Managed for the U.S. Department of Energy by Brookhaven Science Associates Bill Dorsch, Manager Groundwater Protection Group Annual Groundwater Update Review of Plumes,Treatment Systems, Performance and Progress Presentation to CAC November 13, 2014
Transcript
Page 1: Annual Groundwater Update - Brookhaven National Laboratory · 2014-11-14 · Annual Groundwater Update ... Performance and Progress Presentation to CAC November 13, 2014. 2 Agenda

Managed for the U.S. Department of Energy by Brookhaven Science Associates

Bill Dorsch, Manager Groundwater Protection Group

Annual Groundwater Update

Review of Plumes,Treatment Systems, Performance and Progress

Presentation to CAC November 13, 2014

Page 2: Annual Groundwater Update - Brookhaven National Laboratory · 2014-11-14 · Annual Groundwater Update ... Performance and Progress Presentation to CAC November 13, 2014. 2 Agenda

2 2

Agenda

Treatment system status/plume update

Completion of deep Volatile Organic Compounds (VOC) characterization on and off-site

Modification to Industrial Park Treatment System

Reactor surveillance and maintenance update

Page 3: Annual Groundwater Update - Brookhaven National Laboratory · 2014-11-14 · Annual Groundwater Update ... Performance and Progress Presentation to CAC November 13, 2014. 2 Agenda

3 3

Groundwater Status Report (Volume 2 of Site Environmental Report)

Presentation summarizes highlights of 2013 Report

Web link for report: http://www.bnl.gov/gpg/files/Annual_Reports/2013pdf/Main_text.pdf

Page 4: Annual Groundwater Update - Brookhaven National Laboratory · 2014-11-14 · Annual Groundwater Update ... Performance and Progress Presentation to CAC November 13, 2014. 2 Agenda

4 4

Groundwater Treatment Systems/Plumes Status

10 systems operating 5 systems in shut-down

mode 3 systems decommissioned 1996 - 2013:

• 22 billion gallons of contaminated groundwater treated and recharged to the aquifer

• 7,133 lbs VOCs removed

• 29 mCi Sr-90 removed

Page 5: Annual Groundwater Update - Brookhaven National Laboratory · 2014-11-14 · Annual Groundwater Update ... Performance and Progress Presentation to CAC November 13, 2014. 2 Agenda

5 5

Groundwater Treatment System Completion Process

Achieve plume capture goal for system (typically < 50 µg/L Total VOC (TVOC) in monitoring and extraction wells)

Petition Regulators for system shutdown

Upon approval, turn extraction wells off and maintain in standby mode/sample wells for several years If no rebound in VOC concentrations is observed, petition Regulators for system closure (Upon approval, decommission equipment, abandon wells, limited continued monitoring)

Page 6: Annual Groundwater Update - Brookhaven National Laboratory · 2014-11-14 · Annual Groundwater Update ... Performance and Progress Presentation to CAC November 13, 2014. 2 Agenda

6 6

Groundwater Treatment Systems/Plumes Status Systems Closed: OU IV Air Sparge/Soil

Vapor Extraction (2003) Carbon Tetrachloride

(2010) Industrial Park East (2013) Systems Shut Down: OU I South Boundary

(2013) Industrial Park (2013) North Street (2013) North Street East (2014) HFBR Tritium Pump and

Recharge (2013)

Page 7: Annual Groundwater Update - Brookhaven National Laboratory · 2014-11-14 · Annual Groundwater Update ... Performance and Progress Presentation to CAC November 13, 2014. 2 Agenda

7

Groundwater Treatment System

Status

1995 2015 2035 2055 2075

OU I S. Boundary

OU 3 S. Boundary

Industrial Park

OU 3 Middle Rd.

OU 3 WSB

OU 3 Ind.Park E.

OU 3 LIPA/Airport

Magothy

OU 3 North St. East

OU 6 EDB

OU 3 North St.

Carbon Tet

Bldg. 96

OU IV AS/SVE

HFBR

Chem Holes Sr-90

BGRR Sr-90

Groundwater Treatment System Timelines

Original Operations Updated Operations Monitoring Only

Page 8: Annual Groundwater Update - Brookhaven National Laboratory · 2014-11-14 · Annual Groundwater Update ... Performance and Progress Presentation to CAC November 13, 2014. 2 Agenda

VOC Remediation Progress 1997 to 2013

Page 9: Annual Groundwater Update - Brookhaven National Laboratory · 2014-11-14 · Annual Groundwater Update ... Performance and Progress Presentation to CAC November 13, 2014. 2 Agenda

9 9

North Street East Plume/System Shutdown

System shut down June 2014 Historical high TVOC

concentration in this area 490 ug/L in 1998 Maximum TVOC

concentration in 2014 was 7 ug/L (individual VOCs <Drinking Water Standards) No significant VOC

concentration rebound observed

Page 10: Annual Groundwater Update - Brookhaven National Laboratory · 2014-11-14 · Annual Groundwater Update ... Performance and Progress Presentation to CAC November 13, 2014. 2 Agenda

10 10

North Street East Plume/System Shutdown

System shut down June 2014 Historical high TVOC

concentration in this area 490 ug/L in 1998 Maximum TVOC

concentration in 2014 was 7 ug/L (individual VOCs <Drinking Water Standards) No significant VOC

concentration rebound observed

Page 11: Annual Groundwater Update - Brookhaven National Laboratory · 2014-11-14 · Annual Groundwater Update ... Performance and Progress Presentation to CAC November 13, 2014. 2 Agenda

11

Deep VOC Characterization/New Extraction Wells Installed 8 temporary vertical

profile wells and 2 permanent monitoring wells (Weaver Dr.) Installed 8 temporary vertical

profile wells and 8 permanent monitoring wells in Industrial Park Performed capture zone analysis

(groundwater model) using new data to optimally locate extraction wells Installed 2 new deeper extraction

wells in Industrial Park Re-using building and equipment

from decommissioned Industrial Park East Treatment System

Page 12: Annual Groundwater Update - Brookhaven National Laboratory · 2014-11-14 · Annual Groundwater Update ... Performance and Progress Presentation to CAC November 13, 2014. 2 Agenda

12

Deep VOC Characterization/New Extraction Wells Installed 8 temporary vertical

profile wells and 2 permanent monitoring wells (Weaver Dr.) Installed 8 temporary vertical

profile wells and 8 permanent monitoring wells in Industrial Park Performed capture zone analysis

(groundwater model) using new data to optimally locate extraction wells Installed 2 new deeper extraction

wells in Industrial Park Re-using building and equipment

from decommissioned Industrial Park East Treatment System

Page 13: Annual Groundwater Update - Brookhaven National Laboratory · 2014-11-14 · Annual Groundwater Update ... Performance and Progress Presentation to CAC November 13, 2014. 2 Agenda

Bldg. 452 Freon-11 Groundwater Treatment System Update

New extraction well (EW-18) has been in operation since March 2012, ~ 90 lbs. Freon removed

Maximum Freon-11 concentrations in source area currently <50 ug/L

Planning follow up characterization of source area

Evaluating system shutdown in 2015

Page 14: Annual Groundwater Update - Brookhaven National Laboratory · 2014-11-14 · Annual Groundwater Update ... Performance and Progress Presentation to CAC November 13, 2014. 2 Agenda

Bldg. 452 Freon-11 Groundwater Treatment System Update

New extraction well (EW-18) has been in operation since March 2012, ~ 90 lbs. Freon removed

Maximum Freon-11 concentrations in source area currently <50 ug/L

Planning follow up characterization of source area

Evaluating system shutdown in 2015

Page 15: Annual Groundwater Update - Brookhaven National Laboratory · 2014-11-14 · Annual Groundwater Update ... Performance and Progress Presentation to CAC November 13, 2014. 2 Agenda

15 15

Radiological Plumes

Page 16: Annual Groundwater Update - Brookhaven National Laboratory · 2014-11-14 · Annual Groundwater Update ... Performance and Progress Presentation to CAC November 13, 2014. 2 Agenda

16

Chemical Holes Sr-90 Plume Progress

Buried waste excavated in 1997

Extraction Well EW-1 began operating in 2003

EW-2 and EW-3 added in 2007

Historical high Sr-90 concentration of 4,720 pCi/L in 2005, highest in 2014 was 129 pCi/L

Extraction wells currently pulse pumping

Petition for Shutdown planned in 2015

Page 17: Annual Groundwater Update - Brookhaven National Laboratory · 2014-11-14 · Annual Groundwater Update ... Performance and Progress Presentation to CAC November 13, 2014. 2 Agenda

17

Chemical Holes Sr-90 Plume Progress

Buried waste excavated in 1997

Extraction Well EW-1 began operating in 2003

EW-2 and EW-3 added in 2007

Historical high Sr-90 concentration of 4,720 pCi/L in 2005, highest in 2014 was 129 pCi/L

Extraction wells currently pulse pumping

Petition for Shutdown planned in 2015

Page 18: Annual Groundwater Update - Brookhaven National Laboratory · 2014-11-14 · Annual Groundwater Update ... Performance and Progress Presentation to CAC November 13, 2014. 2 Agenda

18 18

Reactor Surveillance and Maintenance Update

Completed upgrade to HFBR security system

Completed BGRR

roof repairs

BGRR former office window replacement in progress

Page 19: Annual Groundwater Update - Brookhaven National Laboratory · 2014-11-14 · Annual Groundwater Update ... Performance and Progress Presentation to CAC November 13, 2014. 2 Agenda

19 19

Reactor Surveillance and Maintenance Update

Completed upgrade to HFBR security system

Completed BGRR

roof repairs

BGRR former office window replacement in progress

Page 20: Annual Groundwater Update - Brookhaven National Laboratory · 2014-11-14 · Annual Groundwater Update ... Performance and Progress Presentation to CAC November 13, 2014. 2 Agenda

20 20

Questions and Answers

Page 21: Annual Groundwater Update - Brookhaven National Laboratory · 2014-11-14 · Annual Groundwater Update ... Performance and Progress Presentation to CAC November 13, 2014. 2 Agenda

21 21

OU 3 Deep VOC Cross-Section


Recommended