+ All Categories
Home > Documents > “EGO II” LEVER HANDLE FLOOR STANDING …“EGO II” LEVER HANDLE FLOOR STANDING SINGLE LEVER...

“EGO II” LEVER HANDLE FLOOR STANDING …“EGO II” LEVER HANDLE FLOOR STANDING SINGLE LEVER...

Date post: 27-May-2020
Category:
Upload: others
View: 24 times
Download: 0 times
Share this document with a friend
1
SPECIFICATIONS TROUBLESHOOTING “EGO II” LEVER HANDLE FLOOR STANDING SINGLE LEVER BATH & SHOWER SET S06725 CHECK POINT Water leaks around the handle 1 Tighten Handle is loose 2 Tighten PROBLEM SOLUTION 7 Hex. Key Cover Body Swivel Ring OPERATING CONDITIONS Water supply pressure : 0.05 ~ 0.75 MPa. Ensure that water supply is clean ( No Sand, Dirt, Etc.). 1. 2. Always wipe chrome plated area with dry soft cloth, and sometimes wipe it with cloth soaked in mild soap. MAINTENANCE R5 INSTALLATION 1 3 Sleeve Anchor * Cut the cover after the mortar dry 5 2 Screw 6 4 * Plastic Cover 6 X Ø6 Holes Floor Water Pass Make sure floor is flat Hot Water Supply Cold Water Supply Mortar Minimum Mortar Level Maximum Mortar Level Base COLD Cover a b Bolt Hex. Key Cap Body * Remove the Base Cover and keep the Bolt HOT Bolt (From step 6) 2. BOLT Flow Regulator Inside (Don’t remove) 1. CONNECTING NUT 8 Packing Flexible Hose Shower Rain Spray Button Massage Spray Button Packing 751 +20 0 55 +0 -20 Ø95 75 +0 -20 945 +20 0 637 +20 0 230 45° 51 30 697.5 +20 0 Floor 30 TX494SEL ATTENTION Use of abrasive cleaning material such as; detergents containing hydrochloric acids, thinner, polishing powder, and nylon brush is not recommended. Flow Regulator should not be remove because it could damage the system 1. 2.
Transcript

SPECIFICATIONS

TROUBLESHOOTING

“EGO II” LEVER HANDLE FLOOR STANDING SINGLE LEVER BATH & SHOWER SET

S06725

CHECKPOINT

Water leaks around the handle 1 TightenHandle is loose 2 Tighten

PROBLEM SOLUTION

7

Hex. Key Cover

Body

Swivel Ring

OPERATING CONDITIONSWater supply pressure : 0.05 ~ 0.75 MPa.Ensure that water supply is clean ( No Sand, Dirt, Etc.).

1.2.

Always wipe chrome plated area with dry soft cloth, and sometimes wipe it with cloth soaked in mild soap.

MAINTENANCE

R5

INSTALLATION 1

3

Sleeve Anchor

* Cut the cover after the mortar dry

5

2

Screw

6

4

* Plastic Cover

6 X Ø6 Holes

Floor

Water Pass

Make sure floor is flat

Hot Water Supply

Cold Water Supply

MortarMinimumMortar Level

MaximumMortar Level

Base

COLD

Cover

a

b

Bolt

Hex. Key

Cap Body

* Remove the Base Cover and keep the Bolt

HOT

Bolt(From step 6)

2. BOLT

Flow Regulator Inside (Don’t remove)

1. CONNECTING NUT

8

Packing

Flexible Hose

Shower

Rain Spray Button

Massage Spray Button

Packing

751+2

0 0

55+0 -2

0

Ø95

75+0 -2

094

5+20

0

637+2

0 0

230

45°

51 30

697.

5+20

0

Floor

30

TX494SEL

ATTENTIONUse of abrasive cleaning material such as; detergents containing hydrochloric acids, thinner, polishing powder, and nylon brush is not recommended.Flow Regulator should not be remove because it could damage the system

1.

2.

Recommended