ANNUAL REPORT 2012/13 DEPARTMENT HIGHER EDUCATION
AND TRAINING
Presentation to theSelect Committee on
Education and Recreation
23 October 2013
Presentation Outline
2
• Achievements• Background Information• Programme Performance on Predetermined Objectives
- Achievements- Targets partially and not achieved - Current status of targets
• Financial Statements- Audit Report- 2012/13 – Allocation versus Expenditure- Main Reasons for Under-Expenditure
Achievements
3
• Further Education and Training student headcount enrolments increased by 90% from 345 566 in 2010 to 657 690 in 2012
• Student headcount enrolments at universities increased by 14% from 837 779 in in 2010 to 953 375 in 2012
• The establishment of the two new universities in Mpumalanga and the Northern Cape. Both universities will open their doors in 2014 in selected academic programmes, using existing buildings
• Demerger of Medunsa Campus from University of Limpopo and establishment of a new university of health sciences
• Building of 12 new Further Education and Training campuses and refurbishment of 2 campuses
• Improved HR and financial management in FET College sector
Achievements
4
• NSFAS which is the primary tool to ensure access for poor students to post-school education has assisted 1.4 million students since 1991 with many NSFAS alumni now playing an important role in our economy and society
• NSFAS student bursary funding at FET Colleges has increased from R318 million in 2010 benefitting 61 703 students to R1.988 billion in 2013 targeting 222 817 students
• NSFAS student bursary funding at Universities has increased from R2.2 billion in 2010 benefitting 148 387 students to R3.693 billion in 2013 targeting 210 000 students
• Expansion and strengthening of teacher education for all education sub-sectors, including pre-schooling, schooling and post-schooling has resulted in an increase from just under 6 000 new teacher graduates in 2008 to 12 999 in 2012
Background Information
5
• The 2012/13 Annual Report is the third Annual Report of the Department of Higher Education and Training
• For the 2012/13 financial year the Department had a total of 107 planned targets:- 62 targets were achieved- 33 targets were partially achieved- 12 targets were not achieved
• 11 of the partially and not achieved targets have subsequently been achieved post 31 March 2013
• Implementation of the phasing-in of VCET function shift and other matters
National Certificate (Vocational) Certification
6
• Unlike the traditional matric examination, examinations for FET colleges are conducted seven times a year and twice a year for AET, with candidates being assessed and certificated in each of these nine examination cycles
• Prior to the establishment of the Department in 2009, certification challenges had already existed in the issuing of NC(V) certificates
• 322 214 NC(V) Levels 2 to 4 certificates have been issued• 16 602 certificates were initially not issued because public FET Colleges owed
certification fees to Umalusi. The Department has successfully intervened and ensured that Umalusi lifts this block. Certificates, which are now being processed for release
• 3 491 certificates have not been issued by Umalusi because of outstanding certification fees owed by private FET Colleges. The Department has contacted each of these institutions to settle outstanding certification debt
• 18 106 certificates have not been processed due to data anomalies in the candidate’s datasets. This is the actual backlog. The Department is in constant engagement with SITA to address these anomalies. SITA is also in the process of sourcing additional capacity to resolve this matter
Leakages of FET Examination Papers
7
Leakages affect only the Engineering Studies Trimester examination cycles:
• November 2012 and April 2013 (24 subjects): Candidates implicated at several centres along with individual candidates at other centres. Leakages reported 2 days ahead of examination
• August 2013 (16 subjects): Candidates implicated at only one centre and limited to individual candidates per centre at other centres – leakages reported during or after the examination
Measures put in place:• Changed distribution to daily delivery of question papers during
August 2013 examinations, i.e. afternoon before, instead of 1-2 weeks in advance as was happening in previous examination cycles
• Exploring viability of moving daily delivery to the morning of the examination
• Collaboration with National Police Commissioner’s office to investigate and detect source of leakages
• Arrests have been made and disciplinary enquiries are underway with regards to implicated staff and students
FET College Councils
8
Number of Colleges which currently have council governance structures •Sixteen public FET Colleges currently have council governance structures
Due date for the appointment of Councils•The appointments to the Free State, Eastern Cape, KwaZulu-Natal and Limpopo Councils have been completed. Gauteng, Northern Cape and North West shortlisting and due diligence have already been completed and appointments will be made during November 2013•Mpumalanga and Western Cape Councils are still in place as they have not yet expired•8 Colleges under administration with their governance structure being fulfilled by the Administrators
FET College Principal and Deputy Principal Posts
9
Principals:
•Post advertised: 13•Interviews conducted: 11•Posts due for short listing: 2•Appointments made: 7•Due for re-advertisement: 3•Interviews done and in process of appointment: 1
Deputy Principals:
•Number appointed: 21•Vacant: 11 posts are in the process of being filled
FET College Turnaround Strategy
10
• To support on human resource management aspects, 20 Human Resource generalists have been appointed and deployed to FET colleges
• South African Institute for Chartered Accountants (SAICA) have been deployed Chartered Accountants in all FET colleges with a view to strengthen financial management capacity
• A College Improvement Project in the Eastern Cape and Limpopo Province is being implemented
• Substantive actions are currently being implemented in FET colleges in pursuit of improved student performance which includes the following:
- Daily monitoring of student attendance, particularly for bursary recipients where travel and accommodation allowance disbursement is linked to attendance
- The administration of the student selection and placement test at the commencement of the academic year
- Delivery of academic support programmes
11
Purpose: To conduct the overall management of the Department and provide centralised support services
Performance Status as at 31 March 2013 Targets
Achieved 11
Partially achieved 6
Not achieved 3
Total Targets 20
Programme 1: Administration
Link between Expenditure and Budgets and performance plans in relation to key indicators
Programme 1: Administration
R’000
Adjusted Appropriation
Actual Expenditure Deviation Virement
AppliedFinal
Variance
Compensation of Employees 90 901 88 023 2 878 (2 613) 265
Goods and Services 69 721 78 885 (9 164) 9 343 179
Transfers and Subsidies 1 014 1 172 (158) 205 47
Machinery and Equipment 2 530 3 575 (1 045) 1 050 5
Total 164 166 171 655 (7 489) 7 985 496
Performance Information Achieved Partially Achieved
Not Achieved
Targets (20) 11 6 3
12
13
Performance Indicators Planned Target 2012/13 Actual Achievement2012/13 Comments
To improve efficiency by implementing the necessary information technology infrastructure and systemsICT governance maturity level achieved
Maturity level 1 Maturity level 1 Target achieved (no deviation)
Percentage networkconnectivity uptime
99.9% networkconnectivity uptime
100% Target achieved (no deviation)
Availability of IT services IT services available 24hours, 7 days a week (24/7)
24/7 Target achieved (no deviation)
Achievements:
Programme 1: Administration
14
Performance indicators Planned Target 2012/13
Actual Achievement
2012/13Comments
To provide effective and efficient human resource planning and management services
Number of months to fill a vacancy
4 months to fill a vacancy
4 months Target achieved (no deviation)
Percentage vacancy rate in the department
Vacancy rate in the department to be reduced to 15%
11% Target achieved(exceeded)
Number of days to resolve disciplinary cases
90 days to resolvedisciplinary cases
148 days Partially achieved: 58 days more to resolve disciplinary cases (experienced delays with the INDLELA cases due to postponements and non-availability of key witness)
Programme 1: Administration
15
Performance indicators Planned Target 2012/13
Actual Achievement
2012/13Comments
Percentage compliance with the Human Resource Strategic Planning Framework
95% compliance 63% compliance Partially achieved:32% below the targetHR Plan was not approved on 30 March 2013.2013 Employment Equity report was submitted after 15 January 2013.
Percentage compliancewith performanceManagement framework
100% compliance with PMDS policy and poor performancemanaged
100% Target achieved(no deviation)
Programme 1: Administration
16
Performance indicators
Planned Target 2012/13
Actual Achievement2012/13 Comments
Ensure adherence to policies and standards on logistical servicesPercentage compliance toSCM and logistical policies and standards
100% compliance to SCM and logistical policiesand standards
Compliance toSCM and LogisticalPolicies andstandards exceptfor the incidentsmentioned in thecomments
Partially achievedInvestigations are taking place on an incident of irregular expenditure due to the non-compliance with SCM policies and failure not to reportall transactions aboveR100 000 to NationalTreasury
Programme 1: Administration
17
Performance indicators
Planned Target 2012/13
Actual Achievement
2012/13Comments
Ensure adherence to policies and standards on logistical servicesNumber of days to pay invoices from service providers
30 days to pay invoicesfrom service providers
30 days except for some exceptions
Partially achievedPayments later than 30days are mainly dueto incorrect bankingdetails provided byservice providers andlarge transfer paymentsthat were rejected bythe system and requiredreprocessing
Programme 1: Administration
18
Performance indicators
Planned Target 2012/13
Actual Achievement
2012/13Comments
To provide effective communication services and events managementFunctional DHETwebsite with quarterlynewsletters
Website available 365 days per year with 4 quarterly newsletters published
Website available 365 days per year with 1 newsletter published
Partially achievedNewsletters could not be published for 3 quarters. as there was no editorial policy.
Percentage response to queries via call centre
100% response to queries via call centre
97.3% Partially achieved:Below target by 2.7%Non-issuing of FET College and SETA certificates
Number of exhibitions and Public Relations events conducted
8 11 Target achieved
Programme 1: Administration
19
Performance indicators
Planned Target 2012/13
Actual Achievement2012/13 Comments
To ensure a safe and healthy physical environment
Percentage compliance with Occupational Health and Safety (OHS)
98% 90% Partially achieved: Below target by 10%.Due to renovations of the building and delays in approval of OHS and Security policies.
To prevent fraud and corruption
Fraud and anti-corruptionstrategy developed and implemented
Fraud and anti-corruption policy implemented Whistle blowingsystem developed andimplemented
Fraud and anti-corruptionpolicy implementedWhistle blowingsystem developed and implemented
Target achieved
Programme 1: Administration
20
Performance indicators Planned Target 2012/13
Actual Achievement2012/13 Comments
To ensure an efficient and effective system of financial and asset management, governance and controls in the department and in relation to its public entitiesNumber of days toprocess transfers and payments
Within 5 days Within 5 days Target achieved
Approved financialstatements
Approved financialstatements
Approved financialstatements
Target achieved
Percentage complianceto PFMA
100% complianceto PFMA
The majority of PFMA compliance matters have been
complied with
Partially achieved.The Department did not reach the target of 30 day payments
Number of agreementsconcluded and projects supported
10 agreementsconcluded and projects supported
No new agreements were signed
Not achieved
Percentage of assets lost and / or unauthorisedmovements
Less than 1% Less than 1% Target achieved
Programme 1: Administration
21
Strategy to deal with under performance in targets in achieved:
• In dealing with the delayed resolutions of disciplinary cases, the Department intends to provide the Chairpersons with a mandate not to allow/grant unnecessary postponements which results into delays.
• Compliance with the Human Resource Strategic Planning Framework will improve as:
- The HR Plan has now been approved and there is improved capacity
- Report on the implementation of the HR Plan has been developed for submission to DPSA
- Macro-organisational structure has been approved by the Minister and was submitted to MPSA for consultation
- Micro-organisational structure has been approved
- Service Delivery Improvement Plan has been approved
Programme 1: Administration
Programme 2: Human Resource Development, Planning and Monitoring Coordination
22
Purpose: To provide strategic direction in the development, implementation and monitoring of the Department policies. Coordinate activities in relation to the HRDS for South Africa.
Performance Status as at 31 March 2013 Targets
Achieved 16
Partially achieved 3
Not achieved 0
Total Targets 19
Programme 2: Human Resource Development, Planning and Monitoring
CoordinationR’000
Adjusted Appropriation
Actual Expenditure Deviation Virement
appliedFinal
Variance
Compensation of Employees 35 967 33 412 2 555 (2 268) 287 Goods and Services 5 617 6 487 (870) 977 107 Transfers and Subsidies 2 544 2 639 (95) 96 1 Machinery and Equipment 214 291 (77) 98 21 Total 44 342 42 829 (1 513) (1 097) 416
Performance Information Achieved Partially Achieved
Not Achieved
Targets (19) 16 3 0
Link between Expenditure and Budgets and performance plans in relation to key indicators
23
24
Performance indicators
Planned Target 2012/13
Actual Achievement2012/13 Comments
Establish and maintain an integrated education and training management information system, linking all providers of education and training into a single system, to provide accurate data on skills supply and demand in the countryPercentage of publicinstitutional dataintegrated into educationand training managementinformation system
80% of public institutionaldata integrated intoeducation and training management informationsystem (Public FET and HE institutions and SETAs)
80% of public institutionaldata integrated (Public FET and HE and AET institutional data integrated) intoeducation and trainingmanagement informationsystem
Target achieved
Achievements:
Programme 2: Human Resource Development, Planning and Monitoring Coordination
25
Performance indicators
Planned Target 2012/13
Actual Achievement2012/13 Comments
Establish and maintain a coherent career management and career information system by 2014A coherent careermanagement andinformation systemestablished (modulebased)
A coherent careermanagement andinformation systemestablished (2 additional modules)
The National Career Advice Portal (NCAP) is established and 2 additional modules are completed (learning pathways and learning directory). It is accessible through the DHET and SAQA websites as well as through direct accessing the NCAP http://ncap.careerhelp.org.za.
Target achieved(exceeded)
Number of users reachedby career guidanceservices
Radio: 2.7 millionExhibitions: 25 000Helpline: 12 000Web portal: 70 000
Radio: 1.991 million per weekExhibitions: 34 800Helpline: 19 828Web Portal: 91 903
Target achieved(exceeded)
Programme 2: Human Resource Development, Planning and Monitoring Coordination
26
Performance indicators
Planned Target
2012/13
Actual Achievement
2012/13Comments Status as at
9 October 2013
Promote research and innovation in the Higher Education and Training Sector by publishing an annual academic journal of contributions from stakeholders in the sector annuallyNumber of academicjournals published forHigher Education and Training
1 academicjournal published for Higher Education and Training
The research bulletin has been approved by the DG, but must still be published
Partially achieved due to capacity constraints within the unit responsible
The research bulletin has now been published (June 2013)
Programme 2: Human Resource Development, Planning and Monitoring Coordination
27
Performance indicators Planned Target 2012/13
Actual Achievement2012/13 Comments
Manage and maintain credible planning and budgeting process for the DHET annuallyAnnual DHETPerformance Plandeveloped withperformance indicators
Annual DHETPerformance Plan developed withperformance indicators
Annual DHETPerformance Plan developed withperformance indicators
Target Achieved
Annual MTEF Bid developed
Annual MTEF Bid developed
Annual MTEF Bid developed
Target Achieved
Number of quarterlyperformance progressreports on theimplementation of thestrategic plan and theAPP produced
4 quarterly performanceprogress reports on theimplementation of thestrategic plan and theAPP produced annually
4 quarterly performanceprogress reports
Target Achieved
Programme 2: Human Resource Development, Planning and Monitoring Coordination
28
Performance indicators
Planned Target
2012/13
Actual Achievement
2012/13Comments Status as at
9 October 2013
An investment report oneducation and training
An investment report oneducation and training
Draft education and traininginvestment report produced
Partially achieved:Draft education and training investment report has been produced but could not be finalised before the end of March 2013 due to capacity constraints within the unit (The official responsible resigned)
The report will be finalised by 31 October 2013.
Programme 2: Human Resource Development, Planning and Monitoring Coordination
29
Performance indicators
Planned Target 2012/13
Actual Achievement
2012/13Comments Status as at
9 October 2013
Pursue and strengthen bilateral relations with priority countries in Africa, Middle East, South and the North as well as with multilateral agencies such as COMEDAF, SADC, AU, ADEA, NESCO, ILO, OECD and the CommonwealthInternational relationsoperational frameworkstrategy developed
International relationsoperational frameworkstrategy developedand approved forimplementa-tion
Draft international relationsoperational frameworkstrategy developed
Partially achieved:An international relations operational framework strategy has been developed and submitted for approval. However the draft had to be subjected to internal consultation processes
The draft international relations operational framework strategy will be finalised by 31 October 2013.
Programme 2: Human Resource Development, Planning and Monitoring Coordination
30
Performance indicators
Planned Target 2012/13
Actual Achievement2012/13 Comments
Implementation plans with priority countriesand multilateral agenciesdeveloped
Implementation plans with priority countriesand multilateral agenciesdeveloped
Implementation plans with priority countries and multilateral agencies developed.
Target achieved
Programme 2: Human Resource Development, Planning and Monitoring Coordination
31
Performance indicators
Planned Target 2012/13
Actual Achievement2012/13 Comments
Maintain database of international engagements of all public post-school institutions and publish an annual report on international collaborationsA publication onInternational cooperationproduced
A publication onInternational cooperationproduced
A publication on international cooperation produced.
Target achieved
Database of internationalengagements of all public post-school institutions maintained
Database of internationalengagements of all public post-school institutionsmaintained
Database of international engagements of all public post-school institutions maintained.
Target achieved
Programme 2: Human Resource Development, Planning and Monitoring Coordination
32
Performance indicators Planned Target 2012/13
Actual Achievement2012/13 Comments
Support, advise and monitor the implementation of the post-school education system legislative framework annuallyPercentage of litigationsdealt with
100% of litigationsdealt with
100% of litigationsdealt with
Target achieved
Percentage of legislationand regulations draftedand amended
100% of legislationand regulations draftedand amended
100% of legislationand regulations draftedand amended
Target achieved
Percentage of legalopinions and agreementsdrafted
100% of legalopinions and agreementsdrafted
100% of legalopinions and agreementsdrafted
Target achieved
Programme 2: Human Resource Development, Planning and Monitoring Coordination
33
Performance indicators
Planned Target 2012/13
Actual Achievement2012/13 Comments
Establish a well functioning Social inclusion, equity and transformation services within the DHET and its entities that will focus on policy research, monitoring and evaluation in matters relating to race, class, gender, age , disability, HIV/ Aids and on career information services and counselingA policy documentdeveloped
A policy documentdeveloped
A policy document was developed and submitted to the Minister and the Oversight Committee on Transformation
Target achieved
Programme 2: Human Resource Development, Planning and Monitoring Coordination
34
Performance indicators Planned Target 2012/13 Actual Achievement
2012/13 Comments
Monitor and support actions needed to implement the statutory functions assigned to the Minister, Director- General, SAQA, CHE, Umalusi and QCTO in terms of the National Qualifications ActNumber of monitoringand evaluation reports
A monitoring and evaluation report
Monitoring report developed
Target achieved
Annual Ministerial policy guidelines developed
Ministerial policy guideline developed
Ministerial policy guideline was developed
Target achieved
percentage of requests for advice from Minister and SAQA answered
100% 100% Target achieved
Programme 2: Human Resource Development, Planning and Monitoring Coordination
Programme 3: University Education
35
Purpose: To develop and coordinate policy and regulatory frameworks for an effective and efficient university education system. To provide financial support to universities, the National Student Financial Scheme and the National Institute for Higher Education
Performance Status as at 31 March 2013 Targets
Achieved 16
Targets partially achieved 13
Targets not achieved 2
Total Targets 31
Programme 3: University Education
R’000
Adjusted Appropriation
Actual Expenditure Deviation Virement
appliedFinal
Variance
Compensation of Employees 36 072 30 579 5 493 (5 181) 312
Goods and Services 7 062 8 343 (1 281) 1 436 155 Transfers and Subsidies 26 189 237 26 189 468 (231) 311 80 Machinery and Equipment 321 323 (2) 12 10
Total 26 232 692 26 228 713 3 979 (3 422) 557
Performance Information Achieved Partially
AchievedNot
Achieved Targets (31) 16 13 2
Link between Expenditure and Budgets and performance plans in relation to key indicators
36
37
Performance indicators
Planned Target for 2012/13
Actual achievement
2012/13 Comments Status as at
9 October 2013
Expand the higher education sector in order to increase equitable access with successNumber of students enrolled in higher education studies at universities
909 716 students enrolled in higher education studies at universities
938 201 students enrolled in higher education studies at universities
Target exceeded:28 485 more students enrolled than the target
2012 Audited: 953 375 students enrolled in higher education studies at universitiesTarget exceeded
Total headcount enrolment over population 20 to 24 years
17.9 17.9 Target achieved
Achievements:
Note 1: The achievement reported as at 31 March 2013 are the 2011 audited figures
Programme 3: University Education
38
Performance indicators
Planned Target for 2012/13
Actual achievement 2012/13
Comments Status as at 9 October 2013
Number of first time enrolments at universities
179 793 first time enrolments at universities
179 105 first time enrolments at universities
Partially achieved: 688 less students enrolled
2012 Audited:169 767 first time enrolments at universities
Environmental impact study conducted
Environmental impact study conducted
Preparations for environmental impact study completed, applications submitted and studies underway. Full studies on all land parcels not complete.
Target not achieved: Environmental impact study not yet complete.
Environmental impact study in process and will be achieved by 31 March 2014
Programme 3: University Education
39
Performance indicators
Planned Target for 2012/13
Actual achievement 2012/13
Comments Status as at 9 October 2013
Gazetting of Seat, and Interim Council for each university
Gazetting of Seat, and Interim Council for each university
Nominations for Interim Councils received and recommendations made; All processes in terms of the Promotion of Administrative Justice Act (PAJA) complete; Draft Gazettes prepared for Minister’s signature.
Target not achieved at the time of reporting as Gazettes were not published
Gazettes published in the second quarter of 2013/14
Programme 3: University Education
40
Performance indicators
Planned Target for 2012/13
Actual achievement 2012/13
Comments
Programme Qualification Framework for each university
Programme Qualification Framework for each university
Programme qualification Framework has been developed for each university
Target achieved
Spatial plan for each university
Spatial plan for each university
Initial spatial plans for each university developed
Target achieved
Number of public higher education institutions involved in foundationphase teacher education
20 public higher education institutions involved in foundationphase teacher education
20 public universities are now involved in Foundation Phase teacher education
Target achieved
Programme 3: University Education
41
Performance indicators
Planned Target for 2012/13
Actual achievement
2012/13 Comments Status as at
9 October 2013
A policy document on FET lecturer qualifications is developed and implemented
A finalised policyon FET lecturerqualificationsgazetted
The final draft is complete and was submitted to the CHE for comments as required by the Higher Education Act
Partially achieved: Final policy not published in the Gazette
A finalised policyon FET lecturerqualificationsGazetted
Number of African students at universities
593 260 African students at universities
640 443 African students at universities
Target achieved (exceeded)14 352 more students enrolled than the target
Programme 3: University Education
42
Performance indicators
Planned Target for 2012/13
Actual achievement
2012/13 Comments Status as at
9 October 2013
Number of female students at universities
593 596 female students at universities
542 997 female students at universities
Partially achieved: 50 599 less female students enrolled than the target
2012 Audited: 554 837 female students at universities
Total number of students in foundation provisioning programmes at universities
14 600 students in foundation provisioning programmes at universities
14 359students in foundation programmes at universities
Partially achieved: 241 less students enrolled than the target
2012 Audited: 14 600 students in foundation programmes at universities
Programme 3: University Education
43
Performance indicators
Planned Target for 2012/13 Actual achievement 2012/13 Comments
Improve success rates in higher education studies at public institutions and therefore increase graduate outputs by 2014Improved use of foundationprovisioningfunds and reportproduced
Improved use of foundationprovisioningfunds and reportproduced
Revised policy to improve the use of Foundation Programmes approved for implementation in 2013/14. Analysis of current use of funding done and report produced.
Target achieved
Programme 3: University Education
44
Performance indicators
Planned Target for 2012/13
Actual achievement
2012/13 Comments Status as at
9 October 2013
Percentage success rate
76% success rate
75% success rate
Partially achieved: 1% below target
2012 Audited : 76%
Number of graduates from universities
167 807 graduates from universities
160 626 graduates from universities
Partially achieved: 7 181 less graduates than the target
2012 Audited: 165 978 graduates from universities
Number of graduates in Engineering Sciences from universities
10 682 graduates in Engineering Sciences from universities
9 387 graduates in Engineering Sciences from universities
Partially achieved: 1 295 less graduates than the target
2012 Audited: 9 974 graduates in Engineering Sciences from universities
Programme 3: University Education
45
Performance indicators
Planned Target for 2012/13
Actual achievement
2012/13 Comments Status as at
9 October 2013
Number of graduates in Human Health and Animal Health fromuniversities
8 535 graduates in Human Health and Animal Health fromuniversities
8 070graduates in Human Health and Animal Health fromuniversities
Partially achieved: 465 less graduates than the target
2012 Audited: 8 015 graduates in Human Health and Animal Health fromuniversities
Number of graduates in Natural and Physical Sciences from universities
5 052 graduates in Natural and Physical Sciences from universities
5 526 graduates in Natural and Physical Sciences from universities
Target achieved (exceeded): 474 more graduates than the target
2012 Audited: 6 366 graduates in Natural and Physical Sciences from universities
Programme 3: University Education
46
Performance indicators
Planned Target for 2012/13
Actual achievement
2012/13 Comments Status as at 9
October 2013
Number of graduates in initial Teacher Education from universities
9 700 graduates in initial Teacher Education from universities
10 543 graduates in initial Teacher Education from universities
Target achieved (exceeded): 843 more graduates than the target
2012 Audited: 12 999 graduates in initial Teacher Education from universities
Programme 3: University Education
47
Performance indicators
Planned Target for 2012/13
Actual achievement
2012/13 Comments Status as at
9 October 2013
Monitor good governance and management of the Higher Education system in order to build capacity and efficiencyPercentage of public higher institutions with good governance and management
78% of public higher institutions with good governance and management
78% of public higher institutions with good governance andmanagement
Target achieved(no deviation)
Percentage registered Private Higher Education Institutions (PHEIs) complying to regulatory criteria
100% PHEIs registered complying to regulatory criteria
99 % of PHEIs complied with the regulatory criteria
Partially achieved: 1% below target
2 (out of 166) PHEIs did not comply with the regulations and were de-registered
Programme 3: University Education
48
Performance indicators Planned Target for 2012/13
Actual achievement 2012/13 Comments
Percentage of Statutes of universities reviewed and published ingovernment gazette
100% of Statutes of universities reviewed and published ingovernment gazette
100% - four statutes submitted for revision in 2012/13 were approved and published in the government gazette.
Target achieved
Number of governance training workshops for ministerial appointees
1 governance training workshop for ministerial appointees
1 governance training workshop successfully held on 1 February 2013
Target achieved
Programme 3: University Education
49
Performance indicators
Planned Target for 2012/13
Actual achievement
2012/13 Comments Status as at
9 October 2013
Number of universities with five Ministerial council appointeesappointed
23 universities with five Ministerial council appointeesappointed
18 universities with five ministerial appointees appointed
Partially achieved: 5 less universities than the target
18 universities with five ministerial appointees appointed
Programme 3: University Education
50
Performance indicators
Planned Target for 2012/13
Actual achievement
2012/13 Comments Status as at 9
October 2013
To develop and enhance the research capacity and productivity of universitiesNumber of postgraduate graduates
44 520 postgraduate graduates
43 067 postgraduate graduates
Partially achieved: 1 453 less graduates than targeted
2012 Audited: 45 593 postgraduate graduates
Number of Masters graduates
4 978 Masters graduates
5 281 Masters graduates
Target achieved (exceeded): 303 more graduates than targeted
2012 Audited: 6 071 Masters graduates
Programme 3: University Education
51
Performance indicators
Planned Target for 2012/13
Actual achievement
2012/13 Comments Status as at
9 October 2013
Number of doctoral graduates
1 785 doctoral graduates
1 576 doctoral graduates
Partially achieved: 209 less graduates than targeted
2012 Audited: 1 878 doctoral graduates
Number of publications
10 807 publications
11 191 publication units produced
Target achieved (exceeded): 384 more than the target
Ratio of research output units per instructional / research staff
1.30 1.25 Partially achieved: 0.05 below target
2012 Audited: 1.30
Programme 3: University Education
52
Performance indicators
Planned Target for 2012/13
Actual achievement 2012/13 Comments
To maintain and enhance the Higher Education Management Information System (HEMIS)Number of updates on the HEMIS for audited student and staff data
2 updates for 23 universities
2 updates for each of the 23 institutions’ student and staff data has been loaded into the National database and reports have been generated
No deviation
Number of updates on the HEMIS system for final building space datafrom the Universities
1 annual update for 23 universities
1 annual update for each of the 23 institutions’ building space data has been loaded to the National database and reports have been generated
No deviation
Programme 3: University Education
53
Purpose: To plan, develop, evaluate, monitor and maintain national policy, programmes and systems for vocational and continuing education and training, including further education and training colleges and post-literacy Adult Education
Performance Status as at 31 March 2013 Targets
Achieved 9
Partially achieved 10
Not achieved 3
Total Targets 22
Programme 4: Vocational and Continuing Education and Training
Programme 4: Vocational and Continuing
Education and TrainingR’000
Adjusted Appropriation
Actual Expenditure Deviation Virement
appliedFinal
Variance
Compensation of Employees 145 393 147 152 (1 759) 3 517 1 758 Goods and Services 52 842 52 950 (108) 417 309 Transfers and Subsidies 4 844 607 4 845 119 (512) 520 8 Machinery and Equipment 1 410 720 690 (554) 136
Total 5 044 252 5 045 941 (1 689) 3 900 2 211
Performance Information Achieved Partially Achieved
Not Achieved
Targets (22) 9 10 3
Link between Expenditure and Budgets and performance plans in relation to key indicators
54
55
Performance indicators
Planned Target 2012/13
Actual Achievement
2012/13Comments
Increase access to and improve success in programmes leading to intermediate and high-level learning by 2014Number of learners enrolled in AETLevel 1-4
255 000 learners enrolled in AETLevel 1-4
250 738 Partially achieved: 4 262 learners below target. The data provided by Provincial Education Department suggests that the funding of the programme is inadequate to support the envisaged expansion of adult education and training
Programme 4: Vocational and Continuing Education and Training
56
Performance indicators
Planned Target 2012/13
Actual Achievement
2012/13Comments
Increase access to and improve success in programmes leading to intermediate and high-level learning by 2014Number of headcount enrolmentsin public FET College programmes
550 000 headcountenrolments in public FET college programmes
657 690 Target achieved (exceeded)• Increased bursary funding made available through the NSFAS, the NSF and SETAs• Increased focus by the Department on profiling of FET Colleges to make them institutions of choice• Active campaigning through media and career guidance activities, by the Department to urge the youth to consider taking vocational programmes offered in FET Colleges
Programme 4: Vocational and Continuing Education and Training
57
Performance indicators
Planned Target 2012/13
Actual Achievement
2012/13Comments
National Senior Certificate for Adults(NASCA) developed
Curriculum support programmes developed
Curriculum support programmes were not developed
Funding for the curriculum development function was only secured during the latter part of the financial year and progress on the project will commence during the 2013/14 financial year.
Number of FET College studentsawarded bursaries
180 826 NC(V) Collegestudents awardedbursaries
188 182 Target exceeded by 7 356.Extra funding was secured to cater for more students than was projected
Programme 4: Vocational and Continuing Education and Training
58
Performance indicators
Planned Target 2012/13
Actual Achievement2012/13 Comments
Number of colleges offering NQF level 5 to 6 programmes
8 colleges offering higher educationprogrammes
8 Colleges offering higher education programmes
Target achieved
Programme 4: Vocational and Continuing Education and Training
59
Performance indicators
Planned Target 2012/13
Actual Achievement
2012/13Comments
Certification rates in the VETqualification
GETC : 30%NC(V) L2: 44%NC(V) L3: 45%NC(V) L4: 47%N1-N3: 33%N4-N6: 40%
GETC: 37%NC(V) L2: 43%NC(V) L3: 43%NC(V) L4: 41% N1-N3: 24% N4-N6: 25%
Curriculum interventions coordinated by the Department assisted with the focus on performance in the GETC by emphasising the provisioning of learning and teaching support material, the training of educators and focusing on the Site Based Assessment Tasks.The low performance, except for the GETC, can mainly be attributed to lecturer capacity, institutional instability and the inability of students to cope with subjects such as Physical Science, Electronic Control and Digital Electronics.
Programme 4: Vocational and Continuing Education and Training
60
Performance indicators
Planned Target 2012/13
Actual Achievement2012/13 Comments
Pass rate in Mathematics and Mathematical Literacy
Mathematics:NC(V) L2: 32%NC(V) L3: 26%NC(V) L4: 26%
Mathematical Literacy:NC(V) L2: 39%NC(V) L3: 37%NC(V) L4: 47%
Mathematics:NC(V) L2: 44%NC(V) L3: 36%NC(V) L4: 43%
Mathematical Literacy:NC(V) L2: 65%NC(V) L3: 78%NC(V) L4: 85%
The improvements in student performance in Mathematics and Mathematical literacy are related to lecturer training in 2012 on both subjects and the development of and training on the Internal Continuous Assessments (ICASS) guidelines.
Programme 4: Vocational and Continuing Education and Training
61
Performance indicators
Planned Target 2012/13
Actual Achievement2012/13 Comments
Certification rates of bursaryrecipients
NC(V) L2: 39%NC(V) L3: 42%NC(V) L4: 43%N1-N3: 40%N4-N6: 40%
NC(V) L2: 36%NC(V) L3: 34%NC(V) L4: 35%N1-N3: 26%N4-N6: 31%
The significantly lower certification rate of bursary recipients suggests that FET Colleges may not effectively apply the academic merit eligibility criteria outlined in the Bursary Scheme Administration Guidelines.
Programme 4: Vocational and Continuing Education and Training
62
Performance indicators Planned Target
2012/13
Actual Achievement
2012/13Comments
Business Management Standards, Qualifications, review, NC(V) selected subjects review and Student Support Services interventions implemented to selected FET Colleges through donor funding and reported on quarterly.
4 quarterly reports
4 quarterly reports
Target achieved
Programme 4: Vocational and Continuing Education and Training
63
Performance indicators Planned Target 2012/13
Actual Achievement
2012/13Comments
Number of lecturers, SSS managers and PDE/Regional offices officials trained to implement the comprehensive student support services framework
128 201 Target achieved (exceeded by 73)
Programme 4: Vocational and Continuing Education and Training
64
Performance indicators Planned Target
2012/13
Actual Achievement
2012/13Comments
Number of trained lecturers to support new curriculum delivery
700 708 trained Target Achieved
Number of trained Provincial Education Department (PED)officials to support new curriculumdelivery
PED officials trained: 60
35 PED officials trained
Partially achieved: Below target by 25.Provinces are not in all instances willing to incur costs to attend workshops. Absenteeism of officials is also experienced.
Programme 4: Vocational and Continuing Education and Training
65
Performance indicators Planned Target
2012/13
Actual Achievement
2012/13Comments
Strengthen the institutional capacity of VET institutions to improve their performance and efficiencyNumber of personnel in vocationaleducation and training institutionstrained to support curriculumdelivery in AET and Colleges
128 No training took place
This training could not happen in the absence of the curriculum and curriculum support materials.
Number of personnel at VETinstitutions trained in financialmanagement
276 No training took place
The deployment of support CFOs through the SAICA intervention programme addressed this indicator and further training was not considered
Programme 4: Vocational and Continuing Education and Training
66
Performance indicators
Planned Target 2012/13
Actual Achievement
2012/13Comments
Number of fully constituted college councils
50 college councils fullyconstituted
31 Partially achieved: 19 college councils could not be constituted . The target was not achieved due to failure to attract suitable candidates in most colleges. The Department will re-advertise and headhunt for suitable candidates
Programme 4: Vocational and Continuing Education and Training
67
Performance indicators
Planned Target 2012/13
Actual Achievement2012/13 Comments
Human Resource Managementand Planning (HRM&P) frameworkfor FET Colleges developed andimplemented
A generic HRM&Pframework developedand approved
A draft generic HRM&P framework
developed
Partially achieved: A draft generic HRM&P framework developed but not approved . Organisational structure completed, Post provisioning norms currently being researched and the career pathing model was delayed by the staff migration processes.
Programme 4: Vocational and Continuing Education and Training
68
Performance indicators
Planned Target
2012/13
Actual Achievement
2012/13Comments Status as at
9 October 2013
Manage and administer a credible and efficient examinations and assessment system for VET institutionsAn efficient registration, resulting,And certification system
An efficient registration,resulting, andcertification system
Candidates in all 449 examination centers were successfully registered for exams. All Report 191 candidates who had successfully completed their part qualifications were certificated.
Partially achieved. No certificates issued for NC(V)
322 214 certificates issued for NC(V) graduates.
Programme 4: Vocational and Continuing Education and Training
69
Performance indicators
Planned Target 2012/13
Actual Achievement2012/13 Comments
Percentage of vocational educationand training institutions conductingimproved assessments
100% vocationaleducation and traininginstitutions conductingimproved assessments
87% institutions conducting national examinations in a credible manner
Partially achieved: 13% of examination centers implicated in leakages during the 7 FETC examination cycles conducted in 2012.Leakages occurred during the 3 Engineering Studies examination cycles in April, August and November 2012 which affected 60 out of the 449 centers that participated in national examinations
Programme 4: Vocational and Continuing Education and Training
70
Performance indicators Planned Target 2012/13
Actual Achievement2012/13 Comments
Provide support for the implementation of a monitoring, evaluation, and research for the improvement of the vocational education and training subsystemNumber of colleges implementing Business Management System standards
BMS expanded to 8 colleges
BMS has been expanded to 8 colleges
Target achieved
Number of AET centers where annual surveys were conducted
2 820 2 820 Target achieved
Number of FET Colleges where annual surveys were conducted
50 50 Target achieved
A model for FET Colleges expansion developed
A model for FET Colleges expansiondeveloped
A model for FET Colleges expansion has been developed
Target achieved
Programme 4: Vocational and Continuing Education and Training
Programme 5: Skills Development
71
Purpose: To promote and monitor the National Skills Development Strategy
Performance Status as at 31 March 2013 Targets
Achieved 10
Partially achieved 1
Targets not achieved 4
Total Targets 15
Programme 5: Skills Development
R’000
Adjusted Appropriation
Actual Expenditure Deviation Virement
appliedFinal
Variance
Compensation of Employees 65 787 61 268 4 519 (4 501) 18Goods and Services 14 043 10 552 3 491 (3 443) 48Transfers and Subsidies 20 417 20 896 (479) 482 3Machinery and Equipment 452 546 (94) 96 2
Total 100 699 93 262 7 437 (7 366) 71
Performance Information Achieved Partially Achieved
Not Achieved
Targets (15) 10 1 4
Link between Expenditure and Budgets and performance plans in relation to key indicators
72
73
Programme 5: Skills Development
Performance indicators
Planned Target
2012/13
Actual Achievement
2012/13Comments Status as at
9 October 2013
Provide a dynamic interface between the workplace and learning institutions and to promote quality learning at work and for work by 2014
Number of artisancandidates foundcompetentNationally.
10 000 8 655 Partially achieved: Below target by 1 345Due to the fact that the performance reported is based on reports received from SETAs and is being corrected through on site validations and support at each SETA.
The target has since been met and exceeded for the year, now at 15 277. At the time of concluding the AR audit processes, verification of the last quarter reports in all affected SETAs was not completed, an exercise that is important for accuracy of reported information
Achievements:
74
Programme 5: Skills Development
Performance indicators Planned Target 2012/13
Actual Achievement
2012/13Comments
Number of graduates receiving Work Integrated Learning (WIL)
8 500 14 961 Target achieved (exceeded) Universities of Technology (UoTs) = 9 981
Public Further Education and Training graduates (FET) = 4 980
Secure trade testing system developed and implemented at all trade test centers
System for management of trade test tasks developed and piloted at 5 test centers
Not achieved Target not achieved: No system developed. Tender for System issued February 2013.
Number of audits conducted at SETA accreditedtrade test centers
20 52 Target achieved (exceeded by 32). Accelerated operationalisation of NAMB
75
Performance indicators Planned Target 2012/13
Actual Achievement2012/13 Comments
Learning Programme Regulations aligned to the Occupational Qualifications Framework
Draft Learning Regulationsissued for publiccomment
Draft Learning Regulationsissued for publiccomment
Target achieved
Policy Framework for ISOE and SDI Agencies developed and implemented
Agency Regulations issued for public comment
Agency Regulations were issued as part of the Learning Programme regulation for public comment
Target achieved
Best Practice annual critical path Frameworksigned off by NSA and implemented
Best Practice Frameworkand Guidelineimplemented
Framework and Guideline in place and implemented.
Target achieved
Percentage of SETAs implementing NSDS III with approved ServiceLevel Agreement
100% SETAsimplementingNSDS III withapproved ServiceLevel Agreement
100% SETAs implementing NSDS III with approved Service Level Agreement
Target achieved
Programme 5: Skills Development
76
Performance indicators Planned Target 2012/13 Actual Achievement2012/13 Comments
Promote the alignment of skills development outputs to the needs of the workplace and to the broader growth needs of the country’s economyNumber of SETAs’ Strategic Plans analysed in relation to the Sector Skills Plans and approved
21 Strategic Plans analysed in relation to the Sector Skills Plans and approved
21 Strategic Plans analysed in relation to the Sector Skills Plans and approved
Target achieved
Improved communication with SETAs through SETA Fora
4 SETA Fora held to improve communicationwith SETAs
4 SETA Fora held to improve communicationwith SETAs
Target achieved
Number of NSDS implementation reports
4 quarterly NSDSimplementation reports
4 quarterly NSDS implementation reports
Target achieved
Programme 5: Skills Development
77
Performance indicators
Planned Target 2012/13
Actual Achievement
2012/13Comments
Number of annual review reports
1 Annual review report
No report was produced
Misalignment of timelines with audited information from stakeholders. Annual review for 2012/13 to be finalised during 2013/14
Provide funds to support projects that are national priorities in the NSDS, that advance the Human Resource Development Strategy (HRDS) of South Africa and that support the NSA in its workAmount earmarked to support projects of national priority
R 2.3 billion R8.833 billion Achieved (exceed by R6.533 billion). The NSF’s high level of performance in committing funds towards skills development projects of national priority during the past financial year is in line with meeting objectives of the NSDS III.
Programme 5: Skills Development
78
Performance indicators
Planned Target 2012/13
Actual Achievement
2012/13Comments
Number of projects supported by National Skills Fund
262 projects supported by National Skills Fund
157 projects Partially achieved: 105 less projects . The NSF funded projects of higher amounts and learner numbers. Hence the NSF over-achieved on the amounts earmarked target and the number of learners trained even though the number of projects as target was not achieved. FET system was able to accommodate more learner intake than smaller projects.
Number of learners trained in NSF projects
32 179 learners trained in NSF projects
95 554 Learners Achieved (exceeded by 63 375). The NSF’s high level of performance of disbursing funds towards skills development projects during the past financial year led to the over-achievement
Programme 5: Skills Development
FINANCIAL INFORMATION
79
80
The Department received an unqualified audit opinionKey matters raised by the Auditor-General:Significant uncertainties• As disclosed in disclosure note 20 to the financial statements, the Department is
the defendant in law suits. The Department is opposing the claims and the ultimate outcome of these cannot presently be determined.
Restatement of Corresponding Figures• As disclosed in disclosure note 24 to the financial statements, the corresponding
figure for lease commitments for the 2011/12 financial year has been restated as a result of a calculation error discovered during March 2013 in the financial statements relating to the year ending 31 March 2012.
• As disclosed in notes 3, 10, 12 and 15 to the financial statements, the corresponding figures for departmental revenue, cash and cash equivalents, receivables and departmental revenue to be surrendered to the revenue fund for 31 March 2012 has been restated as a result of new classification requirements.
• Both restatements were accounting related without any impact on the financial status of the Department.
Auditor-General Report
81
Compliance with laws and regulations
• Human resource management and compensation: Verification processes not performed prior to appointments of new officials
• Annual financial statements: The financial statements submitted for audit purposes did not comply with section 40(1)(a) of the PFMA. The material misstatement identified by the AGSA with regards to cash and cash equivalents, receivables, departmental revenue and NRF receipts to be surrendered to the revenue fund and the employee benefits disclosure note was subsequently corrected
• Other: The Sector Education and Training Authorities’ revised strategic plans were not approved before the beginning of the financial year by the Minister as required by Treasury Regulation 30.1
Auditor-General Report
82
Internal Control• Leadership:
– Management developed action plans to address previously reported root causes resulting from previous year and recurring findings. However some committed action plans are not yet implemented
– There is inadequate consequence management for action plans not implemented to address previously reported internal control deficiencies by external and internal audits
– The Department does not have documented policies and procedures at a programme level for collating, recording and verifying of reporting on actual achievement of planned objectives, indicators and targets
Auditor-General Report
83
• Financial and performance management– The department does not have adequate processes in place to
ensure that financial disclosure notes included in financial statements are accurate
• Governance– Appropriate risk management activities were not implemented to
manage risks identified from the risk assessment process
Auditor-General Report
84
Findings on performance information:
• Performance targets are not specific– Significantly important targets in relation to programme 3 were not
specific in clearly identifying the nature and the required level of performance.
• Performance targets not time bound– Significantly important targets in relation to programme 3 were not
time bound in specifying a time period or deadline for delivery.• Indicators/measures not verifiable
– Significantly important indicators in relation to programme 4 were not verifiable in that valid processes and systems that produce the information on actual performance did not exist.
Auditor-General Report
85
• Reliability of information– Programme 3: Significantly important targets were regarded as
misstated.– Programmes 4 and 5: AG was unable to obtain information and
explanations considered necessary to satisfy the AG with regards to the reliability of information presented with respect to significant targets. This was due to limitations placed on the scope of work due to the absence of systems in place to verify the reporting of actual achievements against significant planned objectives, indicators and targets. The current systems did not allow the AG to perform alternative procedures.
• 39% of total planned targets were not achieved.– Mainly due to the fact that indicators and targets were not suitably
developed during the strategic planning process.
Auditor-General Report
Action Plan Audit Findings
86
• The Department completed action plans regarding audit findings• These plans include all areas raised in the Audit Report as well as all
other matters identified during the audit that resulted in audit queries• Progress on the action plans are being monitored on a bi-weekly basis
and will be reported to the Minister, Audit Committee and Senior Management meetings
2012/13 Allocation versus Expenditure
87
ProgrammeAllocation
R’000
Actual Expenditure
R’000
VarianceR’000
% Spent
1: Administration 172 151 171 655 496 99.7
2: Human Resource Development, Planning and Monitoring Coordination
43 245 42 829 416 99.0
3: University Education 26 229 270 26 228 713 557 100.0
4: Vocational and Continuing Education and Training
5 048 152 5 045 941 2 211 100.0
5: Skills Development 93 333 93 262 71 99.9
6: Direct Charges (SETAs and NSF) 11 694 493 11 694 493 - 100.0
Total 43 280 644 43 276 893 3 751 100.0
Economic ClassificationAllocation
R’000
Actual Expenditure
R’000
DeviationR’000
% Spent
Compensation of Employees 363 074 360 434 2 640 99.3
Goods and Services 158 015 157 184 831 99.5
Financial transactions in assets and liabilities
0 33 (33) 0.0
Transfer Payments
Provinces and municipalities 4 844 607 4 844 607 0 100.0
Departmental agencies and accounts 16 996 514 16 996 473 41 100.0
Universities (current) 20 902 860 20 902 779 81 100.0
Foreign governments and international organisations
2 640 2 639 1 100.0
Non-profit institutions 5 000 5 000 0 100.0
Households 2 305 2 289 16 99.3
Capital Expenditure
Machinery and equipment 5 629 5 455 174 96.9
Total 43 280 644 43 276 893 3 751 100.0
Spending Trends per Economic Classification
88
Explanations of Variances
89
• Programme 1: Administration (Unspent: R496 000)
– Under-expenditure mainly due to:o Staff attrition and posts not filled as projectedo Invoices i.r.o. travel and accommodation not received as projected.
• Programme 2: Planning and Monitoring (Unspent: R416 000)
– Under-expenditure mainly due to:o Staff attrition and posts not filled as projectedo Invoice i.r.o. the strategic plan not received as projected.
• Programme 3: University Education (Unspent: R557 000)
– Under-expenditure mainly due to:o Staff attrition and posts not filled as projectedo Invoices i.r.o. travel and accommodation not received as projectedo Claims for interest and redemption not received as projected
Explanations of Variances
90
• Programme 4: Vocational and Continuing Education and Training
(Unspent: R2.211 million)– Under-expenditure mainly due to:
o Examination claims i.r.o. examiners and moderators not received as projected
o Travel and subsistence claims i.r.o. examiners and moderators not received as projected
o Invoices for travel and accommodation not received as projected
– Saving on computer equipment due to revision of replacement period for some of the equipment as a result of budget constraints
• Programme 5: Skills Development (Unspent: R71 000)– Under-expenditure mainly due to:
o Invoices for goods and services not received as projected.
Thank You