelles
YEAR OF CONSTRUCTION: 2009
ARCHITECT: DG Architects
BUILDING CONTRACTOR: IDC ( Island Development Company)
M&E ENGINEER: EME Overseas ltd.
NATURE OF PROJECT: Island Villas Development
PROJECT CHALLENGES:i. The project itself was a challenge to us and the site logistics on
such a widespread development involved quad bikes and lorries for effective control of the different areas of the project.
EME’S SCOPE OF WORKS:i. Electrical Installations including: HV Substationsii. Power Transformersiii. Main LV Distribution Panels and networkiv. Scene Lighting Systemsv. Early Warning addressable fire detection and alarm systemvi. Public Health Installations including: Pumping stationsvii. Hot and Cold water distribution networks viii. Waste and sewerage collection network ix. Fire protection installations.
electrical • mechanical • networks • industrial • maintenance
PROJECT FIGURES:i. 3.6 MVA of Installed Electrical power supplyii. 120 Km of Power cables iii. Over 500 Km of Wiring installediv. Over 50,000 Electrical outlets installed v. 800 Adressable devices on the fire alarm systemvi. 20Km of Internal plumbing pipingvii. 5 x 30 kW Cold Water Booster Sets on VSD’s viii. 20 Sewerage Lifting Stations ix. 40 Km Internal plumbing piping x. 24 Km HDPE external pipingxi. 25 km uPVC drainage piping installed
EPHELIA RESORTSEYCHELLES
PROJECT NAME: Ephelia Resort – Seychelles
YEAR OF CONSTRUCTION: 2010
ARCHITECT: Jean Marc Eynaud Architects
BUILDING CONTRACTOR: Sanken Overseas Pty ltd.
M&E ENGINEER: ATEC Ingenierie
NATURE OF PROJECT: Hotel Resort
PROJECT CHALLENGES:i. ...
EME’S SCOPE OF WORKS:i. Design and Constructionii. Electrical Installationsiii. Electrical Power Production Plantiv. Fire Protection Installationsv. Telephony and Networkingvi. Video on Demand and CCTVvii. Desalination plant, water treatment and Storageviii. Plumbing Installationsix. Sewerage Collection and Treatmentx. Pools and Pondsxi. Air-conditioning and Ventilation systems
electrical • mechanical • networks • industrial • maintenance
PROJECT FIGURES:i. Desalination Plant of 400 m3/dayii. 25 Km Internal plumbing pipingiii. 15 Km External reticulation pipe worksiv. DX Split units 1200 kW total coolingv. Pools - 1500 m3
FELICITE ISLANDSEYCHELLES
PROJECT NAME: Felicite Island – Seychelles
YEAR OF CONSTRUCTION: 2012
ARCHITECT: Richard Hywel Evans architecture
BUILDING CONTRACTOR: Vijay Construction Pty ltd.
M&E ENGINEER: EME Overseas ltd.
NATURE OF PROJECT: Island Resort
PROJECT CHALLENGES:i. ...
EME’S SCOPE OF WORKS:i. Electrical Installations.ii. Fire detection and alarmiii. Public Health installationsiv. Fire Fighting installations
electrical • mechanical • networks • industrial • maintenance
PROJECT FIGURES:i.
HILTON HOTEL SEYCHELLES
PROJECT NAME: Hilton Hotel Seychelles
YEAR OF CONSTRUCTION: 2004
ARCHITECT: Harry Tirant Associates
BUILDING CONTRACTOR: Laxmanbhai (Sey) pty.
M&E ENGINEER: WSP Mauritius Ltd
NATURE OF PROJECT: Hotel Resort
PROJECT CHALLENGES:i. ...
EME’S SCOPE OF WORKS:i. Electrical, Plumbing, Fire Fighting & Air Conditioning
electrical • mechanical • networks • industrial • maintenance
PROJECT FIGURES:i.
KONOBA RESTAURANTSEYCHELLES
PROJECT NAME: Konoba Restaurant
YEAR OF CONSTRUCTION: 2010
ARCHITECT: Albert Angel - Angel Group
BUILDING CONTRACTOR: EME Overseas ltd
M&E ENGINEER: EME Overseas ltd.
NATURE OF PROJECT: New Offices Building
PROJECT CHALLENGES:i. ...
EME’S SCOPE OF WORKS:i. Electrical Installations (2x 1MVA)Fire detection and alarm
electrical • mechanical • networks • industrial • maintenance
PROJECT FIGURES:i. 2 Water cooled chillers Total 1800 kW coolingii. 3 Air cooled chillers Total 600 kW Coolingiii. 200 Fan Coil unitsiv. 40 Air Handling Unitsv. 15,000 m2 of ductingvi. 200 Dx Split units
PLANTATION CLUBSEYCHELLES
PROJECT NAME: Plantation Club
YEAR OF CONSTRUCTION: 2011
ARCHITECT: DHK Architects
BUILDING CONTRACTOR: Laxmanbhai (Sey) pty.
M&E ENGINEER: WSP Mauritius Ltd.
NATURE OF PROJECT: Hotel Resort
PROJECT CHALLENGES:i. ...
EME’S SCOPE OF WORKS:i. Design and Constructionii. Electrical Installationsiii. Electrical Power Production Plantiv. Fire Protection Installationsv. Telephony and Networkingvi. Video on Demand and CCTVvii. Desalination plant, water treatment and Storageviii. Plumbing Installationsix. Sewerage Collection and Treatmentx. Pools and Pondsxi. Air-conditioning and Ventilation systems
electrical • mechanical • networks • industrial • maintenance
PROJECT FIGURES:i. ...
SHANGRI-LASEYCHELLES
PROJECT NAME: Shangri-La – Seychelles
YEAR OF CONSTRUCTION: 2011
ARCHITECT: Fazakas Architects LLC
BUILDING CONTRACTOR: Fazakas Architects LLC
M&E ENGINEER: EME Overseas ltd.
NATURE OF PROJECT: Island Resort
electrical • mechanical • networks • industrial • maintenance
CINNAMON RED COLOMBO 03, SRI LANKA
PROJECT NAME:
Cinnamon Red – City Hotel
YEAR OF CONSTRUCTION: 2014
ARCHITECT: Design Team 3 (Pvt) Ltd
BUILDING CONTRACTOR: Sanken Construction (Pvt) Ltd
M&E ENGINEER: EME Engineering Lanka (Pvt) Ltd
NATURE OF PROJECT: City Hotel
EME’S SCOPE OF WORKS:
i. Electrical Services
ii. Public Health Services
iii. HVAC Services
iv. Fire Fighting Services (Sprinkler, Hydrant & Fire Suppression)
v. Swimming pool Services
PROJECT CHALLENGES:
i. Fast track Project and limited MEP areas
PROJECT FIGURES:
i. 27 Stories
ii. 214 Keys and 1 Suite
iii. Roof top pool and Gym
electrical • mechanical • networks • industrial • maintenance
MOVENPICK HOTEL COLOMBO 03, SRI LANKA
PROJECT NAME:
Movenpick City Hotel
YEAR OF CONSTRUCTION: In Progress
ARCHITECT: ATS & MICD
BUILDING CONTRACTOR: Sanken Construction (Pvt) Ltd
M&E ENGINEER: EME Engineering Lanka (Pvt) Ltd
NATURE OF PROJECT: City Hotel
EME’S SCOPE OF WORKS:
i. Electrical Services
ii. Public Health Services
iii. Fire Fighting Services (Sprinkler, Hydrant & Fire Suppression)
iv. Swimming pool Services
PROJECT CHALLENGES:
i. 5 star hotel requiring to Movenpick specifications
PROJECT FIGURES:
i. 26 Stories high building
ii. 220 rooms
iii. Roof top pool and Gym
electrical • mechanical • networks • industrial • maintenance
ORWELL RESIDENCY COLOMBO 03, SRI LANKA
PROJECT NAME:
ORWELL Luxury Apartment
YEAR OF CONSTRUCTION: In Progress
ARCHITECT: OENS Studio
BUILDING CONTRACTOR: Maga Engineering (Pvt) Ltd
M&E ENGINEER: EME Engineering Lanka (Pvt) Ltd
NATURE OF PROJECT: Residency Apartment
EME’S SCOPE OF WORKS:
i. Electrical Services
ii. Public Health Services
iii. HVAC Services
iv. Fire Fighting Services (Sprinkler, Hydrant & Fire Suppression)
v. Swimming pool Services
vi. ICT and MATV Services
PROJECT CHALLENGES:
i. A lot of design changes ii. Major design changes in build construction to client’s
requirement
PROJECT FIGURES:
i. 65 units apartment
ii. 25 stories high
electrical • mechanical • networks • industrial • maintenance
SHERATON HOTEL COLOMBO 03, SRI LANKA
PROJECT NAME:
Sheraton Hotel
YEAR OF CONSTRUCTION: 2013
ARCHITECT: Anil Chavda
BUILDING CONTRACTOR: Tudawe Brothers Ltd
M&E ENGINEER (MOCK UP ROOM ONLY): EME Engineering Lanka (Pvt) Ltd
NATURE OF PROJECT: Hotel
EME’S SCOPE OF WORKS:
i. All MEP Services for Mock Up Room
PROJECT CHALLENGES:
i. Tight schedule
electrical • mechanical • networks • industrial • maintenance
ANANTARA RESORT KALUTARA, SRI LANKA
PROJECT NAME:
Anantara Hotel & Resort
YEAR OF CONSTRUCTION: 2015
ARCHITECT: MICD Architects
BUILDING CONTRACTOR: Access Engineering Plc
M&E ENGINEER (DESIGN): EME Engineering Lanka (Pvt) Ltd
NATURE OF PROJECT: Hotel & Resort
EME’S SCOPE OF WORKS:
i. Designing for All MEP Services
PROJECT FIGURES:
i. 5 star luxury leisure
ii. 127 rooms and 5 suits
iii. Yoga pavilion, swimming pool and gym.
electrical • mechanical • networks • industrial • maintenance
DUTCH BAY RESORT KALPITIYA, SRI LANKA
PROJECT NAME:
Dutch Bay Resort
YEAR OF CONSTRUCTION: 2013
ARCHITECT: Design Team 3 (Pvt) Ltd
M&E ENGINEER (CONSULTANT & SUPERVISING): EME Engineering Lanka (Pvt) Ltd
NATURE OF PROJECT: Island Resort
EME’S SCOPE OF WORKS:
i. Consultant and supervising for All MEP Services
PROJECT CHALLENGES:
i. Island resort ii. Separate island
PROJECT FIGURES:
i. 210 rooms
ii. Outdoor swimming pool and restaurant
electrical • mechanical • networks • industrial • maintenance
AVANI BENTOTA RESORT & SPA BENTOTA, SRI LANKA
ALTAIR COLOMBO 02, SRI LANKA
PROJECT NAME:
Altair Project
YEAR OF CONSTRUCTION: In Progress
ARCHITECT: Moshe Safdie
BUILDING CONTRACTOR: Shapoorji Pallonji Group
M&E ENGINEER (SALES CENTRE): EME Engineering Lanka (Pvt) Ltd
NATURE OF PROJECT: Residential & Commercial Development
EME’S SCOPE OF WORKS:
i. Design and built of all MEP Services
PROJECT FIGURES:
i. Sales Gallery
electrical • mechanical • networks • industrial • maintenance
AMARI HOTEL GALLE GALLE, SRI LANKA
PROJECT NAME:
Sino Lanka Hotel Galle
YEAR OF CONSTRUCTION: In Progress
ARCHITECT: Greymatters
BUILDING CONTRACTOR: Sino Lanka Hotel Galle (Pvt) Ltd
M&E ENGINEER: EME Solutions Lanka (Pvt) Ltd
NATURE OF PROJECT: Hotel & Reosrt
EME’S SCOPE OF WORKS:
i. Electrical Services
ii. Public Health Services
iii. HVAC Services
iv. Fire Fighting Services (Sprinkler, Hydrant & Fire Suppression)
v. Swimming pool Services
vi. ICT services
PROJECT CHALLENGES:
i. Client is looking for gold label certificate ii. Implementation of absorbing type chillers coupled with
biomass boilers. iii. Eco friendly STPM
PROJECT FIGURES:
i. 8 Stories * 3 buildings & 172 rooms
ii. Swimming pool, Spa, Banquet Hall and Gym
electrical • mechanical • networks • industrial • maintenance
HILTON COLOMBO COLOMBO 02, SRI LANKA
PROJECT NAME:
Hilton Hotel
YEAR OF CONSTRUCTION: 2015
ARCHITECT: MICD
BUILDING CONTRACTOR: Sanken Construction (Pvt) Ltd
M&E ENGINEER (MOCK UP ROOM 1,2 & MULTI EVENT VENTURE): EME Engineering Lanka (Pvt) Ltd
NATURE OF PROJECT: Hotel Renovation
EME’S SCOPE OF WORKS:
i. All Design and Built Electrical Services for Mock Up room 1 & 2
ii. Consultant of All MEP Services for Multi Event Venture
PROJECT CHALLENGES:
i. Tight schedule
PROJECT FIGURES:
i. Mass amenities including rooms and suites, outdoor pool, bar, restaurant, meeting facilities and gym.
electrical • mechanical • networks • industrial • maintenance
HIGH END RESIDENCE COLOMBO 07, SRI LANKA
PROJECT NAME:
Barnes Place High End Residency
YEAR OF CONSTRUCTION: In Progress
ARCHITECT: IIDA & Design Forum
BUILDING CONTRACTOR: N & A Engineering Services
M&E ENGINEER: EME Solutions Lanka (Pvt) Ltd
NATURE OF PROJECT: Residency
EME’S SCOPE OF WORKS:
i. Electrical Services
ii. Public Health Services
iii. HVAC Services
iv. Fire Fighting Services (Sprinkler, Hydrant & Fire Suppression)
v. Swimming pool Services
vi. ICT services
PROJECT CHALLENGES:
i. High tech residency
PROJECT FIGURES:
i. 3 stories super luxury residency
ii. Swimming pool and water features
iii. Digitalized services
electrical • mechanical • networks • industrial • maintenance
AVANI BENTOTA RESORT & SPA BENTOTA, SRI LANKA
ALTAIR COLOMBO 02, SRI LANKA
PROJECT NAME:
Altair Project
YEAR OF CONSTRUCTION: In Progress
ARCHITECT: Moshe Safdie
BUILDING CONTRACTOR: Shapoorji Pallonji Group
M&E ENGINEER (DESIGN): EME Engineering Lanka (Pvt) Ltd
NATURE OF PROJECT: Residential & Commercial Development
EME’S SCOPE OF WORKS:
i. Design of swimming pool and water features
PROJECT FIGURES:
i. 600 Stories
ii. 400 apartments
electrical • mechanical • networks • industrial • maintenance
KANUHURA ISLAND RESORT MALDIVES
ROJECT NAME:
Kanuhura Island Resort Renovation
YEAR OF CONSTRUCTION: 2014
ARCHITECT: ------
BUILDING CONTRACTOR: Sanken Construction (Pvt) Ltd
M&E ENGINEER (2 MOCK UP VILLAS): EME Engineering Lanka (Pvt) Ltd
NATURE OF PROJECT: Hotel & Resort
EME’S SCOPE OF WORKS:
i. Design and Built of all MEP services for a 2 Mock Up villas
PROJECT CHALLENGES:
i. Fast Track Project – 3 months
PROJECT FIGURES:
i. ------
electrical • mechanical • networks • industrial • maintenance
LUX* MALDIVES MALDIVES
ROJECT NAME:
Lux* Maldives Renovation
YEAR OF CONSTRUCTION: 2015
ARCHITECT: GX Associates/P49 Deesign and Accociates
BUILDING CONTRACTOR: AIMA Construction Company (Pvt) Ltd
M&E ENGINEER: EME Solutions Lanka (Pvt) Ltd
NATURE OF PROJECT: Hotel & Resort
EME’S SCOPE OF WORKS:
i. Design and Built of all MEP services
PROJECT CHALLENGES:
i. Fast Track Project – 6 months
PROJECT FIGURES:
i. Renovation of 50 water restaurants
ii. East building complex restaurant & kitchen
electrical • mechanical • networks • industrial • maintenance
HYATT HOTEL ALLAHABAD, INDIA
ROJECT NAME:
Hyatt Hotel Allahabad
YEAR OF CONSTRUCTION: In Progress
ARCHITECT: Incubis Consultants (India) Pvt Ltd
BUILDING CONTRACTOR: ------
M&E ENGINEER (DESIGN): EME Design Services India (Pvt) Ltd
NATURE OF PROJECT: City Hotel
EME’S SCOPE OF WORKS:
i. Design of all MEP services
PROJECT CHALLENGES:
i. Designing of MEP services to optimize energy efficiency for reducing the cost
PROJECT FIGURES:
i. New city hotel
ii. 170 rooms including banquet hall
electrical • mechanical • networks • industrial • maintenance
HYATT HOTEL HIMACHAL PRADESH, INDIA
ROJECT NAME:
Hyatt Hotel at McLeod Ganj
YEAR OF CONSTRUCTION: In Progress
ARCHITECT: Maps Design
BUILDING CONTRACTOR: ------
M&E ENGINEER (DESIGN): EME Design Services India (Pvt) Ltd
NATURE OF PROJECT: Hotel
EME’S SCOPE OF WORKS:
i. Design of all MEP services
PROJECT CHALLENGES:
i. Logistics to execute the work in the forest of hotel branch ii. Optimizing MEP services to meet the energy challenges
in the area
PROJECT FIGURES:
i. 150 guest rooms and suites
ii. Banquet hall, meeting rooms, swimming pool, SPA and Gym
electrical • mechanical • networks • industrial • maintenance
ALOFT HOTEL BANGALORE, INDIA
ROJECT NAME:
Aloft Hotel
YEAR OF CONSTRUCTION: In Progress
ARCHITECT: Morphogenesis
BUILDING CONTRACTOR: ------
M&E ENGINEER (DESIGN): EME Design Services India (Pvt) Ltd
NATURE OF PROJECT: City Hotel
EME’S SCOPE OF WORKS:
i. Design of all MEP services
PROJECT CHALLENGES:
i. ------
PROJECT FIGURES:
i. 200 guest rooms and suites
ii. Banquet hall, meeting rooms, swimming pool, SPA and Gym
electrical • mechanical • networks • industrial • maintenance
HIGH END RESIDENCE NEW DELHI, INDIA
ROJECT NAME:
High End Residence Project
YEAR OF CONSTRUCTION: In Progress
ARCHITECT: Morphogenesis
BUILDING CONTRACTOR: ------
M&E ENGINEER (DESIGN): EME Design Services India (Pvt) Ltd
NATURE OF PROJECT: Residential
EME’S SCOPE OF WORKS:
i. Design of all MEP services
PROJECT CHALLENGES:
i. Hi-tech residence requiring heating, cooling and high quality fresh air
PROJECT FIGURES:
i. 40 000 sqft area
electrical • mechanical • networks • industrial • maintenance
VINTAGE CAR SHOWROOM DELHI, INDIA
PROJECT NAME:
Vintage Car Showroom
YEAR OF CONSTRUCTION: 2015
ARCHITECT: PLA
BUILDING CONTRACTOR: Intertech
M&E ENGINEER: EME Design Services India (Pvt) Ltd
NATURE OF PROJECT: Commercial Building
EME’S SCOPE OF WORKS:
i. Design and built of all MEP services
PROJECT CHALLENGES:
i. Fast Track Project – 6 months ii. Temperature control environment for vintage cars
PROJECT FIGURES:
i. More than 1500m2 area
ii. Conceived air conditioning system
electrical • mechanical • networks • industrial • maintenance
CHITTAGONG HOTEL CHITTAGONG, BANGLADESH
PROJECT NAME:
Chittagong Hotel
YEAR OF CONSTRUCTION: In Progress
ARCHITECT: MICD Associates / ATS Consultants (Pvt) Ltd
BUILDING CONTRACTOR: Intertech
M&E ENGINEER (DESIGN): EME Design Services India (Pvt) Ltd
NATURE OF PROJECT: Hill Side Hotel
EME’S SCOPE OF WORKS:
i. Design of all MEP services
PROJECT CHALLENGES:
i. Designing hotel in hills of Chittagong ii. Optimizing MEP requirement to reduce the running cost
and improve efficiency
PROJECT FIGURES:
i. 180 rooms
ii. Banquet hall and restaurent