+ All Categories
Home > Documents > Annual Results FY2007 - Implats · 2017. 8. 18. · Annual Results FY2007 2 0 300 600 900 1,200...

Annual Results FY2007 - Implats · 2017. 8. 18. · Annual Results FY2007 2 0 300 600 900 1,200...

Date post: 07-Oct-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
20
1 Empowering our people, growing our production Annual Results FY2007 2 0 300 600 900 1,200 1,500 FY03 FY04 FY05 FY06 FY07 Key features - financial Heps (cents) Up 75% Sales revenue up 80% to R31.5 billion (US$4.4 billion) on higher metal prices Gross profit doubled to R14.5 billion Record headline earnings per share up 75% to R13.12 Final dividend of R7.00 per share; R9.75 for the year Cash net of all borrowings of R2.5 billion
Transcript
Page 1: Annual Results FY2007 - Implats · 2017. 8. 18. · Annual Results FY2007 2 0 300 600 900 1,200 1,500 FY03 FY04 FY05 FY06 FY07 Key features - financial Heps (cents) Up 75% ... Gold

1

Empowering our people,growing our production

Annual Results FY2007

2

0

300

600

900

1,200

1,500

FY03 FY04 FY05 FY06 FY07

Key features - financial

Heps (cents)

Up 75%

Sales revenue up 80% to

R31.5 billion (US$4.4 billion)

on higher metal prices

Gross profit doubled to R14.5 billion

Record headline earnings per share

up 75% to R13.12

Final dividend of R7.00 per share;

R9.75 for the year

Cash net of all borrowings of

R2.5 billion

Page 2: Annual Results FY2007 - Implats · 2017. 8. 18. · Annual Results FY2007 2 0 300 600 900 1,200 1,500 FY03 FY04 FY05 FY06 FY07 Key features - financial Heps (cents) Up 75% ... Gold

2

3

Key features - operational

Safety performance unsatisfactory

Record platinum production of

2.026 million ounces

Group gross margin up 10% to 46%

Group unit cost* up 21% due to

lower production from Impala

Group capital expenditure up to

R2.9 billion

Gross refined platinum production

1,200

1,500

1,800

2,100

FY06 FY07

000 Oz

Up 10%

* Excluding share based payments

4

Key features - corporate

Progress on Black Economic Empowerment (BEE)

Finalised conversion of RBN royalty to equity

Creation of ESOP for 28,000 employees

Acquisition of Afplats consisting of the Leeuwkop project,

and Imbasa and Inkosi

Processing expansion to support annual platinum

throughput of 2.8 million ounces approved

Page 3: Annual Results FY2007 - Implats · 2017. 8. 18. · Annual Results FY2007 2 0 300 600 900 1,200 1,500 FY03 FY04 FY05 FY06 FY07 Key features - financial Heps (cents) Up 75% ... Gold

3

Empowering our people,growing our production

Market review

6

Sales volumes by metal

FY07 FY06 % change

Platinum (000oz) 1,827 1,582 16

Palladium (000oz) 870 896 (3)

Rhodium (000oz) 206 193 7

Nickel (000t) 16.3 14.8 10

Page 4: Annual Results FY2007 - Implats · 2017. 8. 18. · Annual Results FY2007 2 0 300 600 900 1,200 1,500 FY03 FY04 FY05 FY06 FY07 Key features - financial Heps (cents) Up 75% ... Gold

4

7

Average prices achieved

FY07 FY06 % change

Platinum ($/oz) 1,185 988 20

Palladium ($/oz) 334 258 29

Rhodium ($/oz) 5,152 3,015 71

Nickel ($/t) 34,486 15,343 125

Basket ($/Pt oz sold) 2,369 1,721 38

Exchange rate (R/$) 7.20 6.37 13

8

0

3,000

6,000

9,000

12,000

15,000

18,000

FY03 FY04 FY05 FY06 FY07

Metal prices surge

Rand basket revenue per Pt oz soldR/Pt oz

Up 56%

Page 5: Annual Results FY2007 - Implats · 2017. 8. 18. · Annual Results FY2007 2 0 300 600 900 1,200 1,500 FY03 FY04 FY05 FY06 FY07 Key features - financial Heps (cents) Up 75% ... Gold

5

9

Platinum fundamentals remain robust

000 ozPrice ($/oz)

Market moves back into deficit

(250)

(200)

(150)

(100)

(50)

0

50

100

CY03 CY04 CY05 CY06 CY070

200

400

600

800

1000

1200

1400

Surplus/(Deficit) Pt Price Forecast

10

Shanghai platinum trade

0

50

100

150

200

250

300

350

Jun-06 Jul-06 Aug-061,180

1,200

1,220

1,240

1,260

1,280

1,300

1,320

1,340

Volume $ London

Kgs/dayPrice ($/oz)

Page 6: Annual Results FY2007 - Implats · 2017. 8. 18. · Annual Results FY2007 2 0 300 600 900 1,200 1,500 FY03 FY04 FY05 FY06 FY07 Key features - financial Heps (cents) Up 75% ... Gold

6

11

Palladium fundamentals improve

000 ozPrice ($/oz)

0

400

800

1200

1600

CY03 CY04 CY05 CY06 CY070

100

200

300

400

Balanced market

Surplus Pd Price Forecast

12

Rhodium demand remains strong

000 ozPrice ($/oz)

Market remains in deficit

(60)

(30)

0

30

60

90

120

CY03 CY04 CY05 CY06 CY070

1000

2000

3000

4000

5000

6000

Surplus/(Deficit) Rh Price Forecast

Page 7: Annual Results FY2007 - Implats · 2017. 8. 18. · Annual Results FY2007 2 0 300 600 900 1,200 1,500 FY03 FY04 FY05 FY06 FY07 Key features - financial Heps (cents) Up 75% ... Gold

7

13

Contribution to sales revenue by metal

FY07

Platinum Palladium Rhodium Nickel Ruthenium Other

FY06

Empowering our people,growing our production

Financial review

Page 8: Annual Results FY2007 - Implats · 2017. 8. 18. · Annual Results FY2007 2 0 300 600 900 1,200 1,500 FY03 FY04 FY05 FY06 FY07 Key features - financial Heps (cents) Up 75% ... Gold

8

15

Group gross profit highlights

Rm FY2007 FY2006 % change

Sales 31,481 17,500 80

Cost of sales 17,009 10,170 67

Gross profit 14,472 7,330 97

Average exchange rate (R/$) 7.20 6.37 13

16

Headline earnings

3,947

7,232132

1,442

852

1,6957,142

0

2,000

4,000

6,000

8,000

10,000

12,000

FY2006 Gross profit BEE Charge Royalties Taxation Other FY2007

Rm

Up83%

Page 9: Annual Results FY2007 - Implats · 2017. 8. 18. · Annual Results FY2007 2 0 300 600 900 1,200 1,500 FY03 FY04 FY05 FY06 FY07 Key features - financial Heps (cents) Up 75% ... Gold

9

17

2,529

9,022

4,041

598

790298

766

0

2,000

4,000

6,000

8,000

10,000

NormalisedheadlineearningsFY2006

Impala IRS Zimbabweoperations

Marula Other NormalisedheadlineearningsFY2007

Normalised headline earnings by entity

Rm

Up123%

18

Cash net of all debt

0

1,000

2,000

3,000

4,000

FY03 FY04 FY05 FY06 FY07

Rm

Page 10: Annual Results FY2007 - Implats · 2017. 8. 18. · Annual Results FY2007 2 0 300 600 900 1,200 1,500 FY03 FY04 FY05 FY06 FY07 Key features - financial Heps (cents) Up 75% ... Gold

10

Empowering our people,growing our production

Operational review

20

Group safety

0

0.02

0.04

0.06

0.08

0.1

0.12

0.14

0.16

FY03 FY04 FY05 FY06 FY07

Fatal injury frequency rate(per million man hours)

0.00

0.04

0.08

0.12

0.16

0.20

0.24

0.28

0.32

Gol

d Fi

elds

Angl

oGol

d

Nor

anda

SA P

tin

dust

ry

Impl

ats

BHPB

Rio

Tin

to

Angl

oAm

eric

an

Xstr

ata

Page 11: Annual Results FY2007 - Implats · 2017. 8. 18. · Annual Results FY2007 2 0 300 600 900 1,200 1,500 FY03 FY04 FY05 FY06 FY07 Key features - financial Heps (cents) Up 75% ... Gold

11

21

Group safety

0

1

2

3

4

5

6

FY03 FY04 FY05 FY06 FY07

Lost-time injury frequency rate(per million man hours)

0

3

6

9

12

15

Gol

d Fi

elds

SA P

tin

dust

ry

Angl

oGol

d

Nor

anda

Angl

oA

mer

ican

BHPB

Xstr

ate

Impl

ats

Rio

Tin

to

22

Group tonnes milled

000t FY2007 FY2006 % change

Group* 20,732 20,197 3

Impala 16,302 16,441 (1)

Marula 1,450 971 49

Mimosa 1,692 1,532 11

Zimplats 2,133 2,019 6

* Group includes 50% of Mimosa

Page 12: Annual Results FY2007 - Implats · 2017. 8. 18. · Annual Results FY2007 2 0 300 600 900 1,200 1,500 FY03 FY04 FY05 FY06 FY07 Key features - financial Heps (cents) Up 75% ... Gold

12

23

Group refined platinum production

000 oz FY2007 FY2006 % change

1,055

61

69

91

Other IRS 750 529 42

Group 2,026 1,846 10

(6)1,125

37

66

65

5

289

Impala

Marula

Mimosa

Zimplats

24

Group cost per platinum ounce

R/oz FY2007 FY2006 % change

(Refined) 5,612

(In concentrate)

(In concentrate)

(In matte)

Group* (Refined) 5,921 4,890 (21)

8,500

5,413

7,033

4,584

9,443

5,133

6,302

(22)

10

(6)

(12)

Impala*

Marula*

Mimosa

Zimplats

* Excludes share based payments

Page 13: Annual Results FY2007 - Implats · 2017. 8. 18. · Annual Results FY2007 2 0 300 600 900 1,200 1,500 FY03 FY04 FY05 FY06 FY07 Key features - financial Heps (cents) Up 75% ... Gold

13

25

Group operating margins

% FY 2007 FY 2006 % change

Impala 62 53

19

42

5314

42

16

Marula 46 150

Zimplats 55 31

Mimosa 69 31IRS 13 (8)

Group 46 10

26

Impala

Production update

Future production

New shafts on schedule

Smelter and Refineries expansions to 2.8 million

ounces approved

Page 14: Annual Results FY2007 - Implats · 2017. 8. 18. · Annual Results FY2007 2 0 300 600 900 1,200 1,500 FY03 FY04 FY05 FY06 FY07 Key features - financial Heps (cents) Up 75% ... Gold

14

27

Progress on turnaround plan

Focus on people

• Retention strategy - salary adjustments• Bonus scheme - efficiencies up 10%• Accommodation strategy - better living conditions• ESOP - all employees shareholders• Two year wage settlement• CEO Roadshow - improved communication

Motivated employees

28

Production parameters

40,000

45,000

50,000

55,000

60,000

65,000

Jan-Apr 07 May-Aug 07

Up10%

Tonnes per shiftTonnes

3.52

3.62

3.72

3.82

3.92

4.02

FY05 FY06 FY07 Final quarterFY07

Gradeg/t

Page 15: Annual Results FY2007 - Implats · 2017. 8. 18. · Annual Results FY2007 2 0 300 600 900 1,200 1,500 FY03 FY04 FY05 FY06 FY07 Key features - financial Heps (cents) Up 75% ... Gold

15

29

Marula

Safety satisfactory

Tonnes milled up 49% and platinum production up 63% to 65,200 ounces

Unit costs decline as production builds up

Conversion to conventional mining ahead of schedule

Feasibility study on Merensky Reef project under way

30

Afplats

R4.2 billion acquisition of Afplats with an effective 74%

stake in the Leeuwkop project

Development to begin in FY2008

Capital expenditure of R3 billion over the next five years

Production of 160,000 ounces of refined platinum per

annum scheduled for 2013

Page 16: Annual Results FY2007 - Implats · 2017. 8. 18. · Annual Results FY2007 2 0 300 600 900 1,200 1,500 FY03 FY04 FY05 FY06 FY07 Key features - financial Heps (cents) Up 75% ... Gold

16

31

Two Rivers

Production of 87,900 ounces of platinum in concentrate

in FY2007

Ramp up to full production of 120,000 ounces of refined

platinum scheduled for FY2009

Second decline being developed

32

Zimplats

Excellent safety performance

Record platinum production of 96 500 ounces of

platinum in matte

Portal 2 underground mine at full production

Opencast operation to be closed during FY2008

Phase 1 expansion to 160 000 ounces of refined

platinum per annum by FY2010 has commenced

Page 17: Annual Results FY2007 - Implats · 2017. 8. 18. · Annual Results FY2007 2 0 300 600 900 1,200 1,500 FY03 FY04 FY05 FY06 FY07 Key features - financial Heps (cents) Up 75% ... Gold

17

33

Mimosa

Safety disappointing

8.3% increase in platinum production to 78,200 ounces

in concentrate

Mill failure led to lower than anticipated production

Wedza Phase V expansion to 95,000 ounces of refined

platinum per annum in January 2008

34

IRS

Record platinum production of 971 000 ounces of

platinum, an increase of 35%

Gross profit increased by 102% to R1.79 billion

Page 18: Annual Results FY2007 - Implats · 2017. 8. 18. · Annual Results FY2007 2 0 300 600 900 1,200 1,500 FY03 FY04 FY05 FY06 FY07 Key features - financial Heps (cents) Up 75% ... Gold

18

35

Implats scorecard

Safety

Production/growth

- Implats

- Impala

- Afplats

☺Unit cost control

Licence conversions

BEE ownership ☺Returns to shareholders ☺

Empowering our people,growing our production

Growth

Page 19: Annual Results FY2007 - Implats · 2017. 8. 18. · Annual Results FY2007 2 0 300 600 900 1,200 1,500 FY03 FY04 FY05 FY06 FY07 Key features - financial Heps (cents) Up 75% ... Gold

19

37

5 year capex plan

0

500

1000

1500

2000

2500

3000

FY07 FY08 FY09 FY10 FY11 FY12 FY130

1500

3000

4500

6000

7500

IRS Other

Eastern Limb

Zimbabwe

Western Limb

AfplatsMarula MerenskyZimplats Phase 1Refinery expansionSmelter expansionMaintenance capex

RmOz000

38

Conclusion

Fundamentals for PGMs remain solid going forward

Growth profile enhanced to 2.5 million ounces by FY2012

Safety remains a priority

Page 20: Annual Results FY2007 - Implats · 2017. 8. 18. · Annual Results FY2007 2 0 300 600 900 1,200 1,500 FY03 FY04 FY05 FY06 FY07 Key features - financial Heps (cents) Up 75% ... Gold

20

Empowering our people,growing our production

Annual Results FY2007


Recommended