5
Transcript
Page 1: ANSI D SHT 5 - City of St. Petersburg · xUse minimum ASTM A815 Grade 40 Steel xLap #3 bars minimum 15" xLap #5 bars minimum 25" x6" Shell thickness and 2-1/2" concrete coverage are
Page 2: ANSI D SHT 5 - City of St. Petersburg · xUse minimum ASTM A815 Grade 40 Steel xLap #3 bars minimum 15" xLap #5 bars minimum 25" x6" Shell thickness and 2-1/2" concrete coverage are

BYDATE DESCRIPTION:

BYDATE DESCRIPTION:

CITY PROJECT NO. COUNTY FINANCIAL PROJECT ID.

PINELLAS

10999-002

DWG. No

SUNKEN GARDENS

KOI POND RECONSTRUCTION

2 OF 5

3990 SR 64 E., Bradenton, FL 34208

Office: 941-749-0311, Fax: 941-746-7391

[email protected]

P.E. 33678, C.A. 27189

13214-019

NORTH POND PLAN

SCALE: 1"=10'

SUNKEN GARDENS NORTH POND:

TOTAL PERIMETER: 168 LF

EXISTING POND AREA REMAINING: 143 SF

POND AREA RECONSTRUCTION: 636 SF

TOTAL POND VOLUME FROM WEIR: 13,017 GAL

TARGET FLOW: 75 GPM

TURNOVER: ~3 HRS

2

4

"

W

D

4

8

"

W

D

2

4

"

W

D

1

2

"

W

D

E

X

I

S

T

.

W

A

T

E

R

F

A

L

L

FLAMINGO POND PLAN

SCALE: 1"=10'

SUNKEN GARDENS

FLAMINGO POND:

EST. PERIMETER: 290.4 LF

EST. AREA: 1187 SF

EST. VOLUME: 17758 GAL

E

X

I

S

T

.

W

A

T

E

R

F

A

L

L

E

X

I

S

T

.

A

P

P

R

O

X

.

~

2

4

"

W

D

SOUTH POND PLAN

SCALE: 1"=10'

SUNKEN GARDENS

SOUTH POND:

PERIMETER: 91 LF

AREA: 434 SF

VOLUME: 9,220 GAL

TARGET FLOW: 75 GPM

TURNOVER: ~2.0 HRS

2

4

"

W

D

4

8

"

W

D

NOTES:

434 SF TOTAL AREA

164 SF 24" WD (37%)

181 SF 48" WD (41%)

E

X

I

S

T

.

W

A

T

E

R

F

A

L

L

12" WD MIN.

0

SCALE: 1"= 10'

20'10'

0

SCALE: 1"= 10'

20'10'

PARTIAL SITE PLAN

SCALE: 1"=20'

40'10'

SCALE:1"=20'

0 20'

NOTE:CONTRACTOR TO PRESERVE ALL EXISTINGSTRUCTURES OUTSIDE OF THE KOI PONDS(SPECIFICALLY SIDEWALKS AND BRIDGES)

NOTE:NO STRUCTURAL CHANGESAT FLAMINGO POND

HATCHED AREA TO REMAIN

ORIGINAL STRUCTURE

EX

IS

TIN

G

ST

RU

CT

UR

E

NOTE:CONTRACTOR TO PRESERVE ALL EXISTINGSTRUCTURES OUTSIDE OF THE KOI PONDS(SPECIFICALLY SIDEWALKS AND BRIDGES)

EXISTING STRUCTURE

REPLACE FOUNTAIN

W/ PROECO N-107

BLOSSUM NOZZLE

LOCATE RECIRCULATION

PUMP NEAR WATERFALL

NORTH KOI POND

RECONSTRUCTION

SOUTH KOI POND

RECONSTRUCTION

SOUTH KOI POND

FEEDER STREAM

RECONSTRUCTION

NEW WATER

FEATURE IN

FLAMINGO POND

YARD DRAINS

APPROX. LOCATION OF YARD DRAIN

EXISTING WEIR FROM

FEATURE

FOUNTAIN BASE

SCALE: N.T.S.

1-1/2" PVC FLEX HOSE

OR EQUAL

PVC PIPE

PROECO N-107

BLOSSUM NOZZLE

PVC PIPE BOLTED TO

PAVER BASE

VERIFY NOZZLE

HEIGHT

ACCESS AND SOME

STAGING AREA FOR

NORTH POND OFF OF

20TH AVE NORTH

ACCESS AND SOME

STAGING AREA FOR

SOUTH POND

NORTH KOI POND

RECONSTRUCTION

CONTRACTOR TO

MAINTAIN SAFETY FENCE

PEDESTRIAN BARRICADE

CONTRACTOR TO

MAINTAIN SAFETY FENCE

PEDESTRIAN BARRICADE

CONTRACTOR TO

MAINTAIN SAFETY FENCE

PEDESTRIAN BARRICADE

CONTRACTOR TO

MAINTAIN SAFETY FENCE

PEDESTRIAN BARRICADE

SUNKEN GARDENS TO

PROVIDE DAM OF

FLOW FROM FLAMINGO

POND AND IT'S

RECIRCULATION

FLAMINGO

POND

SUNKEN GARDENS TO

PROVIDE DAM OF FLOW

FROM FLAMINGO POND

AND IT'S RECIRCULATION

SETTLING TANKS

HEATER

BIOMEDIA FILTERS

SETTLING TANKS

HEATER

BIOMEDIA FILTERS

CIRCULATION PUMP

4-27-15 ADDED ELECTRICAL SPECIFICATIONSJKK

Page 3: ANSI D SHT 5 - City of St. Petersburg · xUse minimum ASTM A815 Grade 40 Steel xLap #3 bars minimum 15" xLap #5 bars minimum 25" x6" Shell thickness and 2-1/2" concrete coverage are

BYDATE DESCRIPTION:

BYDATE DESCRIPTION:

CITY PROJECT NO. COUNTY FINANCIAL PROJECT ID.

PINELLAS

10999-003

DWG. No

SUNKEN GARDENS

KOI POND RECONSTRUCTION

3 OF 5

3990 SR 64 E., Bradenton, FL 34208

Office: 941-749-0311, Fax: 941-746-7391

[email protected]

P.E. 33678, C.A. 27189

13214-019

NORTH POND PIPING SCHEMATIC

SOUTH POND PIPING SCHEMATIC

SCALE: 3/16"=1'-0"

POOL RECIRCULATION EQUIPMENT FOR

SOUTH KOI POND:

1 Main Drain Cover - AQUASTAR 12X12 WAV

1 Hydrostatic relief valve

1 Skimmer - GRATE

2 Wall Return Fittings - HAYWARD SP1419D

2 Collector Tank - CUSTOM SETTLING TANKS

1 Recirculation Pump - PENTAIR INTERFLO VS

2 D.E. Pres. Sand Filter(s) - PENTAIR, TR140

(LESS SAND MEDIA) OR EQ

BIO MEDIA - SEE NOTES

1 Heater - COATES

2 Pressure Gauges - 2" face

1 Flowmeter - BLUE-WHITE, 2", F-30200P, 40

TO 150

1 Thermometer - In line

1 UV - AQUA ULTRAVIOLET CLASSIC 120

WATT

1 GRATE - LAWSON 12" PERPENDICULAR

SCALE: 3/16"=1'-0"

NOTE:

PIPING IS A SCHEMATIC ONLY. THE

CONTRACTOR WILL INSTALL PIPING IN

THE MOST EFFICIENT CONFIGURATION.

POOL RECIRCULATION EQUIPMENT FOR

NORTH KOI POND:

1 Main Drain Cover - AQUASTAR 12X12 WAV

1 Hydrostatic relief valve

1 Skimmer - GRATE

2 Wall Return Fittings - HAYWARD SP1419D

2 Collector Tank - CUSTOM SETTLING TANKS

1 Recirculation Pump - PENTAIR INTERFLO VS

2 D.E. Pres. Sand Filter(s) - PENTAIR, TR140

(LESS SAND MEDIA) OR EQ

BIO MEDIA - SEE NOTES

1 Heater - COATES

2 Pressure Gauges - 2" face

1 Flowmeter - BLUE-WHITE, 2", F-30200P, 40

TO 150

1 Thermometer - In line

1 UV - AQUA ULTRAVIOLET CLASSIC 120

WATT

1 GRATE - LAWSON 12" PERPENDICULAR

CONNECT TO EXISTING

EXISTING FOUNTAIN

BIOMEDIA FILTERS

HEATER

HEATER

FILTERS

ORIGINAL STRUCTURE

YARD DRAIN

YARD DRAIN

EXISTING FOUNTAIN

APPROX.

LOCATION

OF EXISTING

YARD DRAIN

MAINTAIN

CONSTANT SLOPE

OF PIPE TO TANK

OR VENT TO

SURFACE AT HIGH

POINT(S)

MAINTAIN

CONSTANT SLOPE

OF PIPE TO TANK

OR VENT TO

SURFACE AT HIGH

POINT(S)

BIO MEDIA NOTES:

NEED APPROX. 10 CF PER FILTER.

USE EXTREME BIO MEDIA X075 OR EQUAL

CRITERIA - FINE/FLOAT MEDIA

- SPECIFIC GRAVITY 0.95-0.98

- GREATER THAN >50 SF/CF

BIO MEDIA NOTES:

NEED APPROX. 10 CF PER FILTER.

USE EXTREME BIO MEDIA X075 OR EQUAL

CRITERIA - FINE/FLOAT MEDIA

- SPECIFIC GRAVITY 0.95-0.98

- GREATER THAN >50 SF/CF

DIRECT

OVERFLOW TO

YARD DRAIN LINE

USE ASPHALT EXPANSION JOINT MATERIAL

BETWEEN SIDEWALK AND NEW POND

DIRECT

OVERFLOW

TO YARD

DRAIN LINE

UV

UV

STRIP, CLEAN AND

PREP FOR COATINGS

GENERAL REQUIREMENTS NOTES

1. Bidders are required to attend the on-site pre-bid meeting to view the site, its limitations, and

concerns of representatives of Sunken Gardens.

2. Contractor shall use extreme care within the boundaries of Sunken Gardens, so as not to

damage existing walkways, planting or facilities. Representatives of Sunken Gardens must be

consulted and approve any demolition of existing facilities or trim/removal of any plantings.

3. This work is expected to have organic muck soil conditions. While there is not a requirement to

remove all organic material, it is critical to dewater below any expected levels of excavation,

prior to excavation.

4. Contractor shall engage a soil testing firm for minimum two borings to minimum 6 ft depth near

each existing pond prior to demolition.

5. Contractor shall provide well point dewatering to maintain a dry hole during demolition and

excavation.

6. The contractor shall submit shop drawings/ product sheets and samples of all equipment and

materials for confirmation and approval.

STRUCTURAL NOTES

Use minimum ASTM A815 Grade 40 Steel

Lap #3 bars minimum 15"

Lap #5 bars minimum 25"

6" Shell thickness and 2-1/2" concrete coverage are minimums

Use 4,000 psi shotcrete

It is highly recommended to use shotcrete and to have nozzle man or supervisor of shoot to hold

an ACI Nozzleman Certification.

SCOPE OF WORK NOTES

South Koi Pond:

1. Remove the existing south koi pond structure, except for the vertical pond wall on the south side

against the rising grade and rock waterfall feature.

2. This demolition shall preserve the existing sidewalks in the area (they are historical features),

and shore up the excavation adjacent the sidewalk to prevent subsurface failure that damages

the sidewalk. Where there is minor sloughing of soil under the sidewalk at the time of

concrete shoot of the shell, the contractor shall shoot concrete beyond the designed wall of

the shell to the remaining natural grade, filling any void under the sidewalk.

3. Because the new pond shell is shot against the existing sidewalk, use a ¾” asphalt joint material

at the sidewalk/shell interface.

4. The new koi pond will have a floor that slopes to a drain, three directional returns, a vacuum

fitting, and a constructed weir skimming trough. The bottom drain and skimmer drain lines

shall have a constant slope to the tank inlets. Where there must be high points, a 4” cleanout

“y” shall be installed to grade with reducer fittings and grate for vent.

5. The concrete pond shell shall be finished with the CL Industries, Sunstone Pearl, Black Pearl

product, or other color/ product selected by the owner. The bid shall include this product and

any alternative products recommended by the bidder. This product shall cover all portions of

the concrete shell including the beam areas above water level.

6. The South Koi Pond will have its pump placed near the rock waterfall, and piping run over to

other equipment and back. The existing sidewalk shall be protected during the placement of

the pipe. Once pipe are place under the sidewalk, backfill shall be placed and compacted

under the walk so as not to cause settling in future. Contractor may quote an alternative to

carefully and cleanly cut a section of the historic sidewalk, remove it and replace once the

piping is in place.

7. The treated water is to be returned via valve manifold to the directional returns in the pond, the

existing waterfall feed (connection point to be determined), and the flexible feed line to the

Flamingo Pond line behind the pond.

8. The fountains in the Flamingo Pond will be replaced. Connection to be made with the existing

flexible line and continue over the beam of the pond.

9. The pond treatment system will have a pump to waste for the settled and filtered pond water, to

on side stormwater drains.

10.The filter backwash shall be pumped to on site plantings.

11.The waste settled solids shall be pumped to on site plantings.

North Koi Pond

1. This work involves removing the portion of the existing North Koi Pond “downstream” of the

existing bridge structure.

2. The new pond area will be connected to the existing floor and walls to continue that existing

pond from the weir upstream of the bridge down to the new pond volume. The new shell will

be connected according to the plan, using epoxy embed steel and industry standard

preparation of the existing concrete face.

3. The new koi pond will have a floor that slopes to a drain, three directional returns, a vacuum

fitting, and a constructed weir skimming trough. The bottom drain and skimmer drain lines

shall have a constant slope to the tank inlets. Where there must be high points, a 4” cleanout

“y” shall be installed to grade with reducer fittings and grate for vent.

4. The concrete pond shell shall be finished with the CL Industries, Sunstone Pearl, Black Pearl

product, or other color/ product selected by the owner. The bid shall include this product and

any alternative products recommended by the bidder. This product shall cover all portions of

the concrete shell including the beam areas above water level.

5. The North Koi Pond site has an existing concrete structure to place the pump and heater. The

pump should be placed in a manner for optimum servicing of the strainer basket and motor

replacement, such as the suction end near the structure opening.

6. The pond treatment system will have a pump to waste for the settled and filtered pond water, to

on side stormwater drains.

7. The filter backwash shall be pumped to on site plantings.

8. The waste settled solids shall be pumped to on site plantings.

RECIRCULATION NOTES

1. Plastic pipe exposed to sunlight shall be coated for UV protection.

2. Plastic Pipe shall have NSF-PW seal of approval.

3. Wall inlets shall be directionally adjustable and do not protrude into the pool.

4. Disposal of pool wastewater shall conform to State and County requirements.

5. Pond makeup water supply is from on site well and shall have an air break at point of fill.

NOTE:

AT THE REQUEST OF OWNER

REPRESENTATIVES, THIS DESIGN DOES NOT

CALL FOR REMOVING ORGANIC MUCK

MATERIALS PRIOR TO PLACING THE NEW

STRUCTURES. THEREFORE, THIS DESIGN

CANNOT WARRANT AGAINST SETTLING ISSUES.

PUMP

PUMP

SETTLING TANKS

SETTLING TANKS

4-27-15 ADDED ELECTRICAL SPECIFICATIONSJKK

Page 4: ANSI D SHT 5 - City of St. Petersburg · xUse minimum ASTM A815 Grade 40 Steel xLap #3 bars minimum 15" xLap #5 bars minimum 25" x6" Shell thickness and 2-1/2" concrete coverage are

BYDATE DESCRIPTION:

BYDATE DESCRIPTION:

CITY PROJECT NO. COUNTY FINANCIAL PROJECT ID.

PINELLAS

10999-004

DWG. No

SUNKEN GARDENS

KOI POND RECONSTRUCTION

4 OF 5

3990 SR 64 E., Bradenton, FL 34208

Office: 941-749-0311, Fax: 941-746-7391

[email protected]

P.E. 33678, C.A. 27189

13214-019

1. USE CONCRETE MINIMUM 4,000 PSI @ 28 DAYS2. REINFORCING STEEL: MINIMUM ASTM A815 GR 403. LAP #3 BARS MIN 15", #5 BARS 25"4. MINIMUM CLEARANCE TO SOIL #3 BARS 2.5", #5 BARS 3"5. PLACE STRUCTURE ON UNDISTURBED EARTH OR COMPACTED FILL MEETING 95% MODIFIED PROCTOR

SOUTH KOI POND SECTION C-C

N.T.S.

SOUTH KOI POND FEEDER POND RECONSTRUCTION SECTION

N.T.S.

NORTH KOI POND SECTION A-A

N.T.S.

SOUTH KOI POND SECTION B-B

N.T.S.

TYPICAL SECTION SKIMMER WEIR

N.T.S.

NOTE:PROTECT SIDEWALKS, MOTORIZED WHEELBARROWS OK.

NOTE:DARK FINISH FOR POND WALLS AND CURB: BLACK PEARL BY CL INDUSTRIES

NOTE:PRESERVE BRIDGE FOUNDATION

4-27-15 ADDED ELECTRICAL SPECIFICATIONSJKK

SUNKEN GARDENS NORTH POND

N.T.S.SUNKEN GARDENS SOUTH POND

N.T.S.

Page 5: ANSI D SHT 5 - City of St. Petersburg · xUse minimum ASTM A815 Grade 40 Steel xLap #3 bars minimum 15" xLap #5 bars minimum 25" x6" Shell thickness and 2-1/2" concrete coverage are

BYDATE DESCRIPTION:

BYDATE DESCRIPTION:

CITY PROJECT NO. COUNTY FINANCIAL PROJECT ID.

PINELLAS

10999-005

DWG. No

SUNKEN GARDENS

KOI POND RECONSTRUCTION

5 OF 5

3990 SR 64 E., Bradenton, FL 34208

Office: 941-749-0311, Fax: 941-746-7391

[email protected]

P.E. 33678, C.A. 27189

13214-019

TYPICAL SCHEMATIC

N.T.S.

TYPICAL TANK PLAN

N.T.S.

NORTH KOI POND SCHEMATIC

N.T.S.

SOUTH KOI POND SCHEMATIC

N.T.S.

LEGEND

SWL STATIC WATER LEVEL

OWL OPERATING WATER LEVEL

NOTE:SUPPLIER TO PROVIDE SHOP DRAWINGS OF TANKS

TANK ISOMETRIC

N.T.S.

TANK ELEVATION

N.T.S.

4-27-15 ADDED ELECTRICAL SPECIFICATIONSJKK