415
Electronic Advertising Contract AADD Bids open Thursday, August 11, 2011 Dated July 18, 2011 11 STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION NOTICE TO BIDDERS AND SPECIAL PROVISIONS FOR CONSTRUCTION ON STATE HIGHWAY IN SAN DIEGO COUNTY IN OCEANSIDE AND VISTA FROM 0.2 MILE EAST OF COLLEGE BOULEVARD UNDERCROSSING TO 0.1 MILE WEST OF MELROSE DRIVE UNDERCROSSING In District 11 On Route 78 Under Bid book dated July 18, 2011 Standard Specifications dated 2006 Project Plans approved May 16, 2011 Standard Plans dated 2006 Identified by Contract No. 11-294504 11-SD-78-3.5/5.8 Project ID 1100000387 Federal-Aid Project NH-P078(112)E
Transcript
  • Electronic Advertising Contract AADD Bids open Thursday, August 11, 2011 Dated July 18, 2011

    11

    STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION

    NOTICE TO BIDDERS AND

    SPECIAL PROVISIONS FOR CONSTRUCTION ON STATE HIGHWAY IN SAN DIEGO COUNTY IN OCEANSIDE AND VISTA FROM 0.2 MILE EAST OF COLLEGE BOULEVARD UNDERCROSSING TO

    0.1 MILE WEST OF MELROSE DRIVE UNDERCROSSING

    In District 11 On Route 78

    Under

    Bid book dated July 18, 2011 Standard Specifications dated 2006

    Project Plans approved May 16, 2011 Standard Plans dated 2006

    Identified by

    Contract No. 11-294504

    11-SD-78-3.5/5.8

    Project ID 1100000387

    Federal-Aid ProjectNH-P078(112)E

  • *************************************************************************************************

    SPECIAL NOTICES

    *************************************************************************************************

    Refer to Section 8-1.07, "Liquidated Damages," of the Amendments to the Standard Specifications for your project-specific liquidated damages based on your total bid.

    The contract award period has been extended for this project. The Department is allowing contractors to submit electronic payroll records to the District Labor Compliance

    Office. Refer to section titled "Electronic Submission of Payroll Records" under Section 5, "General," of these special provisions.

  • Contract No. 11-294504

    i

    TABLE OF CONTENTS

    NOTICE TO BIDDERS ....................................................................................................................................................... 1COPY OF BID ITEM LIST .................................................................................................................................................. 3SPECIAL PROVISIONS ...................................................................................................................................................... 6SECTION 1. (BLANK) ....................................................................................................................................................... 6SECTION 2. BIDDING ....................................................................................................................................................... 6

    2-1-01 TIE BID RESOLUTION ................................................................................................................................... 62-1.02 DISADVANTAGED BUSINESS ENTERPRISES ........................................................................................... 62-1.03 OPT OUT OF PAYMENT ADJUSTMENTS FOR PRICE INDEX FLUCTUATIONS ................................... 7

    SECTION 3. CONTRACT AWARD AND EXECUTION ................................................................................................. 83-1.01 CONTRACT AWARD ...................................................................................................................................... 83-1.02 SMALL BUSINESS PARTICIPATION REPORT ........................................................................................... 83-1.03 CALTRANS BIDDER - DBE INFORMATION FORM ................................................................................... 8

    SECTION 4. BEGINNING OF WORK, TIME OF COMPLETION, AND LIQUIDATED DAMAGES ......................... 8SECTION 5. GENERAL ..................................................................................................................................................... 8

    5-1.01 EMISSIONS REDUCTION .............................................................................................................................. 85-1.02 PERFORMANCE OF DBES ............................................................................................................................. 95-1.03 PERFORMANCE OF UDBES ........................................................................................................................... 95-1.04 PAYMENT ADJUSTMENTS FOR PRICE INDEX FLUCTUATIONS .......................................................... 95-1.05 SURFACE MINING AND RECLAMATION ACT ........................................................................................ 125-1.06 ELECTRONIC SUBMISSION OF PAYROLL RECORDS............................................................................ 135-1.07 AREAS FOR CONTRACTOR'S USE ............................................................................................................ 135-1.08 PAYMENTS ................................................................................................................................................... 145-1.09 SUPPLEMENTAL PROJECT INFORMATION ............................................................................................ 145-1.10 RELATIONS WITH CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD ...................... 145-1.11 ENVIRONMENTALLY SENSITIVE AREA ................................................................................................. 155-1.12 NONHIGHWAY FACILITIES (INCLUDING UTILITIES) .......................................................................... 15

    SECTION 6. (BLANK) ..................................................................................................................................................... 15SECTION 7. (BLANK) ..................................................................................................................................................... 15SECTION 8. MATERIALS ............................................................................................................................................... 15SECTION 8-1. MISCELLANEOUS ................................................................................................................................. 15

    8-1.01 PREQUALIFIED AND TESTED SIGNING AND DELINEATION MATERIALS ...................................... 158-1.02 SLAG AGGREGATE ..................................................................................................................................... 21

    SECTION 8-2. CONCRETE ............................................................................................................................................. 228-2.01 PORTLAND CEMENT CONCRETE ............................................................................................................. 228-2.02 CORROSION CONTROL FOR PORTLAND CEMENT CONCRETE ......................................................... 238-2.03 CEMENTITIOUS MATERIAL AND AIR CONTENT .................................................................................. 23

    SECTION 8-3. WELDING ................................................................................................................................................ 238-3.01 WELDING ....................................................................................................................................................... 23

    WELDING QUALITY CONTROL ..................................................................................................................... 25WELDING FOR OVERHEAD SIGN AND POLE STRUCTURES ................................................................... 28

    SECTION 9. (BLANK) ..................................................................................................................................................... 29SECTION 10. CONSTRUCTION DETAILS ................................................................................................................... 29SECTION 10-1. GENERAL .............................................................................................................................................. 29

    10-1.00 CONSTRUCTION PROJECT INFORMATION SIGNS .............................................................................. 2910-1.01 ORDER OF WORK ...................................................................................................................................... 2910-1.02 MATERIAL CONTAINING AERIALLY DEPOSITED LEAD .................................................................. 3010-1.03 WATER POLLUTION CONTROL .............................................................................................................. 3110-1.04 CONSTRUCTION SITE MANAGEMENT .................................................................................................. 4410-1.05 STREET SWEEPING .................................................................................................................................... 5310-1.06 TEMPORARY CONCRETE WASHOUT FACILITY ................................................................................. 5410-1.07 TEMPORARY FIBER ROLL ....................................................................................................................... 5710-1.08 TEMPORARY FENCE ................................................................................................................................. 60

  • Contract No. 11-294504

    ii

    10-1.09 TEMPORARY CONSTRUCTION ENTRANCE ......................................................................................... 6010-1.10 TEMPORARY DRAINAGE INLET PROTECTION ................................................................................... 6310-1.11 COOPERATION ........................................................................................................................................... 7210-1.12 PROGRESS SCHEDULE (CRITICAL PATH METHOD) ........................................................................... 7210-1.13 CONSTRUCTION AREA TRAFFIC CONTROL DEVICES .......................................................


Recommended