Page 1: ANGUILLA ELECTRICITY COMPANY LIMITED (ANGLEC) · Electricity Company Limited, P.O. Box 400, The Valley, AI-2640, Anguilla, BWI. 2.3.4 The proposal must reach the above-mentioned address
Page 2: ANGUILLA ELECTRICITY COMPANY LIMITED (ANGLEC) · Electricity Company Limited, P.O. Box 400, The Valley, AI-2640, Anguilla, BWI. 2.3.4 The proposal must reach the above-mentioned address

ANGUILLA ELECTRICITY COMPANY LIMITED (ANGLEC)

REQUEST FOR PROPOSAL (RFP) AUGUST 2017

CONSULTANCY SERVICES FOR THE DEVELOPMENT OF AN

OCCUPATIONAL HEALTH AND SAFETY PROGRAM

Page 3: ANGUILLA ELECTRICITY COMPANY LIMITED (ANGLEC) · Electricity Company Limited, P.O. Box 400, The Valley, AI-2640, Anguilla, BWI. 2.3.4 The proposal must reach the above-mentioned address

2

CONTENTS

Page

SECTION 1 : Invitation to Tender ……………………………………………. 3

SECTION 2 : Information and Instructions to Bidders …………. 4

SECTION 3 : Terms of Reference ……………………………………………. 7

APPENDIX 1 : Technical Proposal Submission Forms …………………….. 13

APPENDIX 2 : Financial Proposal Submission Forms ……………………… 19

Page 4: ANGUILLA ELECTRICITY COMPANY LIMITED (ANGLEC) · Electricity Company Limited, P.O. Box 400, The Valley, AI-2640, Anguilla, BWI. 2.3.4 The proposal must reach the above-mentioned address

3

1. INVITATION TO TENDER

The Anguilla Electricity Company Limited (ANGUILLA) invites proposals from suitably qualified

Consultants to carry out the assignment of developing an Occupational Health and Safety Program.

All Bidders are expected to be fully qualified prior to submitting their documents. Failure to comply

with these requirements together with packaging and labeling requirements shall lead to

disqualification.

The assignment is to be carried out by a Consultant that will be selected on a competitive basis.

Documents describing the service

The RFP consists of the following documents:

1. Invitation to Tender;

2. Information and Instructions for Bidders;

3. Terms of Reference; and

4. Appendix 1 and 2

Attention is drawn to the last date and time for the submission of proposals being Thursday, August 31,

2017 at 4:00pm.

The Consultant has the sole responsibility of ensuring that the proposal is delivered within this speci fied

time.

Any proposals received after the date and time above will be left unopened.

The Executing Agency:

The Anguilla Electricity Company Limited

P.O. Box 400

The Valley

AI-2640

Anguilla, BWI

Phone : (264) 497-5200

Fax : (264) 497-5440

website: http://www.anglec.com

Page 5: ANGUILLA ELECTRICITY COMPANY LIMITED (ANGLEC) · Electricity Company Limited, P.O. Box 400, The Valley, AI-2640, Anguilla, BWI. 2.3.4 The proposal must reach the above-mentioned address

4

2. INFORMATION AND INSTRUCTIONS TO BIDDERS

These instructions are mainly intended to define how the bidding Consultants should prepare and submit their

proposals. These instructions should be read in conjunction with the Terms of Reference and any other attached

documents.

The proposal must be divided into two parts; Technical Proposal and Financial Proposal.

2.1 Technical Proposal

The technical proposal must cover the following matters:

2.1.1 Background, organization and experience of the bidder in relation to the assignment. A list of at

least three (3) similar assignments undertaken by the bidder during the last five (5) years must be

provided. Projects must be of a similar nature to this request.

2.1.2 Proposed technical approach and work program including:

2.1.2.1 Comments on the Terms of Reference.

2.1.2.2 The general approach proposed for carrying out the consulting services (methodology).

2.1.2.3 Work plan including the organization and time schedule of the proposed services,

estimated duration of the whole assignment and the man days/inputs of each proposed

personnel.

2.1.2.4 Detailed description of the specific tasks to be assigned to each member of the proposed

team.

2.1.3 Name, background, education, and detailed professional experience of each professional who is

going to play a role in this assignment.

2.1.4 Arrangement for office space, transport, communication, office furnisher, etc. required for

undertaking the assignment successfully.

2.2 Technical Proposal Format

As an effort towards standardizing the required elements of the Technical Proposal and to enable the

technical evaluation to be comparable, the bidders are required to fill six (6) standardized forms appended

herewith as APPENDIX 1. These forms are named as follows:

A. Technical Proposal Submission Form

B. References

C. Comments and suggestions on the Description of Services

D. Description of methodology and work plan for performing the assignment

E. Composition of the team and task(s) assignment of each team member

F. Time Schedule for Reports/Activities Delivery

2.3 Financial Proposal

2.3.1 The Financial Proposal must be split based on the expected deliverables. Each deliverable shall be a

part of the total cost of the project. The proposal should also spell out the estimated duration of

each deliverable.

2.3.2 No reimbursable cost shall be allowed under this assignment; hence bidders are urged to include

every cost in their proposals.

Page 6: ANGUILLA ELECTRICITY COMPANY LIMITED (ANGLEC) · Electricity Company Limited, P.O. Box 400, The Valley, AI-2640, Anguilla, BWI. 2.3.4 The proposal must reach the above-mentioned address

5

2.3.3 The Technical Proposal and Financial Proposal must be placed in two separate sealed envelopes,

both of which must be placed in a third outer envelope bearing no identification of the bidder, but

clearly marked, DEVELOPMENT OF OCCUPATIONAL HEALTH AND SAFETY PROGRAM FOR ANGLEC.

An original and three (3) copies should be delivered to The Chief Executive Officer, The Anguilla

Electricity Company Limited, P.O. Box 400, The Valley, AI-2640, Anguilla, BWI.

2.3.4 The proposal must reach the above-mentioned address on or before Thursday, August 31, 2017 at

4:00 p.m.

2.3.5 The proposal must be written in English and should remain valid for 60 days from the date of

submission.

2.3.6 It is desirable that the bidder contacts ANGLEC before a proposal is made to obtain more

clarification on the extent of the required service.

2.3.7 ANGLEC welcomes any further queries which bidders may have in relation to the proposed

assignment, but any delay by ANGLEC in providing the required information will not be considered

as a reason for extending the submission date of the proposals.

2.3.8 The evaluation of the proposals will essentially, but not exclusively, be based on technical

considerations involving the following indicative criteria:

2.3.8.1 General experience of the bidder and experience in the assignments of similar nature;

2.3.8.2 Thoroughness of the approach and work plan;

2.3.8.3 Expertise of key personnel; and

2.3.8.4 Final selection will also take into account the level of the financial proposal.

2.4 Financial Proposal Format

For ease of preparation of the financial proposal and comparable evaluation process, the following three

(3) standardized forms shown in APPENDIX 2 are required to be filled out by all the bidder:

A. Financial Proposal Submission Form

B. Summary of Cost

C. Breakdown of Price per Deliverable

2.5 Clarifications

Any request for clarification must be made fifteen (15) days before the deadline fixed for submission of

proposals.

2.6 Numbers of Proposals

The proposal must be submitted in one (1) original and three (3) copies, clearly marked, DEVELOPMENT OF

OCCUPATIONAL HEALTH AND SAFETY PROGRAM FOR ANGLEC.

2.7 Confidentiality

The Consultant acknowledges that any information concerning the analysis, findings and recommendations

of which the Consultant, its agents or employees become aware during bidding on this RFP or providing any

services under a resulting contract, shall be treated as confidential and will not be released to any other

party without express written consent. The Consultant agrees to take such measures to protect such

information, as it would reasonably be expected to take to protect its own confidential information.

Page 7: ANGUILLA ELECTRICITY COMPANY LIMITED (ANGLEC) · Electricity Company Limited, P.O. Box 400, The Valley, AI-2640, Anguilla, BWI. 2.3.4 The proposal must reach the above-mentioned address

6

2.8 Disclaimer

The Anguilla Electricity Company Limited reserves the right to accept or reject all proposals, in whole or in

part, received because of this request, and to negotiate in any manner necessary to best serve the interest

of the project. Neither the lowest, nor any submission, shall necessarily be accepted and the decision of the

selection committee is final.

Page 8: ANGUILLA ELECTRICITY COMPANY LIMITED (ANGLEC) · Electricity Company Limited, P.O. Box 400, The Valley, AI-2640, Anguilla, BWI. 2.3.4 The proposal must reach the above-mentioned address

7

3. TERMS OF REFERENCE (TOR)

3.1 Background

The Anguilla Electricity Company is the sole supplier of electrical energy on the island of Anguilla. The company

employs over ninety (90) Employees and Contractors engaging in administration, generation of electricity,

transmission and distribution of electricity, material handling and storage along with vehicle maintenance and

repairs.

ANGLEC is committed to meeting the energy requirements of its customers, and is guided by safety,

environmental awareness, reliability and economic feasibility.

A Health and Safety Policy was recently developed to communicate to Staff and the public the importance of

safety to the company. The Policy underscores the responsibility that the Company as an employer and seeks

to create and promote a healthy and safe working environment for all its Employees and Contractors, as well

as its Customers. It is upon this basis that the Company seeks the services of a Consultant to assist in the

modification and review of its current plans and to develop a comprehensive Occupational Health and Safety

Program.

3.2 Purpose

The purpose of the Consultancy is to develop a comprehensive Occupational Health and Safety Program.

3.3 Conduct of Work

The Consultant will work closely with the Health and Safety Officer to ensure that the Consultancy outputs

are consistent with the overall plans of ANGLEC plans and that delivery is on time.

3.4 Scope of Work

The Consultant is expected to meet the following terms of reference:

3.4.1 Assess the current Health and Safety environment existing within ANGLEC, considering the workflow

processes and site locations, and come up with recommendations;

3.4.2 Conduct a holistic risk assessment of the Company, considering the various sites of doing business,

work routines and procedures, and based on the above, formulate a plan for minimizing risks to

company employees;

3.4.3 Create Job Hazard Analysis (JHA) for approximately eighty (80) functions / tasks. These tasks will be in

areas concerning motor vehicle repairs, transmission and distribution, power generation (and its

ancillaries) and material storage and handling. The JHA shall be written in such a manner to allow for:

3.1.3.1 The easy understanding of a new worker;

3.1.3.2 Concise, precise and clear conveying of information; and

3.1.3.3 Its easy fit in to the company’s “Safe Practices and Procedures” section of the Occupational

Health and Safety Program.

3.4.4 Develop a comprehensive Occupational Health and Safety Program (based on sectional listing in table

1) that will ensure that the Company complies with all its responsibilities as mandated by the relevant

legislation (local, regional and international) and best practices;

3.4.5 Develop Working Procedures and Standards that will enforce Company Health and Safe ty Rules;

Page 9: ANGUILLA ELECTRICITY COMPANY LIMITED (ANGLEC) · Electricity Company Limited, P.O. Box 400, The Valley, AI-2640, Anguilla, BWI. 2.3.4 The proposal must reach the above-mentioned address

8

3.4.6 Develop all necessary tools that will facilitate the smooth implementation of the Health and Safety

Policy and Program; and

3.4.7 Assist the Company to establish all health and safety governance structures in line wi th the Health

and Safety Policy.

3.5 Deliverables

The Consultant is expected to produce the following:

3.5.1 An Inception Report within one week of commencement of the consultancy detailing how the TORs

will be met within the agreed time, as well as ANGLEC resources required to carry out the consultancy;

3.5.2 Reviewed and finalized Health and Safety Policy Statement;

3.5.3 Reviewed and finalized company Health and Safety Rules;

3.5.4 Comprehensive Disciplinary Code for Health and Safety rule violations;

3.5.5 An assessment report which states the findings of the situational analysis and recommendations

regarding safety;

3.5.6 Completed Job Hazard Analysis for approximately eighty (80) functions/tasks. The format shall be as

follows:

3.5.6.1 The specific steps used to complete the job;

3.5.6.2 The hazard or hazards involved in each step;

3.5.6.3 The safety measures used to avoid the hazard in each step; and

3.5.6.4 Risk Assessment – Evaluation of risks present at each step. Clarify probability and severity.

3.5.7 Reviewed and completed Disaster, Emergency Response and Business Continuity Plan;

3.5.8 Completed inspection policy document with specific inspection sheets;

3.5.9 Comprehensive training and education program;

3.5.10 Reviewed and finalized Incident Reporting Procedures and Investigations Program;

3.5.11 Reviewed and finalized Joint Health and Safety Committee Charter;

3.5.12 Workplace Hazardous Material Information Systems (WHMIS) Program;

3.5.13 Injury and Illness Prevention and Protection Program;

3.5.14 Violence Prevention Program;

3.5.15 Reviewed and finalized Contractor Safety Program;

3.5.16 Record and Statistic Program;

3.5.17 Compiled workplace inspections checklists, forms, sheets, and registers and any other tools necessary

for the implementation of the Health and Safety Policy;

3.5.18 A final all-encompassing Occupational Health and Safety Program; and

3.5.19 Close out meeting.

Page 10: ANGUILLA ELECTRICITY COMPANY LIMITED (ANGLEC) · Electricity Company Limited, P.O. Box 400, The Valley, AI-2640, Anguilla, BWI. 2.3.4 The proposal must reach the above-mentioned address

9

3.6 Outcomes and Performance Standards

The Consultant will be expected to perform as follows:

Table 1:

SECTION SCOPE OF WORK DELIVERABLES DELIVERY

TIME

Provide an Inception Report

detailing how the TORs will be met within the agreed time, as

well as ANGLEC resources

required to carry out the consultancy.

One week following

contract

signature

HEALTH AND

SAFETY POLICY

STATEMENT

Review and Provide Recommendations (Modify) on current Health and Safety

Policy Statement

. Scope

. Responsibilities

Finalized Document. Ready for Approval.

October to

November

2017

HEALTH AND

SAFETY RULES AND

ENFORCEMENT

Review and Provide Recommendations (Modify) on current Company Health

and Safety Rules.

Finalized Document. Ready for

Approval.

Create company Disciplinary Code for

Health and Safety Violations.

Disciplinary Code for

enforcement.

SAFE PRACTICES AND

PROCEDURES

Assess the current Health and Safety

environment existing within ANGLEC,

considering the workflow processes and site locations, and come up with

recommendations.

Assessment report, stating the

findings of the situational analysis and recommendations.

Create Job Hazard Analysis (JHA) for

approximately eighty (80) functions /

tasks.

These tasks will be in areas concerning

motor vehicle repairs, transmission and distribution, power generation (and its

ancillaries) and material storage and handling.

The information should be outlined as follows:

i. The specific steps used to

complete the job; ii. The hazard or hazards

involved in each step;

iii. The safety measures used to avoid the hazard

in each step; and

iv. Risk Assessment – Evaluation of risks

present at each step. Clarify probability and

severity.

EMERGENCY PROCEDURES

Review and Provide Recommendations

(Modify) on Disaster, Emergency

Response and Business Continuity Plan.

Reviewed and completed

Disaster, Emergency Response

and Business Continuity Plan. November to

December

2017 INSPECTIONS Develop Policy Document.

Policy document

Checklist / Inspection Sheets (Industry specific).

TRAINING AND EDUCATION

Develop Training Matrix to cover all categories of workers.

Comprehensive training and education program.

Page 11: ANGUILLA ELECTRICITY COMPANY LIMITED (ANGLEC) · Electricity Company Limited, P.O. Box 400, The Valley, AI-2640, Anguilla, BWI. 2.3.4 The proposal must reach the above-mentioned address

10

Develop First Aid and Medical Care

Program.

Develop Fire Safety Training Program.

This shall include but not be limited to

General Fire Safety, Emergency Response Teamwork and Industrial Fire

Fighting.

*Should be taken from existing Disaster, Emergency Response and

Business Continuity Plan*

Formalize Safety Competence Program.

INCIDENT REPORTING

PROCEDURES

AND INVESTIGATIONS

Review and Provide Recommendations

(Modify) on current Incident Reporting

Procedure

Finalized Policy Document. Ready for Approval.

JOINT HEALTH AND SAFETY

COMMITTEE

Review and Provide Recommendations (Modify) on current Joint Health and

Safety Committee Charter.

Reviewed and finalized Joint Health and Safety Committee

Charter.

WORKPLACE

HAZARDOUS MATERIAL

INFORMATION

SYSTEMS (WHMIS)

Develop Policy for the appropriate

method for the collection of hazardous

material information and record keeping (Material Safety Data Sheet /

Safety Data Sheet collection).

Workplace Hazardous Material

Information Systems (WHMIS)

Program; 1. Policy Document

2. Training Tool

December to

January 2017

INJURY AND ILLNESS

PREVENTION

AND PROTECTION

Develop comprehensive policy. Injury and Illness Prevention and Protection Program

VIOLENCE PREVENTION

Develop document which speaks to a violence free environment.

*Violations of such shall be tied in to

Health and Safety rules and enforcement*

Violence Prevention Program.

CONTRACTOR SAFETY

Review and Provide Recommendations (Modify) on Contractor Safety Program

Reviewed and finalized Contractor Safety Program.

RECORDS AND STATISTICS

Develop recordkeeping policy and method for statistics tracking.

Record and Statistic Program.

FORMS AND

CHECKLISTS

Compiled workplace inspection checklists, forms, sheets, and

registers and any other tools

necessary for the implementation of the Health

and Safety Policy.

Final draft of Occupational

Health and Safety Program

presentation and close out meeting.

Page 12: ANGUILLA ELECTRICITY COMPANY LIMITED (ANGLEC) · Electricity Company Limited, P.O. Box 400, The Valley, AI-2640, Anguilla, BWI. 2.3.4 The proposal must reach the above-mentioned address

11

3.7 Competency and Expertise Requirements

3.7.1 The Consultant must have a minimum of Post-Graduate Degree in Occupational Safety, Health and

Environmental Management or any closely related field;

3.7.2 The Consultant should have performed at least three (3) assignments i n the development of occupational health and safety programs and procedures governing health and safety in the

workplace.

3.7.3 Previous experience of successfully carrying out similar work in the Caribbean and must be within the

last five (5) years;

3.7.4 The Consultant must demonstrate a good understanding of the ANGLEC business environment.

3.8 Response Requirements

3.8.1 The Consultant is required to submit a detailed definition of the methodology and tools to be applied

in addressing the scope of work and provide an indicative work plan.

3.8.2 The Consultant is also required to provide three (3) reference sites where similar work has been conducted.

3.8.3 The Consultant is further required to provide three (3) testimonial letters or evidence to demonstrate

that good quality work was completed on the quoted reference sites above. The years in which the assignments were carried out should be clearly indicated and experience sites should be of work

carried out within the past five (5) years.

3.9 Definition of Terms

3.9.1 Consultant: means the person who has been proposed to perform the specific role in the scope of

work (may be a company or individual);

3.9.2 Experience: means proven and actual involvement of the Consultant on the specific

project/assignment;

3.9.3 Reference sites: means the contactable reference sites where the Consultant has completed similar work previously;

3.9.4 Methodology: means the methods and tools that will be used to deliver the scope of work.

3.10 Logistics and Timing The urgency of implementing this project calls for a tight schedule as indicated below:

Launching of RFP : August 2017 Final submission of Proposals : August 31, 2017

Selection of successful consultant : September 2017

Award of contract : September 2017

3.11 Remuneration

Remuneration will be based on the completion of deliverables as set out below: i. Phase 1 – 25% - Upon Submission and approval of the Inception Report - 3.5.1

ii. Phase 2 – 25% - Upon Completion of Deliverable - 3.5.2, 3.5.3, 3.5.4, 3.5.5, 3.5.6

iii. Phase 3 – 25% - Upon Completion of Deliverable - 3.5.7, 3.5.8, 3.5.9, 3.5.10, 3.5.11 iv. Phase 4 – 25% - Upon Completion of Deliverable - 3.5.12, 3.5.13, 3.5.14, 3.5.15, 3.5.16, 3.5.17, 3.8.18

3.12 Evaluation Criteria The Consultancy will be awarded based on the following criteria:

3.12.1 Average Consultant’s experience in the field of the assignment

(1yr to 4yrs = 5), (5yrs to 8yrs = 10), (9yrs and up =20) 20

3.12.2 Qualifications and professional experience of key staff proposed for the assignment 10

3.12.3 Understanding of the TOR and methodology to be adopted when conducting the

Page 13: ANGUILLA ELECTRICITY COMPANY LIMITED (ANGLEC) · Electricity Company Limited, P.O. Box 400, The Valley, AI-2640, Anguilla, BWI. 2.3.4 The proposal must reach the above-mentioned address

12

assignment 40

3.12.4 Reference Sites and Testimonials 15

3.12.5 Reasonableness of the duration of the assignment with consideration to 3.5 above 15 TOTAL: 100

Minimum score required to pass the technical evaluation is 75

Consultants that do not pass the technical criteria will not be considered further and the ir financial proposals will

be left unopened.

The evaluation of the overall proposals will be based on the following weights:

70% for the Technical and 30% for the Financial Proposals

3.13 Cost of preparing the Proposal

The cost of preparing the Proposal and negotiating the contract, including visits to the client are not reimbursable as a direct cost of the assignment.

3.14 Conditions for Submissions An original and three (3) copies of the Technical and Financial Proposal in separate envelopes clearly

marked Development of Health and Safety Program for ANGLEC should be delivered to: The Chief

Executive Officer, The Anguilla Electricity Company Limited, P.O. Box 400, The Valley, AI-2640, Anguilla, BWI

Proposals will be opened in the presence of bidders who wish to attend. Electronic submissions by email will not be accepted and late bids will be rejected. All documents should be typed in Times New Roman

font 12.

3.15 Authorized Signatory

An authorized representative of the Consultant shall initial all pages of the Proposal. The representative authorization shall be confirmed by a written Power of Attorney / Justice of the Peace accompanying the

Proposal.

3.16 Requests for Clarification

Any request for clarification of the RFP shall be made, at least 15 days before the date fixed for submission

of the Proposal and the response will be circulated to others.

3.17 Contacts

All requests for clarifications should be directed to Shenique Clare, Health and Safety Officer at [email protected].

Page 14: ANGUILLA ELECTRICITY COMPANY LIMITED (ANGLEC) · Electricity Company Limited, P.O. Box 400, The Valley, AI-2640, Anguilla, BWI. 2.3.4 The proposal must reach the above-mentioned address

13

APPENDIX 1

TECHNICAL PROPOSAL

SUBMISSION FORMS

Page 15: ANGUILLA ELECTRICITY COMPANY LIMITED (ANGLEC) · Electricity Company Limited, P.O. Box 400, The Valley, AI-2640, Anguilla, BWI. 2.3.4 The proposal must reach the above-mentioned address

14

A. TECHNICAL PROPOSAL SUBMISSION FORM

Date: _______________________

The Chief Executive Officer

The Anguilla Electricity Company Limited

P.O. Box 400

The Valley

AI-2640

Anguilla, BWI

Dear Sir,

We, the undersigned, offer to provide the consulting services for the Development of the Occupational Health and Safety Program for ANGLEC in accordance with your Request for Proposal and our Proposal. We are hereby submitting our Proposal, which includes this Technical Proposal and a Financial Proposal sealed under separate envelopes. Our Proposal is binding upon us and subject to the modifications resulting from Contract negotiations. We understand you are not bound to accept any Proposal you receive.

Sincerely,

Authorized Signatory : _______________________________ (supported by Power of Attorney / Justice of the Peace)

Name and Title of Signatory : _______________________________ Name of Bidder : _______________________________

Address : _______________________________

Date : _______________________________

Page 16: ANGUILLA ELECTRICITY COMPANY LIMITED (ANGLEC) · Electricity Company Limited, P.O. Box 400, The Valley, AI-2640, Anguilla, BWI. 2.3.4 The proposal must reach the above-mentioned address

15

B. REFERENCES

Relevant Services Carried Out in the Last Five Years That Best Illustrate Qualifications

Using the format below, provide information on each Assignment.

Assignment Name: Country:

Location within Country: Professional Staff Provided:

Name of Client: No of Staff:

Address: No of Staff – Weeks; Duration of Assignment:

Start Date(Month/Year): Completion Date(Month/Year):

Approx. Value of Services:

Name of Associated Consultants, If Any: No of Weeks of Professional Staff Provided by Associated Consultants:

Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed:

Narrative Description of Project:

Description of Actual Services Provided by Your Staff:

Bidder’s Name: ______________________________________

Page 17: ANGUILLA ELECTRICITY COMPANY LIMITED (ANGLEC) · Electricity Company Limited, P.O. Box 400, The Valley, AI-2640, Anguilla, BWI. 2.3.4 The proposal must reach the above-mentioned address

16

C. COMMENTS AND SUGGESTIONS OF CONSULTANTS ON THE DESCRIPTION OF SERVICES AND TOR.

On the Description of Services:

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

On the TOR:

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

Page 18: ANGUILLA ELECTRICITY COMPANY LIMITED (ANGLEC) · Electricity Company Limited, P.O. Box 400, The Valley, AI-2640, Anguilla, BWI. 2.3.4 The proposal must reach the above-mentioned address

17

D. DESCRIPTION OF THE METHODOLOGY AND WORK PLAN FOR PERFORMING THE ASSIGNMENT

E. TEAM COMPOSITION AND TASK ASSIGNMENTS

Name Relevant Experience

(Years) Task / Function Position

Page 19: ANGUILLA ELECTRICITY COMPANY LIMITED (ANGLEC) · Electricity Company Limited, P.O. Box 400, The Valley, AI-2640, Anguilla, BWI. 2.3.4 The proposal must reach the above-mentioned address

18

F. TIME SCHEDULE FOR REPORTS/ACTIVITIES DELIVERY

WEEKS (represent as a bar chart)

SECTION / DELIVERABLE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Inception Report

Phase 1 - Overall

Health and Safety Policy Statement

Health and Safety Rules and Enforcement

Safe Practices and Procedures

Phase 2 - Overall

Emergency Procedures

Inspections

Training and Education

Incident Reporting Procedures and Investigations

Joint Health and Safety Committee

Phase 3 - Overall

Workplace Hazardous Material Information Systems (WHMIS)

Injury and Illness Protection Program

Violence Prevention

Contractor Safety

Records and Statistics

Forms and Checklists

Final Draft and Close out meeting

Phase 4 - Overall

Signature: _________________________

Position: __________________________

Date: _____________________________

Page 20: ANGUILLA ELECTRICITY COMPANY LIMITED (ANGLEC) · Electricity Company Limited, P.O. Box 400, The Valley, AI-2640, Anguilla, BWI. 2.3.4 The proposal must reach the above-mentioned address

19

APPENDIX 2

FINANCIAL PROPOSAL

SUBMISSION FORMS

Page 21: ANGUILLA ELECTRICITY COMPANY LIMITED (ANGLEC) · Electricity Company Limited, P.O. Box 400, The Valley, AI-2640, Anguilla, BWI. 2.3.4 The proposal must reach the above-mentioned address

20

A. FINANCIAL PROPOSAL SUBMISSION FORM

Date: _______________________

The Chief Executive Officer

The Anguilla Electricity Company Limited

P.O. Box 400

The Valley

AI-2640

Anguilla, BWI

Dear Sir

We, the undersigned, offer to provide the consulting services for the Development of the Occupational Health and Safety Program for ANGLEC in accordance with your Request for Proposal and our Proposal (Technical and Financial Proposals). Our attached Financial Proposal is for the sum of ______________________________________________________________ ($ ) This amount is final. Our Financial Proposal shall be binding upon us subject to the modifications resulting from Contract negotiations, up to expiration of the validity period of the Proposal.

We understand you are not bound to accept any Proposal you receive.

Sincerely,

Authorized Signatory : _______________________________ (supported by Power of Attorney / Justice of the Peace)

Name and Title of Signatory : _______________________________ Name of Bidder : _______________________________

Address : _______________________________

Date : _______________________________

Page 22: ANGUILLA ELECTRICITY COMPANY LIMITED (ANGLEC) · Electricity Company Limited, P.O. Box 400, The Valley, AI-2640, Anguilla, BWI. 2.3.4 The proposal must reach the above-mentioned address

21

B. BREAK DOWN OF PRICE PER SECTION / DELIVERABLE

SECTION / DELIVERABLE INDIVIDUAL COST PHASE COST

Inception Report 1

Health and Safety Policy Statement

2 Health and Safety Rules and Enforcement

Safe Practices and Procedures

Emergency Procedures

3

Inspections

Training and Education

Incident Reporting Procedures and

Investigations

Joint Health and Safety Committee

Workplace Hazardous Material Information

Systems (WHMIS)

4

Injury and Illness Protection Program

Violence Prevention

Contractor Safety

Records and Statistics

Forms and Checklists

Final Draft and Close out meeting

SUB-TOTAL USD

C. TOTAL COST

ITEM DETAILS COST

SUB - TOTAL COST (from above) USD

TOTAL AMOUNT FOR FINANCIAL PROPOSAL USD