12/4/2015
1
Prof. Ranjith Dissanayake
Head, Dept. of Civil Eng., Uni. of Peradeniya
VP, Green Building Council Sri Lanka1
“Sustainability”
&
“Construction”
…contradicting each other
2
Construction?
3 4
Construction?
12/4/2015
2
5 6
8 9
12/4/2015
3
11
EnvironmentalEconomic
Sustainable
Construction
12
BuiltNatural
13
Theoretical
12/4/2015
4
14 15
16 17
12/4/2015
5
18
BUILTTHEORITICAL
NATURAL
ENVIRONMENT
20 21
BUILTTHEORITICAL
NATURALSUSTAINABILITY
12/4/2015
6
22
Construction
Sustainable construction
23
12/4/2015
7
26 27
Man
agem
ent
Mate
rials
an
d
Resourc
es
28 29
GREENSL® Project Certification
40–49 points
50–59 points
60–69 points
70 points & above
12/4/2015
8
APPLICATIONS
32 33
Holcim Awards
12/4/2015
9
Community library and
social recuperation,
Ambepussa.36
Community library and social recuperation, Ambepussa.
The slender building with a footprint of 1,400 sq m sits lightly in the landscape and wraps around an inner courtyard, taking full advantage of cross ventilation and daylighting. Rammed-earth walls and recycled materials
37
38
Mate
rials a
nd
R
esource
s
40
12/4/2015
10
MAS Holding, Thuruliya Sri Lanka
There are countless definitions of sustainability. Many are based on the three-pillar model: a project is considered sustainable when it responds equally to economic, ecological, and social factors –which often can be measured only subjectively – and brings these into lasting balance.
41 42
Quantum change and transferability Ethical standards and social equity Ecological quality and energy conservation Economic performance and compatibility Contextual response and aesthetic impact
43
12/4/2015
11
46
48 49
No Name of the Project Award
1 Central Engineering Consultancy Bureau (CECB)
Gold
2 Holy Family Convent, Kaluthara
Gold
3 Hatton National Bank, Kalmunai
Platinum
4 Department of National Archives
Silver
5 Vario Systems Electronics (Pvt) Ltd, Badalgama
Platinum
6 World Trade Center, Colombo-01
Gold
Certification Projects
12/4/2015
12
50 51
Chiller replacement project
Work description
Energy
savings in Rs
(million)
Estimated
implementation
cost in Rs
(million)
Simple
payback
period
(years)
Install 1st 900 RT chiller 13.7 41 3
Install 2nd 900 RT chiller 13.7 41 3
Install three new chilled water
pumps and three new condenser
water pumps to suit new chillers
with piping modifications
9.5 24 2.5
Total Rs.36.7 million Rs. 106 million 2.9 Years
Introduction
GBCSL
RATING SYSTEM
12/4/2015
13
is to transform the construction industry with green building practices to ensure the future wellbeing of our motherland….
12/4/2015
14
59
Prof. Ranjith DissanayakeHead, Dept. of Civil Eng., Uni. of PeradeniyaVP, Green Building Council Sri Lanka
60 61
12/4/2015
15
62 63
64
OLD NEW
65
Arukkal
12/4/2015
16
66
Arukkal
Call for a consultancy
Puttalama
67
68 69
12/4/2015
17
70 71
73
•Very Good
•Poor
•Good
•OK
•Good
Condition of Bridges
12/4/2015
18
74
Bridge No 2
75
New
Repair
76
New DESIGN
77
12/4/2015
19
79
Repair
New
80
75%
81
12/4/2015
20
82
Moving ?
85
12/4/2015
21
86
12/4/2015
22
90
12/4/2015
23
95 96
12/4/2015
24
101
New
Repair
12/4/2015
25
12/4/2015
26
12/4/2015
27
115