ANTALYA ENERJİ ÜRETİM A.Ş. · Commercial Operating Date : 34,92 MWe Jul. 2006, 17,46 MWe Aug....

Date post: 11-Mar-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
13
December 2018 94,20 MWe (6 x 8,73 MWe + 6 x 6,97 MWe, 50 Hz) Wartsila (20V34SG) Co-Gen & (16V34SG) Simple Cycle NGPP for Sale ANTALYA ENERJİ ÜRETİM A.Ş. ANTALYA NGPP ANTALYA/TURKEY
Transcript
Page 1: ANTALYA ENERJİ ÜRETİM A.Ş. · Commercial Operating Date : 34,92 MWe Jul. 2006, 17,46 MWe Aug. 2008, ... + Spare parts.) 94,20 MWe ANTALYA NGPP For Sale Net Annual Electricity

December 2018

94,20 MWe (6 x 8,73 MWe + 6 x 6,97 MWe, 50 Hz)

Wartsila (20V34SG) Co-Gen & (16V34SG) Simple

Cycle NGPP for Sale

ANTALYA ENERJİ ÜRETİM A.Ş.ANTALYA NGPP – ANTALYA/TURKEY

Page 2: ANTALYA ENERJİ ÜRETİM A.Ş. · Commercial Operating Date : 34,92 MWe Jul. 2006, 17,46 MWe Aug. 2008, ... + Spare parts.) 94,20 MWe ANTALYA NGPP For Sale Net Annual Electricity

94,20 MWe ANTALYA NGPP For Sale

General Information

General Information

Plant is located within the boundry of Antalya Industrial

Zone, which is about 25 km distance from Antalya (at

North-West direction) and 40 km distance from Antalya

Int. Airport.

Company Name : ANTALYA ENERJİ ÜRETİM A.Ş.

Installed Power : 94,2 MWe

Type of Plant : Natural Gas Power Plant

(52,38 MW Co-Gen, 41,82 MW Simple Cycle)

Location : Antalya Industrial Zone / ANTALYA – TURKEY

Commercial Operating Date : 34,92 MWe Jul. 2006, 17,46 MWe Aug. 2008,

41,82 MWe Jul. 2009

Operating Model : IPP / Balancing Plant

Type of Units / Supplier : Gas Engine 20V34SG & 16V34SG / Wartsila –

Finland

Number of Units : 6 x 8,73 MWe + 6 x 6,97 MWe

Grid Connection Voltage : 11 kV to 154 kV

Page 3: ANTALYA ENERJİ ÜRETİM A.Ş. · Commercial Operating Date : 34,92 MWe Jul. 2006, 17,46 MWe Aug. 2008, ... + Spare parts.) 94,20 MWe ANTALYA NGPP For Sale Net Annual Electricity

94,20 MWe ANTALYA NGPP For Sale

Technical Information

Technical Information

Type of Plant : Natural Gas Power Plant (Co-Gen & Simple

Cycle)

Type of Units / Supplier : Gas Engine 20V34SG&16V34SG/Wartsila–Fin

Number of Units, Total Inst. Power : 6 x 8,73 MWe+ 6 x 6,97 MWe = 94,20 MWe

Annual Generation Capacity : Elec.: 740.000.000 kWh – Steam : 30 t/h 14 bar

Simple Cycle Efficiency : 43%

Engine Cooling System : Air Cooled Condenser

Operating Voltage Level, Frequency : 6,3 kV to 34,5 kV to 154 kV, 50 Hz

NGas Inlet Pressure and Consumption : 6 Bar, 23.000 Sm3/hr on full load

Distance to Grid Substation : 100 mt (154 kV OHL)

Maintenance Services of Gen-Sets : Supplied by Wartsila ENPA (Scheduled + Unscheduled

+ Spare parts.)

Page 4: ANTALYA ENERJİ ÜRETİM A.Ş. · Commercial Operating Date : 34,92 MWe Jul. 2006, 17,46 MWe Aug. 2008, ... + Spare parts.) 94,20 MWe ANTALYA NGPP For Sale Net Annual Electricity

94,20 MWe ANTALYA NGPP For Sale

Net Annual Electricity (MWh) & Steam (Ton) Generations

Historical Electricity & Steam Generations

Since the Plant is being operated on balancing (peaking)

model due to hourly Supply-Demand profile of Turkish

Electricity Market, the total annual generation remained

at low levels considering the generation capability.

80.124

167.361

252.076

309.915

380.274358.120

274.441

325.195362.999

223.112

58.439

7.038 22.813 37.312 22.182 32.480 42.196 36.667 36.952 43.742 35.4114.633

0

50.000

100.000

150.000

200.000

250.000

300.000

350.000

400.000

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

ELEC. & STEAM GENERATION

Elec. Gen. (MWH) Steam (TON)

Page 5: ANTALYA ENERJİ ÜRETİM A.Ş. · Commercial Operating Date : 34,92 MWe Jul. 2006, 17,46 MWe Aug. 2008, ... + Spare parts.) 94,20 MWe ANTALYA NGPP For Sale Net Annual Electricity

94,20 MWe ANTALYA NGPP For Sale

Plant Layout

Page 6: ANTALYA ENERJİ ÜRETİM A.Ş. · Commercial Operating Date : 34,92 MWe Jul. 2006, 17,46 MWe Aug. 2008, ... + Spare parts.) 94,20 MWe ANTALYA NGPP For Sale Net Annual Electricity

94,20 MWe ANTALYA NGPP For Sale

Workflow Scheme

Page 7: ANTALYA ENERJİ ÜRETİM A.Ş. · Commercial Operating Date : 34,92 MWe Jul. 2006, 17,46 MWe Aug. 2008, ... + Spare parts.) 94,20 MWe ANTALYA NGPP For Sale Net Annual Electricity

94,20 MWe ANTALYA NGPP For Sale

Operations

• The plant has 94,20 MWe rated power with 6 sets of Wartsila 20V34SG and6 sets of Wartsila 16V34SG Genset. Single Wartsila 20V34SG gas engine canproduce 8,73 MWe and single Wartsila 16V34SG gas engine can produce6,97 MWe electricity per hour. The mechanical power produced with 20 &16 pistons, then transmitted to generator with the shaft and the 11 MVAABB & 9 MVA AVK Generators produce electricity and transmits to ABBMVCells via power cables.

Page 8: ANTALYA ENERJİ ÜRETİM A.Ş. · Commercial Operating Date : 34,92 MWe Jul. 2006, 17,46 MWe Aug. 2008, ... + Spare parts.) 94,20 MWe ANTALYA NGPP For Sale Net Annual Electricity

94,20 MWe ANTALYA NGPP For Sale

Operations

• The plant has 6 sets of HRSG (Heat Recovery Steam Generator), each capable of generating 5 t/h - 14 bar steam for industrial enduserslocated around the area.

Page 9: ANTALYA ENERJİ ÜRETİM A.Ş. · Commercial Operating Date : 34,92 MWe Jul. 2006, 17,46 MWe Aug. 2008, ... + Spare parts.) 94,20 MWe ANTALYA NGPP For Sale Net Annual Electricity

2010 YILI 7 AYLIK ÜRETİMLER (BÜTÇE-

GERÇEK)

9

94,20 MWe ANTALYA NGPP For Sale

Plant Photos

MAIN OFFICE & CONTROL ROOM

Page 10: ANTALYA ENERJİ ÜRETİM A.Ş. · Commercial Operating Date : 34,92 MWe Jul. 2006, 17,46 MWe Aug. 2008, ... + Spare parts.) 94,20 MWe ANTALYA NGPP For Sale Net Annual Electricity

2010 YILI 7 AYLIK ÜRETİMLER (BÜTÇE-

GERÇEK)

10

94,20 MWe ANTALYA NGPP For Sale

Plant Photos

ENGINE ROOM

Page 11: ANTALYA ENERJİ ÜRETİM A.Ş. · Commercial Operating Date : 34,92 MWe Jul. 2006, 17,46 MWe Aug. 2008, ... + Spare parts.) 94,20 MWe ANTALYA NGPP For Sale Net Annual Electricity

2010 YILI 7 AYLIK ÜRETİMLER (BÜTÇE-

GERÇEK)

11

94,20 MWe ANTALYA NGPP For Sale

Plant Photos

TRANSFORMATORS

Page 12: ANTALYA ENERJİ ÜRETİM A.Ş. · Commercial Operating Date : 34,92 MWe Jul. 2006, 17,46 MWe Aug. 2008, ... + Spare parts.) 94,20 MWe ANTALYA NGPP For Sale Net Annual Electricity

2010 YILI 7 AYLIK ÜRETİMLER (BÜTÇE-

GERÇEK)

12

94,20 MWe ANTALYA NGPP For Sale

Plant Photos

WASTE HEAT BOILERS

Page 13: ANTALYA ENERJİ ÜRETİM A.Ş. · Commercial Operating Date : 34,92 MWe Jul. 2006, 17,46 MWe Aug. 2008, ... + Spare parts.) 94,20 MWe ANTALYA NGPP For Sale Net Annual Electricity

2010 YILI 7 AYLIK ÜRETİMLER (BÜTÇE-

GERÇEK)

13

94,20 MWe ANTALYA NGPP For Sale

Plant Photos

AUX. MACHINERY AND SPARE PARTS