MINISTRY OF CONSTRUCTION PUBLIC WORKS ANALYSIS OF RATES FOR BRIDGE WORKS GOVERNMENT OFTHE REPUBLIC OF THE UNION OF MYANMAR SECOND EDITION JUNE 2013
Transcript
  • MINISTRY OF CONSTRUCTION

    PUBLIC WORKS

    ANALYSIS OF RATES

    FOR

    BRIDGE WORKS

    GOVERNMENT OFTHE REPUBLIC OF THE UNION OF MYANMAR

    SECOND EDITION JUNE 2013

  • CONTENTS

    SH-NO

    1 .O

    2.0

    3.0

    4.0

    5.0

    6.0

    NAME OF SUB-HEAD

    BRIDGES

    SUB-HEADS

    Foundation Work

    P.C Girder

    Steel Truss

    Steel Plate Girder

    Suspension and Cablestayed Bridge

    Survey

    Miscellaneous Notes

    -

    PAGE NO

  • 1

    Standard Data for Working Out Rates Per Unit Quantity ofltems of Work.

    Foreman Carpenter (1 st Grade) Carpenter (2nd Grade)

    Worker

    Sr No.

    1

    2.

    3.

    Particulars of Materials and Labour

    X IX. BRIDGES Foundation Works Labour For Driving (250 mm) Diameter Timber Piles inordinary Soil(With 500 kg drop hammer from pulley winch and local trestle and manually operated). Penetration average 6 m. Labour

    Plants Pile driving frame (1)No

    Sundries

    Labour For Driving (250 mm)Diameter Timber Piles inordinary Soil (With pile driving machine). Penetration average 6 m. Labour

    Operator Foreman

    Carpenter (I st Grade) Carpenter (2nd Grade)

    Worker For Operation

    H.S.D Grease

    Plants Pile driving frame (1)No

    Sundries

    Labour for Pile Driving reinforced cement con- crete pile (350 mm x 350 mm x 12000 mm) in ordinary soil (with 12m dieselhammer). Penetration average 12 m. Labour

    Foreman Pile driving machine operator

    Pile driving machine Asst Crane operator

    Worker

    Unit

    Man-Day Man-Day Man-Day Man-Day

    Hour L.S

    Man-Day Man-Day Man-Day Man-Day Man-Day

    litre

    kg

    Hour L.S

    Man-Day Man-Day Man-Day Man-Day Man-Day

    Quantity

    0.3 0.5 0.5 3

    4 -

    0.3 0.3 0.5 0.5 3

    3 0.1

    2.7 -

    0.3 0.3 0.3 0.3 6

    Remarks

    - Cost of Timber piles according to varying dia;

    with all necessary fittings

    is to be included in the

    main estimate.

    - Cost of Timber piles

    according to varying dia;

    with all necessary fittings

    is to be included in the

    main estimate.

    A

  • 2

    StandardData for Working Out Rates Per Unit Quantity of Items of Work-contd.

    Particulars of Materials and Labour

    '001s Required

    12m)rail line trollies for transport of precast bile.

    One crane for loading unloading erecting

    and pitching of precast pile. Pile driving machine (1) No

    ;or Operation

    H.S.D for Pile Driving Machine

    H.S.D for Crane Engine Oil

    Sundries

    .abour for Pile Driving reinforced cement con- rete pile (350 mm x 350 mm x 12000 mm) in ~rdinary soil ( Using drop hammer with winch ~perated by machine).Penetration Average 12m. .abour

    Foreman Operator Worker

    dachine Pile driving machine (1)No

    :or Operation

    Diesel Oil

    Grease Oil Sundries

    Making of Stand Pipe 8 rnrn thk; 12mm thk; (800 mm 0 to 1 650 mm 0 ) (For 1 Sqm)

    Steel fixer

    Worker

    Driving Stand Pipe Driving of Stand Pipe1 350mm 0,1650mm 0 with Vibro Hammer for 1200mm 0 , 1500mm 0 Bored Pile. ( For 1 m )

    Stand pipe Steel fixer

    Head Worker

    Worker

    Unit

    Hour

    Hour

    Hour

    Man-Da: Man-Da:

    Man-Dti

    Remarks

    Cost for R.C Piles to be

    calculated according to

    the reqd.Size and inclu-

    ded in the main estimate.

    Cost for R.C Piles to be

    calculated according to

    the reqd.Size and inclu-

    ded in the main estimate.

  • 3

    Standard Data for Working Out Rates Per Unit Quantity of Items of Work-contd.

    Sr No.

    (b)

    7.

    (a)

    (b)

    Particulars of Materials and Labour

    Electric Helper Operator /Machine Driver

    Sundries

    H.S.D

    Driving of Stand Pipel950rnrn 0,2650mm 0 with Vibro Hammer for1 800mm 0,2500mm0 Bored Pile. ( For 1 m )

    Stand Pipe Steel Fixer

    Head Worker Worker

    Electric Helper Operator /Machine Driver

    Sundries H.S.D

    Removing Stand Pipe Removing of Stand Pipe 1350mm 0,1650mm0 with Vibro Hammer for 1200 mm 0 , 1500mm 0 Bored Pile. ( For 1 m )

    Stand Pipe Steel Fixer

    Head Worker Worker

    Electric Helper Operator Machine Driver

    Sundries

    Removing of Stand Pipe 1950mm 0 , 2650 mm0 with Vibro Hammer for 1800mm 0, 2500mm 0 Bored Pile. ( For 1 m )

    Stand Pipe Steel Fixer

    Head Worker

    Worker

    Electric Helper

    Operator /Machine Driver Sundries H.S.D

    Unit

    Man-Day Man-Day

    L.S litre

    No Man-Day Man-Day Man-Day Man-Day Man-Day

    L.S litre

    No Man-Day Man-Day Man-Day Man-Day Man-Day

    L.S

    No Man-Day

    Man-Day

    Man-Day

    Man-Day

    Man-Day L.S litre

    Quantity

    0.5 0.7 - -

    1 1

    3.2 0.5 0.7 - -

    - 0.7 0.5 2

    0.5 0.5 -

    - 0.7 0.7

    2.5

    0.5 0.5 - -

    Remarks

  • 4

    Standard Data for Working Out Rates Per Unit Quantity of Items of Work-contd

    Head Worker Worker

    Operator Machine Driver Sundries H.S.D

    Sr No. 8.

    9.

    10.

    1 1.

    Remarks Particulars of Materials and Labour

    Fitting of Drilling Equipment to dig Bored Pile. 1200rnm 0 , 1500rnm 0 ,1800mm 0, 2500rnm 0. ( For 1 time )

    Head Worker Worker

    Operator /Machine Driver Sundries H.S.D

    Dismantling of Drilling Equipment. ( For 1 time )

    Drilling of 800mm 0 mini Bored Pile. (Ground, Ordinary Soil) ( For 1 m )

    Head Worker Foreman Worker

    Operator Machine Driver Water Pump Helper

    Sundries H.S.D

    Machinary hair Charges

    Drilling of 800 mm @mini Bored Pile. (Ground , Weathered Soft Rock ) ( For 1 m )

    Head Worker Foreman Worker

    Operator Machine Driver Water Pump Helper

    Sundries H.S.D

    Machinary hair Charges

    -

    Unit

    Man-Day Man-Day Man-Day

    L.S litre

    Man-Day Man-Day Man-Day

    L.S litre

    Man-Day Man-Day Man-Day Man-Day Man-Day

    L.S litre L.S

    Man-Day Man-Day Man-Day Man-Day

    Man-Day L. S litre L.S

    Quantity

    2 7

    0.8 - -

    2

    7 0.8 - -

    0.7 0.5 2

    0.3 0.3 - - -

    1.3 1 4

    0.7 0.7 - - -

  • 5

    Standard Data for Working Out Rates Per Unit Quantity of Items of Work-contd.

    Sr No. 12.

    13.

    14.

    15.

    Particulars of Materials and Labour

    Drilling of 800 rnm 0 mini Bored Pile. (Water, Ordinary Soil) ( For 1 m )

    Head Worker

    Foreman Worker

    Operator /Machine Driver

    Water Pump Helper Sundries

    H.S.D

    Drilling of 800mm 0 mini Bored Pile. (Water , Weathered Soft Rock) ( For 1 m )

    Head Worker Foreman Worker

    Operator /Machine Driver Water Pump Helper

    Sundries H.S.D

    Drilling of 1200mm 0 Bored Pile ( Ordinary Soil ) ( For 1 m )

    Head Worker

    Foreman Worker

    Operator /Machine Driver Water Pump Helper

    Sundries H.S.D

    Drilling of 1500mm 0 Bored Pile ( Ordinary Soil ) ( For 1 m )

    Head Worker Foreman Worker

    Operator Machine Driver

    Water Pump Helper Sundries H.S.D

    Unit

    Man-Day Man-Day

    Man-Day

    Man-Day

    Man-Day L. S litre

    Man-Day Man-Day Man-Day Man-Day Man-Day

    L.S litre

    Man-Day Man-Day Man-Day Man-Day Man-Day

    L. S litre

    Man-Day Man-Day Man-Day

    Man-Day

    Man-Day

    L. S litre

    Quantity

    0.8

    0.6

    2.5

    0.4

    0.4 - -

    1.5 1.2

    5

    0.8

    0.8 - -

    1 0.5 3

    0.5

    0.3 - -

    1.2

    0.5 3.5

    0.5

    0.4 - -

    Remarks

  • Standard Data for Working Out Rates Per Unit Quantity of Items of Work-contd.

    Quantity

    1.4

    0.8 4.3 0.7 0.5 - -

    1.5 0.8 4.5 0.8 0.5 - -

    1.5 0.8 4.8 0.8 0.5 - -

    1.3

    0.5

    3.5

    0.5 0.4 - -

    Unit

    Man-Day Man-Day Man-Day Man-Day Man-Day

    L.S litre

    Man-Day Man-Day Man-Day Man-Day Man-Day

    L.S litre

    Man-Day Man-Day Man-Day Man-Day Man-Day

    L.S litre

    Man-Day Man-Day Man-Day Man-Day Man-Day

    L.S litre

    Sr No. 16.

    17.

    18.

    19.

    Remarks Particulars of Materials and Labour

    Drilling of 1500mm 0 R.C.D Bored Pile

    ( Ordinary Soil ) ( For 1 m ) Head Worker

    Foreman Worker

    Operator Machine Driver Water Pump Helper

    Sundries H.S.D

    Drilling of 1800mm 0 , Bored Pile ( Ordinary Soil ) ( For 1 m )

    Head Worker Foreman Worker

    Operator /Machine Driver Water Pump Helper

    Sundries H.S.D

    Drilling of 2500rnm 0 , Bored Pile ( Ordinary Soil ) ( For 1 m )

    Head Worker Foreman Worker

    Operator /Machine Driver Water Pump Helper

    Sundries H.S.D

    Drilling of 1200mm 0 Bored Pile. ( Weathered Soft Rock Layer Only, Based on Soil Test Result ) ( For 1 m )

    Head Worker Foreman Worker

    Operator /Machine Driver Water Pump Helper

    Sundries H.S.D

  • I

    Standard Data for Working Out Rates Per Unit Quantiry of Items of Work-contd.

    Particulars of Materials and Labour

    lrilling of 1500mm 0 Bored Pile : Weathered Soft Rock Layer Only) Based on Soil rest Result ) ( For 1 m )

    Head Worker

    Foreman

    Worker

    Operator Machine Driver Water Pump Helper

    Sundries H.S.D

    lrilling of 1500rnrn 0 R.C.D Bored Pile Weathered soft rock Layer only Based on soil

    Testresult) ( For 1 m ) Head Worker

    Foreman Worker

    Operator Machine Driver Water Pump Helper

    Sundries H.S.D

    lrilling of 1800mm 0 Bored Pile : Weathered Soft Rock Layer Only Based on Soil Test Result ) ( For 1 m )

    Head Worker

    Foreman Worker

    Operator /Machine Driver Water Pump Helper

    Sundries H.S.D

    Drilling of 2500mm 0 Bored Pile ( Weathered Soft Rock Layer Only based on

    Soil Test Result ) ( For 1 m )

    Head Worker Foreman

    Worker

    Operator Machine Driver

    Unit

    Man-Da: Man-Da: Man-Da: Man-Da:

    Man-Da:

    L.S litre

    Man-D? Man-D?

    Man-D?

    Man-Da:

    Remarks

  • 8

    Standard Data for Working Out Rates Per Unit Quantity of hems of Work-contd.

    Worker Sundries H.S.D

    Sr No.

    24.

    25.

    26.

    27.

    28.

    Particulars of Materials and Labour

    Water Pump Helper Sundries H.S.D

    Mixing of Betonite Solution. (For 1 cum) Worker Sundries H.S.D

    After drilling Bored Pile and fitting tremie pipe to pour concrete , Proving of Slime Wash with Compressor, for cleaning to Bored hole. (For 1 hole)

    Hanging of Steel Cage for 800mm0,1000rnrn 0 , 1200 mm 0 to Bored Hole with Crane. (For 12m length )

    Welding Rod Steel Fixer

    Worker Sundries

    Hanging of Steel Cage for 1500 mrn 0 , 1800 mm 0,2500 mm 0 to Bored Hole with Crane. (For 12m length )

    Welding Rod Steel Fixer

    Worker Sundries H.S.D

    Pouring (1 : 1 ?4 :3) Cement concrete by Tremie Method. (1 cum)

    Head Worker Worker

    Operator /Machine Driver Sundries H.S.D

    Unit

    Man-Day L.S litre

    Man-Day L.S litre

    Man-Day L.S litre

    kg Man-Day Man-Day

    L.S

    kg Man-Day Man-Day

    L.S litre

    Man-Day Man-Day Man-Day

    L.S litre

    Quantity

    0.7 - -

    0.8 - -

    3 - -

    - 2 6 -

    - 3 8 - -

    0.5 0.8 0.1 - -

    Remarks

  • 9

    Standard Data for Working Out Rates Per Unit Quantity of Items of Work-contd.

    Particulars of Materials and Labour

    oining, Dismantling, Cleaning, Painting of

    :arth oil & Grease of Tremie Pipe to be ready. For 1 m )

    Steel Fixer Helper

    Sundries

    3reaking of Bored Pile Head. ( 1 cum ) Head Worker

    Sundries

    Well Foundation Iigging and sinking of 1200mrn0 spun pipe o get specified depth including removing soil md water pumping. (Ground, Ordinary soil) For 1 m)

    Worker Carpenter

    Head Worker Operator

    Steel Fixer Sundries

    Iigging and sinking of 1200mm0 spun pipe o get specified depth including removing soil md water pumping. (Ground, Sand) (For 1 m)

    Worker Carpenter

    Head Worker Operator

    Steel Fixer Sundries

    Digging and sinking of 1200mm0 spun pipe to get specified depth including removing soil

    md water pumping. (Ground, Weathered soft rock) (For 1 m)

    Worker

    Carpenter Head Worker

    Unit

    vim-Daj vim-Daj

    Man-Da: Man-Dq Man-Dq

    L. S

    Man-Dq

    Man-Da, Man-Da

    Remarks

  • 10

    Standard Data for Working Out Rates Per Unit Quantity of Items of Work-contd.

    Sr No.

    34.

    35.

    36.

    37.

    Particulars of Materials and Labour

    Operator Steel Fixer Sundries

    Digging and sinking of 1200mrn0 spun pipe to get specified depth including removing soil and water pumping. (Water, Ordinary soil)

    (For 1 m) Worker

    Carpenter Head Worker

    Operator Steel Fixer Sundries

    Digging and sinking of 1200mm0 spun pipe to get specified depth including removing soil and water pumping. (Water, Sand) (For 1 m)

    Worker Carpenter

    Head Worker Operator

    Steel Fixer Sundries

    Digging and sinking of 1200mm0 spun pipe to get specified depth including removing soil and water pumping. (Water, Weathered soft rock) (For 1 m)

    Worker Carpenter

    Head Worker Operator

    Steel Fixer

    Sundries

    Digging and sinking of 2750mm0 cassion well to get specified depth including removing soil and water pumping. (Ground , Ordinary soil) (For 1 m)

    Quantity

    1.6 1.2 -

    15.6 1.2 1.2 1

    0.7 -

    19.6 1.6 1.2

    1.2 1 -

    31.2 2.4 2.2 1.9 1.4 -

    Unit

    Man-Day Man-Day

    L.S

    Man-Day Man-Day Man-Day Man-Day Man-Day

    L.S

    Man-Day Man-Day

    Man-Day Man-Day Man-Day

    L.S

    Man-Day Man-Day Man-Day Man-Day

    Man-Day

    L,S

    Remarks

  • -1 -1

    Standard Data for Working Out Rates Per Unit Quantity of Items of Work-contd.

    Quantity

    2

    63 0.5 10 3 6

    6.5 9

    10.5 3 -

    2.5 78.8 0.6 12.5 3.8 7.5 8.1 11.3 13.1 3.8 -

    4 126 1

    20 6

    12 13

    18

    Unit

    Man-Day

    Man-Day Man-Day Man-Day Man-Day Man-Day Man-Day Man-Day Man-Day Man-Day

    L.S

    Man-Day Man-Day Man-Day Man-Day Man-Day Man-Day Man-Day

    Man-Day Man-Day Man-Day

    L.S

    Man-Day Man-Day

    Man-Day

    Man-Day Man-Day

    Man-Day Man-Day

    Man-Day

    Sr No.

    38.

    39.

    Remarks Particulars of Materials and Labour

    Head Worker

    Worker Welder

    Operator Steel Fixer

    Foreman Diver

    Helper

    Rigger Carpenter Sundries

    Digging and sinking of 2750mm0 cassion well to get specified depth including removing soil and water pumping. (Ground , Sand) (For 1 m)

    Head Worker Worker Welder

    Operator Steel Fixer

    Foreman Diver Helper

    Rigger Carpenter Sundries

    Digging and sinking of 2750rnm0 cassion well

    to get specified depth including removing soil

    and water pumping. (Ground, Weathered soft rock) (For 1 m)

    Head Worker Worker

    Welder

    Operator Steel Fixer

    Foreman Diver

    Helper

  • 12

    Standard Data for Working Out Rates Per Unit Quantity of Items of Work-contd.

    Remarks Sr No.

    40.

    41.

    42.

    Particulars of Materials and Labour

    Rigger Carpenter Sundries

    Digging and sinking of 2750rnm0 cassion well to get specified depth including removing soil

    and water pumping. (Water , Ordinary soil) (For 1 m)

    Head Worker Worker Welder

    Operator Steel Fixer Foreman

    Diver

    Helper Rigger

    Carpenter Sundries

    Digging and sinking of 2750rnrn0 cassion well to get specified depth including removing soil and water pumping. (Water, Sand) (For 1 m)

    Head Worker Worker Welder

    Operator

    Steel Fixer

    Foreman

    Diver

    Helper Rigger

    Carpenter Sundries

    Digging and sinking of 2750mm0 cassion well

    to get specified depth including removing soil

    and water pumping. (Water, Weathered soft rock) (For 1 m)

    Head Worker

    Unit

    Man-Day Man-Day

    L.S

    Man-Day Man-Day

    Man-Day Man-Day Man-Day Man-Day Man-Day Man-Day

    Man-Day Man-Day

    L.S

    Man-Day Man-Day Man-Day Man-Day Man-Day

    Man-Day

    Man-Day

    Man-Day Man-Day Man-Day

    L.S

    Man-Day

    Quantity

    21 6 -

    2.4 75.6

    0.6 12 3.6 7.2 7.8

    10.8 12.6 3.6 -

    3 94.6 0.7 15

    4.6 9

    9.7

    13.6 15.7 4.6 -

    4.8

  • 13

    Standard Data for Working Out Rates Per Unit Quantity of Items of Work-contd.

    Mechanic Worker

  • Standard Data for Working Out Rates Per Unit Quantity of Items of Work-contd.

  • 15

    Standard Data for Working Out Rates Per Unit Quantity of Items of Work-contd.

    Sr No. - 54.

    I Particulars of Materials and Labour Stressing for Post tension HT Wire to get complete strength . (1 Tendon)

    Erector

    Steel Fixer

    Operator Machine Driver

    Machine Helper Electric Helper

    Worker

    Sundries

    55. Plugging (1 : 1: 1)Cement Concrete into the Concrete cavity of the end-block. (Girder 1 No)

    Mason Worker Sundries

    56.

    1 58. 1 ~ i x i n ~ lowering bar, jacking beam, hanger jack

    Grouting high strength cement motor with Gro-

    uting machine to sheating pipe. (Girder 1 No) Mechanic

    Electric Helper

    Operator Machine Driver Worker Sundries

    57.

    Erector Worker

    Sundries

    Fixing cycle trolley, launching arm and accesso- ries on the bailey girder. (with crane and man) Including fixing break wedge and sway braces. (1 pair)

    Erector

    Worker

    Sundries

    Remarks Unit

    Man-Day

    Man-Day

    Man-Day Man-Day Man-Day Man-Day

    L.S

    Man-Day Man-Day

    L.S

    Man-Day Man-Day

    Man-Day Man-Day

    L.S

    Man-Day

    Man-Day

    L.S

    Quantii

    1

    0.3 0.7 0.3 0.3 11 -

    1 2 -

    3 1 1

    30 -

    8 40 -

    Man-Day 5 Man-Day 35

    L.S -

  • 16

    Standard Data for Working Out Rates Per Unit Quantity ofItems of Work-contd.

    Sr No. 59.

    60.

    61.

    62.

    63.

    64.

    Particulars of Materials and Labour

    Side shifting P.C Girder from casting position to Launghing position distance l m . (1 time)

    Erector Worker Sundries

    Making Jack up P.C Girder, timber crib. Tighting in hanging beam with steel cable, removing crib, fixing to get right alignment between two Launching Arm. (1 time)

    Erector Carpenter Worker Sundries

    Pulling Steel cable from electric winch and fixing them top of the launching Arm. (1 time)

    Erector Electric Helper

    Worker

    Launching P.C Girder by electric winch. Launching (1 time)

    Mechanic Electric Helper

    Erector Worker

    Making Jack Down Launched P.C Girder bracing strut not to fall down. (1 time)

    Erector Carpenter Worker Sundries

    After making jack down dismantling launching equipment from P.C Girder,Pushing Launching arm to the casting stagging. (1 time)

    Erector Machine operator driver

    Worker

    Unit

    Man-Day Man-Day

    L.S

    Man-Day Man-Day Man-Day

    L.S

    Man-Day Man-Day Man-Day

    Man-Day Man-Day Man-Day Man-Day

    Man-Day Man-Day Man-Day

    L.S

    Man-Day Man-Day Man-Day

    Quantity

    5 20 -

    4 2 15 -

    2 1 3

    4 1 2

    20

    4 4

    4 -

    2

    1 6

    Remarks

  • - Sr Jo. - 55.

    i6.

    i7.

    58.

    69

    17

    Slandard Data for Working Out Rates Per Unit Quantity of Items of Work-contd.

    Particulars of Materials and Labour

    Levelling and carving on the Cross Beam for fitting P.C Girder,carving 1200mm 0 x 254mm grouting hole, fitting bearing plate. (1 sheet)

    Mason Erector Worker Sundries

    Fixing pretension frame with anchor bolt on the concrete pretension bench according to the

    required design. (1 0 Nos) Erector Worker

    Putting H.T wire coil (3MT)to the Dispencer with crane using man,fixing bolt & nut. (1 coil-3 ton)

    Erector Worker Sundries

    Pulling H.T wire to Dispencer for required length,cutting then with griding machine. (60 Nos)

    Erector Mechanic

    Head Worker Worker

    Skill (Electric) Sundries

    Fixing repaired wires in pretension bench, anchorage frame systematically. (26m - 38 Nos)

    Erector

    Head Worker Worker Sundries

    (18m - 38 Nos) Erector

    Unit

    Aan-Daj Aan-Daj Am-Daj

    L.S

    Aan-Daj Aan-Daj

    Man-Da

    Man-Da Man-Da

    L.S

    Man-Da

    Remarks

  • Standard Data for Working Out Rates Per Unit Quantig of Items of Work-contd.

    Erector

    Remarks Quantity

    3 25 -

    2

    0.1 0.1 0.1 0.1 0.1 -

    0.1 0.1 0.3 -

    3 8 3 2 1

    1 -

    Unit

    Man-Day Man-Day

    L.S

    Man-Day

    Man-Day Man-Day Man-Day Man-Day Man-Day

    L. S

    Man-Day Man-Day Man-Day

    L.S

    Man-Day Man-Day Man-Day Man-Day Man-Day Man-Day

    L.S

    Sr No.

    70.

    71.

    72.

    73.

    74.

    Particulars of Materials and Labour

    Head Worker Worker Sandries

    Fixing end plate each end of the P.C Girder

    systematically whille arranging H.T wire. (Girder 1 No)

    Stressing for pretension H.t wire to get stressing force3.45 MPa. ( wire 1 No)

    Mechanic Erector

    Machine operator driver Worker

    Skill (electric) Sundries

    Stressing of 12mm 0 or 13 rnm 0 7 strand wire (For 1 No)

    Foreman Steel Fixer

    Worker Sundries

    After fixing and checking P.C wire and rein- forcement due to design, stressing H.T wire to get required design force and elongation. (Wire 38 Nos)

    Erector Worker

    Skill (electric) Hard Worker

    Operator (Jack operator) Operator (Hydraulic pump)

    Sundries

    Fixing accessories on the P.C Girder as per design. (a)Making and fixing hook (2 points)

  • 19

    Standard Data for Working Out Rates Per Unit Quantity of Items of Work-contd

    Remarks Quantity

    2 -

    7

    3 -

    0.4 -

    0.1 -

    0.8 -

    0.2 -

    3

    Unit

    Man-Day L. S

    Man-Day

    Man-Day L.S

    Man-Day L.S

    Man-Day L.S

    Man-Day L.S

    Man-Day L.S

    Man-Day

    Sr No,

    75.

    76.

    77.

    78.

    79.

    Particulars of Materials and Labour

    Erector

    Sundries

    @)Making and fixing shoe plate (1 0 Points) Welder

    (c)fixing througt bolt & nut (1 0 Nos) Erector Sundries

    Fixing of R.S.T Beam, H Beam, Angle, M.S Flat & Channel for casting bed only. (For 10 kg)

    Head Worker Sundries

    Dismantling of R.S.T Beam, H Beam, Angle, M.S Plate, M.S Flat & Channel for casting bed

    only. (For 10 kg) Head Worker

    Sundries

    Fixing of L.S.T Part, Bailey Part & C.H Parts system. ( (For 10 kg)

    Head Worker Sundries

    Dismantling of L.S.T Part , Bailey Part & C.H Parts system. ( (For 10 kg)

    Head Worker Sundries

    Steel Truss Labour for Launching of R.S.JS. over bridge

    sup ports (Using two pulleys and winch from the other side) (5No x 13000rnrn x 610mrn x 190mm) at (43.l)kg per RFT. (Total Weight = 9.3 MTons) Labour

    Bridge Foreman

  • 20

    Standard Data for Working Out Rates Per Unit Quantity of Items of Work-contd.

    Total Kit one One hammer

    Coir rope (25mm 0 61m) 25000 Kg Jacks (2)No

    Bridge Foreman Worker Sundries

  • 2 1

    Standard Data for Working Out Rates Per Unit Quantity of Items of Work-contd

    Quantity

    - - - - - - - - - - - -

    20 150

    1150

    - - - - -

    - - - - - - -

    Unit

    - - - - - - - - - - -

    L.S

    Man-Day

    Man-Day

    Man-Day

    - - - - - - - - - - -

    L.S

    Sr No.

    83.

    Remarks Particulars of Materials and Labour

    Tools Required Total Kit one One hammer

    Coir rope (25mrn 0 61m) 4000 Kg Hand Winch (2)No

    Bailey Roller (6)No Jumper (1 0)No

    Wire Rope (16mm 0 228m) One local JIB

    Double pulley (2)No

    Single pulley (1)No 50000 kg Jacks (2)No

    Sundries

    (b) Labour for assembling and launching C.H. bridge (6.5m Road way)bolts and nuts for all steel works complete (48m) span double depth. (Total Weight = 150 MTons) (By Crane)

    Labour Bridge Foreman

    Skilled Worker

    Unskilled Worker

    Tools Required Total Kit one One hammer

    Coir rope (25mm 0 61m) 4000 Kg Hand Winch (2)No

    Bailey Roller (6)No Jumper (1 0)No

    Wire Rope (1 6mm 0 228m) One local JIB

    Double pulley (2)No

    Single pulley (1)No 50000 kg Jacks (2)No

    Sundries

    Labour for assembling and German bridge

    (3.35m Road way) on scaffolding and lowering down on supports or launching (1 8m)span. (Total Weight = 17.87 MTons)

  • 22

    Standard Data for Working Out Rates Per Unit Quantity of Items of Work-contd.

    Bridge Foreman Worker

    Bridge Foreman Skilled workers

    Unskilled workers

    Sr No.

    84.

    85.

    Particulars of Materials and Labour

    Labour

    Tools Required Bailey Jacks = 2 No Bailey rollers = 7 No

    One spanner One hammer

    Sundries

    Labour for assembling of R.P.T bridge on scaffolding including rivetting and lowering down on supports complete (30m).Span and (5m) road way. (Total Weight = 64.2 MTons) Labour

    Tools Required 4000 Kg hand winch

    Wire rope (12rnm 0 457m) Wire rope (1 6mm 0 457m) Coir rope (25mm 0 152m)

    Service bolts Double pulley (2)No Single pulley (1)No

    One Bellow Dollys (2)No

    Rivetting guns (2)No One compressor with (2)No. Hose pipe (1 52m)

    Local JIB one No. One hammer

    75000 Kg Jacks (2)No Sundries

    Labour for assembling and launching of R.P.T bridge after rivetting complete for all steel works (3Om)span (5m) road way. (Total Weight = 64.2 MTons)

    Unit

    Man-Day Man-Day

    - - - -

    L.S

    Man-Day Man-Day Man-Day

    - - - - - - - - - - - - - -

    L.S

    Quantity

    8 80

    - - - - -

    30 100 420

    - - - - - - - - - - - - - - -

    Remarks

  • 23

    Standard Datafor Working Out Rates Per Unit Quantity of Items of Work-contd.

    Sr No.

    86.

    87.

    Particulars of Materials and Labour

    Labour

    Bridge Foreman Skilled workers

    Unskilled workers Tools Required

    4000 Kg hand winch Wire rope (1 2rnm 0 457m) Wire rope (16rnm 0 457m) Coir rope (25mm 0 152m)

    Service bolts Double pulley (2)No Single pulley (1)No

    One Bellow Dollys (2)No

    Rivetting guns (2)No One compressor with (2)No. Hose pipe (500')

    Local JIB one No. Bailey rollers (6)No

    Jumpers (1 0)No 75000 Kg Jacks (2)No

    Sundries

    Shifting Steel Truss and Bailey by Crane from one place to another (Including hooking, removing, handling with man) (10 MTons)

    Foreman Head Worker

    Worker Sundries

    Sorting & arranging the steel truss systemati- cally, Laying out them for preassambling works systematically. (1 0 MTons)

    Foreman

    Head Worker Worker Sundries

    Unit

    Man-Day Man-Day Man-Day

    - - - - - - - - -

    - - - - - -

    L.S

    Man-Day Man-Day Man-Day

    L.S

    Man-Day

    Man-Day

    Man-Day L.S

    Quantity

    35 120 400

    - -

    - - - - - - -

    - - - - - - -

    1 1 5 -

    1

    1 4 -

    Remarks

  • Standard Data for Working Out Rates Per Unit Quantity ofltems of Work-contd.

    Steel Fixer

    Head Worker Worker

    Operator /Machine Driver Electric Helper

    Sundries

    Remarks Quantity

    2

    1 2

    0.5 0.5 -

    4

    2 4

    1 1 -

    1 4

    1 0.5 4

    0.5

    0.8

    0.5 3

    0.5

    Unit

    Man-Day Man-Day

    Man-Day Man-Day

    Man-Day L. S

    Man-Day Man-Day Man-Day Man-Day Man-Day

    L.S

    Man-Day Man-Day

    Man-Day Man-Day Man-Day Man-Day

    Man-Day Man-Day

    Man-Day Man-Day

    Sr No. 88.

    89.

    90.

    Particulars of Materials and Labour

    Checking the steel truss according to the design

    for preassembling works on the ground. (1 000 kg)

    (a) Erecting the preassembled steel truss from

    pier to pier with erection crane according to the design. (1000 kg)

    Steel Fixer Head Worker

    Worker Operator /Machine Driver

    Electric Helper Sundries

    (b) Allowing 50% of the above expenditure for dismentling.

    (a) Installing Bolts & Nuts, Drift Pins & Tigh- tenning according to the design while erecting steel truss. (1000 Nos)

    Steel Fixer Worker

    - Tightening them with & Electric Guns again before transfering the target place. (1000 Nos)

    Steel Fixer Head Worker

    Worker Electric Helper

    (b) Removing Bolt & Nuts (1 000 Nos)

    Steel Fixer Head Worker

    Worker Electric Helper

  • 25

    Standard Data for Working Out Rates Per Unit Quantity of Items of Work-contd.

    Sr No. 91.

    92.

    93.

    94.

    Particulars of Materials and Labour

    Final Tightenning the ready installed Bolts & Nuts according to theTightenning sequence ( including with checking them whether standard or not ) (1 000 Nos)

    Steel Fixer Head Worker

    Worker Electric Helper

    Sundries

    Checking high tension Bolts & Nuts with check Wrench whether standard or not. (1 000 Nos)

    Steel fixer Worker Sundries

    (a)Fixing the safety Net to the upper & lower steel truss systematically. (1 00 m)

    Carpenter Head Worker

    Worker Sundries

    (b) Removing Safety nets from Steel truss Systemtically. (1 00 m)

    Carpenter Head Worker

    Worker Sundries

    Fixing Sleeper on the top & bottom Chord of the Steel truss. (200 mm x 200 rnm) (a) Carving sleepers fixing on Top Chord. (1 00 Nos)

    Carpenter Sundries

    (b) Drilling holes on the sleepers for hooking. (1 00 Nos)

    Carpenter Sundries

    Unit

    Man-Day Man-Day Man-Day Man-Day

    L. S

    Man-Day Man-Day

    L.S

    Man-Day Man-Day Man-Day

    L.S

    Man-Day Man-Day Man-Day

    L.S

    Man-Day L.S

    Man-Day L.S

    Quantity

    2 1 6

    1.5 -

    1.5 5 -

    4 6 50 -

    2 3

    25 -

    4.5 -

    2.4 -

    Remarks

  • Standard Dafa for Working Out Rates Per Unit Quantity of Items of Work-contd.

    r Particulars of Materials and Labour Unit Quantity Remarks

    0.

    (c) Shifting the sleepers within 30m with man

    and arranging them Systemtically (not more

    than one time. ) (100 Nos)

    Carpenter Man-Day 4

    Sundries L.S -

    (d) Fixing the railway on the sleeper firmly on

    the Top Chord of Installed steel truss.

    - fixing with the required G.Bolt, U.Bolt along

    the rail length for UIS & DIS. (10 m)

    Steel Fixer Man-Day 2

    Carpenter Man-Day 2

    Head Worker Man-Day 1

    Worker Man-Day 9

    Operator /Machine Driver Man-Day 1

    Electric Helper Man-Day 0.5

    Sundries L.S -

    (e) Fixing the railway on the the sleeper firmly

    on the strainger of installed steel truss. - fixing with the J.Bolt or Dog Spike for Up Stream and Down Stream. (10 m)

    Steel Fixer Man-Day 1

    Carpenter Man-Day 1

    Head Worker Man-Day 1

    Worker Man-Day 4.5

    Sundries L.S -

    (f) Dismantling the railway (50 % of fixing)

    95. Installing Erection Tower, Mast Crane & Multi-

    purpose Crane on the Top Chord of the Steel

    Truss. (1000 kg)

    (a) With universal member

    Steel Fixer Man-Day 5

    Head Worker Man-Day 2

    Worker Man-Day 13

    Sundries L.S -

  • 27

    Standard Data for Working Out Rates Per Unit Quantity of Items of Work-contd.

  • Standard Data for Working Out Rates Per Unit Quantiv of Items of Work-contd.

    Quantity

    0.5 1 1 1 -

    20 20 10 100 20 20 -

    4 8 2 7 7

    7 -

    5 9 2

    Unit

    Man-Day Man-Day Man-Day Man-Day

    L.S

    Man-Day Man-Day Man-Day Man-Day Man-Day Man-Day

    L.S

    Man-Day Man-Day Man-Day Man-Day Man-Day Man-Day

    L.S

    Man-Day Man-Day Man-Day

    Sr No.

    99.

    100.

    Remarks Particulars of Materials and Labour

    Steel Fixer Worker

    Operator /Machine Driver Electric Helper

    Sundries

    Shifting Erection Tower on the Top Chord fiom one span to another with winch, Pretension the Steel Cables Final tension with 500 MT Jack and Checking Erection Tower. (1 Time)

    Foreman

    Steel Fixer Head Worker

    Worker Operator /Machine Driver

    Electric Helper Sundries

    While erecting steel truss fiom one Pier to another for the required level, fixing with 100 M Ton jack, 3001350 MTon jack,500 MTon jack, on the bearing of the piers. - After that, making jack up & Jackdown - Shifting horizontally & longitudinally - Other components Work (a) 100 MTon Jack (1 0 Nos per 1 Time)

    Foreman Steel Fixer

    Head Worker Worker

    Operator /Machine Driver Electric Helper

    Sundries

    (b) 3001350 MTon Jack

    (1 0 Nos per 1 Time) Foreman

    Steel Fixer Head Worker

  • 29

    Standard Data for Working Out Rates Per Unit Quantity of Items of Work-contd.

    Sr No.

    101.

    102.

    (a)

    (b)

    (c)

    103.

    Particulars of Materials and Labour

    Worker Operator /Machine Driver

    Electric Helper Sundries

    (c) 500 MTon Jack (1 0 Nos per 1 Time)

    Foreman Steel Fixer

    Head Worker Worker

    Operator /Machine Driver Electric Helper

    Sundries

    Fixing of Bearing. (1 000 kg) Steel Fixer

    Head Worker Worker Sundries

    Cutting steel plate to get required size (With gas) 12mm thk: (for 2500 mm)

    Welder Oxygen gas Propane gas

    16 mm to 20 rnm thk: (for 2500 rnrn) Welder

    Oxygen gas Propane gas

    25 mm to 30 rnrn thk: (for 2500mm) Welder

    Oxygen gas Propane gas

    Welding work. (one ply:) (for 2500mm)

    welding rod (5kglpkt) Welder

    Unit

    Man-Day Man-Day Man-Day

    L.S

    Man-Day Man-Day Man-Day Man-Day Man-Day Man-Day

    L.S

    Man-Day Man-Day Man-Day

    L.S

    Man-Day

    kg kg

    Man-Day

    kg kg

    Man-Day

    kg kg

    Pkt Man-Day

    Quantity

    8 8 8 -

    6 11 3

    8.5 10 10 -

    2 2 9 -

    1 4.5 1.5

    1.5 5

    1.5

    2 6

    1.5

    0.2 1

    Remarks

  • Standard Data for Working Out Rates Per Unit Quanlily of Items of Work-contd.

    Remarks

    Including Loading,

    Unloadtig and shifting

    Quantio

    2.5 3.3 -

    2 1.5 -

    2 2 -

    0.8 -

    1 -

    1 1 1

    0.1 -

    - Moving main cable coin to cutting place by cran

    - Cleaning main cable - Levelling ground and

    setting turn table for

    cutting main cable with

    wheel cutter & chain

    block to get specified

    length.

    - Transferring cutted mai cable

    Unit

    Man-Day Man-Day

    L.S

    Man-Day Man-Day

    L. S

    Man-Day Man-Day

    L.S

    Man-Day L. S

    Man-Day L.S

    Man-Day Man-Day Man-Day Man-Day

    L.S

    ;r Jo.

    04.

    05.

    06.

    07.

    ,08.

    109.

    Particulars of Materials and Labour

    Steel Plate Girder Preassembling of steel plate girder according to design on the ground. (1000 kg)

    Skilled Worker Worker Sundries

    Fixing , Initial & final tightenning of bolt & nuts and drip pins according to the design while assembling steel plate girder .(I000 Nos)

    Skilled Worker Worker Sundries

    Installation of preassembled steel plate girder by crane as per drawing from pier to pier. (1 000 kg)

    Skilled Worker Worker Sundries

    Checking to final tightenned bolt nuts with checking spanner whether standard or not. (1 000 Nos)

    Skilled Worker Sundries

    Placing bearing plate and fixing bolt & nut.

    Skilled Worker Sundries

    Suspension and Cablestayed Bridge Cutting and cleaning main cable (For 10 m)

    Skilled Man Head Worker

    Worker Machine Driver / Operator

    Sundries

  • 3 I

    Standard Data for Working Out Rates Per Unit Quantity ofllems of Work-confd.

    Sr No.

    11 0.

    1 1 1.

    112.

    1 13.

    114.

    Particulars of Materials and Labour

    Taking out and cleaning running cable from

    Cable Drum and placing them on timber crib

    (For 10 m)

    Skilled Man

    Head Worker

    Worker

    Sundries

    Fixing running cable on Winch Drum at

    Up stream and Down stream (For one winch)

    Skilled Man

    Head Worker

    Sundries

    Taking out and cleaning Pilot Cable from Cable

    Drum and placing them on

    timber Crib (For 10 m)

    Skilled Man

    Head Worker

    Worker

    Sundries

    Fixing step by step steel wire rope Pilot Cable

    on each side of Anchor on high Level.

    (For lm)

    Skilled Man

    Head Worker

    Worker

    Sundries

    Fixing Travelling Cage by safety belt on high

    level of Tower with Pulley Travelly.

    (For 1 Cage)

    Skilled Man

    Helper for Skilled Man

    Head Worker

    Electrician

    Sundries

    Unit

    Man-Day

    Man-Day

    Man-Day

    L.S

    Man-Day

    Man-Day

    L.S

    Man-Day

    Man-Day

    Man-Day

    L.S

    Man-Day

    Man-Day

    Man-Day

    L. S

    Man-Day

    Man-Day

    Man-Day

    Man-Day

    L.S

    Quantity

    0.1

    0.1

    0.1 -

    3

    4.5 -

    0.3

    0.2

    0.4 -

    0.3

    0.2

    0.1 -

    13.5

    7.5

    1.5

    0.8 -

    Remarks

    - Including installation of

    lock, Bull Dog Grip

  • Standard Data for Working Out Rates Per Unit Quantity of Items of Work-confd.

    Alignment (For one winch) Skilled Man

    Helper for Skilled Man

    Sundries

    3r Particulars of Materials and Labour

    qo.

    15. Fixing 5 Mton winch According Tower Anchor

    Fixing Supporting Frame Anchor Plate system-

    tically according cable alignment behind

    Anchorage. (For 1 Anchor Supporting Frame) Skilled Man

    Welder

    Worker

    Sundries

    After installation main cable, dismantling

    and cutting supporting Anchor Frame, extra

    Anchor Plate ( For 1 Anchor Supporting

    Unit

    Frame.)

    Quantit

    Skilled Man

    Welder

    Worker

    Sundries

    Man-Day

    Man-Day

    L.S

    3

    4.5 -

    Man-Day

    Man-Day

    Man-Day

    L.S

    3

    1.5

    6 -

    Man-Day

    Man-Day

    Man-Day

    Welder

    Operator of welding M/C Worker

    Sundries

    1

    0.5

    1.8

    11 8. Fixing roller by welding on high level of Tower with safety belt. (For 1 No)

    Skilled Man

    1 19. Making for Cable clamp systemmatically and

    making hole for Bolt & Nut For Tower Tilting

    work. (For Cable clamp 1 set) Welder

    Helper For Welder Sundries

    Man-Day

    Man-Day

    Man-Day

    L.S

    0.5

    Man-Day

    Man-Day

    Man-Day

    L.S

    120. Fixing firmly Over lapping at least 5MTon Chain

    0.3

    1.3 1.8 -

    I block, Steel Wire rope with Bull Dog Grip at

    Remarks - - ~

    Including timber support

    and wedging according

    inline of Anchor slab

    Including temporary

    welding work

  • 33

    Standard Data for Working Out Rates Per Unit Quantity of Items of Work-contd.

    Particulars of Materials and Labour

    nall Anchor For Tower Tilting.(For small achor (Dead men) 1 No)

    Skilled Man Sundries

    king Over Lapping and chainging way of chain )r 10 MTon Chain Block at 10 MTon pulley tee1 Wire with Bull Dog Grip at Anchor Canopy or Tower Tilting. :or Anchor 1 Point)

    Skilled Man Worker Sundries

    urning back Tower According specific besign For TowerTiting. For One Tower (2)Nos)

    Skilled Man Worker Sundries

    'ransfering cable from stockyard to Anchorage by men and placing one on another (8)shape In timber crib. (For 10 m)

    Skilled Man Head Worker

    Sundries

    nstallation of Main Cable for Bridge (For1 Om) Skilled Man

    Head Worker Electrician

    Mechanic Welder

    Sundries

    Unit

    tan-Day Ian-Day

    L.S

    tan-Day Ian-Day

    L.S

    Remarks

    Inserting Main Cable to

    Anchor Plate

    a Putting on place upon

    temporary rope

    . holding upon Main Cab1 at saddle at each Tower

    with B.D Grip by safety

    belt and layer with Filler

    stand

    . Transfering cable from

    one Tower to another

  • Standard Data for Working Out Rates Per Unit Quantity of Items of Work-contd.

    Head Worker Electrician Sundries

    Head Worker

    Worker Sundries

    Remarks

    - Taking out cable from Anchor Plate of Ancho-

    rage

    - Checking Cable of Back stay between Tower and

    Anchorage

    - Numbering cable by layer and layer

    - Installation of Main Cable on high level over

    water by life jacket and

    safety belt

    - Joining heavy Cable lamp to

    Travelly by pulley and

    chain block

    - Specified cable marking on main cable

    - Doing difficulty on high level of Main Cable

    - Fixing Suspender Rod on main cable with Hing

    shaft and safety pin

    - Transfering suspender rod to working area

    by Manpower

    Quantity

    14

    3 4 -

    0.3 0.1 -

    0.4 -

    7

    2

    0.5 -

    Unit

    Man-Day

    Man-Day Man-Day

    L.S

    Man-Day Man-Day

    L.S

    Man-Day L.S

    Man-Day

    Man-Day

    Man-Day L.S

    Sr No.

    125.

    (a)

    (b)

    (c)

    126.

    (a)

    Particulars of Materials and Labour

    Installation of Cable Top Clamp. (For Cable Clamp 1 set)

    Skilled Man

    Tightening Bolt & Nut for one time (For 10 Nos of Bolt)

    Skilled Man Electrician Sundries

    Painting Enamel paint for cable Top Clamp on high level (For 1 no of Top Clamp)

    Skilled Man Sundries

    Installation Suspender Rod (For Suspender Rod 1 No)

    Skilled Man

  • 35

    Standard Data for Working Out Rates Per Unit Quantity of Items of Work-contd.

    Skilled Man

    Mechanic for Grout pump Electrician

    Head Worker Sundries

    Remarks Quantity

    0.1 0.1 -

    0.1 0.1 -

    0.2 0.1 -

    1 0.1 -

    3.5

    0.5 0.5 5 -

    0.5 -

    Unit

    Man-Day Man-Day

    L. S

    Man-Day Man-Day

    L.S

    Man-Day Man-Day

    L.S

    Man-Day Man-Day

    L.S

    Man-Day Man-Day Man-Day Man-Day

    L.S

    Man-Day L.S

    Sr No.

    (b)

    (c)

    127.

    128.

    129.

    130.

    Particulars of Materials and Labour

    Threading Suspender U bolt ,painting grease, Checking Bolt & Nut washer and Specifing U Bolt marking

    Skilled Man Head Worker

    Sundries

    Painting Enamel paint for Suspender rod by safety belt on high level

    Skilled Man

    Head Worker Sundries

    Adjusting Back stayed (for 1 Om) Skilled Man

    Head Worker Sundries

    Stressing Main Cable and Specifing Elongation within Anchor according specified tension. (For 1 Om)

    Skilled Man Head Worker

    Sundries

    Grouting Cement motor for Cable Guide Tube

    within Anchor after stressing Main cable. (For 1 Om)

    Releasing binding cable Working length position

    of Main Cable For Enclosing Blockafter stressing. ( For 1 No of cable )

    Skilled Man Sundries

  • 36

    Standard Data for Working Out Rates Per Unit Quantity of Items of Work-contd.

    Skilled Man Sundries

    Sr No. 13 1.

    132.

    133.

    134.

    135.

    1 36.

    137.

    Particulars of Materials and Labour

    Adjusting and cutting layer of cable to install Anchor Plate For Stressing. (For 1 No of cable)

    Shifting bailey (or) Steel truss on ground for PreAssembling work. (For 1000 Kg)

    Skilled Man Head Worker

    Sundries

    Preassembling work for bailey (or) steel truss. (For 1000 Kg)

    Skilled Man Head Worker

    Sundries

    Shifting heavy bailey (or) Steel Truss from Preassembled Yard to join cable car by Crane (For 1000 Kg)

    Skilled Man Head Worker

    Sundries

    Fixing preassembled bailey (or)Steel Truss on Suspender Rod of Main Cable. (For 1000 Kg)

    Skilled Man Head Worker

    Sundries

    Fixing Safety Net (For 1 m) Skilled Man

    Sundries

    Removing safety Net (For 1 m) Skilled Man

    Sundries

    Unit

    Man-Day L.S

    Man-Day Man-Day

    L.S

    Man-Day Man-Day

    L. S

    Man-Day Man-Day

    L.S

    Man-Day Man-Day

    L.S

    Man-Day L.S

    Man-Day L.S

    Quantity

    0.1 -

    1.5 1.5 -

    5 0.5 -

    0.8 1 -

    7.5 10 -

    0.5 -

    0.2 -

    Remarks

  • 37

    Standard Data for Working Out Rates Per Unit Quantity of Items of Work-contd.

    Sr No. 138.

    139.

    140.

    14 1.

    142.

    143.

    144.

    Particulars of Materials and Labour

    Laying systematically small Transon walk way and Checking, Laying Decking Beam (For 1 000 Kg)

    Skilled Man Sundries

    Canying Decking Beam and small Transon difficulty by man power on temporary walkway at high level of main bridge. (For 1000 Kg)

    Skilled Man

    Sundries

    Putting heavy Decking slab on main bridge by crane (For 1000 Kg)

    Skilled Man Head Worker

    Sundries

    Adjusting bailey (or)Steel truss of main bridge to get specified camber by wing temporary cable and Cushion Block. (For Suspender Hanger 1 Point)

    Skilled Man Sundries

    Jacking Down bailey (or)Steel truss with right alignment to get final R.L by using 30 MTon Jack Cushion Block and M.S Plate.(For one Pier)

    Skilled Man Sundries

    Fixing Bearing Bolt to Bearing Mat and Bailey (or)Steel truss Pin to Bearing Mat & Bailey (or)Steel truss. (For one Pier)

    Skilled Man

    Sundries

    Pouring High Strength Concrete to get required Bearing Level (For 1 Bearing)

    Skilled Man

    Unit

    Man-Day L.S

    Man-Day

    L.S

    Man-Day Man-Day

    L.S

    Man-Day L. S

    Man-Day L.S

    Man-Day

    L. S

    Man-Day

    Quantity

    9.5 -

    2 -

    0.8 1.3 -

    3.5 -

    13.5 -

    12 -

    5

    Remarks

    - Include adjusting bottom surface of Bearing Mat

    to get specified R.L.

    - Including cushion.

  • Standard Data for Working Out Rates Per Unit Quantity of Items of Work-contd.

  • 39

    Standard Datafor Working Out Rates Per Unit Quantity of Items of Work-contd.

    Quantity

    0.5 0.5

    0.5 0.5

    0.5 0.5

    0.3 1

    1

    1

    1

    1

    0.5 0.5

    Unit

    Man-Day Man-Day

    Man-Day Man-Day

    Man-Day Man-Day

    Man-Day Man-Day

    Man-Day

    Man-Day

    Sr No. 152.

    153.

    154.

    155.

    156.

    157.

    158.

    Remarks Particulars of Materials and Labour

    Reading and specifying the centre of the Bored pile when driving stand pipe from control point by using theodolite.(l Time)

    Surveyor Helper

    Surveying and specifying concrete top level to pour bored concrete.(l Time)

    Surveyor Helper

    Checking Bored Pile position after pouring concrete. (1 Time)

    Surveyor Helper

    Surveying and Checking Bored Pile after pouring concrete to know stable or unstable. (1 Time)

    Surveyor Helper

    Surveying and specifying Cap position of Abutment or Pier.(l Time)

    Surveyor

    Surveying and Checking settlement of pier cap in water. (1 Time)

    Surveyor

    Surveying and specifying Shaft position of Abutment

    159.

    160.

    or Pier.(l Time) Surveyor

    Surveying and specifling Bearing position of Abutment or Pier. (1 Time)

    Surveyor

    Specifling and Checking Level to fix M.S Rod in Pile Cap, Shaft , Cross-beam. (1 Time)

    Surveyor Helper

    Man-Day

    Man-Day

    Man-Day Man-Day

  • Standard Data for Working Out Rates Per Unit Quantity ofltems of Work-contd.

    Particulars of Materials and Labour

    Levelling Cap (or) Shaft (or) Cross Beam in their form works before pouring concrete. (1 Time)

    Surveyor Helper

    Helper

    162. Rechecking position of Pile (or)Cap (or) Shaft (or) Cross Beam after concreting. (1 Time)

    Surveyor

    before pouring concrete for one pier. (1 Time) Surveyor Helper

    163.

    Surveying , Checking and specifying centre of Abutment (or) pier systematically. (1 Time)

    Surveyor Helper

    Surveying bearing hole depth to get right depth

    Surveying and Checking bottom ground of Pier in water. (1 Time)

    Surveyor Helper

    Transfering and rechecking level Mark for specifiec place from one bench Mark to another.(100 m)

    Surveyor

    I Helper

    Unit Quantity 4 Man-Day Man-Day

    I

    0.3

    1

    Man-Day

    Surveying Echo Sounding Pier in water and water level daily. (1 Time)

    Surveyor

    0.5

    Man-Day 0.5

    Man-Day Man-Day

    Man-Day Man-Day

    Man-Day Man-Day

    Man-Day Man-Day

    0.5 0.5

    0.3 0.5

    0.3 0.3

    Man-Day

    Remarks

    0.5

    Fixing bearing for one pier of main bridge (or) 1 Approach bridge (Position or Grouting to fix bearing hole position Bearing.) (1 Time) Surveying Position

    Surveyor Helper

    Man-Daj Man-Daj

  • 41

    Standard Data for Working Out Rates Per Unit Quantity of Items of Work-contd.

    Quantity

    3

    3

    0.5

    0.5

    0.5

    0.5

    0.3

    1

    0.3

    1

    0.3

    1

    0.5

    0.5

    0.5

    0.5

    Unit

    Man-Day

    Man-Day

    Sr No.

    (b)

    169.

    Remarks Particulars of Materials and Labour

    Rechecking position.

    Surveyor

    Helper

    Fixing bearing for one pier of main bridge (or)

    (a)

    (b)

    170.

    171.

    (a)

    (b)

    172.

    173.

    Approach bridge(Position or Grouting to fix bearing

    hole position Bearing.) (1 Time)

    Levelling Surveyor

    Helper

    Rechecking level

    Surveyor

    Helper

    Surveying and Rechecking 18m(or)2 1 m(or)24m(or)

    27m(or)30m Girder for pouring concrete. (1 No) Surveyor

    Helper

    Surveying for erection of main truss to get specified

    level. (1 Time) Surveyor

    Helper

    Surveying , Leveling and checking for erection of main truss to get specified level. (1 Time)

    Surveyor

    Helper

    Surveying and Checking Level for Laying Precast

    slab and finished level. (1 Time) Surveyor

    Helper

    Surveying and specifjing Center line for installation

    of Road Curb and Hand Rail. (1 Time) Surveyor

    Helper

    Man-Day

    Man-Day

    Man-Day

    Man-Day

    Man-Day

    Man-Day

    Man-Day

    Man-Day

    Man-Day

    Man-Day

    Man-Day

    Man-Day

    Man-Day

    Man-Day

  • Standard Data for Working Out Rates Per Unit Quantity ofItems of Work-contd.

    Road Curb and Hand Rail. (1 Time)

    Surveyor

    Sr No. 174.

    Helper

    Particulars of Materials and Labour

    Surveying and specifLing level for installation of

    Man-Day Man-Day

    Remarks Unit

    0.5

    0.5

    175.

    176.

    177.

    178.

    (a)

    @)

    179.

    (a)

    Quantitj

    0.5

    0.5

    0.3

    1

    0.3

    1

    0.5

    0.5

    0.5

    0.5

    0.5

    0.5

    Surveying and specifling level for laying AC.(l Time) Surveyor Helper

    Surveying Overlay, Road Curb, Hand Rail and AC to get right alignment. (1 Time)

    Surveyor Helper

    Surveying Precast Slab, Overlay, Road Curb, Hand Rail level. (1 Time)

    Surveyor Helper

    Surveying position of anywork before starting work (Excavation or Fixing Reinforcement and forrnwork

    Man-Day Man-Day

    Man-Day Man-Day

    Man-Day Man-Day

    or Pouring concrete or embedded plate or Hand Rail or Road Curb or P.C Girder or Collosion Barrier or Decking slab or Girder Overlay or AC or Anchor

    Box or Bored Pile or Stand Pipe or Keyline or Cap Skirting or Road or Drain or Box Culvert or Steel Truss or Pier Cap or shaft Cross-beam or Abutment or Retaining Wall or Rail Road or Vertical devia - tion.) (1 Time)

    Surveyor Helper

    Man-Day Man-Day

    Rechecking position of anywork after working.(l Time) Surveyor Helper

    Man-Day Man-Day

    Surveying alignment (Center Line)of anywork before working. (1 Time)

    Surveyor Helper

    Man-Day

    Man-Day

  • 43

    Srandard Data for Working Out Rates Per Unit Quantity ofltems of Work-contd

    Quantity

    0.5 0.5

    0.5 0.5

    0.5 0.5

    0.5 0.5

    0.5 0.3

    0.5 0.3

    0.5 0.5

    0.5 1.5

    2 4

    Unit Sr No.

    Remarks Particulars of Materials and Labour

    (b)

    180.

    (a)

    (b)

    18 1.

    182

    (a)

    (b)

    (c)

    183.

    184.

    Rechecking alignment (Center Line)of anywork after working. (1 Time)

    Surveyor Helper

    Surveying and levelling anywork before working. (1 Time)

    Surveyor Helper

    Man-Day Man-Day

    Man-Day Man-Day

    Rechecking level of anywork before working.(l Time) Surveyor Helper

    Surveying and checking settlement (Main Bridge or Approach Bridge or Highway or Railway.)(l Time)

    Surveyor Helper

    Man-Day Man-Day

    Man-Day Man-Day

    Checking for theodolite level and E.D.M instrument which are used for surveying in bridge construction. Theodolite Calibration. (1 Time)

    Surveyor Helper

    Level Calibration. (1 Time) Surveyor Helper

    E.D.M Calibration. (1 Time) Surveyor Helper

    Determination of Pier Position by E.D.M including

    finding distance between piers etc; other relevant or equivalent works.(l Time)

    Surveyor Helper

    Level Net Survey Calculation & Drawing.(l Time) Surveyor Helper

    Man-Day Man-Day

    Man-Day Man-Day

    Man-Day Man-Day

    Man-Day Man-Day

    Man-Day Man-Day

  • 44

    Standard Datafor Working Out Rates Per Unit Quantity of Items of Work-contd.

    Sr No. 185.

    (a)

    (b)

    (c)

    Particulars of Materials and Labour

    Triangulation Net Survey Basic Line Measurement (1 Time)

    Surveyor Helper

    Calculation & Drawing.(l Time) Surveyor Helper

    Check Base & Distance Measurement(1 Time) Surveyor Helper

    Unit

    Man-Day Man-Day

    Man-Day Man-Day

    Man-Day Man-Day

    Quantity

    3 4.5

    2 4

    0.5 0.5

    Remarks

  • 45

    Standard Data for Working Oui Rates Per Unit Quantity of Items of Work-contd.

    Sr No.

    1

    2

    Particulars of Materials and Labour

    MISCELLANEOUS NOTES

    For contractor's profit and overheads (Taxes , safety charges , management & etc.)

    For Bridge Machinery Work (Use according to rate of analysis of Machanical Department.)

    Unit

    L.S

    L. S

    Quantity

    -

    -

    Remarks


Recommended