ANR Monthly Customer Update – August 2017 August 22, 2017
Transcript

ANR Monthly Customer Update – August 2017

August 22, 2017

ANR Customer Update Meeting, June 2017

Agenda Presenters

• Storage Update Jeff Keck, Storage Planning & Development

• Operational Update Alfred F. DeGrazia Jr., Gas Control & Planning

• Noms & Scheduling Keith Flynn, Noms & Scheduling

2

Storage Update

Jeff Keck – Storage Planning and Development

EIA Storage Position: The Big Picture

4

3.082 Tcf as of Friday, August 11, 2017

DateANR’s Reported EIA Storage Inventory

(MMcf)

8/11/2017 187,027

8/12/2016 189,845

8/14/2015 132,164

Storage Position

Working gas in underground storage compared with the 5-year maximum and minimum

(Volumes in MMcf)

5

196,948 MMcf as of 8/17/17

-

50,000

100,000

150,000

200,000

250,000

300,000

3/3

1

4/3

0

5/3

1

6/3

0

7/3

1

8/3

1

9/3

0

10/3

1

5 Yr Max - Min Range 5 Yr Avg 2017

Storage Inventory – 2017 vs. 2016

6

% of Storage

Capacity 2017 Percent Full

YOY Difference

(2016 - 2017)

Aug 17th

ANR Pipeline 76% 1.0%

ANRSCo 83% -5.2%

Blue Lake 88% 0.1%

Eaton Rapids 54% -22.3%

Storage Operations

7

• The current volume in storage exceeds the five-year average level by roughly 27 Bcf. This has moderated over the last two months from about 40 Bcf over the five-year level earlier in the summer and is well within reasonable parameters.

• Due to stronger summer power loads, total injections have averaged 352 MMcf/d from June 19 through August 17, down from the average of about 565 MMcf/d through June 18.

• There are no concerns with meeting firm customer demand for injection.

Operational Update

Alfred F. DeGrazia Jr. – Gas Control & Operations Planning

ANR May Average Daily System Flows

ANR

Great Lakes

9

1

2

3

4

5

6

8

9

SW Headstation: 636 MDth/667 MDth per day.

Wisconsin: 469 MDth/2,244 MDth per day.

Michigan Leg South flows through St. John averaged 938 MDth/1,261 MDth per day in the eastbound direction. June flows averaged 1,162 MDth per day.

The Michigan Leg North volumes flowed northbound with average deliveries of 1,117 MDth per day between Bridgman and Woolfolk compressor stations. June flows averaged 1,343 MDth per day.

ANRPL Storage injections averaged 549 MDth per day.

In the Southeast Area, offshore receipts averaged 207 MDth per day and deliveries averaged 753 MDth per day between Eunice and Patterson and Eunice and Grand Chenier.

Flows along the south end of the Southeast Mainline averaged 803 MDth per day southbound through the Jena compressor station.

On the north end of the Southeast Mainline, REX Shelbyville receipts averaged 1,125 MDth per day, a ~90-MDth decrease over June receipts. Flows into Defiance from the south averaged 763 MDth per day versus 948 MDth per day in June.

Deliveries to MichCon at Willow Run averaged 404 MDth per day. June flows averaged 670 MDth per day.

1

2

3

4

5

6

7

8

9

7

ANR Monthly Deliveries to Power Plants

10

103.7

73.282.1

121.5135.1

230.4

127.4 129.3

232.5

284.9

144.4

0

25

50

75

100

125

150

175

200

225

250

275

2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

MM

Dth

Dec

Nov

Oct

Sep

Aug

Jul

Jun

May

Apr

Mar

Feb

Jan

ANR Posted Capacity Impacts August 2017

Posted Capacity Restrictions as of August 2017

Southeast Gathering Area - Lowry Plant Outlet - DRN #38278 CN ID #8258

(Lowry Plant shut-in due to gas quality issues) 8/8 - 8/31

Eunice Eastbound - DRN #226641 PSO ID #8172

29-MMcf/d (leaving 588-MMcf/d available) 7/26 - 10/31

Greenville TGP/ANR Delivery - DRN #307790 CN ID #8247

TGP Greenville shut-in due to pressure incompatibility 8/4 - 8/31

Jena Southbound - DRN #9505489 CN ID #8173

247-MMcf/d (leaving 903-MMcf/d available) 7/26 - 10/31

Willow Run Delivery Meter - DRN #42078 PSO ID #8257

148-MMcf/d (leaving 609-MMcf/d available) 9/14 - 9/21

St. John Eastbound - DRN #226633 PSO ID #8256

95-MMcf/d (leaving 1,186-MMcf/d available) 8/15 - 8/29

30-MMcf/d (leaving 1,251-MMcf/d available) 8/30 - 9/9

St. John Eastbound - DRN #226633 PSO ID #8197

720-MMcf/d (leaving 561-MMcf/d available) 9/18 - 9/22

420-MMcf/d (leaving 861-MMcf/d available) 9/23 - 9/27

SWML Northbound - DRN #226630 PSO ID #8266

125-MMcf/d (leaving 574-MMcf/d available) 8/18 - 8/31

11

2017 ANR Mainline Compressor and Pipeline Maintenance Projects

ANR

Great Lakes

SEML Compressor OverhaulsPosted August capacity impacts to Eunice Eastbound, Eunice Southbound, Jena South,

SEML North of REX and Defiance SouthPlanned and Unplanned Maintenance

*No impact to Services

12

SWML Pipeline Integrity DigsMissouri/Illinois Area Digs through July and August

ILI Pig Runs July and August*Will impact IT and FS ServicesSWML Compressor Overhauls*Will impact IT and FS Services

Tie-Line Compressor OverhaulNo impact to services

HCA Class Change ProjectSt. John, Indiana

9/18 – 9/27 *Will impact IT, FS and portion of FP

*Commissioning activities ongoing for SEML Overhauled Units – Brownsville, Celestine and

Shelbyville

13

Outage Postings

• Service Impacts are estimates. Actual nominations, markets, weather and pipeline conditions, etc. will determine any level of curtailments.

• Projects may be added, altered, delayed or cancelled. Emergent work cannot be planned and will happen from time to time.

• Notice of such planned work, including any additions or changes, will be provided via a posting under the Planned Service Outage (PSO) category in GEMS. Emergent work will be posted under the Critical Notice category as soon as possible.

Noms & Scheduling

Keith Flynn – Noms & Scheduling

ANR IPLS Locations

The ANR Locations where Parking and Lending is permitting for use with Rate Schedule IPLS is available under the

Non-Critical Notice section on ANR’s Informational Postings website: http://anrebb.transcanada.com/

This persistence notice can be viewed under the “Notices” menu under “Non-Critical Notices” with the subject

IPLS Locations:

ANR IPLS Locations

IPLS Locations Available before 1/1/2017 Additional IPLS Locations Available after 1/1/2017

755893 - IPLS Mone 505584 - IPLS Rex Shelbyville

766182 - IPLS Brownsville 505585 - IPLS Overisel

766183 - IPLS Weakley 505586 - IPLS Stag Lake

766312 - IPLS Holland BPW 505587 - IPLS Detroit A

766313 - IPLS Napoleon 866062 - IPLS Willow

766324 - IPLS South Craig 505597 - IPLS Crystal Falls

866060 - IPLS Bedison 505598 - IPLS Farwell

866061 - IPLS Lebanon 505599 - IPLS Marshfield/Viking

866062 - IPLS Wauseon 505600 - IPLS Monclova

866067 - IPLS Panola 505601 - IPS Paulding

866068 - IPLS Monee 505602 - IPLS Janesville

9505488 - IPLS Covert

103565 - IPLS SE

103702 - IPLS SW

243097 - ANR Joliet HUB

Pursuant to the FERC Letter order accepting ANR Pipeline Company's 12/1/16 filing of a new Parking and

Loan Pro Forma Service Agreement, effective 1/1/17 under RP17-237, ANR will now be posting the IPLS

locations rather than listing them in the tariff.

16

ANR Marketing Contacts

For IPLS Availability and Pricing, please contact the following:

Adam Lakhani

Phone: (832) 320-5559

Email: [email protected]

Dan Junek

Phone: (832) 320-5825

Email: [email protected]

…or your ANR Marketing Rep.

17

ANR Customer Assistance

For further customer assistance concerning scheduling priorities related to your specific firm service agreement(s),

firm service rights and features, GEMS new user training, virtual and face-to-face meetings, etc., please contact

the ANR Noms & Scheduling Team:

Toll Free: 1-800-827-5267

Group Email: [email protected]

Web address for the ANRPL Tariff: www.anrebb.transcanada.com

18

Thank you.


Recommended