Analyze Optimize Enterprise Power Costs, Inc. 2010 All rights reserved. Confidential and Proprietary to Power Costs, Inc. May not be distributed or reproduced without permission PCI Outage- Management & GADS Modules August 11, 2011
Transcript
Page 1: Analyze Optimize Enterprise  Power Costs, Inc. 2010 All rights reserved. Confidential and Proprietary to Power Costs, Inc. May not be distributed or reproduced.

Analyze

Optimize

Enterprise

Power Costs, Inc. 2010 All rights reserved. Confidential and Proprietary to Power Costs, Inc. May not be distributed or reproduced without permission

PCI Outage-Management & GADS Modules

August 11, 2011

Page 2: Analyze Optimize Enterprise  Power Costs, Inc. 2010 All rights reserved. Confidential and Proprietary to Power Costs, Inc. May not be distributed or reproduced.

Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.com Page 2

PCI GSMS Bid-to-Bill Solution for SPP Market

PCI GenManager Bid Formulator Bid Evaluator LMP Manager ISO Communication Wind Module Pre-Settlement Shadow Settlement Settlement Allocation P&L Analyzer

PCI GenPortal & GenBase Datamart Deal Capture Gas Management Outage Management &

GADS

PCI GenTrader Unit Commitment

Page 3: Analyze Optimize Enterprise  Power Costs, Inc. 2010 All rights reserved. Confidential and Proprietary to Power Costs, Inc. May not be distributed or reproduced.

Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.com

Who currently Uses PCI Software Solutions?

PCI GSMS Suite is currently used to Manage around 50% of the US Generation Capacity.

ERCOT (80%), MISO (70%), CAISO (90 %), PJM (30%), SPP (85%)

Page 4: Analyze Optimize Enterprise  Power Costs, Inc. 2010 All rights reserved. Confidential and Proprietary to Power Costs, Inc. May not be distributed or reproduced.

Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.com

Who currently Uses PCI Software Solutions?

PCI GSMS Suite is currently used to Manage around 50% of the US Generation Capacity.

ERCOT (80%), MISO (70%), CAISO (90 %), PJM (30%), SPP (85%)

CustomerPCIGT

PCIGP

PCIGM

American Electric Power X X

City Public Service – San Antonio

X X ERCOT

NV Energy X CAISO

Consumers Energy X X MISO

CDWR X CAISO

Alliant Energy X MISO

Ameren Energy (UE & AEM) X X MISO

Dominion X X PJM

Kansas City Power & Light X X SPP

Empire District X SPP

Florida Power & Light X X

Madison Gas & Electric X MISO

Calpine Energy X X ERCOT

Topaz Power X X ERCOT

Lower Colorado River Authority X X ERCOT

City of Ames MISO

Southern California Edison X X CAISO

Oklahoma Gas & Electric X X SPP

CustomerPCIGT

PCIGP

PCIGM

Duke Energy X X

Direct Energy X

Xcel Energy X X MISOSPP

Optim Energy X X ERCOT

Sempra Energy X X CAISO

Pacific Gas & Electric X CAISO

NRG (Texas) X X

Bryan Texas Utilities X

GDF Suez North America X X ERCOT

MidAmerican Energy X X MISO

Progress Energy X X PA

Westar Energy X X SPP

Orlando Utilities Commission X

NIPSCO X X MISO

FirstEnergy X X PJM

San Diego Gas & Electric X X CAISO

GenOn X X

Page 5: Analyze Optimize Enterprise  Power Costs, Inc. 2010 All rights reserved. Confidential and Proprietary to Power Costs, Inc. May not be distributed or reproduced.

Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.comPage 5

1/1/2007

Objectives for PCI Outage-Management Module

Automate workflow to:– Capture all Plant Outage

information required by ISO– Submit outage & deratings to

the new SPP Outage Scheduler system

– Manage all Communications and approval process with ISO schedulers

– Manage Communications and approval process with Plant Managers

Submit outage data to NERC GADS and produce plant performance reports

Use outage & derating data to formulate DA & RT offers and forecast DA awards for generators

Page 6: Analyze Optimize Enterprise  Power Costs, Inc. 2010 All rights reserved. Confidential and Proprietary to Power Costs, Inc. May not be distributed or reproduced.

Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.comPage 6

1/1/2007

SPP Outage Management

SPP is replacing their “OPS1” Outage Scheduler Solution SPP Go-Live is 9/13 using SPP Web page. API becomes available on 9/20.

Option to keep existing business process or migrate to direct submit by Generators.

SPP Outage Scheduler will be integrated into Current Market now and pushed over to future market.

PCI Outage Management can implement with SPP API so clients can manage outages from PCI instead of from SPP Web page.

PCI Outage Management functionality can be delivered for use with new SPP Outage Scheduler.

Page 7: Analyze Optimize Enterprise  Power Costs, Inc. 2010 All rights reserved. Confidential and Proprietary to Power Costs, Inc. May not be distributed or reproduced.

Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.comPage 7

1/1/2007

Major changes from OPS1

Important Differences between OPS1 and CROW No longer limited to submission at a Balancing Authority

level, may submit at the GOC level. SPP’s CROW will use complete names. PCI automatically

translates from your in house names to the SPP names. Generation derates will be handled differently from what is

currently in OPS1. Generation derates reflect the unit’s Net Available Capacity.– Ex: 100 MW unit is derated to 75 MW. Unit is available to

produce 75 MW. (In OPS2 you would enter a 25 MW curtailment.)

Page 8: Analyze Optimize Enterprise  Power Costs, Inc. 2010 All rights reserved. Confidential and Proprietary to Power Costs, Inc. May not be distributed or reproduced.

Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.com

Capabilities of PCIOutage-Management Module

Enter, edit, and submit outage requests:– Planned (>= 48 hours Lead Time)– Urgent (>= 24 hours to 7 days Lead Time)– Emergency (<= 24 hours Lead Time)– Forced (<= 1 hours Lead Time)

Manage 3-way communication between plant managers, portfolio managers, and ISO operators: – Submit requests internally for

approval and manage approval process

– Submit outage requests to ISO Outage Schedule for ISO approval

– Track ISO approvals – Manage pending requests– Track submissions and alarms

Page 8

Page 9: Analyze Optimize Enterprise  Power Costs, Inc. 2010 All rights reserved. Confidential and Proprietary to Power Costs, Inc. May not be distributed or reproduced.

Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.com

Main Outage-ManagementScreen

Provide Web-Based GUI to enter & update outages

Provide XML data links to communicate with ISO

Provide filters & validation rules to speed up and automate outage-management workflow

Page 91/1/2007

Page 10: Analyze Optimize Enterprise  Power Costs, Inc. 2010 All rights reserved. Confidential and Proprietary to Power Costs, Inc. May not be distributed or reproduced.

Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.com Page 10

Sections divide up read-only, required, and optional fields

Access to historic reviews

Create recurring outages on new

Page 11: Analyze Optimize Enterprise  Power Costs, Inc. 2010 All rights reserved. Confidential and Proprietary to Power Costs, Inc. May not be distributed or reproduced.

Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.com

Sample Workflow Process

Single, coordinated stream of data.

Page 12: Analyze Optimize Enterprise  Power Costs, Inc. 2010 All rights reserved. Confidential and Proprietary to Power Costs, Inc. May not be distributed or reproduced.

Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.com

Provide Gantt Chart to Easily Track Ouatges

View outages using a Gant chart.

Filter units and types of outage.

Select / Edit outage details.

Page 121/1/2007

Page 13: Analyze Optimize Enterprise  Power Costs, Inc. 2010 All rights reserved. Confidential and Proprietary to Power Costs, Inc. May not be distributed or reproduced.

Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.com

Using PCI Outage-Management Moduleto Automate NERC GADS Reporting

Capture all outage & derating data required to support NERC GADS reporting:– Assign unique GADS Id

for each outage– Provide combo box to

allow user to select GADS cause code

– Allow user to specify unit code and utility code required for NERC reporting

– Assign a 2-character event type to describe outage

– Specify an equipment type associated with outage event

Page 13

Page 14: Analyze Optimize Enterprise  Power Costs, Inc. 2010 All rights reserved. Confidential and Proprietary to Power Costs, Inc. May not be distributed or reproduced.

Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.com

Using PCI Outage-Management Moduleto Create GADS Performance Reports

Capture EMS Breaker Status.

Can automatically Generate Outage Tickets based on the breaker status

Compute GADS Performance Statistics

Generate GADS Performance Reports by Plant/Unit

Generate NERC-compliant files

Option to ETL GADS Data to PCI Data Warehouse for BI Reporting

Page 14

Page 15: Analyze Optimize Enterprise  Power Costs, Inc. 2010 All rights reserved. Confidential and Proprietary to Power Costs, Inc. May not be distributed or reproduced.

Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.com

Business Intelligence / Data Warehouse Analytics

Page 15

Example 1 – GADS Reporting – Event Reporting and Analysis

Example 2– “In the Money” Analysis– Compare GADS Performance Records to

Performance History in the ISO

Page 16: Analyze Optimize Enterprise  Power Costs, Inc. 2010 All rights reserved. Confidential and Proprietary to Power Costs, Inc. May not be distributed or reproduced.

Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.com

Sample PCI Report to Summarize Turbine Service Hours

Page 16

Page 17: Analyze Optimize Enterprise  Power Costs, Inc. 2010 All rights reserved. Confidential and Proprietary to Power Costs, Inc. May not be distributed or reproduced.

Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.com

Fully Integrated with PCI GSMS Modules

• PCI Outage Manager is fully integrated with other PCI Modules

• Outages can be entered in the PCI Outage-Management Module. After outage is approved: PCI Bid Formulator can

automatically adjust offer parameters to reflect the current outage status

PCI Bid Evaluator can be run to Forecast DA Awards

PCI GenTrader can use outage information for unit-commitment and production costing runs

Page 17

Page 18: Analyze Optimize Enterprise  Power Costs, Inc. 2010 All rights reserved. Confidential and Proprietary to Power Costs, Inc. May not be distributed or reproduced.

Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.com

Summary of PCI ExtendedOutage-Management Module

Manage outage lifecycle:– Submit new outage requests– Update existing requests– Download status of existing

outages

Fully integrated with:– ISO Outage Scheduler– Other PCI GSMS modules

(GenTrader, Bid Evaluator, Bid Formulator)

Automate NERC GADS Reports

Page 18

Page 19: Analyze Optimize Enterprise  Power Costs, Inc. 2010 All rights reserved. Confidential and Proprietary to Power Costs, Inc. May not be distributed or reproduced.

Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.com

For More Information

Bid-To-Bill Automation– Forecast LMPs– Automate XML Communications with

ISO– Create Unit & Demand Bids– Evaluate Bidding Strategies– Perform Shadow Settlement– Manage Outages & Deratings

Transaction Management – Deal Capture– Create MISO Financial Contracts– Settlement of Bilateral Transactions

Operations & Trading– Optimal unit commitment and

economic dispatch– Fuel scheduling– Ancillary services optimization

Post Analysis– P&L Analyzer

Gas Management– Forecast Gas Burn– Optimize Pipeline Uses– Nominate Gas & Pipeline Volumes

PCI GENERATION SUPPLY MANAGEMENT SYSTEM™

Stuart Wright303-940-1444

[email protected]

Ali Merchant630-770-1055

[email protected]

Jason Hebert713-231-7454

[email protected]

Bryan Kelly916-799-2006

[email protected]