Transcript
  • 8/3/2019 Annual Meeting JS

    1/33

    Y 2011 Earnings Call - Jindal Saw Dt-13 May11

    Operator

    Ladies and gentlemen, good day and welcome to the Jindal Saw Limited FY11 Results Conference Call hosted by MF Global SifySecurities India Private Limited. As a reminder all participants' line will be in the listen-only mode. And there will be an opportunityfor you to ask questions at the end of today's presentation. Please note that this conference is being recorded. I would now like to hand

    the conference over to Mr. Kapil Bagaria. Thank you and over to you sir.

    Kapil Bagaria, MF Global Sify Securities India Pvt. Ltd.

    Thank you, Faisal. Good evening everyone. On behalf of MF Global, I welcome you all to the FY11 earnings conference call of JindaSaw Limited. To discuss the results we have with us Mr. Indresh Batra and Mr. Vinay Gupta. I would first like to hand over the floorto Mr. Batra to give some initial remarks. And then we can proceed to the Q&A session. So, over to you, sir.

    Indresh Batra, Managing Director

    Good afternoon. Thanks a lot for attending this call. I along with Vinay would present you with what happened in last three monthsand how does it look for next twelve months. Couple of major highlights of the points. Our performance on the profit after tax level

    has been below the market estimate and also about the guidance we were giving. The reason

    was a very significant part of our Helical SAW prices, which was done for domestic GAIL was extremely low margin driven businesswhich was about 3 to Rs. 4000 per metric tonne EBITDA number. So, that has reflected majorly during this quarter. The second is thaon an yearly basis with one analyzes, we have been able to do an EBITDA of 20%, which has been our consistent guidance that wewould be.. For first three quarters, we did above 20% and for the fourth quarter we did 15%. Thereby generating an aggregateEBITDA of about 20%.

    The raw material pricing on the input side specially the coal prices and the coke prices, both have really short-up, as well as the ironore prices they are significantly hinged-up. So, that's why we are very excited about our backward integration into mine, which shouldresult in the significant saving, when they get on line. I will definitely give you an update as to what is happening on mines.

    It's a result which is on fourth quarter side I would definitely in a state that these are subdued results. But in terms of our overall yearlydelivery, we are within the margins in terms of 20% EBITDA and about 11% PAT on a yearly basis. We have comeback to a run rateof about 1,200 crores and we expect that going forward we would be doing about 1.1 odd million tonnes of sale of pipe this year,which will primarily comprise of about 650 to 700,000 tonnes of LSAW and HSAW combined. We would be doing about 300,000tonnes of ductile iron pipes, which will include enhanced production for some part of the year from our Abu Dhabi plant.

    And we will be doing about 160,000 tonnes of seamless pipe, which will also include some drill pipe in it, which is gettingcommissioned as we speak, it's a relabeled in terms of production. These are some of the challenges of raw material costs are nounder the control even the best of judgment we can, commodity prices have reasonably been volatile. We have been able to controlthem on our LSAW, HSAW style, because of our policy to contract the steel pricing from the steel makers as soon as we get an order.But in the business of ductile iron pipes, where we use iron ore and coal, these are more salt driven. And our order book also is not ofa contractual nature, where we get a significant order for a significant period of time.

    So, there we get definitely affected. Every single shipment of coal can change the pricing in a very significant way. I think the wholeindustry is witnessing that. Our outlook on commodity pricing, it is difficult to take a call. We would have to play as we go alongThis can post some rest to, as specifically to our ductile business. But our backward integration into iron ore mines, which is about90% or 85% of our total raw material cost, should bring up clear winner in the whole ductile iron space. And we are able to streamlinepricing as well as the volatility of that pricing.

    In terms of what should we expect next year, as I said we should be looking at good terms of tonnage, which should deliver top-line athe current market pricing of about 6,500 crores. We would be targeting about 17 to 18% EBITDA at this level, which is lower than20% plus for the last two years, but this is primarily because of the higher input pricing. We see that in the fourth quarter being, of thecurrent financial year to be significantly higher EBITDA, because of our mining coming into the play. We expect that our iron oremine, which we said should be able to supply our beneficiated iron ore by September. We still are not taking as a prudent policy forOctober to December, but we are taking the benefit from January to March.

  • 8/3/2019 Annual Meeting JS

    2/33

    This should be a reasonably large value creator. So, we will see the third and what for sure the fourth quarter has to be the significanthigher EBITDA number. Thereby implying that we would see lower EBITDA numbers on first and second quarter. Because wecontinue to execute some part of our domestic Helical SAW price, which are not analyzing any meaningful EBITDA. We would bevery careful with the market opportunities that we can produce since there is 1 million tonnes of may be Helical's and LSAWcombined. But we will not take orders, which are not, do not meet our hurdle rate of our EBITDA expectation. We have miningoperations remain on track and I continue to emphasize because I believe that's a very, very large value creator for Jindal Saw.

    The first value comes out of the beneficiated iron ore itself. The iron ore should allow us to have about 300 crores saving on EBITDAalone, even taking a conservative deal. Part of that would be available this year and for the whole next year that would be availableWe also are setting 2.4 million tonne pellet plant in phases. The first phase should be fully available for benefit, for the FY12 and '13.We expect to generate about 700 crore additional EBITDA from that. We would be commissioning the expansion of our ductile ironplant both in Abu Dhabi and Mundra by December of this year.

    So, they will remain available for one quarter. But we haven't taken the full one quarter production benefit in this financial year. Oursecond phase of palletization would get commissioned in '13, '14, where we expect again a very significant EBITDA transfer to thebusiness. We expect these results to be delivered, as we expect for the next financial year in terms of tonnage, sizing and EBITDAOur first two quarters would be subdued, but our next two quarter would be, and the fourth quarter specifically would be significant.

    I think with this I would be very happy along with Vinay to answer your specific queries and points in details you would like to knowAnd I am very happy to do that. Thanks.

    Questions And Answers

    Operator

    Thank you very much sir. Ladies and gentlemen, we will now begin with the question-and-answer session. [Operator Instructions].The first question is from the line of Ram Modi from Dolat Capital. Please go ahead.

    Ram Modi

    Hello. Good evening sir.

    Indresh Batra, Managing Director

    Good evening, Ram.

    Ram Modi

    Sir, just wanted to know the employee cost has jumped a lot so is there any specific reason?

    Indresh Batra, Managing Director

    The annual increment process in our company is done in October. And it gets implemented by January or February, but the wages are

    due as of 1st October. So, there is a significant outflow which is very, I mean it's every year you will see that there is a significantjump, but it's on account of wages. We normally would go with the industry standard, but our average wage and fees has been about11 to 12%.

    Ram Modi

    Just wanted to know how much is, what the quarterly run rate we can expect on employee cost now? Just wanted to check how muchwas the arrear for the quarter, October to December?

    Indresh Batra, Managing Director

  • 8/3/2019 Annual Meeting JS

    3/33

    It's about 5 crores.

    Ram Modi

    Okay.

    Indresh Batra, Managing Director

    Sorry 50 crores.

    Ram Modi

    Okay, okay. And sir, if you can just provide us an update on the Jindal ITF business that will be helpful?

    Indresh Batra, Managing Director

    Sure. Ram, we can give this, but we can go with the Jindal SAW questioning and I would comeback and give you a detailed update tothe, for the benefit of everyone in Jindal ITF.

    Ram Modi

    Okay, okay. Fine, okay. And sir just to be, wanted to know how the pricing has been moving in DI pipes? Have we will been able to aleast for new orders able to pass on the cut, increased raw material cost or the pricing remains the same and we are hit by rawmaterials? I am just...

    Indresh Batra, Managing Director

    As of now the pricing power is not with the producer. We expect that rational pricing should move, but as of today the pricing isalmost what it was last quarter and quarter before. And the coke prices have moved up significantly.

    Ram Modi

    So, for even the new orders the margins will below?

    Indresh Batra, Managing Director

    I mean there is a three month gap. I can't say what we will book for three month later production won't be higher. But I would berealistic that there is a significant opportunity to increase the pricing.

    Ram Modi

    Okay. I will join back in the queue sir, yeah.

    Operator

    Thank you. The next question is from the line of Puneet Gulati from HSBC. Please go ahead.

    Puneet Gulati

    Hi. Just wanted to understand when you said there won't be a huddle rate below which you will beat, what is that hurdle rate in termsof EBITDA?

  • 8/3/2019 Annual Meeting JS

    4/33

    Indresh Batra, Managing Director

    We are looking for about 9 to Rs. 10,000 EBITDA on LSAW basis per tonne, per metric tonne. And we are looking on HSAWsomething like Rs. 4,000 EBITDA.

    Puneet Gulati

    Okay. And is this, what is currently in the market as well?

    Indresh Batra, Managing Director

    Currently, I think lot of producer would be doing at negative EBITDA frankly. In terms of Jindal Saw has shown cost operationalefficiency, but I won't comment on what they are doing. But on the orders which we are executing on the GAIL, which is HSAWprice, we haven't been able to realize Rs. 4,000 EBITDA margin.

    Puneet Gulati

    Okay. And how much of that order is still left?

    Indresh Batra, Managing Director

    There is a significant portion, it's about 65 to 70,000 tonnes more often.

    Puneet Gulati

    Okay. More often.

    Indresh Batra, Managing Director

    That's right.

    Puneet Gulati

    Okay. So, your sales, is it possible to give us a breakup of LSAW and HSAW for fourth quarter?

    Indresh Batra, Managing Director

    Absolutely, we can. In terms of, actually you are talking about the quantity?

    Puneet Gulati

    Yeah.

    Indresh Batra, Managing Director

    Yeah. It's approximately 70,000 tonne of longitudinal and roughly 35,000 of Helical what we sold in this quarter.

    Puneet Gulati

    Okay. And, okay. So, this Helical was all GAIL, is it?

  • 8/3/2019 Annual Meeting JS

    5/33

    Indresh Batra, Managing Director

    All, GAIL.

    Puneet Gulati

    Okay. And is it possible to have a similar breakup for the order book, your $1 billion order book in tonnage?

    Indresh Batra, Managing Director

    Approximately 4 lakh tonne of longitudinal.

    Puneet Gulati

    Sorry?

    Indresh Batra, Managing Director

    4 lakh tonne of longitudinal.

    Puneet Gulati

    Okay.

    Indresh Batra, Managing Director

    Approximately 2 lakh tonne of Helical.

    Puneet Gulati

    Okay.

    Indresh Batra, Managing Director

    Close to 180 to 190,000 tonne of ductile. And around 20,000 ton of seamless.

    Puneet Gulati

    Okay.

    Indresh Batra, Managing Director

    Close to 800,000 tonnes put together.

    Puneet Gulati

    Okay.

    Indresh Batra, Managing Director

    Yeah.

  • 8/3/2019 Annual Meeting JS

    6/33

    Puneet Gulati

    Okay. So, that's fine. I'll come back with the questions on JITF data. Thanks for this.

    Indresh Batra, Managing Director

    Thanks.

    Operator

    Thank you. The next question is from the line of Sai Anjali Nair from Capital Market. Please go ahead.

    Sai Anjali Nair

    Hi. Just a little follow-up to one of the questions you had answered. You said that the pricing is now with the producers now and it'sbeen almost the same as what you have been in the last quarter and the previous quarter. Can you tell why the pricing is not moving upthough the coke prices are going up?

    Indresh Batra, Managing Director

    It's about a competitive dynamics in terms of supply and demand. There have been two plants, which have been commissioned in thatone year on ductile iron side. This fresh capacity has definitely put pressure in terms of producers capability to carry this quarter.

    Sai Anjali Nair

    Okay. Also I am so sorry, I just missed out one of your initial remarks. You have said that in FY12, '13, there will be something whichshould be around 700 crore addition, will be an addition to your EBITDA, I missed out?

    Indresh Batra, Managing Director

    Yes, Sai Anjali, we have been allocated mines by Rajasthan, on which the work is continuing. We have about 200 million tonnes ofproven reserves as of today. Our intended use of this mining, the resources have been number one to put up a beneficiation plant tofeed the blast furnace for iron ore. The second purpose of that is to produce 2.4 million tonnes of pallet plants, setting up these plantsin two phases. And I was taking about the EBITDA increase due to the pallet plant capacity.

    Sai Anjali Nair

    That's through pallet plant. Okay.

    Indresh Batra, Managing Director

    That's right.

    Sai Anjali Nair

    All right. Yeah, that's it from me. Thank you.

    Indresh Batra, Managing Director

    Thanks.

  • 8/3/2019 Annual Meeting JS

    7/33

    Operator

    Thank you. The next question is from the line of Nirmal Shah from Alchemy. Please go ahead.

    Nirmal Shah

    Yeah. Good evening sir. Sir, I wanted your volume breakup for the full year for SAW pipes, how much did you produced forlongitudinal and spiral?

    Indresh Batra, Managing Director

    Can you just - do you think that would be helpful?

    Nirmal Shah

    Okay. Sir can you just give us EBITDA, hedge list for these two categories for the year, so that we can come to know how much wassurprising pressure on Y-o-Y basis you are feeling right now?

    Indresh Batra, Managing Director

    Sure. Just hold for a second, yeah we will definitely give you this. Vinay is just digging into that data. If you have the question, nextquestion?

    Nirmal Shah

    Yeah sir, my next question is based on your current order book, close to you have a 6 lakh tonnes of SAW pipe order book. So you arenow hedged back to bit for your raw material price in that?

    Indresh Batra, Managing Director

    Absolutely. For full tonnage, absolutely.

    Nirmal Shah

    So, basically it will be like close to Rs. 10,000 a tonne EBITDA for LSAW and close to 4,000 for spiral, is it right?

    Indresh Batra, Managing Director

    I mean this is not a just a multiplication number. We said, yeah it's about 10,000 and it's about 4,000 for the spiral.

    Nirmal Shah

    Okay. Thanks a lot.

    Indresh Batra, Managing Director

    Thanks, Nirmal.

    Operator

    The next question is from the line of Vineet Maloo from Birla Sun Life. Please go ahead.

  • 8/3/2019 Annual Meeting JS

    8/33

    Vineet Maloo

    Hi. Good afternoon sir.

    Indresh Batra, Managing Director

    Hhi.

    Vineet Maloo

    Sir, still wanted to know your coal inventory situation, I mean you mentioned that coal prices have gone up. So, you already startedbuying $330 coal, right?

    Indresh Batra, Managing Director

    That's right.

    Vineet Maloo

    And so would we have any of the earlier lower price coal in the inventory or all of that has been exhausted?

    Indresh Batra, Managing Director

    We have up to June, but the next cargo which will come in would be at a higher price. But prices have been pretty strong for last aboufour to five month. So, there is no significant advantage of pricing being driving at a very traffic speed. So, that we can take advantageof the dual inventory. Second is that this inventory has to be related with our capacity to push up the prices.

    Vineet Maloo

    Sure.

    Indresh Batra, Managing Director

    So, that flexibility as of today is not available as I said because of the competitive dynamic. So, there is no significant lower price forcoal or coke inventory available with us.

    Vineet Maloo

    No. I'm asking from a point of view that in terms of accounting, we would see lower margins only in September quarter due to highcoal prices right, because you said till June you would still have old inventory?

    Indresh Batra, Managing Director

    That's the correct interpretation. Yeah.

    Vineet Maloo

    Right. It is later to come, but in terms of accounting it will come a little later.

    Indresh Batra, Managing Director

  • 8/3/2019 Annual Meeting JS

    9/33

    This is right. This is absolutely right.

    Vineet Maloo

    And the second thing is on your employee cost, I mean I just wanted to understand, you said 10 to 11% increase you have givenright?

    Indresh Batra, Managing Director

    Okay. Vineet, it's actually what we were trying to streaming that the appraisals under review in the company from October tilSeptember. So, with some other extent that the normal employee increase for the company is wholly 10 to 11 or 12%. Okay, when wetake the salary in the quarter, it was with the arrears. So, the whole of the arrears get reflected in this quarter. So, when you will see thenext quarter, it will be like, if we say Rs. 45 crore in the third quarter. So, that's a 10 to 12% on that. So, it will be 50 croresapproximately the salary. Because it is an additional two quarter employee cost, which has been cash payable in this quarter, whichhas been paid.

    Vineet Maloo

    Sir, the two quarters of increments you are saying, right?

    Indresh Batra, Managing Director

    Yes, that's right. So, as the arrear of the increments.

    Vineet Maloo

    Right, understood. Sir, still I mean sir you reported staff was roughly 64 odd crores and sir two quarters of increment I would saywould 10, 12 crores not more than, right?

    Indresh Batra, Managing Director

    Okay, yeah.

    Vineet Maloo

    So, that would...

    Indresh Batra, Managing Director

    Arrears of that would be in addition of 100 cores, say 54 into 2.

    Vineet Maloo

    Sorry, 100 crores, I didn't understand I mean.

    Indresh Batra, Managing Director

    Arrears which are paid for the salary.

    Vineet Maloo

    Right.

  • 8/3/2019 Annual Meeting JS

    10/33

    Indresh Batra, Managing Director

    Has getting reflected in cash outflow in that, this particular...

    Vineet Maloo

    Sir, these arrears are since when? This are 1 October 2010, right?

    Indresh Batra, Managing Director

    Yes, that's right, yeah.

    Vineet Maloo

    Right. So, I mean there is only three months worth of arrears which are paid out in this quarter?

    Indresh Batra, Managing Director

    No, October, November, December, January, February, March.

    Vineet Maloo

    Yeah, Jan, Feb, March would be for this year itself right?

    Indresh Batra, Managing Director

    Yeah. It's okay.

    Vineet Maloo

    Right. So I just feeling...

    Indresh Batra, Managing Director

    Okay. Let's understand.

    Vineet Maloo

    Yeah.

    Indresh Batra, Managing Director

    Up to November, December is arrear for the last quarter.

    Vineet Maloo

    Right.

    Indresh Batra, Managing Director

  • 8/3/2019 Annual Meeting JS

    11/33

    For, January and February, you get the salary and the increase values...

    Vineet Maloo

    Right.

    Indresh Batra, Managing Director

    So, if you compared with the September, last quarter which ended December, actually if I have got Rs. 100 salary in Decemberquarter, if I could get 110. So, I will get the arrear for October, November, December and I'll get the salary at the rate of 110 forJanuary, February, March also.

    Vineet Maloo

    Right, right. I understood. But as I am saying your absolute amount of staff cost in December '10 was roughly 46 crores.

    Indresh Batra, Managing Director

    That's right.

    Vineet Maloo

    Right. So, on that if I get 10% increase it will be roughly like 50 crores, which would have happened in, 50, 51 crore which shouldhave happened in December right. So, the 5 crores that did not happened in December quarter has come in this quarter, right?

    Indresh Batra, Managing Director

    Right. Okay.

    Vineet Maloo

    Right. So, I am unable to understand this 100 crores number.

    Indresh Batra, Managing Director

    No, no. It's 64 crores.

    Vineet Maloo

    Right.

    Indresh Batra, Managing Director

    I confused it was with 12 months result, which is 196 crores.

    Vineet Maloo

    Right, right.

    Indresh Batra, Managing Director

  • 8/3/2019 Annual Meeting JS

    12/33

    Let's take a ballpark number. We had 47 crore employee cost, it got increased by say 10%. So, it reached 52 crores plus this increasewhich is the new salary for Jan quarter is 54. So, there is 5 crore of additional, the 54 plus 5 or 6 whatever takes us to 59, 60 croreThat's the number which is getting differentiate here. One month, just the arrear on the increased cost. So, 5 or 6 crore increase plusthe new rule, I mean the new base which is 5 to 6 crore enhance, will lead to 10 to 12 crore difference between last quarter and thisquarter. So, 47 becomes 64 may be it's not exact number of 47 to 64. But that's the rational behind it may be the increase was 12%may be the increase was 13%.

    Vineet Maloo

    Right. I guess I'll understand it separately, because I mean according to me the difference is coming 20 crores, what you say should be10 to 12 crores. I will just try and understand it separately. Thanks.

    Indresh Batra, Managing Director

    I mean if we just subtract 47 out of 64, it's about 17 crores.

    Vineet Maloo

    Right, yeah.

    Indresh Batra, Managing Director

    And you are at 20, I am at 12. So, there is somewhere between, but definitely we would love to take it offside.

    Vineet Maloo

    Sure, sure. Thank you.

    Indresh Batra, Managing Director

    Right.

    Operator

    Thank you. The next question is from the line of Mihir Jhaveri from Religare Capital Market. Please go ahead.

    Mihir Jhaveri

    Good evening sir.

    Indresh Batra, Managing Director

    Good evening.

    Mihir Jhaveri

    Sir, is it possible for you to give us the breakup for the realizations in Q4 in terms of LSAW, HSAW and DI? And what it is currentlystand into, the realizations? First question. And sir also the CapEx for FY12 and FY13?

    Indresh Batra, Managing Director

  • 8/3/2019 Annual Meeting JS

    13/33

    Mihir, you need the realization for this quarter?

    Mihir Jhaveri

    Yeah, this quarter. Separate breakup of the realization?

    Indresh Batra, Managing Director

    For all the products?

    Mihir Jhaveri

    Yeah.

    Indresh Batra, Managing Director

    Okay. See, in any case I think you could work out the realization formation from my note, because we have given the quantity andwell you got in any case. You can take the longitudinal as we said we sold roughly 20,000 tonnes, the realization for around Rs.67,000.

    Mihir Jhaveri

    Okay, sir.

    Indresh Batra, Managing Director

    Helical around 35,000, realization Rs. 42,000.

    Mihir Jhaveri

    Okay.

    Indresh Batra, Managing Director

    Inland to is around Rs. 73,000. Okay, and ductile is Rs. 45,000.

    Mihir Jhaveri

    And sir how it is standing currently this must be...

    Indresh Batra, Managing Director

    This is fourth quarter.

    Mihir Jhaveri

    Yeah. So, is it anything different, it is gone down or have been stable at current level currently?

    Indresh Batra, Managing Director

    Okay. In the third quarter, you are talking about vis--vis current quarter vis--vis let's say April, May, June.

  • 8/3/2019 Annual Meeting JS

    14/33

    Mihir Jhaveri

    Yes, sir.

    Indresh Batra, Managing Director

    See April, May, June, I think it should be more or less in the similar meaning except that the seamless, I think it is he seam. So, ductile

    could also be, ductile might be 45 or 46, but everything would be in the same range.

    Mihir Jhaveri

    Okay, okay sir.

    Indresh Batra, Managing Director

    Yeah.

    Mihir Jhaveri

    And sir can you give us the CapEx for FY12, FY13?

    Indresh Batra, Managing Director

    See basically, I mean it is difficult to differentiate between the two years, but what, we can give, normally we give the theme is thatwe relevantly in ductile India which is taking Rs. 350 crore, we are standardizing close to 70, 75 crore by March and balance willcome is '11 to '12. And then beneficiation and pellet put together will be in the range of Rs. 350, Rs. 375 crores will be, which weexpand in '11, '12, '12, '13 mainly. And seamless around 100, 125, which will again '11, '12 and some portion will go to '12, '13.

    Mihir Jhaveri

    Okay, sir.

    Indresh Batra, Managing Director

    Yeah.

    Mihir Jhaveri

    Okay. Thanks a lot sir.

    Operator

    Thank you. The next question is from the line of Harshad Gujarati from Khandwala Securities. Please go ahead.

    Analyst

    Yeah, good evening sir. Two questions. One is on the, your, status of your iron ore mine, when it is expected to start? And how muchof incremental benefit you are expecting from the mining division as well as the backward integration, which you are doing from thepellet segment side? And how much will be incremental addition at EBITDA level, EBITDA part?

    Indresh Batra, Managing Director

  • 8/3/2019 Annual Meeting JS

    15/33

    Our iron ore mines, we have an internal target of commissioning that by September. But we are thinking that we need to build somecushion and that's why we have taken the production of mine from January to March. Our target is to mine about 800,000 tonnes ofiron ore mine. Iron ore which will be supplied to our blast furnace, which will be producing about 550,000 tonnes of hot metal to beconverted into ductile iron pipes.

    Analyst

    Okay.

    Indresh Batra, Managing Director

    Current price, the lended cost of iron ore from Bellary to Jindal SAW is about Rs. 7,000.

    Analyst

    Okay.

    Indresh Batra, Managing Director

    This wood should be available to us at half the cost. I mean the pricing is not something which is stable. But we have taken aconservative view and we think that this should allow us to save Rs. 3,500 per tonne.

    Analyst

    Okay. Which includes the logistical cost?

    Indresh Batra, Managing Director

    Yeah, yeah it does.

    Analyst

    Okay.

    Indresh Batra, Managing Director

    I mean from Bellary to Mundra is about twice the distance between, where our current mines are in Bhilwara to Mundra.

    Analyst

    Okay.

    Indresh Batra, Managing Director

    And Rs. 3,500 multiplied by Rs. 800,000 should give the EBITDA addition.

    Analyst

    Okay. So this 800,000 you are talking about for FY12 or FY13?

  • 8/3/2019 Annual Meeting JS

    16/33

    Indresh Batra, Managing Director

    This is will be the availability, but this will be available only for one quarter. So, if there is 300 crore benefit, 75 crore should beavailable this financial year.

    Analyst

    This financial, and then remaining will be coming from the next financial year?

    Indresh Batra, Managing Director

    Next financial year, we should take full 300 crore benefit.

    Analyst

    Okay. What is the total approved capacity of this mine?

    Indresh Batra, Managing Director

    This about 6000 tonnes per day.

    Analyst

    6000 plus tonne day. Okay, that is...

    Indresh Batra, Managing Director

    So, this is about 3 million odd tonnes.

    Analyst

    3 million per annum.

    Indresh Batra, Managing Director

    Yeah. We want to use 2.2 million tonnes for pallet and we want to use 800,000 for feeding our blast furnace.

    Analyst

    Okay. And this year you are expecting, how much of production will come, this 800,000 tonnes

    Indresh Batra, Managing Director

    No, I said one quarter so that means about 150,000 tonnes, for financial number we have taken 150,000 tonnes.

    Analyst

    150,000 will be addition only this year.

    Indresh Batra, Managing Director

  • 8/3/2019 Annual Meeting JS

    17/33

    That's right,

    Analyst

    Okay. And one more thing on industry perspective, can you throw some light more on how the demand supply in the pipe divisionespecially, in the domestic market and international market?

    Indresh Batra, Managing Director

    I would go product-wise, segment-wise. The oil and gas transportation business is reasonably robust in terms of expenditure. Ourbusiness is divided into exports and domestic selling. Domestic market is reasonably price constrained that's what is I was talkingearlier about, which is reflecting in 3 to Rs. 4,000 EBITDA. I am not very hopeful that the domestic market would have a significanprice increase, but export markets are getting more and more strong. Our order book primarily comprises of export, where our marginon the LSAW side are still Rs. 10,000 plus.

    Analyst

    Okay.

    Indresh Batra, Managing Director

    We would like to continue to enlarge that. There is a significant demand emerging from almost all parts of the world. We gotsignificant orders from Far East including Australia, Burma. Our traditional markets of Iran, Iraq, Saudi Arabia are still very, verystrong. And North America is emerging to be a very strong demand center, because of the shale gas, which is giving selling to bothour seamless business as well as large diameter oil and gas transportation business.

    Analyst

    Okay.

    Indresh Batra, Managing Director

    Our seamless business is extremely strong that's what is reflected in our EBITDA margins as well. We are selling that product at anaverage realization of 73,000. We think that this has a potential to move up. We have commissioned a drilling for dwell pipe unit. Weexpect that we will be selling 10 to 12,000 tonnes of drilled pipes, which are currently selling at about $4,000.

    This should further be graded demand after we have established ourselves in North American market, would be a significant productbecause of the shale gas discovery. Our third business is ductile iron pipe, which is a domestic business for us. There the supplydemand challenges are there, but the fundamental demand of creating urban infrastructure is still very much there. The capacity iscompletely sold out for last five year. We have no issue, the issue is the rising input prices and our capability to pass those stockpressure. They will get ease, because of our mine, as well as our new capacity coming in Abu Dhabi, which is as I said is a market ofabout 2 to 3 million tonnes of pipes and we would be the first player in that, manufacturing sector in that.

    So, I am quite confident in terms of partly achieving 1.1 million tonne plus pipes, with an EBITDA margin which will be slow as we

    execute some of the domestic spiral orders. Moving up significantly in third, fourth quarter because of mines and commissioning ofAbu Dhabi plant.

    Analyst

    Okay. How much of your revenue, you are expecting from this KG Basin area? And how much will it going to affect your business asbecause the capacity of, the production of the KG Basin gas has decreased substantially. So is there any affect on your business side?

    Indresh Batra, Managing Director

  • 8/3/2019 Annual Meeting JS

    18/33

    We have never done any business with Reliance of course in terms of supplying them sites.

    Analyst

    Okay. One more question last on the pallet segment. You are setting up total 2.1 million tonne of capacity, right?

    Indresh Batra, Managing Director

    2.4 million.

    Analyst

    2.4. So, this will be purely for the captive consumption or are you going to sale merchant basis also?

    Indresh Batra, Managing Director

    We have no captive use for pallet, it's all for merchant trading.

    Analyst

    Okay. Thank you, sir. Thanks.

    Indresh Batra, Managing Director

    Thanks a lot.

    Operator

    Thank you. The next question is from the line of Sanjay Satpathy from Merrill Lynch. Please go ahead.

    Sanjay Satpathy

    Hello, sir. Just couple of, information wanted. On the DI pipe, can you just let us know what is the current EBITDA margin for thequarter?

    Indresh Batra, Managing Director

    That's close to Rs. 8,500. You want in percentage terms?

    Sanjay Satpathy

    No, in terms of rupees per tonne. It was 8,500 in March quarter.

    Indresh Batra, Managing Director

    Yeah, that's right.

    Sanjay Satpathy

    And it has fallen from about Rs. 11,000 in the previous quarters. Am I right sir?

  • 8/3/2019 Annual Meeting JS

    19/33

    Indresh Batra, Managing Director

    That's correct...

    Sanjay Satpathy

    Okay, okay. And sir I mean you were giving a bit information about the realization of LSAW and HSAW, I could not really take it

    down. Can you just repeat it for myself?

    Indresh Batra, Managing Director

    Absolutely, longitudinal approximately 67,000, Helical is 42,000, seamless 73,000, ductile 45,000.

    Sanjay Satpathy

    Sir, just wanted ask on, just hear your on thought on this question that you always complain that the EBITDA margin within the Indiafor this Helical pipes, even for usage in the oil and gas sector is extremely low. Whereas for customers in U.S. and other markets ismuch better than that of Indian market. So, why is it like that? Is it because Indian companies are not quality conscious or why is ithat? That's one. And then the second thing is that, do you think this global margin will sustain or they will come down to Indian

    level?

    Indresh Batra, Managing Director

    The first point which we raise is about domestic market, what has happened was that in last about 12 or 18 months, there have beenfour of five players which have entered the market, which were primarily water sectors there like Ratnamani, like Pratibha. So, theyneeded to qualify. So, qualification is a very significant achievement for them, which set up the price trend in India. I believe that thisis not sustainable for a long-term. That's one reason of pricing actually getting to a lower level.

    In terms of the pricing in the international market is again simply a concern of demand and supply. As of right now we are seeing avery significant demand ramp up, which is maintaining the prices. Within that LSAW, which is a preferred product in somegeographies, where the supply is not very large. I mean in India except for Jindal Saw are significant player, most of the players.. This

    also allows us to alter our product mix in favor of LSAW, where our margins are still significant and increasing.

    Sanjay Satpathy

    Okay. And as far as your effort at capturing more markets here in North America, how the progress is? And I mean when can we seethe mix, and your product market changing significantly in favor of North America and other markets away from India?

    Indresh Batra, Managing Director

    We are away from India, but not necessarily the markets are North American. We have had as I was mentioning earlier, we have gotabout 300,000 tonnes order only from Australia and Burma kind of markets, where we are not a very regular supplier. Our other

    significant markets are Saudi Arabia, Iran and Iraq. We are doing business in North America by having the coating and doublejointing operations. We think that in next six to nine months, we should be able to secure some order book from there as well.

    Sanjay Satpathy

    Thanks a lot sir. And wish you all the best for rest of the year.

    Indresh Batra, Managing Director

    Thanks a lot.

  • 8/3/2019 Annual Meeting JS

    20/33

    Operator

    Thank you. The next question is from the line of Abhilasha Sable from Techno Shares & Stock. Please go ahead.

    Abhilasha Sable

    Sir, all my questions have been answered. Thank you.

    Indresh Batra, Managing Director

    Thanks a lot.

    Operator

    Thank you. The next question is from the line of Ruchi Vora from UBS. Please go ahead.

    Indresh Batra, Managing Director

    Hello?

    Operator

    The next question is from the line of Bharat Goraya from ICICI Bank. Please go ahead.

    Analyst

    Yeah. Good afternoon sir.

    Indresh Batra, Managing Director

    Good afternoon.

    Analyst

    Sir, I just one small thing on the other expenditures you shared your expense have gone up, because of higher transportation cost. So,can you just quantify that number? And what is the split in the other expenditure, I just wanted to know?

    Indresh Batra, Managing Director

    Okay. Other expenditure, the other manufacturing expenses, administrative expenses, marketing and selling expenses it also includesthe freight outward.

    Analyst

    Okay.

    Indresh Batra, Managing Director

    We have said that other expenditures have gone up on account of higher freight cost, typically this include few consignments, whichhave gone to Latin America and some other portion. There the freight cost was higher as compared to say Middle East plus the inpucost other than the fee have also increased significantly in the last few months, which includes coating material and other thingsBecause couple of these things are related to petrochemicals also. So, these all prices have gone up in the last few months.

  • 8/3/2019 Annual Meeting JS

    21/33

    Analyst

    So, going forward this will be the standard run rate. Is Latin America, a new geography for us? Or Is it...

    Indresh Batra, Managing Director

    No, we have a presence there. We have executed very significant orders in countries like Peru and all that. That's a significant market

    but the logistics needs to be clearly understood as the pipe we sold, where you manufacture it. But there is a, I mean one of the largestE&P, spend increases have happened in Latin America specially in Brazil and other countries in Latin America. That's a verysignificant market for us. And we are looking at a, I mean we are present in those markets. We have executed significant ordersprobably the only Indian player who have brought an orders from Chile and Guatemala as well as Peru. We believe that that wouldalso provide us a reasonable order book, but it has to be remunerative for us.

    Analyst

    Okay. And sir one small question, I might be a bit ignorant. On the pallet, I just wanted to know what will be your incrementalcontribution from there, you said it was 2.2 tonnes. So, on the EBITDA front what would be your cost fee? And what would be, youwill be selling at, so a rough number there?

    Indresh Batra, Managing Director

    The current prices of pallet is about Rs. 10,400, but it's delivered for something like you are able to realize Rs. 8,000. And EBITDAmargin at this level is close to 70%. And all I said was that 2.4 million tonne, we should be able to realize the top-line of about 1,800crores and an EBITDA margin of about 1,000 crores.

    Analyst

    That's fine sir. Brilliant. Thanks a lot.

    Indresh Batra, Managing Director

    Thanks.

    Operator

    Thank you. The next question is from the line of Garima Mishra from Citigroup. Please go ahead.

    Garima Mishra

    Yeah. Hello sir. I had a few questions basically on this iron ore mining business. Are there any clearances or any issues which arepending and which might not be within the company's control and could lead to delays? Or everything is sorted out and I mean

    implementation is well on target?

    Indresh Batra, Managing Director

    As of now we have no pending clearances to be obtain from any regulatory authority, be it state government, municipal authority orcentral government. The execution work is in reasonable pace, which is what we expect should let us meet our deadline. But given thenature of the capital expenditure in capital goods industry, we have taken a margin of not projecting the financials from Octoberonwards, but January onwards. So, these are on track.

    Garima Mishra

  • 8/3/2019 Annual Meeting JS

    22/33

    Okay, sir. Sir, also on the DI pipe business, you mentioned that the domestic business continues to be under pressure especially on thepricing front as well as the raw material front. You think this trend will be attributable to the Abu Dhabi business also, when you startproduction from there? Or you think pricing there would be stronger?

    Indresh Batra, Managing Director

    It is one of the big rational for us to look for geographical diversification by putting up a plant in Abu Dhabi was that there was noproduction in that large market of the world. So, we wanted to move away a business which could experience a year or two years ofover capacity. And I do not foresee any reason, because the pricing in Abu Dhabi or

    in Western Europe today is about 40% higher than what is surprising in India.

    Garima Mishra

    All right sir. Sir you don't think there could be any competitive pressures et cetera there, because some of the other players are alsotalking of Middle East as an upcoming area, wherein they see very robust demand. So, you don't think there, at least there would beany significant pricing pressures going forward?

    Indresh Batra, Managing Director

    I will be very honest with you, any domestic player today in ductile business is losing money. If we are making Rs. 9,000 EBITDAwe are probably amongst the, probably one more player from the east which is making money. I am not too sure that after spending 5or 600 crores in establishing capacity here and losing money. You are left with pretty much a lot of money to do other things.

    Garima Mishra

    Right

    Indresh Batra, Managing Director

    But I can't rule anything out. There is a very significant entry barriers into those markets.

    Garima Mishra

    Okay.

    Indresh Batra, Managing Director

    And my feeling is that we should, we can't say no to a competitor coming in, but say for next three years, would there be acompetition, because our mill is going into production end of this calender year.

    Garima Mishra

    Right.

    Indresh Batra, Managing Director

    So, there is always a first mover advantage. You see in Jindal Saw, we have taken advantage of first mover on a multiple cases. Wewere the first player to enter into oil and gas pipe segment and it needs reasonable amount of cash flows. In ductile iron business, wemade significant amount of cash flows and we get into mining, which probably as a pipe producer no other player has.

    Garima Mishra

  • 8/3/2019 Annual Meeting JS

    23/33

    Right.

    Indresh Batra, Managing Director

    Which allows us to continue to sustain margins. But you have to be ahead of competition, not follow the competition.

    Garima Mishra

    Right.

    Indresh Batra, Managing Director

    But we can't rule out the competition per se. It's good for us, it keeps us on our toes.

    Garima Mishra

    Right sir. Sir, also you mentioned that there are significant entry barriers there in the Middle East. Could you just elaborate on that alittle bit?

    Indresh Batra, Managing Director

    Our Abu Dhabi plant, planning started about three and a half years back.

    Garima Mishra

    Right.

    Indresh Batra, Managing Director

    And it takes that much amount of time to I mean seek it towards and put up a plant which is, I mean if you see the whole West Asiathere the plants could be put up have a very small land base type, just to obtain all the clearances sign. And I mean that market is wideopen for last 50 years, I mean no European never went and set up plant there. It's not easy I mean to do manufacturing per se. Just thefact that we offer a significant industrial facilities like Shadeed Iron & Steel in Oman, which is a largest steel plant of Middle East. Wehave some amount of operational efficiency as well as linkages there.

    Garima Mishra

    Okay, sir. Sir, also one last thing you also mentioned that on the seamless pipes you're planning to sale pipes in North America. So, dowe have clearances there, all the API clearances et cetera?

    Indresh Batra, Managing Director

    Today also we sell about 50% of our production in North American markets.

    Garima Mishra

    Right.

    Indresh Batra, Managing Director

    And we have all the clearances for last four years. What I talked about was a drill pipe, which have seeking and getting clearances for

  • 8/3/2019 Annual Meeting JS

    24/33

    That's a significant value addition to just seamless pipes.

    Garima Mishra

    All right sir. Thank you so much.

    Indresh Batra, Managing Director

    Thank you.

    Operator

    Thank you. The next question is from the line of Bhavin Chedda from Enam Holdings. Please go ahead.

    Bhavin Chedda

    Yeah. Good evening sir.

    Indresh Batra, Managing Director

    Hi.

    Bhavin Chedda

    Sir, you said 35,000 tonne, the entire HSAW volume was to the GAIL in the quarter, there is no other HSAW volume?

    Indresh Batra, Managing Director

    No, in this quarter it was only GAIL. Plane GAIL order.

    Bhavin Chedda

    Okay. And how much is pending now of GAIL? Because I believe you got some 110k right?

    Indresh Batra, Managing Director

    It is about 70,000, which is pending.

    Bhavin Chedda

    So, 70k will be pending, will be entirely executed in Q1 or it will get carry forward?

    Indresh Batra, Managing Director

    It's Q1 and Q2.

    Bhavin Chedda

    Q1 and Q2. Okay. Sir, what I am trying to do is I executed, I deducted your GAIL low margin orders and also it seems that yourmargins are fallen to around Rs. 9,200 a tonne, which I think quarter three blended which was 12,000. So, is that the balance fallattributed to significant fall in DI pipe margin?

  • 8/3/2019 Annual Meeting JS

    25/33

    Indresh Batra, Managing Director

    That's correct.

    Bhavin Chedda

    And now, is this the reality for DI pipes or you think there will be recovery?

    Indresh Batra, Managing Director

    I would not like to presume that and build it into numbers. I would think that this is newly added.

    Bhavin Chedda

    Okay. And sir just coming back to your net debt number, I think there is a note that there is some commitment spending also. So, whatwill be the actual debt if these commitments are made?

    Indresh Batra, Managing Director

    Okay. If you are referring to the buyers credit, which is a standard financing.

    Bhavin Chedda

    Right.

    Indresh Batra, Managing Director

    So, you add that which we mentioned. So, it is going to be in the range of 1600, 1700 crores all put together.

    Bhavin Chedda

    So, operational debt will be 16, 1700 crores.

    Indresh Batra, Managing Director

    Yes, yes. But that's a bias... We put it this time, because lot of people ask about it, and once they started we will exclude it also.

    Bhavin Chedda

    Okay. And sir what will be your CWIP on 31st March?

    Indresh Batra, Managing Director

    We are making the final balance sheet of course, because this balance sheet, the P&L and balance sheet was for the purpose of quarterresults. So, final balance sheet is still under preparation. So, let me come up with this. It will take few weeks.

    Bhavin Chedda

    Okay. And sir the ForEx MPM note, which you give every quarter, I believe the expiry of this contract is March 12, right?

  • 8/3/2019 Annual Meeting JS

    26/33

    Indresh Batra, Managing Director

    December 12.

    Bhavin Chedda

    December 12. So, you are 18 months away, roughly 18 months away from the actual realization.

    Indresh Batra, Managing Director

    Right.

    Bhavin Chedda

    So, in the worst case scenario, if the yen stays currently, this will be the actual cash payout by December 12?

    Indresh Batra, Managing Director

    Okay. See, certainly we are engaged with the banks.

    Bhavin Chedda

    Right.

    Indresh Batra, Managing Director

    And we are trying to work out various possibilities and with various options, looking, also looking at the possibilities of longerpayment schedule. Okay, without involving the inter-payment. So, not much of information can be shared, because that we are tryingto see how we can pay the amount.

    Bhavin Chedda

    Okay.

    Indresh Batra, Managing Director

    Over a longer period of time.

    Bhavin Chedda

    Okay. And sir on the pipe order value terms you have given. Can you break it into volumes also?

    Indresh Batra, Managing Director

    Yeah, we just gave it that's let's say 600,000 tonne is LSAW, HSAW which is 400,000 longitudinal, 200,000 helical.

    Bhavin Chedda

    Okay.

    Indresh Batra, Managing Director

  • 8/3/2019 Annual Meeting JS

    27/33

    150 to 190,000 tonne in ductile.

    Bhavin Chedda

    Okay.

    Indresh Batra, Managing Director

    Close to 20,000 tonne of seamless. So, everything put together approximately 800,000 tonnes.

    Bhavin Chedda

    Everything put together 800. Okay. And sir now other businesses can we ask the questions, or we are done with the points?

    Indresh Batra, Managing Director

    If other participants have no other questions, then we can enter in ITF.

    Bhavin Chedda

    Okay. Sir, any numbers you want to update on that, how much loss annually will be there on Jindal ITF? And what will be the debt inthat company and CapEx for FY12?

    Indresh Batra, Managing Director

    I think in terms of the financial for 31st March, we would rather like to wait for the consolidated number, because everyone in thecompilation.

    Bhavin Chedda

    Right.

    Indresh Batra, Managing Director

    So, there is no difference in the numbers. But in general once people are done, we can discuss about the current status and the progressmoving forward.

    Bhavin Chedda

    Okay. I am done on pipes.

    Indresh Batra, Managing Director

    Moderator can ask, if there is any other questions.

    Operator

    Sir we do have a question, should we move on to the next question?

    Indresh Batra, Managing Director

  • 8/3/2019 Annual Meeting JS

    28/33

    Okay.

    Operator

    The next question is from the line of Chirag Shah from IDFC. Please go ahead.

    Chirag Shah

    No, all my questions have been answered. Thanks.

    Operator

    Thank you.

    Indresh Batra, Managing Director

    Moderator.

    Operator

    Yes sir.

    Indresh Batra, Managing Director

    Yeah, it's almost 5:30, we go to JITM, because it is less than one hour.

    Operator

    Sure. Sir, we move to ITF discussion sir.

    Indresh Batra, Managing Director

    Yeah. Okay. All right. I will just brief you about the Jindal ITF. Our revenues for financial year '11 were about 250 crores with apositive EBITDA. And our expectation of FY11 in terms of our internal planning is about 1,000 to 1,100 crores with EBITDA ofabout 132 crores. Our all businesses are at this stage cash positive.

    Our water business which is going to be the largest part of this Jindal ITF has a order book of 1,192 crores as of today, which weexpect to execute over next 18 months. There are three basic verticals of this business. The number one business is about the upstreamEPC business, which is not the long-term goal of our company. We want to become an owner operator of water asset.

    So, significant portion of our business development activity goes on booked basis, where we are building water reuse facility. Waterreuse is a very significant portion of our business. Our third business is concession business, which we are engaged with Jindal ManilaWater, which is our joint venture partner, which we are trading as of now about six cities on water supply. Our goal is in next fiveyears to be able to serve about 6 million customer, that is a very large, ambitious goal. But as of this year, we expect to close at leastone water concession.

    We are also adding one more vertical to this water space which is desalination. As of today we are engaged in a process of becomingthe only water company out of this part of Asia to have the technology of desalination. We are engaged with that process, but as oftoday we would not be in position to divulge the details. But that probably would be a significant step as the water continues tobecome a challenge for more number of industries in more number of countries and regions. We believe desalination would be a verysignificant solution along with water reuse.

    So, our focus continue to remain on building and owning the water asset, which we see a very significant opportunity for Jindal

  • 8/3/2019 Annual Meeting JS

    29/33

    Waterways. As of now the waste-to-energy facility, which is the largest in this country should have the first boiler fired before 30thJune COD by the regulatory authorities by 30th September. As of now we are L1 in other, three other such waste projects, which againhad a significant amount of potential. India generates about 160,000, 170,000 tonnes of waste everyday.

    I think these businesses have a significant upside. These are businesses which can generate 50% plus EBITDA margins. And theyhave a significant again first mover advantage that if you are able to tie up with the city for 25 to 30 years of its waste processing, youare almost an incumbent for 30 years and probably a great advantage for next 30. Our

    other services business have a significant upside potential. These are executionally challenging businesses, Jindal Water and JindalUrban has made that, have gone through that journey. And we think that this would generate significant free cash flow as well as thevalue creation opportunity.

    In Jindal Waterways, as of end of April, we would have 13 ships, which is an enhancement from eight ships we had. We would havetwo of our ships in our subsidiary company in Singapore, which would allow us to take the advantage of the lower bunker cost. Weexpect this business to do about 250 crore of revenue with about 55 crore of EBITDA. Our fourth business is Jindal RailInfrastructure, which commissioned a plant to produce 1,000 rail wagons. As of today, we are expecting the award through our tenderprocess, the tender has been floated. This is for 18,000 wagons and we believe that we should be able to execute 500 wagons this yearat a roughly price of 30 odd lakhs.

    We think we should be able to generate 150 crore of revenue this year with an EBITDA of about 13%, 1,3, 13%. And Jindal Shipyardoperate part making facility in Calcutta, which was an acquisition we did about two years back. As of today, it has delivered 2,500tonnes, which is going to be operational in July and would be operated by Jindal Waterways.

    This is Jindal ITF, we continue to believe that investment in these infrastructure areas, where there is a huge latent demand, but thesector per se is not one of the easiest sectors to operate to any company which is able to build up the all the PQ requirement, theexecution capabilities and has a significant profit and loss account to show the significant activity would have a significant potential tocreate value.

    We as of today raised 200 crores of quasi-equity from IFCI, which is converted in fifth year. It was raised at 9.25% debt, which allowus to fund these businesses without Jindal Saw putting in money, which had a commitment to put $100 million, which is debt. All ourbusinesses as of today would be a function of this 200 crores, which was raised in month of I think 31, March, sometime in MarchWe should be in a position to not raise anymore equity unless there was a significant inorganic opportunities.

    The chances of that happening always is, can never be put more than 50%. So, we are very confident of achieving the numbers wehave given. We should produce a significant amount of EBITDA, may be in financial year '12, we might not be in a position to

    generate free cash flows, but our EBITDA margins would be significant to serve with debt and as well as capital depreciation. If thereare any specific question, I would love to answer them.

    Operator

    Sure sir. Shall we move on to, our next question sir?

    Indresh Batra, Managing Director

    Sure.

    Operator

    The next question is from the line of Vineet Maloo from Birla SunLife. Please go ahead.

    Vineet Maloo

    Sir, my question has been answered. Thank you.

    Operator

  • 8/3/2019 Annual Meeting JS

    30/33

    Thank you. The next question is from the line of Tridhi Trivedi from Mandate Securities. Please go ahead.

    Indresh Batra, Managing Director

    Hello?

    Operator

    Ma'am your line has been unmuted. You may go ahead please.

    Analyst

    No, my question has been answered sir. Thank you very much.

    Operator

    Thank you. The next question is from the line of Puneet Gulati from HSBC. Please go ahead.

    Puneet Gulati

    Hi. Yeah, I didn't quite catch it I think what is the status of CETP plant in Sitarganj, is it operational?

    Indresh Batra, Managing Director

    No, the Sitarganj plant should be operational by September. There was a delay because of the clearances by the ESIPL developersthere with the Uttaranchal government, which has been resolved. The work is in full swing. We should be operational in month ofSeptember and the annuity should start coming from that month.

    Puneet Gulati

    What is the percentage of completion of project?

    Indresh Batra, Managing Director

    Yeah, I mean it's about, all the mechanical parts have been delivered, 99% of all civil construction is done. As of now we are justdoing the instrumentation part.

    Puneet Gulati

    Okay. And what is the status on the Timarpur-Okhla Waste Management Company, is the power plant still sir?

    Indresh Batra, Managing Director

    No, as I said that this should be operational by June, we will be filing the first order in June.

    Puneet Gulati

    So, what has been the reason for this delay, I thought it should have been done in the previous financial year right?

    Indresh Batra, Managing Director

    Not at all. We said 31st March 2011 is the commissioning date.

  • 8/3/2019 Annual Meeting JS

    31/33

    Puneet Gulati

    Okay.

    Indresh Batra, Managing Director

    And the contractual obligation is to do it by 30th September 2011. So, we are right there in the middle.

    Puneet Gulati

    Okay, fine. Thank you so much.

    Indresh Batra, Managing Director

    Thanks.

    Operator

    Thank you. The next question is from the line of Manish Bishnoi from Macquarie Bank. Please go ahead.

    Manish Bishnoi

    Hi, Mr. Indresh. I just want to ask few things, I mean I had questions on pipe, but given that we have moved to infrastructure, whawill be the contribution next year you said?

    Indresh Batra, Managing Director

    In terms of EBITDA, we should be generating about 120 crore plus EBITDA.

    Manish Bishnoi

    Okay. If you don't mind, I just have some quick questions on core business of pipe.

    Indresh Batra, Managing Director

    Sure.

    Manish Bishnoi

    You are guiding around 1.1 million tonnes for the next year. We have seen in last two quarters, your execution has been a bit weak, Iam not sure it was due to shipping delays or something. Are you confident of executing that much orders next year?

    Indresh Batra, Managing Director

    I mean we have an order book of about 600,000 tonnes on the large diameter and we have rest of the order book which is more spobasis of another 200,000. So, we have an 800,000 order book in this year. All we need to do is execution, but in terms of first twoquarters of last financial year, we didn't have as much significant order book. And these are large chunk orders, which allow us to havean operational efficiency compared to the last financial year, first two quarter. Our order sizes were small, which led to frequent sizechanges in terms of the mills.

    What we have right now is like a single order of 160,000 tonnes from say Australia. This allows us to have an operating efficiency.

  • 8/3/2019 Annual Meeting JS

    32/33

    Our mills have a capacity to produce more than 1.1 million tonnes only on large diameter. We are quite confident that we woulddeliver these volumes.

    Manish Bishnoi

    Okay. On the demerger of the investment and when will that be happening?

    Indresh Batra, Managing Director

    We think that the court should approve it by July of 2011. And after that it should start trading on Stock Exchange with notice andregulation process whatever that it is, Vinay what do you think what would be that time period.

    Vinay Gupta, Vice President Finance

    The first week, let's say court should get approved then on the Board meetings and then listing requirement, listing BSE whatever itsays it's mandatory 30 to 45 days. So, may be by the end of July or earlier August. But let's target the first week of August, this shareshould be able to trade in the stock market.

    Manish Bishnoi

    Okay. And on the iron ore mines. How are you going to transport it from Bhilwara to Mundra through road, through rail, what's yourplan right now?

    Indresh Batra, Managing Director

    As of now, logistics which have been planned is on road basis, the distance is not very large. And there is a benefit of a reverse trafficgoing to Kandla because of the truck, which carries a imported goods the Hinterland. But we are in a process of engaging with railwaygovernment, government of India Railways for putting a prospect there, which should again bring down the cost of logisticsignificantly.

    Manish Bishnoi

    Okay. Thank you.

    Indresh Batra, Managing Director

    Thanks a lot.

    Operator

    Thank you. Ladies and gentlemen, that was the last question. I would now like to hand the floor back to Mr. Kapil Bagaria. Thank youand over to you sir.

    Kapil Bagaria, MF Global Sify Securities India Pvt. Ltd.

    For giving us this opportunity to host this conference call, I would also like to thank all the participants for dialing into the call.Thanks.

    Operator

    Thank you, sir. Thank you members of the management. On behalf of MF Global Sify Securities India Private Limited that concludethis conference call. Thank you for joining us and you may now disconnect your lines. Thank you.

  • 8/3/2019 Annual Meeting JS

    33/33

    Indresh Batra, Managing Director

    Thanks a lot.