20 March, 2015 2014 Annual Results Presentation
Transcript

20 March, 2015

2014

Annual Results Presentation

Disclaimer

Huaneng Renewables Corporation Limited

This document has been prepared by Huaneng Renewables Corporation Limited (the “Company”) solely for information use during its presentation held in connection with the release of its 2014 annual results announcement and may not be taken away, reproduced, redistributed or passed on, directly or indirectly, to any other person (whether within or outside your organization/firm) or published in whole or in part, for any purpose The information contained in this document has not been independently verified. This document does not purport to be comprehensive or to contain all the information that a recipient may need in order to evaluate the Company and its subsidiaries (the “Group”). No representation or warranty expressed or implied is made as to, and no reliance should be placed on, the fairness, accuracy, completeness or correctness of such information or opinions presented or contained herein. The information and opinions contained in this document are provided as of the date of this presentation, are subject to material change without notice and will not be updated or otherwise revised to reflect any developments, which may occur after the date of the presentation. The accuracy of the information and opinions contained in this document is not guaranteed. Neither the Company, nor any of its respective affiliates or any of its directors, officers, employees, advisers or representatives shall have any liability whatsoever (in negligence or otherwise) for any loss howsoever arising from any information contained or presented in this document or otherwise arising in connection with this document. It is not the intention to provide, and you may not rely on these materials as providing, a complete or comprehensive analysis of the Company’s financial or trading position or prospects. This document contains statements that reflect the Company’s current beliefs and expectations about the future as of the respective dates indicated herein. These forward-looking statements are based on a number of assumptions about the Company’s operations and factors beyond the Company’s control and are subject to significant risks and uncertainties, and, accordingly, actual results may differ materially from these forward-looking statements. These forward-looking statements are not a guarantee of future performance. Accordingly, you should not place undue reliance on any forward-looking information. The Company assumes no obligation to update or otherwise revise these forward-looking statements for new information, events or circumstances that occur subsequent to such dates This document does not constitute or form part of, and should not be construed as, an offer to sell or issue or the solicitation of an offer to buy or acquire securities of the Company or any holding company or any of its subsidiaries in any jurisdiction or an inducement to enter into investment activity. No part of this document, nor the fact of its distribution, shall form the basis of or be relied upon in connection with any investment decision, contract or commitment whatsoever.

1)Performance overview

2)2014 business review

3)2015 trends and targets

Performance overview in 2014

Huaneng Renewables Corporation Limited

2013 2014

59.09 61.51

(RMB 100 million)

Revenue

(RMB 100 million)

Adjusted EBITDA(1)

(RMB 100 million)

Net profit attributable to equity

shareholders

(RMB cents per share)

EPS

(%)

Net profit margin(2)

(RMB per KWH)

Wind power WA on–grid tariff (Inc. Tax)

2013 2014

46.76 54.48

2013 2014

9.13 11.21

2013 2014

10.66 12.39

2013 2014

17.0% 18.7%

2013 2014

0.594 0.598

(1)Adjusted EBITDA does not include other incomes (2)Net profit margin =net profit / revenue(does not include franchise construction revenue)

Performance overview

Power generation achieved steady growth through enhancing marketing approaches and improving equipment efficiency

Huaneng Renewables Corporation Limited

Region 2014 2013 Change(%)

Wind power generation 11,675,171.9 11,141,875.1 4.8%

including:: Inner Mongolia

2,795,683.6 3,096,665.0 -9.7%

Liaoning 2,057,122.2 2,115,846.7 -2.8%

Shandong 1,686,521.0 1,678,333.0 0.5%

Yunnan 1,546,919.3 1,126,898.3 37.3%

Shanxi 1,100,131.1 888,195.6 23.9%

Guizhou 676,062.7 593,546.0 13.9%

Guangdong 477,106.6 483,626.0 -1.3%

Hebei 503,080.6 523,297.0 -3.9%

Sichuan 43,078.2 - -

Xinjiang 534,315.8 370,618.1 44.2%

Jilin 103,668.8 108,408.5 -4.4%

Shanghai 116,963.2 129,098.6 -9.4%

Shaanxi 34,518.8 27,342.3 26.2%

Solar power generation 502,669.2 1,198.4 41,845.0%

Total 12,177,841.1 11,143,073.5 9.3%

(100 Gwh)

Geographical partition of gross power generation

Region 2014 2013 Change(%)

Wind power utilization hours 1,875 2,029 -7.6%

Inner Mongolia 1,627 1,810 -10.1%

Liaoning 1,730 1,908 -9.3%

Shandong 1,853 1,972 -6.0%

Yunnan 2,923 2,655 10.1%

Shanxi 1,896 2,252 -15.8%

Guizhou 1,594 2,092 -23.8%

Guangdong 1,882 2,085 -9.7%

Hebei 1,853 1,960 -5.5%

Sichuan 2,708 - -

Xinjiang 2,744 3,741 -26.7%

Jilin 1,841 2,190 -15.9%

Shanghai 1,949 2,152 -9.4%

Shaanxi 1,902 2,099 -9.4%

Solar power utilization hours 1,420 - -

(hours)

Weighted average utilization hours

2014 business review

Project construction proceeded effectively and the structural layout continuously optimize

Huaneng Renewables Corporation Limited

Yunnan 26%

Sichuan 19%

Guizhou 15%

Shanxi 8%

Guangdong

6%

other region

26%

(MW)

Distribution of newly added projects in 2014

(%)

Capacity proportion of Inner Mongolia, Liaoning

and Jilin province gradually decreasing

Solar 330.0

Solar 485.0

Wind 6,220.9

wind 7,526.4

6,550.9

2013 2014

1,305.5

155

(MW)

Total installed capacity

57.4 52.5

47.6 41.3

0.0

10.0

20.0

30.0

40.0

50.0

60.0

2011 2012 2013 2014

2014 business review

Breakthroughs in preliminary development and resources

reserved for future projects is sufficient

Huaneng Renewables Corporation Limited

Non-

curtailing

areas92%

Capacity in the 4th batch of approved national

planned wind power projects amount to 1,915MW

Approved photovoltaic projects of 253.5MW in 2014

Total approved wind power projects in of

2,037.5MW in 2014

Enhance the cooperation with wind power, solar power equipment manufacturing enterprises

80

60 50

23.5

20 20

Inner mongolia

Hebei

Xinjiang

Yunnan

Shanxi

Liaoning

Non-

curtailing

areas

80%

2014 business review

Remarkable operating management performance

Huaneng Renewables Corporation Limited

Target Liaoning Juliangtun WP project(48MW)

Date of

agreement

March 2014

Target Huaneng Ge’ermu phase 1-3 on-grid

photovoltaic power station (70MW)

Date of

completion

April 2014

Process of acquisitions in 2014

Issuer Huaneng Renewables Corporation Limited

Offering type Private placement

Date December 2014

Offering Size 698,780,832H shares (20% of outstanding shares prior to the

offering)

Net proceeds Approx. HK$1.72 billion

H-share private placement under general mandate

Financial management enhanced Technical support reinforced

Investor relations management

recognized by the market

Strengthen

capital

control

Expanding

financing

channels

Severe

financial

cost control

Initially completed 3 topics under national

project 863, building up a large number of

technological achievements in various aspects

Collaborated with professional scientific

institutions on establishment of joint workshop

to provide scientific basis for wind resources

assessment and project decision making

scientific achievements honored with industry

and national awards, innovative capability

recognized by wind industry

2014 business review

Coped with policy risk associated with wind power tariff reduction in a proactive and effective manner

Huaneng Renewables Corporation Limited

NDRC announced onshore wind

power tariff reduction 68% of newly installed projects in

2015 distributed in Zone I-III 53% of under construction Wind

power projects located in Zone I-III

by end of 2014

76%of 2014 approved projects were

located in Zone IV

70% of un-constructed projects

within four batches national pre-

approval plans located in Zone IV

85% of proposed project for 5th

batch of national pre-approval plans

located in Zone IV

Zone IV

47% Zone I-III

53%

Zone I-III 68%

Zone IV

76%

Zone I-III

24%

Zone IV

70%

Zone I-III

30% Zone IV

85%

Zone I-III

15%

On 07/01/2015, NDRC announced that

the standardized on-grid tariffs of new

on-shore wind farms in Zones I, II and

III in China will be lowered by Rmb

0.02 /kWh while that in Zone IV remain

unchanged. The new tariffs are

applicable to on-shore wind projects

approved after 01/01/2015 and the

ones approved before 01/01/2015 but

become operative after 01/01/2016.

Zone IV 32%

2014 business review

Present situations

Huaneng Renewables Corporation Limited

Reform of power sector will lead to more intensive market competition

The policy adjustment of wind power tariff affects the development of wind power projects in

partial regions

The general economic condition brings slackened growth of the gross electricity consumption

across whole society

Challenges

The fundamental direction of State for carrying out energy restructuring and vigorously

developing low-carbon green energy remains unchanged

The renewable portfolio standard has been submitted to the State Council, expected to be

implemented recently.

The UHV long-distance power transmission channel has been under rapid construction and

development

The renewable power industry has a bright future

Opportunities

2015trends and targets

Huaneng Renewables Corporation Limited

Key jobs in 2015

Strengthen resources development to promote a steady enhancement in sustainability

Promote the construction progress in full swing, and

accelerate the pace of transformation and upgrade

Stick to the economic efficiency-focused management

philosophy for continuous profitability enhancement

Continue to proceed management innovation to further

enhance the Company’s competitiveness

Focus on improvement of development efficiency and quality

Achieve synchronous growth of installed capacity and profitability

01

02

03

04

2015trends and targets

Thank you