+ All Categories
Home > Documents > ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF...

ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF...

Date post: 23-Aug-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
44
THE BIAKOYE DISTRICT ASSEMBLY ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013
Transcript
Page 1: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

THE BIAKOYE DISTRICT ASSEMBLY

ANNUAL PROGRESS

REPORT

OF

PROJECTS/PROGRAMMES

JANUARY, 2013

Page 2: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

1

TABLE OF CONTENTS

Page

CHAPTER ONE

INTRODUCTION

1.1 Background 1

1.2 Key monitoring and evaluation objectives for the year 2

1.3 Methodology 3

1.4 Challenges 3

CHAPTER TWO

MONITORING AND EVALUATION ACTIVITIES

2.1 Introduction 4

2.2 Status of Development Project Implemented (Jan - Dec. 2012) 4

2.3.0 Status of Development Projects (Physical) From Jan. – Dec. 2012 5-14

2.3.1 Status of Implementation of 2012 Annual Action Plan 15-29

2.3.2 Update on Disbursements from Funding Sources 30

2.4 Update on Core District Indicators 31

2.5 Human Resource Development 32

2.6 Good Governance 33

2.7.0 Employment 34

2.7.1 National Youth Employment Programme (NYEP) 34

2.7.2 Council for Technical, Vocational and Educational Training (COTVET) 35

2.7.3 Local Enterprises and Skills Development Programme (LESDEP) 36

2.7.3 Youth Enterprises and Skills Development Centre (YESDEC) 36

Page 3: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

2

2.8.0 Update on Critical Development and Poverty Issues 37

2.8.1 Agriculture 37

.2.8.2 Governance 37

2.8.3 Health 38

2.8.4 Education 38

2.8.5 Participatory Monitoring and Evaluation 39

CHAPTER THREE

THE WAY FORWARD

3.1 Introduction 40

3.2 Key Issues 40

3.3 Recommendations 40-41

Appendix 1 A photo of one of the Development Projects

Page 4: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

3

CHAPTER ONE

INTRODUCTION

1.1Background

The Biakoye District Assembly was carved out of the former Jasikan District in 2007. It was the

established by Legislative Instrument (L.I.) 1910 on 1st of November, 2007 and inaugurated on

15th of March, 2011.

It is located in the Northern part of the Volta Region of Ghana and lies within longitude 0 150 E

and 0 450 E and latitude 6 450 N and 7 150 N at the heart of the Volta – Region. It shares

common boarders with the Hohoe and Jasikan Districts to the east, Kpando to the south, Kadjebi

and Krachi East Districts to the North and the Volta Lake to the west.

The District has a total land area of 738.20 sq. km. representing about 4.08% of the total land

area of the Volta Region (18,093.27). The District Capital is Nkonya-Ahenkro, located in the

southern part of the District and about 10km from Kpando.

Based on the 2010 unpublished population and housing census, Biakoye District’s population is

now estimated to be 66,086 comprising approximately 36,347 women and 29,739 men. The

District grows at an annual rate of 1.9% (Volta Regional Growth Rate).

Vision

Biakoye District seeks to become the leading aqua culture and vegetable exporting District in the

country.

Mission

The Biakoye District Assembly exists to ensure the social, economic and political well-being of

its people through public-private partnership and fiscal, material, human resources mobilization

in an atmosphere of peace and unity.

The Annual Progress Report, including that of the fourth quarter, for the period under review

was prepared by the DPCU in fulfillment of the NDPC regulation. It is a comprehensive report

Page 5: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

4

on the status of development projects/programmes undertaken by the Biakoye District Assembly

from 1st January to 31st December, 2012.

The 2012 Annual Action Plan was prepared based on the Ghana Shared Growth and

Development Agenda (GSGDA) which spans from 2010 to 2013. The policy framework has

seven thematic areas - Ensuring and Sustaining Macroeconomic Stability; Enhancing

Competitiveness in Ghana’s Private Sector; Accelerated Agricultural Modernization and

Sustainable Natural Resource Management; Oil and Gas Development; Infrastructures, Energy

and Human Settlements Development; Human Development, Productivity and Employment and

Transparent and Accountable Governance.

During the period under review, the District focused on three major areas of the plan. These were

human development, transparent and accountable governance and infrastructural development.

The major activities carried out were continuation and completion of projects started during the

past years, especially from 2011. Major staff development programmes were also undertaken.

On human development, many educational activities were undertaken including construction of

classroom blocks and teachers bungalows. Also paramount is the continuation of the School

Feeding Programme.

Major achievements were made especially in the areas of agriculture, health and water and

sanitation sectors.

1.2 Key Monitoring and Evaluation Objectives for the year

The Monitoring and Evaluation of projects were carried out to track progress of work in the

2010-2013 District Medium Term Development Plan (DMTDP) based on the Ghana Shared

Growth and Development Agenda (GSGDA).

Page 6: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

5

The Monitoring and Evaluation (M&E) plan seeks to achieve the following objectives:

1. To ensure that projects and programmes are implemented according to plan.

2. To assess the performance of the District Medium Term Development Plan (DMTDP).

3. To assess the impact of the plan on beneficiaries.

4. To provide information for incorporation into subsequent development plans.

1.3 Methodology

Relevant and appropriate data was collected from District Assembly offices and other

decentralized departments/units for this report. The data was collected mostly on the proposed

projects/activities in the Medium Term Development Plan as far as the various departments were

concerned. Others including the National Youth Employment Programme (NYEP), Local

Enterprises and Skills Development Programme (LESDEP), Youth Enterprises and Skills

Development Centre (YESDEC) and Council for Technical, Vocational and Educational

Training (COTVET) were also considered.

The data collected was collated and analysed. Consequently, the result of the analysis was

organized into the 2012 Annual Progress Report.

1.4 Challenges

Difficulties faced included:

• Inadequate documentation on projects/programmes.

• Delayed and inadequate funding.

• Inadequate motivation for M & E staff.

• Inadequate effective monitoring and supervision of projects.

Page 7: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

6

CHAPTER TWO

MONITORING AND EVALUATION ACTIVITIES

2.1 Introduction

Monitoring and evaluation is an indispensable exercise in the implementation of the DMTDP. It

enables the District to assess the level of achievement of developmental targets, identify

constraints and failures and suggest ways of improving project designs to achieve better impact.

This chapter therefore entails the status of projects, disbursement of funds, indicators and targets

of the MTDP, development and poverty issues etc of the year under review.

2.2 Status of Development Project Implemented (January – December, 2012)

An analysis of the year revealed that projects or programmes designed for implementation in the

previous quarters that were not completed were, as usual, rolled over. New ones were also

considered for implementation.

The assessment showed great achievement with the Ghana Education Trust Fund (GETFUND)

projects, but moderate with the decentralized departments that is mostly involved in the

implementation of non-physical projects.

Page 8: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

7

2.2.1 STATUS OF DEVELOPMENT PROJECTS (PHYSICAL) FROM JAN. – DEC. 2012.

GHANA EDUCATION TRUST FUND (GETFUND)

NO

TITLE OF THE

PROJECT

SECTOR LOCATION CONTRAC

TOR

START

DATE

EXPECTED

END DATE

PROJECT

COST (GH¢)

AMOUNT

SPENT

(GH¢)

% OF

WORK

DONE

SOURCE

OF

FUNDING

REMARKS

1

CONSTRUCTION

OF 6 UNIT

CLASSROOM

BLOCK WITH

ANCILLARY

FACILITIES

EDUCATION NKONYA

ASAKYIRI

EP PRIMARY

ATINOS

CO LTD

15/09/2010 15/5/2011 148,672.88 32,556.79 100% GETFUND COMPLETED

2

CONSTRUCTION

OF 6 UNIT

CLASSROOM

BLOCK WITH

ANCILLARY

FACILITIES

EDUCATION NKONYA

NTSUMURU

EP PRIMARY

MATRAMS

CO.LTD

15/09/2010 15/5/2011

146,343.21 - 90% GETFUND COMPLETED

3

CONSTRUCTION

OF 6 UNIT

CLASSROOM

BLOCK WITH

ANCILLARY

FACILITIES

EDUCATION KWAME-

KROM R/C

PRIMARY

RESIDO

VENTURES

15/09/2010 15/5/2011 145,569.92 60,847.86 100% GETFUND COMPLETED

4

CONSTRUCTION

OF 6 UNIT

CLASSROOM

BLOCK WITH

ANCILLLARY

FACILITIES

EDUCATION KWAME-

KROM DA

PRIM. ‘A’

(KANA)

HARSON

LTD

15/09/2010

15/5/2011 155,000.00 179,824.83 100% GETFUND COMPLETED

5

CONSTRUCTION

OF 6 UNIT

CLASSROOM

BLOCK WITH

ANCILLLARY

FACILITIES

EDUCATION KWAME-

KROM DA

PRIM. ‘ABC’

DECCOS

ENT.LTD

15/09/2010

15/5/2011 155,000.00 - 60% GETFUND WORK IN

PROGRESS

Page 9: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

8

NO

TITLE OF THE

PROJECT

SECTOR LOCATION CONTRAC

TOR

START

DATE

EXPECTED

END DATE

PROJECT

COST (GH¢)

AMOUNT

SPENT

(GH¢)

% OF

WORK

DONE

SOURCE

OF

FUNDING

REMARKS

6

CONSTRUCTION

OF 6 UNIT

CLASSROOM

BLOCK WITH

ANCILLLARY

FACILITIES

EDUCATION

KWAME-

KROM DA

PRIM. ‘B’

(NEWTOWN)

KINGSLEY

ENT.

15/09/2010

15/5/2011 155,000.00 - 70% GETFUND WORK IN

PROGRESS

9 CONSTRUCTION

OF 6UNIT

CLASSROOM

BLOCK WITH

ANCILLARY

FACILITIES

EDUCATION TAPA

AMPEKROM

PRIMARY

DELOVEL

Y CO.LTD

15/09/2010 15/5/2011 149,043.48 - 50% GETFUND ABANDON -

ED

10 CONSTRUCTION

OF 6 UNIT

CLASSROOM

BLOCK WITH

ANCILLARY

FACILITIES

EDUCATION AGYAMAN-

SU

HAABU

CO.LTD

15/09/2010 15/5/2011 150,000.00 98,150.08 60% GETFUND

WORK IN

PROGRESS

11 CONSTRUCTION

OF 6 UNIT

CLASSROOM

BLOCK WITH

ANCILLARY

FACILITEIES

EDUCATION WORAWORA

EP PRIMARY

ASARE &

SONS

CONST.

LTD

15/09/2010

15/5/2011 145,135.00

- 90% GETFUND

WORK IN

PROGRESS

13

CONSTRUCTION

OF 6 UNIT

CLASSROOM

BLOCK WITH

ANCILLARY

FACILITIES

EDUCATION APESOKUBI

RC PRIMARY

GRUMAH

TWINS

LTD

15/09/2010 15/5/2011 149,773.96 49,353.39 100% GETFUND COMPLETED

14

CONSTRUCTION

OF 6 UNIT

CLASSROOM

BLOCK WITH

ANCILLARY

FACILITIES

EDUCATION NTUMDA EP

PRIMARY

ENG.

TECH.

SERVICES

LTD

15/09/2010 15//5/2011 149,960.91 75,881.29 80% GETFUND WORK IN

PROGRESS

Page 10: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

9

NO

TITLE OF THE

PROJECT

SECTOR LOCATION CONTRAC

TOR

START

DATE

EXPECTED

END DATE

PROJECT

COST (GH¢)

AMOUNT

SPENT

(GH¢)

% OF

WORK

DONE

SOURCE

OF

FUNDING

REMARKS

15 CONSTRUCTION

OF 6 UNIT

CLASSROOM

BLOCK WITH

ANCILLARY

FACILITIES

EDUCATION OMANKRAD

O KROM DA

PRIMARY

KENZE

LTD

15/09/2010 15/5/2011 149,000.00 - 100% GETFUND COMPLETED

16

CONSTRUCTION

OF 6 UNIT

CLASSROOM

BLOCK WITH

ANCILLARY

FACILITIES

EDUCATION ADENKENSU

DA

PRIMARY

- 15/09/2010 15/5/2011 150,000.00 - 100% GETFUND WORK IN

PROGRESS

17

CONST. OF 6UNIT

CLASSROOM

BLK WITH

ANCILLARY

FACILITIES

EDUCATION

BOWIRI

ANYINASI

COSCON

LTD

15/09/2010 15/5//2011 150,000.00 - 60% GETFUND WORK IN

PROGRESS

18

CONSTRUCTION

OF 6 UNIT

CLASSRM

BLOCK WITH

ANCILLARY

FACILITIES

EDUCATION BOWIRI

TAKRABE

DELTAFA 12/08/2011 12/04/2012 159,683.91

- 60% GETFUND WORK IN

PROGRESS

19

2 NO. TWO

BEDROOM SEMI-

DETACHED

MASTERS

BUNGALOWS

EDUCATION NKONYA

SHS

WILFE-

RICH

CONSTRU

CTION LTD

MARCH,

2011

MARCH, 2012 230,000.00

376,630.00 100% GETFUND COMPLETED

20 1 NO. TWO

BEDROOM SEMI-

DETACHED

MASTERS

BUNGALOWS

EDUCATION NKONYA

SHS

TLC

VENTURES

LTD

MARCH,

2011

MARCH, 2012 115,000.00

75,859.86 80% GETFUND WORK IN

PROGRESS

Page 11: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

10

NO

TITLE OF THE

PROJECT

SECTOR LOCATION CONTRAC

TOR

START

DATE

EXPECTED

END DATE

PROJECT

COST (GH¢)

AMOUNT

SPENT

(GH¢)

% OF

WORK

DONE

SOURCE

OF

FUNDING

REMARKS

21 1 NO. TWO

BEDROOM SEMI-

DETACHED

MASTERS

BUNGALOWS

EDUCATION NKONYA

SHS

YAKGAKS

SERVICES

MARCH,

2011

MARCH, 2012 115,000.00

167,599.21 100% GETFUND COMPLETED

22 1 STOREY 12

UNIT

CLASSROOM

BLOCK

EDUCATION WORAWORA

SHS

ANDULITT

ENTERPRE

SE

JULY, 2011 JULY, 2012 586,570.00

- 100% GETFUND COMPLETED

23

CONSTRUCTION

OF A DINING

HALL WITH

KITCHEN

COMPLEX

EDUCATION WORAWORA

SHS

WILKADO

CONSTRU

CTION

WORK LTD

MAY, 2011 MAY, 2012 755,000.00 208,764.79 10% GETFUND WORK IN

PROGRESS

24 CONSTRUCTION

OF 2 STOREY

BOYS

DORMETORY

EDUCATION WORAWORA

SHS

GBEDEKA

CONST.

LTD

MAY, 2011 MAY, 2012 660,000.00 110,430.24 30% GETFUND WORK IN

PROGRESS

25

CONSTRUCTION

OF 2 STOREY

GIRLS

DORMETORY

EDUCATION

WORAWORA

SHS

RECOM

ENG. AND

TEC. SER.

COM. LTD

MAY, 2011 MAY, 2012 660,000.00 - - GETFUND ABAND’ED

AND RE-

AWARDED

27 CONSTRUCTION

OF 6UNIT

CLASSROOM

BLOCK WITH

ANCILLARY

FACILITIES

EDUCATION

WURUPONG

PRESBY

PRIM.

LOMATSU

ENT.

JAN, 2012 AUG, 2012 155,947.55 - 50% GETFUND WORK IN

PROGRESS

Page 12: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

11

NO

TITLE OF THE

PROJECT

SECTOR LOCATION CONTRAC

TOR

START

DATE

EXPECTED

END DATE

PROJECT

COST (GH¢)

AMOUNT

SPENT

(GH¢)

% OF

WORK

DONE

SOURCE

OF

FUNDING

REMARKS

28 CONSTRUCTION

OF 6UNIT

CLASSROOM

BLOCK WITH

ANCILLARY

FACILITIES

EDUCATION NKONYA-

AHUDWO

LOMATSU

ENT.

JAN, 2012 AUG, 2012 149,861.58 - 20% GETFUND WORK IN

PROGRESS

29 CONSTRUCTION

OF 6UNIT

CLASSROOM

BLOCK WITH

ANCILLARY

FACILITIES

EDUCATION

AKPOSO

KABO DA

PRIMARY

FIRST

LIGHT

CONST.

WORKS

JUNE , 2012 JAN. , 2013 150, 000.00 - 60% GETFUND WORK IN

PROGRESS

30 REHABILITA-

TION OF BOYS’

DORMITORY ’A’

EDUCATION NKONYA

SHS

SHAKIS

ENTERPRI

SE

MARCH,

2012

NOV, 2012 429,667.49

240,488.33

90% GETFUND WORK IN

PROGRESS

31 REHAB. OF

DINING HALL

AND KITCHEN

EDUCATION NKONYA

SHS

SHAKIS

ENTERPRI

SE

MARCH,

2012

NOV, 2012 771.537.46

402,200.31

60% GETFUND WORK IN

PROGRESS

32 REHAB. OF 3 –

STOREY

CLASSROOM

BLOCK

EDUCATION NKONYA

SHS

ADRISON

CO. LTD.

MARCH,

2012

NOV, 2012 370,085.76

155,940.04

70% GETFUND WORK IN

PROGRESS

33 REHAB. OF

BOYS’

DORMITORY ‘B’

EDUCATION NKONYA

SHS

K.K.

JAMAT

MARCH,

2012

NOV, 2012 419,404.80 - 80% GETFUND WORK IN

PROGRESS

Page 13: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

12

NO

TITLE OF THE

PROJECT

SECTOR LOCATION CONTRAC

TOR

START

DATE

EXPECTED

END DATE

PROJECT

COST (GH¢)

AMOUNT

SPENT

(GH¢)

% OF

WORK

DONE

SOURCE

OF

FUNDING

REMARKS

34 REHAB. OF

ROADS AND

DRAINS

EDUCATION NKONYA

SHS

ANASTASI

A CO. (GH)

LTD.

MARCH,

2012

NOV, 2012 833,963.83 - 70 %

GETFUND

WORK IN

PROGRESS

35 REHAB. OF

POWER SUPPLY

AND STREET

LIGHTING

SYSTEM

EDUCATION NKONYA

SHS

MAKS

ENG. LTD.

MARCH,

2012

NOV, 2012 86,710.00 - - GETFUND CONTRACT

TERMINA-

TED

RETENDER-

ING IN

PROGRESS

DISTRICT ASSEMBLY COMMON FUND (DACF)

NO

TITLE OF THE

PROJECT

SECTOR LOCATION CONTRAC

TOR

START

DATE

EXPECTED

END DATE

PROJECT

COST (GH¢)

AMOUNT

SPENT

(GH¢)

% OF

WORK

DONE

SOURCE

OF

FUNDING

REMARKS

36 RENOVATION OF

DISTRICT POLICE

STATION

SECURITY NKONYA-

AHENKRO

DWD - - 8,690.72

8,690.72 100% DACF COMPLETED

37 PROCUAMENT

OF 10 NO. 13 m3

CENTRAL

REFUSE

CONTAINERS

SANITATION

DISTRICT

WIDE

SHEPHERD

STAR ENT.

(5),

DAPHIL

ENT. (5)

DECEMBE

R, 2011

MARCH, 2012 59,500.00 59,500.00 100% DACF COMPLETED

38 CONSTRUCTION

OF DCE’S

BANGALOW

GOV’NANCE NKONYA-

AHENKRO

MAXI

PRINCE

ASS. LTD

JAN, 2012 JUNE ,2012 374,000.00 101,289.25 40% DACF WORK IN

PROGRESS

NO

TITLE OF THE

PROJECT

SECTOR LOCATION CONTRAC

TOR

START

DATE

EXPECTED

END DATE

PROJECT

COST (GH¢)

AMOUNT

SPENT

(GH¢)

% OF

WORK

DONE

SOURCE

OF

FUNDING

REMARKS

Page 14: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

13

39 CONSTRUCTION

OF DCD’S

BANGALOW

GOV’NANCE NKONYA-

AHENKRO

OMSTAR

LIMITED

JAN, 2012 JUNE ,2012 288,668.91 47,305.62 15% DACF WORK ON

HOLD

40 EXTENTION OF

ELECTRICITY

LOW VOLTAGE

NETWORK

ENERGY KLAGBOKO-

PE

DEMSACK

ENG.

WORKS

LTD

AUG. ,2012 AUG. ,2012 24,000.00 24,000.00 100% DACF COMPLETED

(Transformer

required)

41 3-PHASE

ELECTRICAL

INSTALLATION

AT ASSEMBLY’S

NEW SITE

ENERGY NKONYA-

AHENKRO

DEMSACK

ENG.

WORKS

LTD

APRIL,

2012

MAY, 2012 96,223.00 96,223.00 100% DACF COMPLETED

42 INSTALLATION

OF STREET

LIGHTS

ENERGY SELECTED

COMM’TIES

DEMSACK

ENG.

WORKS

LTD.

JAN. , 2012 MARCH,

2O12

49,593.00 49,593.00 100% DACF COMPLETED

43 RENOVATION OF

BUILDING

STRUCTURES

FOR SOLAR

PANNEL

INSTALLATION

ENERGY OVERBANK

COM’TIES

TAPA

ALAVANYO

DWD APRIL’

2012

JUNE’ 2012 40,545.00 40,545.00 100% DACF COMPLETED

44 CONSTRUCTION

OF FIRE

APPLIANCE BAY

SECURITY NKONYA-

AHENKRO

RISCHADC

E

MAY’ 2012 JUNE’ 2012 9,663.15 9,663.15 100% DACF COMPLETED

45 DRILLING OF 15

NO. BORE

HOLES

WATER AND

SANITATION

SELECTED

COM’TIES

KUADECK

LTD

JUNE, 2012 NOV ,2012 170,463.30 120,000 65% DACF ON-GOING

NO

TITLE OF THE

PROJECT

SECTOR LOCATION CONTRAC

TOR

START

DATE

EXPECTED

END DATE

PROJECT

COST (GH¢)

AMOUNT

SPENT

(GH¢)

% OF

WORK

DONE

SOURCE

OF

FUNDING

REMARKS

Page 15: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

14

46 DRILLING OF 1

BOREHOLE AT

NKONYA SHS

WATER AND

SANITATION

NKONYA-

AHENKRO

KUADECK

LTD

FEB. , 2012 MARCH, 2012 20,000.00 20,000.00 100% DACF COMP’TED

47

CONSTRUCTION

OF A

SLAUGHTER

HOUSE AT

ABOTOASE

ECONOMIC ABOTOASE FEKIOP

LTD,

ACCRA

MAY, 2012 JULY, 2012 107,103.70 33,443.95 40% DACF ON-GOING

48

RENOVATION/

REFURBISHMEN

T OF DCD’S

BUNGALOW

GOV’NANCE NKONYA-

NTUMDA

DIVINE

GUIDANCE

ENT.

APRIL,

2012

JUNE., 2012 22,125.95 22,125.95 100% DACF COMPLETED

49 PROVISION OF

STAND-BY

GENERATOR

(CENTRAL

ADMINIS’TN.)

ENERGY NKONYA-

AHENKRO

CUMMINS

GHANA

LTD.

APRIL,

2012

MAY, 2012 25,882.50 25,882.50 100% DACF COMPLETED

50 PROVISIOV OF

STAND-BY

GENERATOR

(DCE’S RES.)

ENERGY NKONYA-

TEPO

BENKROA

DU ENT.

APRIL,

2012

MAY, 2012 19,000.00 19,000.00 100% DACF COMPLETED

51 REHAB. OF

ABOTOASE

LORRY PARK

ACCESS ROAD

ECONOMIC ABOTOASE DEMESAC

O CONST.

WKS LTD

JAN. , 2012 MARCH ,2012 111,172.70 111,172.70 100% DACF

COMPLETED

52 PAINTING OF

DCE’S RES

GOV’NANCE NKONYA-

TEPO

DWD SEPT, 2012 OCT, 2012 4,466.00 4,466.00 100% DACF COMPLETED

53 SUPPLY OF

SCHOOL

FURNITURE FOR

PRIMARY

SCHOOLS

EDUCATION SELECTED

SCHOOLS

SHIELD

AND

SHELTER

MARCH,

2012

AUG, 2012

57,360.00 57,360.00 100% DACF COMPLETED

NO

TITLE OF THE

PROJECT

SECTOR LOCATION CONTRAC

TOR

START

DATE

EXPECTED

END DATE

PROJECT

COST (GH¢)

AMOUNT

SPENT

(GH¢)

% OF

WORK

DONE

SOURCE

OF

FUNDING

REMARKS

Page 16: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

15

54 CONTRUCTION

OF SLUB FOR

GENERATOR SET

ENERGY NKONYA-

TEPO

DWD APRIL,

2012

JUNE., 2012

722.00

722.00

100%

DACF

COMP’TED

56 CONSTRUCTION

OF GENERATOR

SLUB

ENERGY NKONYA-

AHENKRO

DWD APRIL,

2012

JUNE., 2012

764.38

764.38

100%

DACF

COMP’TED

57 CONST OF

SECURITY

BOOTH AT DCE’S

RES

ADMINISTRA

TIVE

NKONYA-

TEPO

DWD APRIL,

2012

JUNE., 2012

2,759.00

2,759.00

100%

DACF

COMP’TED

58

CONST OF

PUBLIC POUND

SANITATION

NKONYA-

WURUPONG

DWD

APRIL,

2012

JUNE., 2012

4,876.45

4,876.45

90%

DACF

ON-GOING

59

CONST OF

PUBLIC POUND

SANITATION

NKONYA-

AHENKRO

DWD

APRIL,

2012

JUNE., 2012

5,625.60

5,625.60

100%

DACF

COMP’TED

60

CONST OF 3 UNIT

CLASSROOM-

PAVILLION

(ABOTOASE

PENTECOST

PRIMARY)

EDUCATION

ABOTOASE

DWD

JULY, 2012

SEPT, 2012

18,938,58

18,938,58

100%

DACF

COMP’TED

61 CONST OF

DISABLE

ACCESSIBILITY

( RAMPS) TO BDA

OFFICES

SOCIAL NKONYA-

AHENKRO

DWD APRIL,

2012

JUNE., 2012 2,555.00 2,555.00 100% DACF

COMP’TED

62 CONST OF CHPS

COMPOUND AT

TAKROBE

HEALTH TAKRABE

LINKDON

VENTURES

APRIL

,2012

JULY,2012 86,316.94

- - DACF ABAND’ND,

TO BE RE-

AWARDED

NO

TITLE OF THE

PROJECT

SECTOR LOCATION CONTRAC

TOR

START

DATE

EXPECTED

END DATE

PROJECT

COST (GH¢)

AMOUNT

SPENT

(GH¢)

% OF

WORK

DONE

SOURCE

OF

FUNDING

REMARKS

Page 17: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

16

63 CONST OF CHPS

COMPOUND AT

NKONYA –

ASAKYIRI

HEALTH NKONYA -

ASAKYIRI

ALDZI

VENTURES

AUG., 2012 OCT. ,2012 86,852.29 13,027.85 10% DACF ON HOLD

64 CONSTRUCTION

OF A

SLAUGHTER HSE

AT NKONYA-

AHENKRO

ECONOMIC NKONY-

AHENKRO

ADRISON

CO. LTD

APRIL

,2012

SEPT, 2012 87,698.16 12,760.05 0% DACF UNRESOLVE

D LAND

ISSUES

65 REPAIR AND

INSTALLATION

OF STREET

LIGHTS

ENERGY DISTRICT-

WIDE

DEMSACK

ENG. WKS.

LTD.

NOV.’ 2012 DEC.’ 2012 62,000.00 62,000.00 100% DACF COMPLETED

OTHERS

NO

TITLE OF THE

PROJECT

SECTOR LOCATION CONTRAC

TOR

START

DATE

EXPECTED

END DATE

PROJECT

COST (GH¢)

AMOUNT

SPENT

(GH¢)

% OF

WORK

DONE

SOURCE

OF

FUNDING

REMARKS

66 CONSTRUCTION

OF 6UNIT

CLASSRM

BLOCK WITH

ANCILLARY

FACILITIES.

EDUCATION BOWIRI

KYIRAHIN

A.E.S.L SEPT , 2011 MAY , 2012 282, 000.00 - 60% MIN. OF

EDUCATN

WORK IN

PROGRESS

Page 18: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

17

2.2.2 STATUS OF IMPLEMENTATION OF 2012 ANNUAL ACTION PLAN

Ensuring and Sustaining Macroeconomic Stability

Objective 1: To increase internal revenue mobilization by 20% by 2013

Activities Location Output Time frame (quarter) Annual Budget Implement Remarks

1st 2nd 3rd 4th IGF External

Organize 1 No.

tax campaign

quarterly

District-

wide

1 No. tax

campaign

undertaken

1,000 District

Finance

Office/

ISD, NCCE

Done

Objective 2: To reduce audit queries by 70% through good public expenditure management

Prepare

quarterly and

annual progress

reports

DA 4 No. APR

prepared

400 DPCU/Dec

entralized

De-Part-

ments

On-going

Fix Taxes, fees

and levis of

District

Assembly

DA Fees Fixed 15,000 DFO/ DA Done

Provide ID

cards and

uniforms for

revenue

collectors

DA ID and

uniforms

provided

10,000 DFO/ DA

Done

Establish

revenue task

force

DA Task force

in place

12,000 DFO/ DA Done

Establish

incentives

schemes for

collectors

DA Schemes

developed

8,000 DFO/ DA Done

Conduct

research and

create revenue

database

DA Database

created

10,000 DFO/ DA On-going

Train revenue

collectors and

staff

DA Collectors

trained

10,000 DFO/ DA Not done

Provide 5 No.

revenue

barriers

District

wide

Barriers

provided

25,000 DFO/ DA On-going

Prepare annual

expenditure

reports

DA Annual

Expenditure

Reports

prepared

400 District

Finance

Office/

DPCU

Done

Page 19: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

18

Enhancing Competitiveness in Ghana’s Private Sector

Objectives: To promote and create productive employment opportunities 1,000 youth by 2013

Activities Location Output Time frame (quarter) Annual Budget Implement

Remarks

1st 2nd 3rd 4th Local External

Attend Regional

trade and

investment fair

Ho Participated

in Regional

Fair

4,000 DPCU/Stak

eholders

Not done

Support to Self-

help projects

District

wide

Community

self-

initiated

projected

supported

10,000 Com

munities/

T/A

Council

On- going

Objective 2: To improve 6 major market in the District by 2013

Assist private

investors to access

land

District-

wide

Private

investor

assisted to

access land

DA/ NBSSI On-going

Development of

Markets

District

wide

Markets

developed

80,000 DWD/

Traditional

Authorities

On-going

Construction 3No.

of Meat shops

Worawora,

Ahenkro

and

Kwame-

krom

3No. meat

shops

constructed

60,000 DWD

/DPCU /

Not done

Surveying and

Acquisition of

Land

Ahenkro Land

acquired

10,000 DPCU/

Physical

Planning

On-going

Assist and

encourage local

production and

processing

District

wide

Local

production

enhanced

10,000 DA/ NBSSI Not done

Invest into

research and

development of

local industry

District

wide

Research

carried out

15,000 DA/ DPCU Not done

Page 20: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

19

Accelerated Agricultural Modernization and Sustainable Natural Resource Management

Objective 1: To increase crop production in the District by 20% and animal production by 15%

by 2013

Activities Location Output Time frame (quarter) Annual Budget Implem

ent

Remarks

1st 2nd 3rd 4th

Local External

Identify, update and

disseminate existing

technological packages

District-

wide

New Techs

introduced

9,600.00 DADU/

FBOs

On-

going

Introduce improved varieties

(high yielding disease

resistant) vegetable crops

District-

wide

Improved

crops seeds

introduced

10,000.00 DADU

FBOs /

On-

going

Introduce Livestock and

poultry breeds

District-

wide

Improved

breeds

introduced

1,516.00 DADU

FBOs /

On-

going

Train community livestock

workers to act service agents

District-

wide

Service

Agents

trained

5,100.00 DADU

/FBOs

On-

going

Train vegetable farmers and

related food crop farmers

district-wide

Selected

Communiti

es

Farmers

trained

3,000.00 DADU/

Mass

media

On-

going

Promote the production and

consumption of protein

fortified maize

District-

wide

Protein

fortiefied

maize

grown

5,440.00 DADU/

FBOs/

ISD

Done

Educate and train consumers

on appropriate food

combination of available

foods to improve nutrition

District-

wide

Consumers

sensitized

5,440.00 DADU/

ISD

On-

going

Train and resource extension

workers in post harvest

handling tech.

DADU Extension

staff trained

5,440.00 DADU/

MoFA

On-

going

Train producers, processors

and market women in post

harvest handling

District-

wide

People

trained in

post harvst

5,400.00 DADU/

ISD/

FBOs

On-

going

Facilitate loans and credit for

farmers and farmer groups

District-

wide

Loans

facilitated

3,000.00 DADU/

MoFA

On-

going

Monitoring of pest and

diseases

District-

wide

Diseases

and pest

identifeid

1,476.00 DADU/

Veterin

ary

On-

going

Train selected farmers in the

installation, operation and

maintenance in

recommended irrigation

technologies

District-

wide

Farmers

trained

4,240.00 DADU/

FBOs

On-

going

Partner Private Sector to

invest in fish farming and

DADU Potential

investors

35,000.00 DADU/

DA

On-

going

Page 21: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

20

provide seed capital for

Associations

identified

Build capacity of nursery

operators in all tree crop

growing areas and support

them(certify and assist to

obtain resources) to expand

quality of tree crops

seedlings

District-

wide

Nursery

operators

trained

3,340.00 DADU/

Nursery

Opera-

tors

On-

going

Provide adequate and

effective extension

knowledge in livestock

management, record keeping

and financial management to

men and women farmers

District-

wide

Livestock

rearer

trained

5,472.00 DADU/

FBOs

On-

going

Introduce a sustained

programme for vaccination

for all livestock

District-

wide

livestock

vaccinated

4,500.00 DADU/

Veterin

ary

On-

going

Assist fish farmers to Access

credit and promote

marketing of fish

DADU credit

accessed

3,000.00 DADU/

ISD

On-

going

Facilitate the building of

FBOs from primary to

tertiary level at the district

level

District-

wide

FBOs

formed

7,680.00 DADU/

FBOs

Done

Train farmer groups on

effective application of

chemicals

District-

wide

farmers

trained

2,220.00 DA

FBOs

DU/

On-

going

Build the capacity of field

officers in use of new

technologies

DADU Field

officers

trained

8,44.00 DADU/

MoFA

On-goig

Deliver existing technologies

as packages to farmers

District-

wide

Farmers

taught new

tech

6,000.00 DADU

FBOs /

On-

going

Intensify field

demonstration/field day,

field trips/study tours

District-

wide

Field

Demos

organized

18,160.00 FBOs On-

going

Organize training for farmers

in crop production

DADU Training

organised

8,000.00 DADU/

Regiona

l MoFA

On-

going

Strengthen the cost centers in

terms of financial

management and reporting

DADU officials

trained

7,512.00 DADU/

DA

On-

going

Engage consultant for fish

farming

DADU consultant

engaged

19,000.00 DADU/

DA

Not

done

Publicize policy and sector

plans to private and civil

entities (National Farmers

Day)

District-

wide

National

Farmers day

celebrations

held

14,200.00 DADU/

DA

On-

going

Page 22: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

21

Procure irrigation pumps and

accessories for farmer

groups along the Lake

Selected

com-

munities

irrigation

pumps and

accessories

procured

12,000 DADU/

DA

On-

going

Rehabilitate 1 No. office

block at Abotoase

Abotoase Office

rehabilitated

10,500 DADU/

DA

Not

done

Encourage vegetable farmers

to form Associations

District-

wide

Associa-

tions

formed

2,000.00 DADU/

DA

Done

Rehabilitate road network in

vegetable producing

communities

District-

wide

Road

rehabilitated

48,000.00 DADU/

DA

On-

going

Encourage the establishment

of Cage Culture

Selected

com

munities

Cage

Culture

established

3,500.00 DADU/

DA

On-

going

Oil and Gas Development

Objective: To encourage and support the youth to train in the oil and gas sector

Activities Location Output Time frame (quarter) Annual Budget Implement

Remarks

1st 2nd 3rd 4th Local External

Organize annual

awareness

creation on the

prospects of oil

and gas sector

District-

wide

Natives

sensitized on

opportunities

in the oil

sector

750 ISD/ NCCE Not done

Infrastructure, Energy and Human Settlements Development

Objectives: To improve road infrastructure in the District by 45% by 2013

Activities Location Output Time frame (quarter) Annual Budget Implement

Remarks

1st 2nd 3rd 4th Local External

Objective 2: To provide and extend potable water to cover 65% of the population by 2013

Extend pipe water

to Tapa area and

other underserved

communities

Tapa Area

and other

selected

communities

Pipe water

extended

100,000 DWST/

DWD

On-going

Repair of broken

down boreholes

Selected

communities

Defunct

boreholes

repaired

10,000 DWST/

DWD

On-going

Page 23: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

22

Construct 1No

Mech. Borehole at

NKOSEC

NKOSEC Borehole

construcetd

20,000 DWD/

DPCU

Done

Rehabilitate 1No

broken down

borehole at

NKOSEC

NKOSEC Broken

down

borehole

rehabilitated

5.000 DWD/

DPCU

Not done

Objective 3: To increase electricity coverage to 75% by 2013

Extend electricity

to underserved

communities

selected

communities

communitie

s connected

with

electricity

50,000 SDDA/

ECG

ON-going

To improve environmental sanitation by 2013 Construction of

Slaughter Slabs

District Wide Slaughter

slabs

constructed

10,000 DWST/

DWD

Not done

Manage waste

(liquid & solid)

District Wide Solid and

liquid waste

managed

84,000 DWST/

Zoomlion

On-going

Conduct Home

Inspection by

Environmental

Health Staff

District Wide House-to-

house

inspection

conducted

6,000 EHSU/ DA On-going

Conduct food

hygiene inspection

(med. Screening,

meat inspection)

District Wide food

hygiene

inspection

conducted

2,000 EHSU/ DA On-going

To enhance the orderly physical development of five towns guided by properly drawn layout plans to improve

aesthetic beauty by 2013

Intensify training

and skill

development in

land use planning

DA Training

intensified

8,000 DTCP/ DA Not done

Demarcate layout

of communities

DW Layout

demarcated

10,400 DTCP/ DA Not done

Preparation of

District Maps

District Wide District

maps

produced

5,000 DA/Town

Planning

Dept

On-going

Energy

Assist investors in

the oil industry to

access land

District-wide Petroleum

Companies

assisted

500 DWD/ EPA On-going

Page 24: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

23

Human Development, Productivity and Employment

EDUCATION

Objectives 1: To achieve 85% performance in BECE by 2013

Activities Location Output Time frame (quarter) Annual Budget Implement Remarks

1st 2nd 3rd 4th Local External

Undertake monthly

intensified

supervision and

monitoring in all

basic schools.

District

wide

12 No. circuit

supervision

carried out

1,500.00 GES/ DEPT On-going

Organize District-

wide INSET

programme

District-

wide

INSET

programme

organized

7,500 GES/ DA Done

Conduct District-

wide Mock Exams in

all JHS

District

wide

District-wide

Mock Exams

conducted

12,500.00 GES/School

Ad-

ministration

Done

Conduct Common

Exams for Basic

schools

District

wide

Common

exams for

Basic schools

conducted

5,960.25 GES/ School

Ad-

ministration

Done

Procure and

distribute 400 tables

and chairs to all

Primary Schools

District

wide

400 tables and

chairs

provided to

Primary

Schools

20,000.00

GES/ DWD

Done

Provide incentives to

teachers in deprived

area schools

District

wide

Teachers

motivated

7,500.00 GES/ DA Not done

Best Teacher

Awards

DED Best Teacher

Awards

organized

5,000 GES/ DA Not done

Financial Support for

training of 100

Teachers (UTTDBE)

District-

wide

100 teachers

trained

1,000 DA/ GES On-going

Objective 2: To improve and provide basic educational infrastructure, facilities and services by 2013

Construction of 1 No

6 Unit Classroom

Blocks with Office

Mawoe-

kpor

1 No. 6 unit

classroom

block

constructed

160,000 DWD/ GES Not done

Support to STME

Clinic

District

wide

STME Clinic

organized

4,000 GES/ DA Done

Support to youth,

Sports and Culture

development

District-

wide

District Sports

and Cultural

activities

supported

22,500 DEPT/ GES

Done

Page 25: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

24

Construct sports park

and play ground

District

wide

Sports park

and play

ground

constructed

50,000 DWD/ DPCU Not done

Construct 3No 2Unit

KG Classroom block

at Abotoase E.P,

Tapa Amanya R.C

and Tepo

Abotoa-

se E.P,

Tapa

Amanya

R.C and

Tepo

Classroom

block

constructed

240,000 DWD/ DPCU Not done

Construct 2No.

kitchen for School

Feeding Programme

Selected

location

4,000 DWD/ DPCU Not done

Improved education service delivery

Supply of Office

Furniture to GES

Office

Ahenkro Office

furniture

provided

10,000 DWD/ GES Not done

Extend electricity to

basic schools

District

wide

Electricity

provided

10,000 DWD/ DPCU On-going

Construct 1No.

District library at

Ahenkro

Ahenkro Library

constructed

25,000 DWD/ DPCU Not done

Construct 2No 6

Unit classroom block

at Kyirahini Prim.

And Appiahkrom

DA Primary

Kyirahin

and

Appiah-

krom

Classroom

constructed

320,000 DWD/ DPCU On-going

(at Kyirahin)

HEALTH:

Objective 1: To increase access to quality health service by 50% by 2013

Activities Location Output Time frame (quarter) Annual Budget Implement Remarks

1st 2nd 3rd 4th Local External

Create

awareness on

diseases,

prevention and

control

District-

wide

Disease

prevention

and

awareness

created

2,500 DHD/ DA/

ISD

Done

Orientate

community

members on

services at

various

facilities in the

District

District-

wide

Citizens

oriented

1,250 DHD/ DA Done

Page 26: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

25

Organize

comprehensive

outreach

services to

hard, far, island

and peninsular

communities

Remote

areas

Remote

areas access

health

service

2,000 DHD/ DA Done

Organize

monitoring and

supervision

visits to sub-

districts and

communities

District-

wide

Sub-

structures

monitored

5,000 DHD/ DHD Done

Organize

various health

related

celebrations

District-

wide

Health

sector

celebrations

organized

6,000 DHD / DHD Done

Establish and

furnish

Ahenkro

1No.NHIS at

Ahenkro

Ahenkro NHIS

established

20,000 DPCU/ DHD Not done

Create

awareness on

NHIS benefits

District

wide

Awareness

created

3,000 NHIS/ DA Done

Procure

logistics to

NHIS Office

Ahenkro

Logistics

provided

10,000 NHIS/ DA Not done

Objective 2: To improve upon health infrastructure by December 2013

Operationalize

6 No. CHPS

compound

Selected

Communit

ies

6 No. CHPS

compound

in use

35,000.00 DHD/ DA Done

Construct 2No.

CHPS

compound

Takrabe,

Asakyiri

CHPS

constructed

170,000 DWD/ DHD On-going

Objective 3: : To improve maternal and child health care by 2013

Carry out

National Polio

Immunization

District

wide

National

Polio

Immunizati

on held

20,000

DHD/ DA Done

Page 27: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

26

Objective 4: To reduce the incidence of malaria and other diseases by 20% by December 2013

Undertake

district-wide

mosquito

spraying

exercise and

other malaria

control

programs

District

wide

homes and

mosquito

breeding

places

sprayed

6,000 DHD/ EHD Done

Carry out

disease

surveillance

District

wide

Disease

surveillance

carried out

2,000 DHD/ DHD Done

Undertake

quarterly

monitoring of

disease control

and cold chain

activities at

sub-district

levels

District

wide

disease

control and

cold chain

activities

monitored

4,000 DHD/ DHD Done

HIV and AIDS

Objective: To reduce the incidence of HIV and AIDS and other STIs by 50% by December 2013

Counterpart

Fund’g support

for MSHAP

District

wide

MSHAP

Supported

2,500 DAC/ DHD Not done

HIV/AIDS

Education and

Campaign

District-

wide

HIV/AIDS

education

undertaken

2,500

DAC/ DHD

Done

Organize HIV

sensitization,

Voluntary

Testing and

Counseling

District

wide

Sensitizatio

n done

8,000 DAC/ DHD Done

Organize

workshop for

mothers,

pregnant

women and

vulnerable

groups

District

wide

Workshop

down

3,300 DA/C DHD Not done

Monitoring and

Evaluation of

HIV/AIDS

Activities

District-

wide

HIV/AIDS

activities

monitored

4,500 DAC/ DHD Done

Page 28: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

27

Productivity and Employment generation

Activities Location Output Time frame (quarter) Annual Budget Implement Remark

1st 2nd 3rd 4th Local External

Enroll 100

women in non-

formal

education

District-

wide

100 women

enrolled in

formal

education

20,000 Non Formal

Education/

NCCE

On-going

Open Rural

Enterprise

Dev’t Centre to

advise youth

District

wide

Rural

Enterprise

Developme

nt establised

8,500 NBSSI/

DPCU

Not done

Provide joint

venture service

to youth in

entrepreneur-

ship

District

wide

Joint

venture

services

provided

10,000 NBSSI/

DPCU

Not done

Transparent and Accountable Governance

Objective 1: To strengthen functional relationship between the Assembly, its members and

citizens by 2013

Activities Location Output Time frame (quarter) Annual Budget Implement Remarks

1st 2nd 3rd 4th Local External

Hold regular

General

Assembly

meetings

Ahenkro General

Assembly

sessions

held

18,750.00 DA/

District

Finance

Office

Done

Establish FM

Station

Ahenkro FM station

established

57,000 DPCU/ DA Not done

Hold regular

Town Hall

Meetings at

Town/Area

Council level

Sub-

structures

Regular

Town Hall

meetings

held

6,250.00 DA/

Town/Area

Council

On-going

Support to

government

projects

District

wide

Gov’t

project

supported

30,000

DPCU/

Town/Area

Council

Done

Improve and

reconstruct

Nkonya

Ahenkro

market

Ahenkro Market

reconstruct-

ted

40,000 DWD/

DPCU

Not done

Construction of

Office

Complex ph.1

Ahenkro 1 No.

administrati

ve office

constructed

500,000 DWD/

DPCU

Not done

Page 29: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

28

Support to Sub-

District

Structures

District

Wide

Sub-District

structures

provided

with

logistics

60,000 DPCU/

Councils

On-going

Organize

Courses,

seminars and

workshops for

staff member’s

development

Various

locations

Courses,

Seminars

and

Workshops

organized

10,000.00 DA/

ILGS/VRC

C Etc

Done

National Days

Celebration

DA Celebration

s organized

10,000 DPCU/

District

Finance

Office

Done

Contributions

Towards

NALAG

Accra NALAG

Dues

4,000 District

Finance

Office/

DACF

Administrat

or

Done

Support to

VRCC

programmes

Ho Financial

support to

VRCC

10,000 District

Finance

Office/

VRCC

On-going

Construction of

District Chief

Executive’s

Bungalow

Ahenkro DCE’s

bungalow

constructed

80,000.00 DWD/

DPCU

On-going

Construction of

District Coord.

Director’s

Bungalow

Ahenkro DCD’s

bungalow

constructed

80,000.00 DWD/

DPCU

On-going

Constriction of

2No 3 Bedroom

Bungalows

with Boys

Quarters

Ahenkro 2No. staff

bungalow

constructed

160,000 DA/ DPCU Not done

Construction of

2No Semi-

Detached

Bungalows

Ahenkro 12No. semi-

detached

bungalow

constructed

120,000 DWD/

DPCU

Not done

Rent temporal

accommodation

for staff

Ahenkro Staff

accommoda

tion rented

15,000 District

Finance

Office/

DWD

On-going

Construct

Nkonya

Ahenkro Lorry

station

Ahenkro Lorry

station

constructed

40,000 DWD/

DPCU

Not done

Purchase DA Generator 25,000 DA/ DPCU Done

Page 30: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

29

standby

generators

purchased

Objective 2: To promote district level planning and budgeting involving all stakeholders through

a participatory process Activities Location Output Time frame (quarter) Annual Budget Implement Remarks

1st 2nd 3rd 4th Local External

Hold quarterly

DPCU

meetings

DA Quarterly

DPCU

meetings

held

300 DPCU/ DA Done

Review annual

plans & budget

DA Plans &

budget

reviewed

3,000 DPCU/ DA Done

Organize

training for

staff

DA Training

held

15,000 DPCU/ DA Done

Prepare

monitoring and

evaluation plan

District-

wide

M&E plan

prepared

20,000 DPCU/

Relevant

institutions

Done

Purchase of

1No 4x4

Vehicle

Ahenkro 1 No. 4x4

Vehicle

procured

50,000 DPCU/ DA Not done

Rehabilitation

of Monitoring

Vehicle

Ahenkro

10,000 DPCU/ DA Done

Prepare and

gazette annual

Fee Fixing

Resolution

DA 2010 Fee-

Fixing

Resolution

prepared

250 DPCU/

F&A Sub-

Committee

Done

Purchase of

Office

Equipment

Ahenkro Office

equipments

procured

30,000.00 District

Finance

Office/

Procure-

ment Unit

Done

Objective 3: To improve the capacity of security agencies to provide internal security for human

safety and protection. Activities Location Output Time frame (quarter) Annual Budget Implement Remarks

1st 2nd 3rd 4th Local External

Make

budgetary

allocation for

disaster

management

District

wide

NADMO

activities

funded

40,000 NADMO/

DPCU

Done

Page 31: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

30

Organize public

education on

disaster related

issues

District-

wide

Education

on disaster

organized

1,250 NADMO/

DPCU

On-going

Improve and

ensure safety

standards at

Abotoase Lake

Transportation

Abotoase Safety

standard

ensured

4,000 NADMO/

DPCU

On-going

Objective 4: To empower women and mainstream gender into the socio-economic development

of the district Activities Location Output Time frame (quarter) Annual Budget Implement Remarks

1st 2nd 3rd 4th Local External

Resource 50

women to

contest in DA

Elections

District-

wide

50 women

resourced

for DA

elections

55,000.00 NCCE/

Dept of

Social

Welfare

Not done

Provide support

to women

group in

business

development

District

wide

Women

group

supported

20,000 DSW/ DA Done

Objective 5: To identify and equip the vulnerable and excluded with employable skills by 2013

Activities Location Output Time frame (quarter) Annual Budget Implement Remarks

1st 2nd 3rd 4th Local External

Provide care

and support for

the aged and

vulnerable

District-

wide

Care and

support

provided

5,000 Social

Welfare

Dept./

Vulnerable

groups

Done

Sensitization of

Children’s Act

and Juvenile

Act

District-

wide

sensitization

on

children’s

act held

500 Social

Welfare

Dept./

NCCE

Not done

Community

sensitization of

child labour,

child abuse and

Human/Child

District-

wide

citizens

sensitized

on child

labour/

abuse

500 Social

Welfare

Dept./

NCCE

On-going

Page 32: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

31

trafficking

Family

reconciliation

and handling of

maintenance

cases

District-

wide

Families

reconciled

1,000 Social

Welfare

Dept./

Judicial

Service

Done

National Day

Celebrations

for aged

District-

wide

Natioanl

aged days

celebrated

5000 Social

Welfare

Dept./ DA

Not done

Page 33: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

32

2.3 Update on Disbursements from Funding Sources

The tables below show the funding sources of projects, and update on disbursements of funds in

the district.

Table 2.3.1: Update of funding sources

SOURCES 2011 (GH¢) 2012 (GH¢) TOTAL (GH¢)

DACF 302,394.12 476,120.72 778,514.84

MP’s FUND 52,407.42 56,593.29 109,000.71

IGF 1,553,346.90 96,382.20 1,649,729.10

GOG GRANTS 49,392.00 293,806.86 343,198.86

PLWD - 93,392.50 93,392.50

DDF 67,374.75 39,039.00 106,413.75

DONOR GRANTS

(EU,CBRDP, MSHAP)

4,000 171,666.00 175,666.00

TOTAL REVENUE 2,028,915.19 1,227,000.57 3,255,915.76

Source: BDA, Jan, 2013.

Page 34: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

33

Table 2.3.2: Update on disbursements (DACF)

SECTORS 2011 (GH¢) 2012 (GH¢) TOTAL (GH¢)

ADMINISTRATION 27,611.59 1,533,060.00 1,560,672.10

SPECIAL PROJECTS 97,877.55 171,666.00 269,543.55

TOTAL EXPENDITURE 125,489.14 1,704,726.51 1,830,215.65

Source: BDA, Jan, 2013.

2.4 Update on Core District Indicators

Table 2.4.1: A table showing district core indicators, targets and achievement of 2012

Food Crop Production

NO INDICATORS DISTRICT

BASELINE

(2011)

MET.TON

DISTRICT

TARGET (2012)

MET.TON

INDICATOR

LEVEL (2012)

MET.TON

PROGRESS MADE

TOWARDS

ACHIEVEMEENT

1 Maize 5,710 5,800 6,000

1.Training of farmers

2.Supply of inputs

2 Cassava 650 650 500

3 Plantain 230 230 230

4 Yam 680 700 690

5 Rice 1,125 1,750 1,800 1. Training of farmers

2. Supply of inputs

6 Vegetables

a. Okro

900 920 950 2. Training and education

b. Pepper ( Kpakposhitor )

62 65 60

c. Pepper ( Bird Eye Chili )

- 7.2 8 1.Introduction of new

variety

2. Supply of inputs

3. Training

d. Garden Egg 35 35 35

Source: DDA, BDA, Jan, 2013

Page 35: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

34

Animal Production

NO INDICATORS DISTRICT

BASELINE

(2011) STOCK

NO.

DISTRICT

TARGET (2012)

STOCK NO.

INDICATOR LEVEL

(2012) STOCK NO.

PROGRESS MADE

TOWARDS ACHIEVEMENT

1 Goat 12,400 12,400 12,000

2 Sheep 9,500 9,000 8,000

3 Cattle 450 400 380

4 Poultry

Local

15,500

• 17,000

• 16,000

Improved 3,500 5,000 4,000 1.Farmer education

2.Financial support

5 Pig 250 200 220

6 Fish 55,275 55,000 54,000

Source: DDA, BDA, Jan, 2013

2.5 Human Resource Development

Table 2.5 Update of Human Resource Development

NO

Indicators

Target

2012

Baseline

2011

Indicators

level

2012

Progress

made towards

achievements

1 HIV/AIDS Prevalence rate (% of adult

population, 15 – 49 yrs. HIV +)

0 0.23% 0.25%

2 Maternal Mortality Ratio (Number of

deaths due to pregnancy and child birth

per 100,000 live births

0/100,000 222/100,000 288/100,000

3 Under – five mortality rate (Number of

deaths occurring between birth and

exact age five per 1000 live births)

0/1,000 3/1,000 2/1,000

4 Malaria case fatality rate (General) per

10,000 population

0/10,000 4/10,000 15/10,000

5 Percentage of population with

sustainable access to safe water sources

6 Percentage of population with access to

improved sanitation(WC,KVIP,HHVIP)

7 Gross enrolment Rate (Indicators the

number of pupils/students at a given

level of schooling regardless of age – as

proportion of the number of children in

the relevant age group)

- Primary

98.5%

98%

98.4%

Page 36: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

35

- J S .S

- S .S. S

Net Admission Rate in Primary

Schools(Indicators primary one

enrolment of pupils aged 6 years)

86%

76%

81%

73%

85%

75.6%

8 Gender Parity Index (Ratio between

girls and boys enrolment rates, the

balance of parity is 1.00

- K G

- Primary

- J H S

- S H S

0.97

0.98

0.79

0.86

0.97

0.97

0.76

0.81

0.97

0.98

0.77

0.84

9 Proportion of youth benefiting from

skills/apprenticeship and entrepreneurial

training

2.6 Good Governance

NO

Indicators

Target

2012

Baseline

2011

Indicator

level

2012

Progress

made towards

achievements

10 Total amount of internally generated

revenue

588,100 433,655.53 92,341.77

11 Amount of development partner and

NGO funds contribution to DMTDP

implementation

326,153

-

-

12 Amount of DA’s expenditure within the

DMTDP budget (Percentage of DA’s

expenditure in the annual budget.)

2,692,753 292,779.00 2,121,084.00

13 Number of reported cases of abuse

(children, women, men)

-

- -

14 Police citizen ratio - - -

Source: BDA, Jan, 2013

Page 37: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

36

2.7.0 Employment

2.7.1 NATIONAL YOUTH EMPLOYMENT PROGRAMME (NYEP)

The National Youth Employment Programme (NYEP) scheme provided employment for a

number of the youth in the district. The total number of people employed under the various

modules as shown below.

Table 2.7.1.1: A table showing number of youth employed by the NYEP

Source: NYEP, BDA, DEC., 2012

No Module No. Employed Total

2011 2012

1 Community Education

Teaching Assistants

(CETA)

66 66 132

2 Health Extension Workers 53 7 60

3 Dress Making/Tailoring 27 90 117

4 Prison Service Support 3 0 3

5 Fire Service Support 0 4 4

6 Hair Dressing 45 0 45

7 Community Protection

Assistants

1 0 1

8 Zoomlion 79 0 79

9 Total 274 167 441

Page 38: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

37

2.7.2 COUNCIL FOR TECHNICAL, VOCATIONAL AND EDUCATIONAL TRAINING

(COTVET)

Table 2.7.2.1: A table showing number of youth provided with employable skills under the

COTVET programme.

Source: BDA, Jan, 2013

Module

No. Of Beneficiaries

2011 2012

Garments 14 20

Cosmetology 12 13

Auto mechanic 12 -

Electronic 12 -

I.C.T - 17

Carpentry - 6

Block laying - 5

Total 50 61

Page 39: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

38

2.7.3 LOCAL ENTERPRISES AND SKILLS DEVELOPMENT PROGRAMME

(LESDEP)

A total of forty (40) people were trained with requisite skills in their chosen trades. Below is the

distribution:

S/N TRADE BENEFICIARY

1. Hairdressing 10

2. Sewing 10

3. Photography 5

4. Barbering 5

5. Food & Catering 10

GRAND TOTAL 40

Source: BDA, Jan, 2013

2.7.3 YOUTH ENTREPRISES AND SKILLS DEVELOPMENT CENTRE (YESDEC)

A total of seven hundred and seventy-five (775) people were registered out of which two

hundred and thirty-five (235) were trained with requisite skills under the various modules of the

programme as tabled below:

S/N MODULE BENEFICIARY

1. Grass-cutter

Rearing

75

2. Liquid Soap

Making

60

Page 40: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

39

3. Beauty-care 100

GRAND TOTAL 235

Source: BDA, Jan, 2013

Three (3) knitting and three (3) sewing machines were supplied to six (6) identified dressmakers

in selected communities.

2.8.0 Update on Critical Development and Poverty Issues

The progress of development attained in the various sectors of the district includes the following:

2.8.1Agriculture

The district recorded an increase in food crop and animal production, even though some of the

targets set were not achieved. This implies that the standard of living and income levels of

farmers had increased with reference to that of 2011.

It is worth noting that yearly targets were exceeded in the areas of maize, cassava, okro, piggery

and poultry production.

A new variety of pepper known as ‘Bird Eye Chili Pepper’ was introduced to farmers in the

District. The District Assembly has provided irrigation equipments for the establishment of about

four –acre demonstration farm of the pepper by the Ablorga farmers group.

2.8.2 Governance

General Assembly, DISEC and the various sub–committee meetings etc were regularly held to

discuss issues on social infrastructural development, peace and security. However there was a

Page 41: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

40

clash between the Nkonya of this district and Alavanyo of the Hohoe Municipal Assembly

resulting in insecurity during the last quarter of the year.

The situation was under control with the detachment of Military and Police personnel to the

District.

2.8.3 Health

There was significant improvement under this sector. Newly recruited Community Health Nurses

were posted to this district. The District Health Directorate took delivery of a pick-up to improve

upon supervision and monitoring.

A number of people were encouraged to register under the National Health Insurance Scheme

(NHIS) in the district. The absence of NHIS office is hampering readily registration of clients

under the scheme in the district.

2.8.4 Education

The education sector saw major boost in terms of classroom block infrastructure at both first and

second cycle levels. Thirty-two (32) GETFUND projects were ongoing of which ten (10) was

completed and in use. They included classroom blocks, teachers/masters bungalows, dormitories

and dining halls etc. The implementation of School Feeding Programme (SFP) in 19 basic

schools in the district also enhanced school attendance and enrolment at primary schools.

Similarly, the introduction of the Capitation Grant to basic schools and the distribution of 300

laptop computers have lessen the burden on parents over their children’s school fees and also

improved ICT training in schools.

However, education in the district is saddled basically with the following challenges.

Page 42: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

41

• Inadequate trained teachers.

• Inadequate decent classrooms, especially, at the overbank communities.

• Inadequate teaching and learning materials etc.

2.8.5 Participatory Monitoring and Evaluation

All stakeholders, including, opinion leaders, Assembly Members, NGO’s, Heads of

Decentralized Departments participated in the monitoring and evaluation exercise through data

collection, group discussion and among others.

Monitoring and evaluation was also achieved through the assessment of performance of

interventions through progress reports.

2.9 District Development Facility (DDF)/Capacity Building

This District received an amount of thirty-nine thousand and forty-two Ghana Cedis (39,042.00)

as capacity component of its share of the DDF. The fund was disbursed to purchase office

equipments and to train the staff and other members of the Assembly as follows:

No. Project Location Contractor Start

Date

Completion

Date

Project

Cost

% of

Work

Done

1.

ICT training of

thirty(30 no.)

number staff

Nkonya-

Ahenkro

Biig Plus

GH Ltd

Nov.

2012 Dec. 2012 10,200.00 100

2.

Training of

town/Area Council

Nkonya Biig Plus

GH Ltd Nov.

2012 Dec. 2012 8,000.00

100

3.

Development of

revenue data base

and Training of

revenue collectors

on revenue

database

Nkonya Biig Plus

GH Ltd

Nov.

2012 Dec. 2012 10,000.00

100

4.Purchase of office

equipment

Nkonya Biig Plus

GH Ltd

Nov.

2012 Dec. 2012 12,000.00

100

Page 43: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

42

CHAPTER THREE

THE WAY FORWARD

3.1 Introduction

This chapter covers key issues, recommendations and conclusion.

3.2 Key Issues

Some of the key development issues arising from the expressed needs and aspirations were poor

infrastructure, limited access to quality health care, poor environmental sanitation, youth

unemployment, low agricultural productivity, poor quality education, poor revenue generation,

inadequate and delayed release of funds for developmental projects/programmes etc.

After the monitoring and evaluation exercise, however, it was realized that some of the issues

had been addressed. For example the various modules under the NYEP, COTVET and LESDEP

etc had provided skills training and employment for a number of the youth.

There had also been improvement in the educational infrastructure due to the various

interventions under the GETfund.

3.3 Recommendations

1. Funds should be released adequately and timely from the Central Government for

development projects/programmes.

2. The Assembly should be involved in the execution of Central Government’s project in the

district for effective monitoring and supervision.

Page 44: ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMESBiakoye… · ANNUAL PROGRESS REPORT OF PROJECTS/PROGRAMMES JANUARY, 2013 . 1 TABLE OF CONTENTS Page CHAPTER ONE INTRODUCTION ... 2.2

43

3. The Assembly should be committed to the implementation of projects/programmes of the

approved Annual Action Plan and Budgets.

4. The Assembly should improve local revenue generation.

5. Decentralized department should submit their report timely to the DPCU.

6. Motivation for the monitoring and evaluation team members.

Conclusion

The District Assembly must generate more revenue to be able to implement more development

project/programmes to improve upon the socio–economic well-being of its people.


Recommended