+ All Categories
Home > Documents > Annual Report –2007 Submitted by Tonya Galbraith, Town Manager Feb. 12, 2008.

Annual Report –2007 Submitted by Tonya Galbraith, Town Manager Feb. 12, 2008.

Date post: 11-Jan-2016
Category:
Upload: hugo-oneal
View: 217 times
Download: 3 times
Share this document with a friend
Popular Tags:
12
Annual Report –2007 Submitted by Tonya Galbraith, Town Manager Feb. 12, 2008
Transcript
Page 1: Annual Report –2007 Submitted by Tonya Galbraith, Town Manager Feb. 12, 2008.

Annual Report –2007Submitted by Tonya Galbraith,

Town ManagerFeb. 12, 2008

Page 2: Annual Report –2007 Submitted by Tonya Galbraith, Town Manager Feb. 12, 2008.

Updated, along with Department heads, the comprehensive 5-year Capital Project Plan;

Assisted Parks Board and HNTB with the completion of the 5-year Parks Master Plan;

Facilitated new trash contract with Caldwell Gravel Services; Assisted the Redevelopment Commission on implementing the Economic

Development Plan. The RDC interviewed several marketing firms to help with marketing the plan and hired Hirons & Company;

Contracted with Wowlinx for IT services; Implemented Town Council notebooks for use at meetings; Co-hosted with the McCordsville United Methodist Church the first ever McCordsville

night at the Indianapolis Indians; Hired a full-time administrative assistant to work with Town Manager and Clerk-

Treasurer; Continued serving on the Hancock Economic Development Council board; Appointed to serve on the Indiana Association of Cities and Town’s (IACT),

Legislative Committee, chaired the Indiana Municipal Management (IMMA) Legislative Committee and continued serving as IMMA secretary/treasurer;

Appointed by the Indiana Speaker of the House to serve on the Indiana Advisory Commission on Intergovernmental Relations;

Testified before the Annexation Summer Study Committee; Served as a panelist on IACT’s Newly Elected Officials regional and statewide

workshops.

Page 3: Annual Report –2007 Submitted by Tonya Galbraith, Town Manager Feb. 12, 2008.

Worked with developers on several new projects, including Copper Leaf, a 55+ target development, and McCord Square, a 90 acre regional commercial retail and business center;

Served as staff to the Planning and Zoning Committee, Redevelopment Commission and Board of Zoning Appeals;

Served as the initial point of contact for all potential developments;

Served on the Metropolitan Planning Organization’s Regional Transportation Council, the Mt. Comfort Road Corridor steering committee and other MPO committees;

CVS Grand Opening – July 2007McCordsville Corner Shoppes

Page 4: Annual Report –2007 Submitted by Tonya Galbraith, Town Manager Feb. 12, 2008.

Completed and passed the Mayflower BOD lab testing for IDEM laboratory certification;

Wastewater treatment plant expansion (Phase 4) under design;

Completed start-up of Geist Woods Estates Lift station;

Completed start-up of McCordsville Commons Lift Station;

57.2 million gallons of wastewater treated;

1,319 sewer utility locates;

920,000 gallons of sludge removed;

Richard Watts and Don Cottey at wastewater treatment plant

Steve Gipson works at the lab

Page 5: Annual Report –2007 Submitted by Tonya Galbraith, Town Manager Feb. 12, 2008.

Added 1.24 miles to street inventory (total now 24.61 miles);

Coordinated with INDOT on the US 36 (Broadway) project;

Logged 26.6 hours on street sweeper and removed 39 cubic yards of debris;

Removed 475 signs in the Town’s right-of-way;

Re-stoned all alley’s (using the backhoe);

Purchased new street signs for Highland Springs

Milled and resurfaced portions of Briarway Lane, Briarway Court, Northview Drive and Ridgeway Court;

Re-stripped 650N, 750N, 800N and 900N; and,

UV heat treated, patched, and did pothole repair on 900N

Don Cottey works on salt truck

Page 6: Annual Report –2007 Submitted by Tonya Galbraith, Town Manager Feb. 12, 2008.

GPS mapped stormwater structures in Highland Springs;

Completed design of Form Street Stormwater Improvement;

Drainage approval issued for Emerald Springs Sec. 4, Deer Crossing Sec. 3A, and Geist Woods Estates, Sec. 2;

Drainage approvals pending for Bay Creek Sec. 3 and McCordsville Self Storage;

Received approval of FEMA map revisions;

Assumed control of floodplain reviews;

Staff received training on erosion control plot plan reviews;

Submitted MS4 year-end report to IDEM.

Richard Watts repairs flow meter

Page 7: Annual Report –2007 Submitted by Tonya Galbraith, Town Manager Feb. 12, 2008.

Increased sewer billings accounts by 90;

Trained one new employee;

Completed upgrade to billing software; began on-line payments;

Completed 248 work orders for water turn-offs;

Attended the Frey training conference;

Developed commercial building permit process;

Implemented new procedure for storage of month end reports;

Staff attended a workshop on collections;

Staff attended an Excel seminar;

Added a work station at the front desk.

Ann Welling

Tamyra Estes and Ann Welling handle utility billing and collections

Page 8: Annual Report –2007 Submitted by Tonya Galbraith, Town Manager Feb. 12, 2008.

Construction drawing approvals issued for Emerald Springs Sec. 4, Deer Crossing Sec. 3A, and Geist Woods Estates Sec. 2;

Emerald Springs Sec. 6 under construction; CVS Pharmacy completed; McCordsville Commons and McCordsville Corner

Shoppes completed; 76 Final Occupancy Permit Releases approved; Development sections recorded – Bay Creek East Sec.

2; Deer Crossing Sec. 5; Final asphalt surface installed in Bay Creek Sec. 4, Deer

Crossing Sec. 4, Gateway Crossing Sec. 4 and most of Sec. 1;

190 building permits reviewed and 108 permits approved.

•Public Works Commissioner Ron Crider Mike Cousins decides whether to approve or deny permits

Page 9: Annual Report –2007 Submitted by Tonya Galbraith, Town Manager Feb. 12, 2008.

Assessed Value Property Tax Rate

2002 = $47,609,750 .64

2003 = $86,015,080 .426

2004 = $112,465,600 .3395

2005 = $142,779,200 .308

2006 = $178,083,660 .3344

2007 = $217,308,830 .4327

Administrative Assistant Melissa Nevins and Clerk-Treasurer Cathy Gardner

Page 10: Annual Report –2007 Submitted by Tonya Galbraith, Town Manager Feb. 12, 2008.

Geist Woods Estates

• Bay CreekTotal in 2006 = 25 Total in 2007 = 10

• Bay Creek EastTotal in 2006 = 21 Total in 2007 = 29

• Deer CrossingTotal in 2006 = 26 Total in 2007 = 12

• Emerald SpringsTotal in 2006 = 31 Total in 2007 = 40

• Gateway CrossingTotal in 2006 = 15 Total in 2007 = 1

• Geist Woods Estates Total in 2007 = 6

Total 2006 = 118 Total 2007 = 98

Custom homes in Geist Woods Estates

Page 11: Annual Report –2007 Submitted by Tonya Galbraith, Town Manager Feb. 12, 2008.

• Bay Creek (based on 10 builders information forms): $133,577

• Bay Creek East (based on 29 builders information forms): $211,848

• Deer Crossing (based on 12 builders information forms): $133,517

• Emerald Springs (based on 40 builder information forms): $112,859

• Gateway Crossing (based on 1 builders information form): $170,000

• Geist Woods Estates (based on 6 builder information forms): $420,000

Page 12: Annual Report –2007 Submitted by Tonya Galbraith, Town Manager Feb. 12, 2008.

• Aspen Self Storage ;

• Greenfield Banking Company;

Developments partially through the process:

• Copper Leaf – 55+ targeted (residential, commercial, medical) – has gone through the Planning & Zoning committee process. Has yet to go through the Area Plan Commission. Will still need Council approval for the rezoning and 146 acre annexation;

• McCord Square – 90+ acre (retail, commercial, civic uses) – has gone through the Planning & Zoning committee process. Has yet to go through the Area Plan Commission and will still need Council approval for the rezoning;

• Interurban Place – retail/residential located on North Broadway;

• Star Financial Bank – will be located as an out lot at the McCordsville Commons. Construction date unknown.

Greenfield Banking Company