ANAHITA ESTATES MAURITIUS PROJECT NAME: Anahita Estates - Waterfront Residences YEAR OF CONSTRUCTION: 2007 ARCHITECT: Wimberley Allison Tong & Goo BUILDING CONTRACTOR: Rehm Grinaker Construction Co Ltd M&E ENGINEER: Capita Symond Ltd. NATURE OF PROJECT: IRS Appartments PROJECT CHALLENGES: i. Fast track Project - we had to incorporate major chages by Client. EME’S SCOPE OF WORKS: i. Main LV Distribution network ii. Lighting Systems iii. Early Warning addressable fire detection and alarm system electrical mechanical networks industrial maintenance PROJECT FIGURES: i. 86 Km of electrical Wiring installed ii. More than 500 Detectors Installed
Transcript
Page 1: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

ANAHITA ESTATESMAURITIUS

PROJECT NAME: Anahita Estates - Waterfront Residences

YEAR OF CONSTRUCTION: 2007

ARCHITECT: Wimberley Allison Tong & Goo

BUILDING CONTRACTOR: Rehm Grinaker Construction Co Ltd

M&E ENGINEER: Capita Symond Ltd.

NATURE OF PROJECT: IRS Appartments

PROJECT CHALLENGES:i. Fast track Project - we had to incorporate major chages by Client.

EME’S SCOPE OF WORKS:

i. Main LV Distribution networkii. Lighting Systemsiii. Early Warning addressable fire detection and alarm system

electrical • mechanical • networks • industrial • maintenance

PROJECT FIGURES:i. 86 Km of electrical Wiring installedii. More than 500 Detectors Installed

Page 2: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

BANK OF MAURITIUSMAURITIUS

PROJECT NAME: Bank of Mauritius

YEAR OF CONSTRUCTION: 2004

ARCHITECT: Lampotang & Siew Architects

BUILDING CONTRACTOR: General Construction ltd

M&E ENGINEER: WSP Mauritius ltd.

NATURE OF PROJECT: Bank

PROJECT CHALLENGES:i. No particular Challenges on this project

EME’S SCOPE OF WORKS:i. Air Conditioning & Ventilation Systems ii. Building Management Systemiii. Automated controls, PLC’s and Drivesiv. Data Center Mechanical Installations.

electrical • mechanical • networks • industrial • maintenance

PROJECT FIGURES:i. More than 40,000 SqM of Sheet Metal Ducting Installedii. More than 4Km of Chilled Water Pipe worksiii. 24 Air Handling Unitsiv. 450 VAVs installedv. 750 Points Johnson Control BMS System installed.

Page 3: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

BARCLAYS BANKMAURITIUS

PROJECT NAME: Barclays head offices at Ebene

YEAR OF CONSTRUCTION: 2008

ARCHITECT: Francis Wong Architect

BUILDING CONTRACTOR: Gamma Civic Construction Co Ltd

M&E ENGINEER: WSP Mauritius ltd.

NATURE OF PROJECT: Bank

PROJECT CHALLENGES:i. Fast Track Project - six monthsii. Installed and comissioned adaptive control lighting system and

sophisticated LON based BMS Systemiii. Form IV MLV panel installed

EME’S SCOPE OF WORKS:i. Main LV Distribution Panels and networkii. Lighting Systems -UPS Networkiii. Early Warning addressable fire detection and alarm system iv. Lightning Protection Systemv. Building Management Systemvi. Public Health Servicesvii. Fire Protection Installationsviii. Ventilation and Air Conditioning systemix. Data Center Electrical and Mechanical Installations.

electrical • mechanical • networks • industrial • maintenance

PROJECT FIGURES:i. 1MW Electrical power supplyii. xx KM of Power cables installed - xx KM

Page 4: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

BELLE MARE WATER PARKMAURITIUS

PROJECT NAME: Belle Mare Water Park

YEAR OF CONSTRUCTION: 2000

ARCHITECT: Francis Wong Architect

BUILDING CONTRACTOR: Bhunjun & Sons Co Ltd

M&E ENGINEER: Profive ltd.

NATURE OF PROJECT: Amusement Centre

PROJECT CHALLENGES:i. Site Logistics involved in working on a widespread development

of 120,000 SqM

EME’S SCOPE OF WORKS:i. Electrical installationsii. Main LV Distribution Panels and networkiii. Lighting Systemsiv. Early Warning addressable fire detection and alarm system v. Lightning Protection Systemvi. Public Health Servicesvii. Fire Protection Installationsviii. Ventilation and Air Conditioning systemix. Pools and water features

electrical • mechanical • networks • industrial • maintenance

PROJECT FIGURES:i. 1 MW of Installed Electrical Powerii. 10 Km of Power cablesiii. 50 Km of Wiring installediv. 2,000 Electrical outlets installedv. 50 Adressable devices on the fire alarm systemvi. 5 Pool Plantrooms, filtration and treatment systems spread over

30 Acres of Land.

Page 5: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

PROJECT CHALLENGES:i. No particular Challenges on this project

EME’S SCOPE OF WORKS:i. Electrical Installations including: Standby Generator setii. HV Substationiii. Power Transformersiv. Main LV Distribution Panels and networkv. Lighting Systemsvi. UPS Networkvii. IP telephony and Data networkviii. Early Warning addressable fire detection and alarm system ix. Lightning Protection Systemx. Building Management System xi. Public Health Servicesxii. Fire Protection Installationsxiii. Ventilation and Air Conditioning systemxiv. Cold Rooms

electrical • mechanical • networks • industrial • maintenance

PROJECT FIGURES:i. 1.6 MW of Installed Electrical Powerii. 10 Km of Power cablesiii. 20 Km of Wiring installediv. 2,000 Electrical outlets installed v. 50 Adressable devices on the fire alarm systemvi. 1300 m2 Cold Room Panelsvii. Rooftops Units of 900 Kw Total Coolingviii. DX Split units of 350 Kw Total Coolingix. GRP water storage tank 240 m3

CARREFOURSEYCHELLES

PROJECT NAME: Carrefour – Seychelles

YEAR OF CONSTRUCTION: 2000

ARCHITECT: Quadra Architecture

BUILDING CONTRACTOR: EME Overseas ltd.

M&E ENGINEER: EME Overseas ltd.

NATURE OF PROJECT: Hypermarket

Page 6: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

PROJECT CHALLENGES:i. Site Logistics involved in working on a widespread development

incorporating 65,000 SqM of gardens

EME’S SCOPE OF WORKS:i. Electrical Installations including:Standby Generator setsii. HV Substation iii. Power Transformersiv. Main LV Distribution Panels and networkv. Lighting Systemsvi. UPS Networkvii. Lightning protection systemviii. Early Warning addressable fire detection and alarm system. ix. Telephone and Data wiring systems.x. Public Health Installations including: Pumping stationsxi. Cold water distribution networkxii. Hot water storage and distribution networkxiii. Waste and sewerage collection networkxiv. Fire protection installations.

electrical • mechanical • networks • industrial • maintenance

PROJECT FIGURES:i. 2.4 MVA of Installed Electrical power supply ii. 20 Km of Power cablesiii. 400 Km of Wiring installed iv. 12,000 Electrical outlets installed v. 400 Adressable devices on the fire alarm system. vi. 20Km of Internal plumbing piping vii. 15 Km of pre-insulated PEX pipes installedviii. 10Km of UPVC External underground piping Installedix. 10 Sewerage lifting stations.

CLUB MED HOTELMAURITIUS

PROJECT NAME: Club Med Hotel at Albion

YEAR OF CONSTRUCTION: 2008

ARCHITECT: Jean Michel D’Unienville Architects

BUILDING CONTRACTOR: General Construction Co Ltd

M&E ENGINEER: ATEC

NATURE OF PROJECT: Hotel Resort

Page 7: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

PROJECT CHALLENGES:i. Generator Sets had to be lifted and installed on the Roof of the

Building.

EME’S SCOPE OF WORKS:i. Electrical Installations including: Standby Generator setsii. HV Substationiii. Power Transformers iv. Main LV Distribution Panels and network v. Lighting Systemsvi. Early Warning addressable fire detection and alarm system.vii. Telephone and Data wiring systemsviii. CCTV Installationsix. Public Health Installations including: Pumping stationsx. Cold water distribution networkxi. Waste and sewerage collection networkxii. Fire protection installations.

electrical • mechanical • networks • industrial • maintenance

PROJECT FIGURES:i. 2.0 MVA of Installed Electrical Power supplyii. 2 Generator Sets of 800 KVA Each iii. 8 Km of Power cablesiv. 20 Km of Wiring installedv. 7,000 Electrical outlets installedvi. Over 200 Adressable devices on the fire alarm system. vii. 5Km of Internal plumbing piping viii. 2Km of UPVC piping Installed

CMC MEDINE MEWS MAURITIUS

PROJECT NAME: CMC Medine Mews

YEAR OF CONSTRUCTION: 2007

ARCHITECT: Phillippe Choo Associates

BUILDING CONTRACTOR: Rehm Grinaker Construction Co Ltd

M&E ENGINEER: WSP Mauritius LTD

NATURE OF PROJECT: Retail and Commercial Development

Page 8: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

PROJECT CHALLENGES:i. ...

EME’S SCOPE OF WORKS:i. Plumbing, Fire Fighting & Steam Installations

electrical • mechanical • networks • industrial • maintenance

PROJECT FIGURES:i.

OBEROI FLIGHT CATERING MAURITIUS

PROJECT NAME: Oberoi Flight Catering Facility at SSR International Airport

YEAR OF CONSTRUCTION: 2010

ARCHITECT: ...

BUILDING CONTRACTOR: Rehm Grinaker Construction Co Ltd

M&E ENGINEER: Hooloomann & Associates

NATURE OF PROJECT: Food Production

Page 9: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

PROJECT CHALLENGES:i. ...

EME’S SCOPE OF WORKS:i. Electrical Works

electrical • mechanical • networks • industrial • maintenance

PROJECT FIGURES:i.

GARDEN TOWER MAURITIUS

PROJECT NAME: Garden Tower at Port Louis

YEAR OF CONSTRUCTION: 2008

ARCHITECT: Lampotang & Siew Architects

BUILDING CONTRACTOR: Gamma Civic Construction Co Ltd

M&E ENGINEER: WSP Mauritius Ltd

NATURE OF PROJECT: Retail, Commercial Development & Offices Complex

Page 10: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

PROJECT CHALLENGES:i. ...

EME’S SCOPE OF WORKS:i. Electrical and Mechanical Installations

electrical • mechanical • networks • industrial • maintenance

PROJECT FIGURES:i.

IFS LTD MAURITIUS

PROJECT NAME: International Financial Services Ltd

YEAR OF CONSTRUCTION: 2008

ARCHITECT: Carlynn Wynch Architect

BUILDING CONTRACTOR: PAD & Co Ltd

M&E ENGINEER: Design II Engineering Ltd

NATURE OF PROJECT: New Offices Building

Page 11: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

PROJECT CHALLENGES:i. ...

EME’S SCOPE OF WORKS:i. Design and Buildii. Air-conditioning – chilled water system  iii. Hot water production & distribution- heat recovery  iv. Cold water & distribution  v. Irrigation  Fire fighting installationvi. Electrical Installation (2x1MVA) including fire alarms.vii. SCS and Telephonyviii. Generators Plantix. Swimming Pools

electrical • mechanical • networks • industrial • maintenance

PROJECT FIGURES:i.

LE PRESKIL RESORT AND SPAMAURITIUS

PROJECT NAME: Le Preskil Resort and Spa

YEAR OF CONSTRUCTION: 2002

ARCHITECT: Jean Michel D’Unienville Architects

BUILDING CONTRACTOR: Rehm Grinaker Construction Co Ltd

M&E ENGINEER: EME Engineering Ltd.

NATURE OF PROJECT: Hotel Resort

Page 12: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

PROJECT CHALLENGES:i. ...

EME’S SCOPE OF WORKS:i. Plumbing, Drainage and Fire Fighting Services

electrical • mechanical • networks • industrial • maintenance

PROJECT FIGURES:i.

MALL OF MAURITIUSMAURITIUS

PROJECT NAME: Mall of Mauritius at Bagatelle

YEAR OF CONSTRUCTION: 2011

ARCHITECT: Boogertman Partners & Architects’ Studio Ltd.

BUILDING CONTRACTOR: Rehm Grinaker Construction Co Ltd.

M&E ENGINEER: WSP Mauritius Ltd.

NATURE OF PROJECT: Retail and Commercial Development

Page 13: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

PROJECT CHALLENGES:i. Systems were re-designed during construction due to Project

alterations ii. 3000 Light fittings were delivered late and had to be installed in

2weeks iii. Project was a fast track one

EME’S SCOPE OF WORKS:i. HV Substationii. Power Transformersiii. Main LV Distribution Panels and network iv. Lighting Systems v. UPS Network vi. Early Warning addressable fire detection and alarm system.

electrical • mechanical • networks • industrial • maintenance

PROJECT FIGURES:i. 2 Mw of Installed Powerii. 15Km of Power Cables installediii. 500Km of electrical wiring installediv. 25,000 Electrical connecttion outlets installedv. 600 Adressable devices installed on the fire alarm system

MOVENPICK HOTELMAURITIUS

PROJECT NAME: Movenpick Hotel

YEAR OF CONSTRUCTION: 2005

ARCHITECT: Jean Francois Koenig Architects

BUILDING CONTRACTOR: Bhunjun & Sons Co Ltd

M&E ENGINEER: WSP Mauritius Ltd.

NATURE OF PROJECT: Hotel Resort

Page 14: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

PROJECT CHALLENGES:i. ...

EME’S SCOPE OF WORKS:i. Electrical, Plumbing, Fire Fighting & Air Conditioning

electrical • mechanical • networks • industrial • maintenance

PROJECT FIGURES:i. ...

STATE HOUSEMAURITIUS

PROJECT NAME: State House at Reduit

YEAR OF CONSTRUCTION: 2005

ARCHITECT: ...

BUILDING CONTRACTOR: General Construction Co Ltd

M&E ENGINEER: ...

NATURE OF PROJECT: Building Renovation

Page 15: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

PROJECT CHALLENGES:i. ...

EME’S SCOPE OF WORKS:i. Plumbing and Drainage Installations

electrical • mechanical • networks • industrial • maintenance

PROJECT FIGURES:i. ...

SUFREN HOTELMAURITIUS

PROJECT NAME: Sufren Hotel Project at Port Louis

YEAR OF CONSTRUCTION: 2004

ARCHITECT: Jean Francois Adam Architects

BUILDING CONTRACTOR: General Construction Co Ltd / Cogir JV

M&E ENGINEER: RPW Consultants Engineers

NATURE OF PROJECT: Hotel

Page 16: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

PROJECT CHALLENGES:i. ...

EME’S SCOPE OF WORKS:i. Design & Buildii. Electrical Installationsiii. Fire detection and alarmiv. Plumbing installationsv. Fire fighting installationsvi. Fire Suppression installations

electrical • mechanical • networks • industrial • maintenance

PROJECT FIGURES:i. ...

TAJ EXOTICA RESORTS & SPAMAURITIUS

PROJECT NAME: Taj Exotica Resorts & Spa

YEAR OF CONSTRUCTION: 2004

ARCHITECT: Maurice Giraud Architects

BUILDING CONTRACTOR: General Construction ltd

M&E ENGINEER: Proburo ltd.

NATURE OF PROJECT: Hotel Resort

Page 17: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

PROJECT CHALLENGES:i. ...

EME’S SCOPE OF WORKS:i. Electrical Installationsii. Air-conditioning and Ventilation systems

electrical • mechanical • networks • industrial • maintenance

PROJECT FIGURES:i. 4500 kW Total Cooling Capacityii. 2200 Indoor Evaporator Unitsiii. 400 Condensing Unitsiv. 15 Km of Refrigerant pipeworks

EDEN ISLAND SEYCHELLES

PROJECT NAME: Eden Island – Seychelles

YEAR OF CONSTRUCTION: 2011

ARCHITECT: DMP Architects

BUILDING CONTRACTOR: Vijay Construction Pty ltd.

M&E ENGINEER: WSP South Africa

NATURE OF PROJECT: Island Village Development

Page 18: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

PROJECT CHALLENGES:i. Site Logistics involved in working on a remote island development

at 45 mins flight distance from Mahe. ii. Housing and feeding our labour on site as well.

EME’S SCOPE OF WORKS:i. Electrical Installations including:connection to Base load

Generator setsii. HV Substationiii. Power Transformersiv. Main LV Distribution Panels and networkv. Lighting Systems vi. Fire Protection Installations vii. Public health Installationsviii. Sewerage Collection and Treatmentix. Pools and Pondsx. Air-conditioning and ventilation systems xi. Irrigation

electrical • mechanical • networks • industrial • maintenance

PROJECT FIGURES:i. 800 KW of installed electrical power supplyii. 120 DX Split units 800 kW total cooling iii. 10 Km Internal Plumbing pipe worksiv. 1200 Pop up Irrigation sprinklerv. 1400 m3 of Pools

DESROCHES VILLAS SEYCHELLES

PROJECT NAME: Desroches Villas – Seychelles

YEAR OF CONSTRUCTION: 2009

ARCHITECT: DG Architects

BUILDING CONTRACTOR: IDC ( Island Development Company)

M&E ENGINEER: EME Overseas ltd.

NATURE OF PROJECT: Island Villas Development

Page 19: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

PROJECT CHALLENGES:i. The project itself was a challenge to us and the site logistics on

such a widespread development involved quad bikes and lorries for effective control of the different areas of the project.

EME’S SCOPE OF WORKS:i. Electrical Installations including: HV Substationsii. Power Transformersiii. Main LV Distribution Panels and networkiv. Scene Lighting Systemsv. Early Warning addressable fire detection and alarm systemvi. Public Health Installations including: Pumping stationsvii. Hot and Cold water distribution networks viii. Waste and sewerage collection network ix. Fire protection installations.

electrical • mechanical • networks • industrial • maintenance

PROJECT FIGURES:i. 3.6 MVA of Installed Electrical power supplyii. 120 Km of Power cables iii. Over 500 Km of Wiring installediv. Over 50,000 Electrical outlets installed v. 800 Adressable devices on the fire alarm systemvi. 20Km of Internal plumbing pipingvii. 5 x 30 kW Cold Water Booster Sets on VSD’s viii. 20 Sewerage Lifting Stations ix. 40 Km Internal plumbing piping x. 24 Km HDPE external pipingxi. 25 km uPVC drainage piping installed

EPHELIA RESORTSEYCHELLES

PROJECT NAME: Ephelia Resort – Seychelles

YEAR OF CONSTRUCTION: 2010

ARCHITECT: Jean Marc Eynaud Architects

BUILDING CONTRACTOR: Sanken Overseas Pty ltd.

M&E ENGINEER: ATEC Ingenierie

NATURE OF PROJECT: Hotel Resort

Page 20: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

PROJECT CHALLENGES:i. ...

EME’S SCOPE OF WORKS:i. Design and Constructionii. Electrical Installationsiii. Electrical Power Production Plantiv. Fire Protection Installationsv. Telephony and Networkingvi. Video on Demand and CCTVvii. Desalination plant, water treatment and Storageviii. Plumbing Installationsix. Sewerage Collection and Treatmentx. Pools and Pondsxi. Air-conditioning and Ventilation systems

electrical • mechanical • networks • industrial • maintenance

PROJECT FIGURES:i. Desalination Plant of 400 m3/dayii. 25 Km Internal plumbing pipingiii. 15 Km External reticulation pipe worksiv. DX Split units 1200 kW total coolingv. Pools - 1500 m3

FELICITE ISLANDSEYCHELLES

PROJECT NAME: Felicite Island – Seychelles

YEAR OF CONSTRUCTION: 2012

ARCHITECT: Richard Hywel Evans architecture

BUILDING CONTRACTOR: Vijay Construction Pty ltd.

M&E ENGINEER: EME Overseas ltd.

NATURE OF PROJECT: Island Resort

Page 21: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

PROJECT CHALLENGES:i. ...

EME’S SCOPE OF WORKS:i. Electrical Installations.ii. Fire detection and alarmiii. Public Health installationsiv. Fire Fighting installations

electrical • mechanical • networks • industrial • maintenance

PROJECT FIGURES:i.

HILTON HOTEL SEYCHELLES

PROJECT NAME: Hilton Hotel Seychelles

YEAR OF CONSTRUCTION: 2004

ARCHITECT: Harry Tirant Associates

BUILDING CONTRACTOR: Laxmanbhai (Sey) pty.

M&E ENGINEER: WSP Mauritius Ltd

NATURE OF PROJECT: Hotel Resort

Page 22: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

PROJECT CHALLENGES:i. ...

EME’S SCOPE OF WORKS:i. Electrical, Plumbing, Fire Fighting & Air Conditioning

electrical • mechanical • networks • industrial • maintenance

PROJECT FIGURES:i.

KONOBA RESTAURANTSEYCHELLES

PROJECT NAME: Konoba Restaurant

YEAR OF CONSTRUCTION: 2010

ARCHITECT: Albert Angel - Angel Group

BUILDING CONTRACTOR: EME Overseas ltd

M&E ENGINEER: EME Overseas ltd.

NATURE OF PROJECT: New Offices Building

Page 23: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

PROJECT CHALLENGES:i. ...

EME’S SCOPE OF WORKS:i. Electrical Installations (2x 1MVA)Fire detection and alarm

electrical • mechanical • networks • industrial • maintenance

PROJECT FIGURES:i. 2 Water cooled chillers Total 1800 kW coolingii. 3 Air cooled chillers Total 600 kW Coolingiii. 200 Fan Coil unitsiv. 40 Air Handling Unitsv. 15,000 m2 of ductingvi. 200 Dx Split units

PLANTATION CLUBSEYCHELLES

PROJECT NAME: Plantation Club

YEAR OF CONSTRUCTION: 2011

ARCHITECT: DHK Architects

BUILDING CONTRACTOR: Laxmanbhai (Sey) pty.

M&E ENGINEER: WSP Mauritius Ltd.

NATURE OF PROJECT: Hotel Resort

Page 24: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

PROJECT CHALLENGES:i. ...

EME’S SCOPE OF WORKS:i. Design and Constructionii. Electrical Installationsiii. Electrical Power Production Plantiv. Fire Protection Installationsv. Telephony and Networkingvi. Video on Demand and CCTVvii. Desalination plant, water treatment and Storageviii. Plumbing Installationsix. Sewerage Collection and Treatmentx. Pools and Pondsxi. Air-conditioning and Ventilation systems

electrical • mechanical • networks • industrial • maintenance

PROJECT FIGURES:i. ...

SHANGRI-LASEYCHELLES

PROJECT NAME: Shangri-La – Seychelles

YEAR OF CONSTRUCTION: 2011

ARCHITECT: Fazakas Architects LLC

BUILDING CONTRACTOR: Fazakas Architects LLC

M&E ENGINEER: EME Overseas ltd.

NATURE OF PROJECT: Island Resort

Page 25: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

electrical • mechanical • networks • industrial • maintenance

CINNAMON RED COLOMBO 03, SRI LANKA

PROJECT NAME:

Cinnamon Red – City Hotel

YEAR OF CONSTRUCTION: 2014

ARCHITECT: Design Team 3 (Pvt) Ltd

BUILDING CONTRACTOR: Sanken Construction (Pvt) Ltd

M&E ENGINEER: EME Engineering Lanka (Pvt) Ltd

NATURE OF PROJECT: City Hotel

EME’S SCOPE OF WORKS:

i. Electrical Services

ii. Public Health Services

iii. HVAC Services

iv. Fire Fighting Services (Sprinkler, Hydrant & Fire Suppression)

v. Swimming pool Services

PROJECT CHALLENGES:

i. Fast track Project and limited MEP areas

PROJECT FIGURES:

i. 27 Stories

ii. 214 Keys and 1 Suite

iii. Roof top pool and Gym

Page 26: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

electrical • mechanical • networks • industrial • maintenance

MOVENPICK HOTEL COLOMBO 03, SRI LANKA

PROJECT NAME:

Movenpick City Hotel

YEAR OF CONSTRUCTION: In Progress

ARCHITECT: ATS & MICD

BUILDING CONTRACTOR: Sanken Construction (Pvt) Ltd

M&E ENGINEER: EME Engineering Lanka (Pvt) Ltd

NATURE OF PROJECT: City Hotel

EME’S SCOPE OF WORKS:

i. Electrical Services

ii. Public Health Services

iii. Fire Fighting Services (Sprinkler, Hydrant & Fire Suppression)

iv. Swimming pool Services

PROJECT CHALLENGES:

i. 5 star hotel requiring to Movenpick specifications

PROJECT FIGURES:

i. 26 Stories high building

ii. 220 rooms

iii. Roof top pool and Gym

Page 27: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

electrical • mechanical • networks • industrial • maintenance

ORWELL RESIDENCY COLOMBO 03, SRI LANKA

PROJECT NAME:

ORWELL Luxury Apartment

YEAR OF CONSTRUCTION: In Progress

ARCHITECT: OENS Studio

BUILDING CONTRACTOR: Maga Engineering (Pvt) Ltd

M&E ENGINEER: EME Engineering Lanka (Pvt) Ltd

NATURE OF PROJECT: Residency Apartment

EME’S SCOPE OF WORKS:

i. Electrical Services

ii. Public Health Services

iii. HVAC Services

iv. Fire Fighting Services (Sprinkler, Hydrant & Fire Suppression)

v. Swimming pool Services

vi. ICT and MATV Services

PROJECT CHALLENGES:

i. A lot of design changes ii. Major design changes in build construction to client’s

requirement

PROJECT FIGURES:

i. 65 units apartment

ii. 25 stories high

Page 28: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

electrical • mechanical • networks • industrial • maintenance

SHERATON HOTEL COLOMBO 03, SRI LANKA

PROJECT NAME:

Sheraton Hotel

YEAR OF CONSTRUCTION: 2013

ARCHITECT: Anil Chavda

BUILDING CONTRACTOR: Tudawe Brothers Ltd

M&E ENGINEER (MOCK UP ROOM ONLY): EME Engineering Lanka (Pvt) Ltd

NATURE OF PROJECT: Hotel

EME’S SCOPE OF WORKS:

i. All MEP Services for Mock Up Room

PROJECT CHALLENGES:

i. Tight schedule

Page 29: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

electrical • mechanical • networks • industrial • maintenance

ANANTARA RESORT KALUTARA, SRI LANKA

PROJECT NAME:

Anantara Hotel & Resort

YEAR OF CONSTRUCTION: 2015

ARCHITECT: MICD Architects

BUILDING CONTRACTOR: Access Engineering Plc

M&E ENGINEER (DESIGN): EME Engineering Lanka (Pvt) Ltd

NATURE OF PROJECT: Hotel & Resort

EME’S SCOPE OF WORKS:

i. Designing for All MEP Services

PROJECT FIGURES:

i. 5 star luxury leisure

ii. 127 rooms and 5 suits

iii. Yoga pavilion, swimming pool and gym.

Page 30: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

electrical • mechanical • networks • industrial • maintenance

DUTCH BAY RESORT KALPITIYA, SRI LANKA

PROJECT NAME:

Dutch Bay Resort

YEAR OF CONSTRUCTION: 2013

ARCHITECT: Design Team 3 (Pvt) Ltd

M&E ENGINEER (CONSULTANT & SUPERVISING): EME Engineering Lanka (Pvt) Ltd

NATURE OF PROJECT: Island Resort

EME’S SCOPE OF WORKS:

i. Consultant and supervising for All MEP Services

PROJECT CHALLENGES:

i. Island resort ii. Separate island

PROJECT FIGURES:

i. 210 rooms

ii. Outdoor swimming pool and restaurant

Page 31: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

electrical • mechanical • networks • industrial • maintenance

AVANI BENTOTA RESORT & SPA BENTOTA, SRI LANKA

ALTAIR COLOMBO 02, SRI LANKA

PROJECT NAME:

Altair Project

YEAR OF CONSTRUCTION: In Progress

ARCHITECT: Moshe Safdie

BUILDING CONTRACTOR: Shapoorji Pallonji Group

M&E ENGINEER (SALES CENTRE): EME Engineering Lanka (Pvt) Ltd

NATURE OF PROJECT: Residential & Commercial Development

EME’S SCOPE OF WORKS:

i. Design and built of all MEP Services

PROJECT FIGURES:

i. Sales Gallery

Page 32: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

electrical • mechanical • networks • industrial • maintenance

AMARI HOTEL GALLE GALLE, SRI LANKA

PROJECT NAME:

Sino Lanka Hotel Galle

YEAR OF CONSTRUCTION: In Progress

ARCHITECT: Greymatters

BUILDING CONTRACTOR: Sino Lanka Hotel Galle (Pvt) Ltd

M&E ENGINEER: EME Solutions Lanka (Pvt) Ltd

NATURE OF PROJECT: Hotel & Reosrt

EME’S SCOPE OF WORKS:

i. Electrical Services

ii. Public Health Services

iii. HVAC Services

iv. Fire Fighting Services (Sprinkler, Hydrant & Fire Suppression)

v. Swimming pool Services

vi. ICT services

PROJECT CHALLENGES:

i. Client is looking for gold label certificate ii. Implementation of absorbing type chillers coupled with

biomass boilers. iii. Eco friendly STPM

PROJECT FIGURES:

i. 8 Stories * 3 buildings & 172 rooms

ii. Swimming pool, Spa, Banquet Hall and Gym

Page 33: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

electrical • mechanical • networks • industrial • maintenance

HILTON COLOMBO COLOMBO 02, SRI LANKA

PROJECT NAME:

Hilton Hotel

YEAR OF CONSTRUCTION: 2015

ARCHITECT: MICD

BUILDING CONTRACTOR: Sanken Construction (Pvt) Ltd

M&E ENGINEER (MOCK UP ROOM 1,2 & MULTI EVENT VENTURE): EME Engineering Lanka (Pvt) Ltd

NATURE OF PROJECT: Hotel Renovation

EME’S SCOPE OF WORKS:

i. All Design and Built Electrical Services for Mock Up room 1 & 2

ii. Consultant of All MEP Services for Multi Event Venture

PROJECT CHALLENGES:

i. Tight schedule

PROJECT FIGURES:

i. Mass amenities including rooms and suites, outdoor pool, bar, restaurant, meeting facilities and gym.

Page 34: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

electrical • mechanical • networks • industrial • maintenance

HIGH END RESIDENCE COLOMBO 07, SRI LANKA

PROJECT NAME:

Barnes Place High End Residency

YEAR OF CONSTRUCTION: In Progress

ARCHITECT: IIDA & Design Forum

BUILDING CONTRACTOR: N & A Engineering Services

M&E ENGINEER: EME Solutions Lanka (Pvt) Ltd

NATURE OF PROJECT: Residency

EME’S SCOPE OF WORKS:

i. Electrical Services

ii. Public Health Services

iii. HVAC Services

iv. Fire Fighting Services (Sprinkler, Hydrant & Fire Suppression)

v. Swimming pool Services

vi. ICT services

PROJECT CHALLENGES:

i. High tech residency

PROJECT FIGURES:

i. 3 stories super luxury residency

ii. Swimming pool and water features

iii. Digitalized services

Page 35: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

electrical • mechanical • networks • industrial • maintenance

AVANI BENTOTA RESORT & SPA BENTOTA, SRI LANKA

ALTAIR COLOMBO 02, SRI LANKA

PROJECT NAME:

Altair Project

YEAR OF CONSTRUCTION: In Progress

ARCHITECT: Moshe Safdie

BUILDING CONTRACTOR: Shapoorji Pallonji Group

M&E ENGINEER (DESIGN): EME Engineering Lanka (Pvt) Ltd

NATURE OF PROJECT: Residential & Commercial Development

EME’S SCOPE OF WORKS:

i. Design of swimming pool and water features

PROJECT FIGURES:

i. 600 Stories

ii. 400 apartments

Page 36: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

electrical • mechanical • networks • industrial • maintenance

KANUHURA ISLAND RESORT MALDIVES

ROJECT NAME:

Kanuhura Island Resort Renovation

YEAR OF CONSTRUCTION: 2014

ARCHITECT: ------

BUILDING CONTRACTOR: Sanken Construction (Pvt) Ltd

M&E ENGINEER (2 MOCK UP VILLAS): EME Engineering Lanka (Pvt) Ltd

NATURE OF PROJECT: Hotel & Resort

EME’S SCOPE OF WORKS:

i. Design and Built of all MEP services for a 2 Mock Up villas

PROJECT CHALLENGES:

i. Fast Track Project – 3 months

PROJECT FIGURES:

i. ------

Page 37: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

electrical • mechanical • networks • industrial • maintenance

LUX* MALDIVES MALDIVES

ROJECT NAME:

Lux* Maldives Renovation

YEAR OF CONSTRUCTION: 2015

ARCHITECT: GX Associates/P49 Deesign and Accociates

BUILDING CONTRACTOR: AIMA Construction Company (Pvt) Ltd

M&E ENGINEER: EME Solutions Lanka (Pvt) Ltd

NATURE OF PROJECT: Hotel & Resort

EME’S SCOPE OF WORKS:

i. Design and Built of all MEP services

PROJECT CHALLENGES:

i. Fast Track Project – 6 months

PROJECT FIGURES:

i. Renovation of 50 water restaurants

ii. East building complex restaurant & kitchen

Page 38: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

electrical • mechanical • networks • industrial • maintenance

HYATT HOTEL ALLAHABAD, INDIA

ROJECT NAME:

Hyatt Hotel Allahabad

YEAR OF CONSTRUCTION: In Progress

ARCHITECT: Incubis Consultants (India) Pvt Ltd

BUILDING CONTRACTOR: ------

M&E ENGINEER (DESIGN): EME Design Services India (Pvt) Ltd

NATURE OF PROJECT: City Hotel

EME’S SCOPE OF WORKS:

i. Design of all MEP services

PROJECT CHALLENGES:

i. Designing of MEP services to optimize energy efficiency for reducing the cost

PROJECT FIGURES:

i. New city hotel

ii. 170 rooms including banquet hall

Page 39: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

electrical • mechanical • networks • industrial • maintenance

HYATT HOTEL HIMACHAL PRADESH, INDIA

ROJECT NAME:

Hyatt Hotel at McLeod Ganj

YEAR OF CONSTRUCTION: In Progress

ARCHITECT: Maps Design

BUILDING CONTRACTOR: ------

M&E ENGINEER (DESIGN): EME Design Services India (Pvt) Ltd

NATURE OF PROJECT: Hotel

EME’S SCOPE OF WORKS:

i. Design of all MEP services

PROJECT CHALLENGES:

i. Logistics to execute the work in the forest of hotel branch ii. Optimizing MEP services to meet the energy challenges

in the area

PROJECT FIGURES:

i. 150 guest rooms and suites

ii. Banquet hall, meeting rooms, swimming pool, SPA and Gym

Page 40: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

electrical • mechanical • networks • industrial • maintenance

ALOFT HOTEL BANGALORE, INDIA

ROJECT NAME:

Aloft Hotel

YEAR OF CONSTRUCTION: In Progress

ARCHITECT: Morphogenesis

BUILDING CONTRACTOR: ------

M&E ENGINEER (DESIGN): EME Design Services India (Pvt) Ltd

NATURE OF PROJECT: City Hotel

EME’S SCOPE OF WORKS:

i. Design of all MEP services

PROJECT CHALLENGES:

i. ------

PROJECT FIGURES:

i. 200 guest rooms and suites

ii. Banquet hall, meeting rooms, swimming pool, SPA and Gym

Page 41: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

electrical • mechanical • networks • industrial • maintenance

HIGH END RESIDENCE NEW DELHI, INDIA

ROJECT NAME:

High End Residence Project

YEAR OF CONSTRUCTION: In Progress

ARCHITECT: Morphogenesis

BUILDING CONTRACTOR: ------

M&E ENGINEER (DESIGN): EME Design Services India (Pvt) Ltd

NATURE OF PROJECT: Residential

EME’S SCOPE OF WORKS:

i. Design of all MEP services

PROJECT CHALLENGES:

i. Hi-tech residence requiring heating, cooling and high quality fresh air

PROJECT FIGURES:

i. 40 000 sqft area

Page 42: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

electrical • mechanical • networks • industrial • maintenance

VINTAGE CAR SHOWROOM DELHI, INDIA

PROJECT NAME:

Vintage Car Showroom

YEAR OF CONSTRUCTION: 2015

ARCHITECT: PLA

BUILDING CONTRACTOR: Intertech

M&E ENGINEER: EME Design Services India (Pvt) Ltd

NATURE OF PROJECT: Commercial Building

EME’S SCOPE OF WORKS:

i. Design and built of all MEP services

PROJECT CHALLENGES:

i. Fast Track Project – 6 months ii. Temperature control environment for vintage cars

PROJECT FIGURES:

i. More than 1500m2 area

ii. Conceived air conditioning system

Page 43: ANAHITA ESTATES ESTATES MAURITIUS PROJECT NAME: ... General Construction ltd M&E ENGINEER: ... 10Km of UPVC External underground piping Installed

electrical • mechanical • networks • industrial • maintenance

CHITTAGONG HOTEL CHITTAGONG, BANGLADESH

PROJECT NAME:

Chittagong Hotel

YEAR OF CONSTRUCTION: In Progress

ARCHITECT: MICD Associates / ATS Consultants (Pvt) Ltd

BUILDING CONTRACTOR: Intertech

M&E ENGINEER (DESIGN): EME Design Services India (Pvt) Ltd

NATURE OF PROJECT: Hill Side Hotel

EME’S SCOPE OF WORKS:

i. Design of all MEP services

PROJECT CHALLENGES:

i. Designing hotel in hills of Chittagong ii. Optimizing MEP requirement to reduce the running cost

and improve efficiency

PROJECT FIGURES:

i. 180 rooms

ii. Banquet hall and restaurent