Berlin Wholesale MarketThe centre of freshness in the heart of Berlin
Innovation in Development
Agenda
Facts and Figures
Business Strategy
Projects
Partners
Future Plans
7/30/2019 AndreasFoidl
2/20
2
Agenda
Facts and Figures
Business Strategy
Projects
Partners
Future Plans
The Company
Founded in 1960
Shareholder
Government of Berlin
Company objectives
Renting
Facilitymanagement
Operator of consumer
market halls
Staff
27 Employees
Headquarters
Berlin, Beusselstr. 44 N-Q
Facts and Figures
7/30/2019 AndreasFoidl
3/20
3
The Market
Size
326,475 m
Products
Fruit and vegetables
Meat
Fish
Additional foods
Services
Customers Restaurants, Hotels
Bulk consumers
Retailers
Street markets
Turnover
500,000 t/ 1.0 Bn.
Facts and Figures
Former Flower Market
Size
23,037 m
Products Cut flowers
Plants
Grower products
Services
Turnover
31.0 Mio.
Relocation: Beusselstrae
in 2010
Divestment: 2011 - 2013
Facts and Figures
http://www.berliner-grossmarkt.de/dt/blumengrossmarkt_lage.asp?site=blumengrossmarkt&usite=blumengrossmarkt&ansicht=1&lage=blumehttp://www.berliner-grossmarkt.de/dt/blumengrossmarkt_lage.asp?site=blumengrossmarkt&usite=blumengrossmarkt&ansicht=2&lage=blumehttp://www.berliner-grossmarkt.de/dt/anfahrtsplan.asp?site=grossmarkt2&usite=anfahrtsplan&ansicht=1http://www.berliner-grossmarkt.de/dt/anfahrtsplan.asp?site=grossmarkt2&usite=anfahrtsplan&ansicht=27/30/2019 AndreasFoidl
4/20
4
Consumer market halls Size
Arminius 2,917 m
Eisenbahn 2,567 m
Marheineke 1,648 m
Products
Fruit and vegetables
Fish and Meat
Delicacies
Services
Marheineke Market Hall:
Reconstruction 2007
Arminius Market Hall:
New Operator 2010
Eisenbahn Market Hall:
New Investor (2012)
Facts and Figures
The Market in 2004
Facts and Figures
7/30/2019 AndreasFoidl
5/20
5
Facts and Figures
Facts and Figures
Distribution channels in the retail sector
Retail Stores
Supermarkets
Department Stores
Discounters
7/30/2019 AndreasFoidl
6/20
6
Highly competitive market
Obsolete infrastructure and technical
equipement
Problems of hygiene and certification
Two wholesale markets with high operatingcosts
Consumer market halls with a high rate of
vacancy and a low basis of income
Facts and Figures
Management Results
Agenda
Facts and Figures
Business Strategy
Projects
Partners
Future Plans
7/30/2019 AndreasFoidl
7/20
7
Business Strategy
Providing a one-stop shopping area for fresh
products
Expanding the range of fresh products
Providing modern infrastructure
Reducing the operating costs
Developing new retail concepts
Commitment to nutrition awareness Generating cash flow for investments
Agenda
Facts and Figures
Business Strategy
Projects
Partners
Future Plans
7/30/2019 AndreasFoidl
8/20
8
New building for Deutsche See
Enlargement of Otto Weihe GmbH
Reconstruction of the fruit and vegetable
market hall
New building for Markt- und Khlhallen AG
Relocation of the flower market
Modernizing the waste managment station Children and nutrition
Development of new energy concepts
Projects
Sharing investment risks
Developing and implementing a new retail
concept for the Marheineke Market Hall
Long-term contract with a new operator for
the Arminius Market Hall
Selling the Eisenbahn Market Hall to
investors with proper concept
Selling the properties surrounding the former
Flower Market
Projects
7/30/2019 AndreasFoidl
9/20
9
1,200 m
Market leader for
fresh and frozen fish
in Germany
Former building
rented by local
health authorities
New Deutsche See Building
Projects
New Deutsche See building
1,200 m
Market leader for
fresh and frozen fish
in Germany
Projects
7/30/2019 AndreasFoidl
10/20
10
Enlargement of Otto Weihe GmbH building
4,400 m warehouse
Biggest tenant at the
market
Projects
Projects
Reconstruction of the Fruit and Vegetable Market
7/30/2019 AndreasFoidl
11/20
11
Covered parking
area for employees
(800 parking spaces)
Centralization of
private parking
Projects
Reconstruction of the Fruit and Vegetable Market
80 ramps for loading
and unloading
Reduction of
operating costs: 20%
Reconstruction of the Fruit and Vegetable Market
Projects
7/30/2019 AndreasFoidl
12/20
12
Projects
Reconstruction of the Fruit and Vegetable Market
Covered area of
12,000 m
Temporary location of
business
7,000 m of additional
sales area
New technical
equipment Open and friendly
atmosphere
High level of hygiene
Projects
Reconstruction of the Fruit and Vegetable Market
7/30/2019 AndreasFoidl
13/20
13
Projects
Reconstruction of the Fruit and Vegetable Market
New cafe for
customers and
employees
1,700 m cooling and
freezing warehouse
More efficient:
single storeywarehouse (13 m)
Projects
New building for Markt- und Khlhallen AG
7/30/2019 AndreasFoidl
14/20
14
12,300 m sales area
(increase of 100%)
5,300 m for plants
5,000 m cut flowers
2,000 m florists`
supplies
Projects
Relocation of the Flower Market
Projects
New waste management station
Greater logistical
flexibility
Increased hygienicstandards
Multifunctional building
7/30/2019 AndreasFoidl
15/20
15
Projects
Projects
Initiatives in Nutrition Awareness
7/30/2019 AndreasFoidl
16/20
16
The Market in 2004
Projects
The Market in 2012
Projects
Overall Investment: 50 Mio. (35 Mio. )
7/30/2019 AndreasFoidl
17/20
17
Agenda
Facts and Figures
Business Strategy
Projects
Partners
Future Plans
German association ofmarkets
20 full members in threecountries
21 passive members
Network of wholesale andretail markets
More than 200 members
Networking on aworld-wide basis
Partners
7/30/2019 AndreasFoidl
18/20
18
Agenda
Facts and Figures
Business Strategy
Projects
Partners
Future Plans
Former Flower Market
New zoning law:
2009
Sale of exterior space:
July 2010
Sale of market hall:
July 2010
Sale of remaining
space:
2012
New concepts for
creative industries in
the city centre
Future Plans
7/30/2019 AndreasFoidl
19/20
19
Solar power 2012
Central cooling system 2013
Wood chip heating system 2013
Geothermal heat pump system ???
1
11
2
3
4
1
23
4
5,0 Mio.
Future Plans
Main Goals: Reduction of operating costs and climate
change
1
1
Investment: 2.0 Mio.
Output: 1.2 MWh
Public-Private Partnership
Long-term contract
Fixed price for electricity
Future Plans
Built in 2012: Solar power station
7/30/2019 AndreasFoidl
20/20
Solar power 2012
Central cooling system 2013
Wood chip heating system 2013
Geothermal heat pump system ???
1
11
2
3
4
1
23
4
5,0 Mio.
Future Plans
Main Goals: Reduction of operating costs and climate
change
1
1