1
2
Annexure-I
Details of Material
Sl. No.
SIL Material Code
Description Quantity Required (In nos.)
Specifications
1. F49511624 HIGH PRESSURE HOSE 3/4” 3000 MM
10.00 As Per Description (Best Quality ) & ISI Mark
2. F49511640 H.P. HYDROLIC HOSE 5000MM 3/4” BSP-FITTING AT BOTH END W.P. 150-200
10.00 As Per Description (Best Quality) & ISI Mark
3
4
5
6
7
8
Annexure-III
CHECK LIST
Tender No. Due Date
(Please ensure that following documents/details have been enclosed /accepted)
Sl. No. Particulars Status Please tick
(√)
1 Every page of tender duly signed, stamped & attached Yes
2 Validity of offer 90 days from the tender opening date Yes
3 Quoted prices shall be FIRM & FINAL for full supply of order. Yes
4
Following declarations on party letterhead enclosed
a) We hereby certify that we have not been blacklisted by any Public Sector Undertaking/Public Department.
b)We have gone through the terms and conditions given in your above tender form, is accepted and agreed by us
Yes
5 PRICE BID :Party to indicate excise duty, sales tax / VAT etc
- All column of price bid filled up in the price bid Yes
6 All prices quoted against individual items in figures and also in words in price bid
Yes
7 The Delivery Term shall be “FOR SIL Stores”, Yes
8 The Payment term shall be “45 days direct credit from the date of receipt
of material at SIL” Yes
9 S.I.L. reserves the right to reject any offer due to non-compliance with the above conditions and/or non-receipt of this form in duly filled condition - Agreed
Yes
10 For Delivery Term FOR SIL, Transit insurance shall be at party’s end and it should be included in quoted basic rate.
Yes
11 Integrity Pact document accepted and Signed by Party Yes
12
Extra for New Vendors.
To submit Vendor Registration Form along with offer (available in SIL web
site- www.scootersindia.com) Enclosed.
Yes
9
Annexure-IV
PRICE BID
Supplier’s Name: …………….. Enquiry No:
Dated: Signature of Supplier
Seal:
Sl. No.
Material Code
Description Quantity Reqd.
(In Nos.)
TO BE FILLED BY VENDORS
Basic Rate Per Unit (Exclusive Taxes)
( In Rupees) Excise Duty (%)
CST Against “Form
C” (%)
VAT + SAT (%)
In Digits
In words
1. F49511624 HIGH PRESSURE HOSE 3/4” 3000 MM
10.00
2. F49511640 H.P. HYDROLIC HOSE 5000MM 3/4” BSP-
FITTING AT BOTH END W.P. 150-200
10.00
10
Annexure-V
SIL – SPECIAL TERMS AND CONDITIONS Criteria for quantity distribution shall be as follows:-
The following Special Conditions without any deviation needs to be adhered to.
I. Check list must be filled up and enclosed by vendors.
II. Prices shall be firm as per PO for full supply.
III. The payment terms shall be 45 days direct credit from the date of receipt of material at SIL.
IV. The supply shall be strictly as per specification (Annexure-I)
V. The delivery term shall be “FOR SIL Store “
VI. Test Certificate mast be enclosed along with Supply.
VII. In addition to above New Vendors shall submit Vendor Registration Form (available in SIL
Website – www.scootersindia.com) along with offer.
Item Sl. No. Distribution (in %)
L1 Source L2 Source
2 100 -
11
Annexure-VI PRICE-BID EVALUATION CRITERIA
(1) Bid shall be evaluated on the basis of cost to SIL (as per the basis given below), subject to fulfillment of special terms & conditions:-
Sl. No. Factors
1 Basic Price
2 Discount (Less)
3 Packing & forwarding
4 Excise Duty
5 CST with or without form
6 UP VAT
7 others
8 Development Tax
9 freight
10 Transit insurance
11 Payment Terms In Days
12 Modvat(Less)
13 UPTC(Less)
Excise and UP VAT will be returned to SIL. Cost to SIL = [1-2+3+5+7+8+9+10] Landed cost = [1-2+3+4+5+6+7+8+9+10] Payment term = Factor Applicable* x Landed cost
*(2) Quantity distribution 100% On L1 source. The following loading factors shall be applicable w.r.t. different payment terms in number of days for relative evaluation purpose.
Sl. No. Payment Term Credit Days Value of Loading factor
1. Credit period(PREFERED) 45 0
2. Credit period 60 (-) 0.0070
3. Credit period (>) 60 (-) 0.0070
4. Credit period 30 (+) 0.0070
5. Credit period 21 (+) 0.0111
6. Credit period 15 (+) 0.0139
7. Payment through bank/ COD 0 (+) 0.0209
8. Advance payment (against Performa Invoice)
(-) 45 (+) 0.0418
12
Annexure – VII
13
14
15
16
17