Apex Mine Reclamation
UTAH BOARD OF OIL, GAS AND MINING
2015 EARTH DAY AWARD
Presented by:
Dave Enos
Manager, Dormant Properties
Teck American Incorporated
Lynn Kunzler
Reclamation Specialist
Utah Division of Oil, Gas and Mining
1
3
Canada’s Largest Diversified Mining Company
#1 Producer of steelmaking coal in North America
#2 Exporter of steelmaking coal in the world
#3 Zinc miner in the world
Top ten Copper miner in the Americas
Building an Energy business
Sustainability Milestones
Received the PDAC 2014 Environmental and Social Responsibility Award
Best 50 Corporate Citizens in Canada 2014
Ranked four years in a row on the Dow Jones Sustainability World Index
One of top 100 most sustainable companies in the world and one of Canada’s most sustainable companies
Top 50 Socially Responsible Corporations in Canada
Received the Globe Foundation Environment Award in 2014
4
• Apex Mine is located 14 miles west of St. George.
• Property consists of 24 patented mining claims and 9 unpatented mining
claims covering 619 acres.
• Germanium, gallium, and copper deposit found near the contact of the
Pennsylvanian Callville Limestone and overlying Permian Pakoon Dolomite
• Copper mined from 1872 until the 1940s.
• In 1985 Apex became the world’s first primary producer of germanium and
gallium, producing until 1987.
• Teck, and a joint venture partner Penarroya, purchased the property in
1996.
Apex Mine Reclamation
55555
• In 2002, Teck inventoried dangerous mine features including stopes, adits
and shafts.
• In 2003 and 2008, bat gates and grates, foam closures, and fences were
installed to address public safety concerns.
• Increasing vandalism/trespassing by mineral collectors prompted Teck to
begin planning for further reclamation.
• In 2011, Teck initiated a reclamation program that included:
Demolishing and removing site equipment and infrastructure
Re-grading and contouring the former mine pad, dump, and roads
• Annual inspections observed areas of poor re-vegetation; initiated
additional seeding in 2014.
• Operation and maintenance activities are conducted as needed.
Apex Mine Reclamation
66666
2003 and 2008 Reclamation Activities
Hazard Mitigation (Shaft Barricading)
Apex Mine Reclamation
88888
2011 Reclamation Activities
Hazard Mitigation (Portal Barricading)
1616161616
September 2011 November 2011
Apex Mine Reclamation