10 July 2017 National Treasury ANNUAL EVALUATION OF BEPPs – FOCUS ON SPATIAL PLANNING 2017/18 MTREF
Transcript
Page 1: ANNUAL EVALUATION OF BEPPs FOCUS ON SPATIAL PLANNING … _Centre... · (iv) List of prioritised IZ-wide projects, with descriptions, high level costings and mapped number references

10 July 2017

National Treasury

ANNUAL EVALUATION OF BEPPs

– FOCUS ON SPATIAL PLANNING

2017/18 MTREF

Page 2: ANNUAL EVALUATION OF BEPPs FOCUS ON SPATIAL PLANNING … _Centre... · (iv) List of prioritised IZ-wide projects, with descriptions, high level costings and mapped number references

Well Governed Cities

Partnership-based approach to the

financing, packaging & delivery of

catalytic projects in spatially

targeted areas

Enabling Environment for

City Transformation

Restructured fiscal & financial

framework to support urban

growth

Compact Cities &

Transformed Urban Space

Inclusive Cities

Productive Cities

Sustainable Cities

Urban

economic

growth and a

reduction of

inequality and

poverty

New housing options

with social diversity

Affordable & efficient

public transport services

Integrated public

transport system that is

used by the majority of

city inhabitants

Growing city economies

Increased city

productivity

Sustainable resource

utilisation

Delivery of catalytic projects in

spatially targeted areas

Citizen involvement in the

delivery of projects in spatially

targeted areas

Accessible social

facilities and services

COMPACT CITIES & TRANSFORMED

URBAN SPACES

Page 3: ANNUAL EVALUATION OF BEPPs FOCUS ON SPATIAL PLANNING … _Centre... · (iv) List of prioritised IZ-wide projects, with descriptions, high level costings and mapped number references

UNS, Integration Zone, Precinct Planning

– Urban Network Strategy Guidelines

– Integration Zone Planning Guidelines

– Precinct Planning Guidelines

– Precinct Management Guidelines

Page 4: ANNUAL EVALUATION OF BEPPs FOCUS ON SPATIAL PLANNING … _Centre... · (iv) List of prioritised IZ-wide projects, with descriptions, high level costings and mapped number references

IGPP & CATALYTIC PROJECTS - DIRECT RESULT OF

SPATIAL PLANNING

Page 5: ANNUAL EVALUATION OF BEPPs FOCUS ON SPATIAL PLANNING … _Centre... · (iv) List of prioritised IZ-wide projects, with descriptions, high level costings and mapped number references

URBAN NETWORK PLANNING - 2016/17 BEPPs

Page 6: ANNUAL EVALUATION OF BEPPs FOCUS ON SPATIAL PLANNING … _Centre... · (iv) List of prioritised IZ-wide projects, with descriptions, high level costings and mapped number references

Minimum Requirements 2017/18

Approved

BEPP

2017/18

a) A draft Spatial Logic (mapped) for all IZs including highlighted Prioritised IZ showing:-

township populations;

Identified economic nodes, segmented into emerging (urban hubs), declining (CBDs) and established

employment nodes;

Prioritised marginalised areas segmented into townships, informal settlements and inner cities

b) A statement of the prioritization of the various integration zones in terms of the Intergovernmental Project Pipeline

(Annexure 2).

Approved

BEPP 2018/19

a) A prioritised integration zone plan consisting of the following:

(i) IZ Targets (Residential, Community, Employment, Transport)

(ii) Prioritised precincts (IZ phasing)

(iii) Precinct Targets (Residential, Community, Employment, Transport)

(iv) List of prioritised IZ-wide projects, with descriptions, high level costings and mapped number references in

the Intergovernmental Project Pipeline format (Annexure 2).

(v) Prioritised IZ-wide interventions (land release proposals, procurement proposals, proposed policy,

regulations, incentives, further studies, operational efficiencies, specifically public transport, including

alignment between modes and spheres)

b) Evidence of consultation with relevant provincial, national and SOE sectors (minutes and attendance registers of

meetings).

The content will appear as Section B of the BEPP

6

Finalising urban network and Integration Zone planning and prioritisation

Page 7: ANNUAL EVALUATION OF BEPPs FOCUS ON SPATIAL PLANNING … _Centre... · (iv) List of prioritised IZ-wide projects, with descriptions, high level costings and mapped number references

7

EKURULENI 2017/18 BEPP URBAN NETWORK PLAN

Page 8: ANNUAL EVALUATION OF BEPPs FOCUS ON SPATIAL PLANNING … _Centre... · (iv) List of prioritised IZ-wide projects, with descriptions, high level costings and mapped number references

8

BCM 2017/18 BEPP URBAN NETWORK PLAN

King Williams Town

Bhisho

Berlin Industrial

East Ldn CBD

Mdantsane Urban

Hub

Mt Ruth

Station

Page 9: ANNUAL EVALUATION OF BEPPs FOCUS ON SPATIAL PLANNING … _Centre... · (iv) List of prioritised IZ-wide projects, with descriptions, high level costings and mapped number references

9

ETHEKWINI 2017/18 BEPP URBAN NETWORK PLAN

Page 10: ANNUAL EVALUATION OF BEPPs FOCUS ON SPATIAL PLANNING … _Centre... · (iv) List of prioritised IZ-wide projects, with descriptions, high level costings and mapped number references

10

JOHANNESBURG 2017/18 URBAN NETWORK PLAN

Page 11: ANNUAL EVALUATION OF BEPPs FOCUS ON SPATIAL PLANNING … _Centre... · (iv) List of prioritised IZ-wide projects, with descriptions, high level costings and mapped number references

11

TSHWANE 2017/18 URBAN NETWORK PLAN

Page 12: ANNUAL EVALUATION OF BEPPs FOCUS ON SPATIAL PLANNING … _Centre... · (iv) List of prioritised IZ-wide projects, with descriptions, high level costings and mapped number references

12

MANGAUNG 2017/18 URBAN NETWORK PLAN

Page 13: ANNUAL EVALUATION OF BEPPs FOCUS ON SPATIAL PLANNING … _Centre... · (iv) List of prioritised IZ-wide projects, with descriptions, high level costings and mapped number references

13

NMB 2017/18 URBAN NETWORK STRATEGY

Page 14: ANNUAL EVALUATION OF BEPPs FOCUS ON SPATIAL PLANNING … _Centre... · (iv) List of prioritised IZ-wide projects, with descriptions, high level costings and mapped number references

14

CAPE Town 2017/18 URBAN NETWORK PLAN

Page 15: ANNUAL EVALUATION OF BEPPs FOCUS ON SPATIAL PLANNING … _Centre... · (iv) List of prioritised IZ-wide projects, with descriptions, high level costings and mapped number references

15

CAPE Town 2017/18 URBAN NETWORK PLAN