ANNOUNCEMENT CBM & PETROLEUM BIDDING ROUND
DIRECT PROPOSAL YEAR 2011
MINISTRY OF ENERGY AND MINERAL RESOURCES REPUBLIC OF INDONESIA
DIRECTORATE GENERAL OF OIL AND GAS
LEGEND :
GMB BANGKANAI I BLOCK
GMB BANGKANAI I BLOCK (CENTRAL & EAST KALIMANTAN)
SIZE : 1,082 SQ KM
WEST SUMATERA
LEGEND :
GMB BANGKANAI III BLOCK
GMB BANGKANAI III BLOCK (CENTRAL & EAST KALIMANTAN)
SIZE : 962.2 SQ KM
East Kalimantan
LEGEND :
GMB BANGKANAI IV BLOCK
GMB BANGKANAI IV BLOCK (CENTRAL KALIMANTAN)
SIZE : 1,430 SQ KM
Central Kalimantan
South Kalimantan
LEGEND :
GMB KUALA KAPUAS I BLOCK
GMB KUALA KAPUAS I BLOCK (CENTRAL KALIMANTAN)
SIZE : 1,500 SQ KM
Central Kalimantan
South Kalimantan
LEGEND :
GMB KUALA KAPUAS II BLOCK
GMB KUALA KAPUAS II BLOCK (CENTRAL KALIMANTAN)
SIZE : 1,500 SQ KM
LEGEND :
GMB WEST SANGA – SANGA I BLOCK
GMB WEST SANGA-SANGA I BLOCK (EAST KALIMANTAN)SIZE : 1,634 SQ KM
No
WORKING AREA
Contract Model
TERMS AND CONDITIONS
Minimum CommitmentBlocks Size(Km 2)
RelinquishmentDMO\ (%)
FTP*(%)
Gov. Split(%)
After Tax
Contractor Split (%)After Tax
Cost Recovery
Minimum Signature Bonuss
(US$)
First3 Year
(%)
Remaining Area
6 Year*(%)
1. GMB Bangkanai I 1.082 PSC 10 80 25 10 55 45 100% 1,000,000
G&G Study, 2 Corehole, 2 Exploration Well + Production Test
2. GMB Bangkanai II 1.022 PSC 10 80 25 10 55 45 100% 1,000,000
G&G Study, 2 Corehole, 2 Exploration Well + Production Test
3. GMB Bangkanai III 962 PSC 10 80 25 10 55 45 100%
1,000,000 G&G Study, 2 Corehole, 2 Exploration Well + Production Test
4. GMB Bangkanai IV 1.430 PSC 15 70 25 10 55 45 100% 1,000,000
G&G Study, 2 Corehole, 2 Exploration Well + Production Test
5. GMB Kuala Kapuas I 1.500 PSC 15 70 25 10 55 45 100% 1,000,000
G&G Study, 2 Corehole, 1 Exploration Well + Production Test
6. GMB Kuala Kapuas II 1.500 PSC 15 70 25 10 55 45 100% 1,000,000
G&G Study, 2 Corehole, 1 Exploration Well + Production Test
7. GMB TanahLaut 1.046 PSC 10 80 25 10 55 45 100% 1,500,000
G&G Study, 2 Corehole, 2 Exploration Well + Production Test
8. GMB West Sanga-Sanga I 1.634 PSC 20 60 25 10 55 45 100% 1,000,000
G&G Study, 2 Corehole, 1 Exploration Well + Production Test
Information :* FTP 10% for Government and undivided w ith Contractor
TERMS AND CONDITIONS OF CBM DIRECT PROPOSAL TENDER YEAR 2011
Information :1) FTP 20% share for the Government and the Contractor based on the amount of split2) DMO Fee after 5 (f ive) years of production by 25% of export price3) For the above calculation results based on the tax by 40%. Realization of Profit Sharing Amount under the provisions of the applicable tax regulations
TERMS AND CONDITIONS OF PETROLEUMDIRECT PROPOSAL BIDDING SECOND ROUND YEAR 2011
No.
Working Area
Contract Model
Term and Condition
MINIMUM COMMITMENT
Relinquishment First
3 YearFTP1)
DMO
Gov. Split (%)
After Tax3)
Contractor Split (%)
After Tax3) Minimum Bonus (US$)
Block Size (Km2)
Volume Fee2) Oil Gas Oil Gas
1 KUALA PAMBUANG 7.946,19 PSC 30% 20 25% 25% 60 60 40 40 1.000.000 SEISMIC
CBM & PETROLEUMBIDDING ROUND SCHEDULE
DIRECT PROPOSAL TENDER
• ACCESS BID DOCUMENT : SEPTEMBER 12, 2011 - OCTOBER 26, 2011
• CLARIFICATION FORUM : OCTOBER 17, 2011 – OCTOBER 25, 2011
• SUBMIT PARTICIPATING DOCUMENT : OCTOBER 27, 2011, TIME 09.30 AM – 02.30 PM
CONDITIONS FOR PARTICIPATING IN TENDER
• Bid Document Fee is US$ 5,000 (one Bid Document coresspond to one block)• Payment shall be made to the account of "Kegiatan Pelaksanaan Pengelolaan
(KPP) Wilayah Kerja Minyak dan Gas Bumi number 122.00.0110899-5, Bank Mandiri Cabang Jakarta Kebon Melati”, SWIFT CODE: BMRIIDJA
• Data Package Fee for each block may vary based on data quantity for each block
• Data other than Data Package may be accessed from Speculative Survey Company.
THANK YOU
FURTHER INFORMATION, PLEASE CONTACT :
DIREKTORAT JENDERAL MINYAK DAN GAS BUMIDIREKTORAT PEMBINAAN USAHA HULU MINYAK DAN GAS BUMI
PLAZA CENTRIS BUILDING, 7TH FLOORJL. HR. RASUNA SAID KAV. B-5, JAKARTA 12929, INDONESIA
PHONE: 62-21- 5268910 PESAWAT : 139, 145, 169FACSIMILE : 62-21-5269151
http : www.migas.esdm.go.id