Angra dos Reis — Brazil
Transcript

Angra dos Reis — Brazil

Reactor Specs

• Single Primary Reactor– 4.5 GW peak power (4.1 average)– Allows measurement of backgrounds

• Approval from the reactor company– Site access– Reactor company is providing detailed civil

construction cost estimates

The Site

Far Site Design

Summary

• Approval from Reactor Company– 4.1 GW single reactor complex

• A Civil Construction Design Exists– Well known granite structure– Sent out to Local Contractors for detailed Cost

Estimate (expected by March 20)

• Possible Detector Locations are restricted by local geology– Far site can have 600-700 mwe– Near site has to be shallow


Recommended