Appendix 11: Planning Maps Mauao Base Track Remediation Project | Application for Resource Consent and Assessment of Environmental Effects Appendix 11: Planning Maps
Transcript
  • Appendix 11: Planning Maps

    Mauao Base Track Remediation Project | Application for Resource Consent and Assessment of Environmental Effects

    Appendix 11: Planning Maps

  • MAUAO BASE TRACK REMEDIATION

    BOP Regional Natural Resources PlanDate: 25 June 2018 | Revision: C

    Plan prepared for Tauranga City Council by Boffa Miskell LimitedProject Manager: [email protected] | Drawn: JWa | Checked: SGrwww.boffamiskell.co.nz

    File Ref: T17136_01_MHWSBuffer_RevC.mxd

    0 40 m

    1:1,000 @ A3

    Projection: NZGD 2000 New Zealand Transverse MercatorData Sources: Lysaghts Ltd, GHD Ltd, Tauranga City Council.

    °This plan has been prepared by Boffa Miskell Limited on thespecific instructions of our Client. It is solely for our Clients usein accordance with the agreed scope of work. Any use orreliance by a third party is at that partys own risk. Whereinformation has been supplied by the Client or obtained fromother external sources, it has been assumed that it is accurate.No liability or responsibility is accepted by Boffa MiskellLimited for any errors or omissions to the extent that theyarise from inaccurate information provided by the Client orany external source.

    Lege

    nd

    Natural Spring

    Natural Spring

    Mean High Water Springs [TCC CP]Slope >35° - approximate

    Existing Temporary TrackExisting Track Alignment

    MHWS 40 metre offsetMHWS 20 metre offsetProposed Base Track Alignment

    Proposed Boardwalk AlignmentProposed Corridor

  • MAUAO BASE TRACK REMEDIATION

    Proposed BOP Regional Coastal Environment PlanDate: 25 June 2018 | Revision: C

    Plan prepared for Tauranga City Council by Boffa Miskell LimitedProject Manager: [email protected] | Drawn: JWa | Checked: SGrwww.boffamiskell.co.nz

    File Ref: T17136_02_RPSLayers_RevC.mxd

    0 40 m

    1:1,000 @ A3

    Projection: NZGD 2000 New Zealand Transverse Mercator

    Data Sources: Lysaghts Ltd, GHD Ltd, Tauranga City Council,Bay of Plenty Regional Council.

    °This plan has been prepared by Boffa Miskell Limited on thespecific instructions of our Client. It is solely for our Clients usein accordance with the agreed scope of work. Any use orreliance by a third party is at that partys own risk. Whereinformation has been supplied by the Client or obtained fromother external sources, it has been assumed that it is accurate.No liability or responsibility is accepted by Boffa MiskellLimited for any errors or omissions to the extent that theyarise from inaccurate information provided by the Client orany external source.

    Proposed Base Track Alignment

    Proposed Boardwalk Alignment

    Proposed Corridor

    Existing Temporary Track

    Existing Track Alignment

    Historic Heritage Inventory Coastal (Proposed)

    Area Occupied by Port of Tauranga (Proposed)

    Areas of Significant Cultural Value (Proposed)

    Coastal Environment Zone (Proposed)

    Harbour Development Zone (Proposed)

    Indigenous Biological Diversity Area A (Proposed)

    Indigenous Biological Diversity Area B (Proposed)

    Mooring Area (Proposed)

    (ONFL) Outstanding Natural Features and Landscapes (Proposed)

    Personal Water Craft Area

    Tauranga Port Zone (Proposed)

  • ")

    ")")Kinonui Pa

    Waipatukakahu

    Kinonui

    MAUAO BASE TRACK REMEDIATION

    Tauranga City PlanDate: 25 June 2018 | Revision: C

    Plan prepared for Tauranga City Council by Boffa Miskell LimitedProject Manager: [email protected] | Drawn: JWa | Checked: SGrwww.boffamiskell.co.nz

    File Ref: T17136_04_TCCLayers_RevC.mxd

    0 40 m

    1:1,500 @ A3

    Projection: NZGD 2000 New Zealand Transverse Mercator

    Data Sources: Lysaghts Ltd, GHD Ltd, Tauranga City Council,Bay of Plenty Regional Council.

    °This plan has been prepared by Boffa Miskell Limited on thespecific instructions of our Client. It is solely for our Clients usein accordance with the agreed scope of work. Any use orreliance by a third party is at that partys own risk. Whereinformation has been supplied by the Client or obtained fromother external sources, it has been assumed that it is accurate.No liability or responsibility is accepted by Boffa MiskellLimited for any errors or omissions to the extent that theyarise from inaccurate information provided by the Client orany external source.

    Proposed Base Track AlignmentRecorded Archaeological SiteHistoric Place [NZHPT]

    Proposed Boardwalk AlignmentProposed CorridorSignificant Archaelogical AreasSignificant Maori AreasOutstanding Natural Features And Landscapes Plan AreaImportant Amenity Landscapes Plan AreaSpecial Ecological Area Category 1Special Ecological Area Category 2Conservation Zone

  • Appendix 12: Annotated Planning Maps

    Mauao Base Track Remediation Project | Application for Resource Consent and Assessment of Environmental Effects

    Appendix 12: Annotated Planning Maps

  • MAUAO BASE TRACK REMEDIATION

    BOP Regional Natural Resources Plan with Rule AnnotationsDate: 12 July 2018 | Revision: 0

    Plan prepared for Tauranga City Council by Boffa Miskell LimitedProject Manager: [email protected] | Drawn: JWa | Checked: SGrwww.boffamiskell.co.nz

    File Ref: T17136_08_BOPRegNatRes_Anno.mxd

    0 40 m

    1:1,000 @ A3

    Projection: NZGD 2000 New Zealand Transverse MercatorData Sources: Lysaghts Ltd, GHD Ltd, Tauranga City Council.

    °This plan has been prepared by Boffa Miskell Limited on thespecific instructions of our Client. It is solely for our Clients usein accordance with the agreed scope of work. Any use orreliance by a third party is at that partys own risk. Whereinformation has been supplied by the Client or obtained fromother external sources, it has been assumed that it is accurate.No liability or responsibility is accepted by Boffa MiskellLimited for any errors or omissions to the extent that theyarise from inaccurate information provided by the Client orany external source.

    Lege

    nd

    Natural Spring

    Natural Spring

    Mean High Water Springs [TCC CP]

    Slope >35° - approximate

    Existing Temporary TrackExisting Track Alignment

    MHWS 40 metre offsetMHWS 20 metre offset

    Proposed Base Track AlignmentProposed Boardwalk AlignmentProposed Corridor

    LM R4 Rule 1C - Discretionary

    LM R4 Rule 2C - Discretionary

  • MAUAO BASE TRACK REMEDIATION

    Proposed BOP Regional Coastal Environme nt Plan w ith Rule AnnotationsDate: 12 July 2018 | Revision: 0

    Plan pre pared for Tauranga City Council by Boffa Misk e ll LimitedProject Manager: [email protected] | Drawn: JWa | Checked: SGrw w w.boffamisk e ll.co.nz

    File Ref: T17136_09_PropBOPRCEP_Anno.mxd

    0 40m

    1:1,000@ A3

    Projection:NZGD 2000 Ne w Zealand T ransve rse Me rcator

    Data Sources: Ly saghts Ltd, GHD Ltd, Tauranga City Council,Bay of Ple nty Regional Council.

    °T his plan has be e n pre pared by Boffa Misk e ll Limited on thespecific instructions of our Clie nt. It is sole ly for our Clie nts usein accordance w ith the agre ed scope of w ork. Any use orre liance by a third party is at that party s ow n risk. Whe reinformation has be e n supplie d by the Clie nt or obtained fromothe r exte rnal source s, it has be e n assumed that it is accurate.No liability or re sponsibility is acce pted by Boffa Misk e llLimited for any e rrors or omissions to the exte nt that the yarise from inaccurate information provided by the Clie nt orany exte rnal source.

    Propose dBase T rack Alignme nt

    Propose dBoardw alk Alignme nt

    Propose dCorridor

    ExistingT e mporary T rack

    ExistingT rack Alignme nt

    HistoricHe ritage Inve ntory Coastal (Propose d)

    AreaOccupie dby Portof T auranga(Propose d)

    Areasof SignificantCultural Value (Propose d)

    Coastal Environme ntZone (Propose d)

    HarbourDeve lopme ntZone (Propose d)

    Indige nousBiological Dive rsity Are aA(Propose d)

    Indige nousBiological Dive rsity Are aB(Propose d)

    MooringAre a(Propose d)

    (ONFL)OutstandingNatural Feature sandLandscape s(Propose d)

    Pe rsonal Wate rCraftAre a

    TaurangaPortZone (Propose d)

    Rule CD8 - Discretionary

    Rule PZ 10 – Discretionary

    Rule SO11 - Discretionary, Rule DD14 - Discretionary, Rule RM2 - Discretionary

  • ")

    ")")Kinonui Pa

    Waipatukakahu

    Kinonui

    MAUAO BASE TRACK REMEDIATION

    Tauranga City Plan with Rule Annotations - Rule 4C.5(c)Date: 12 July 2018 | Revision: 0

    Plan prepared for Tauranga City Council by Boffa Miskell LimitedProject Manager: [email protected] | Drawn: JWa | Checked: SGrwww.boffamiskell.co.nz

    File Ref: T17136_10_TCCCP_Rule4C_Anno.mxd

    0 40 m

    1:1,500 @ A3

    Projection: NZGD 2000 New Zealand Transverse Mercator

    Data Sources: Lysaghts Ltd, GHD Ltd, Tauranga City Council,Bay of Plenty Regional Council.

    °This plan has been prepared by Boffa Miskell Limited on thespecific instructions of our Client. It is solely for our Clients usein accordance with the agreed scope of work. Any use orreliance by a third party is at that partys own risk. Whereinformation has been supplied by the Client or obtained fromother external sources, it has been assumed that it is accurate.No liability or responsibility is accepted by Boffa MiskellLimited for any errors or omissions to the extent that theyarise from inaccurate information provided by the Client orany external source.

    Proposed Base Track AlignmentRecorded Archaeological SiteHistoric Place [NZHPT]

    Proposed Boardwalk AlignmentProposed CorridorSignificant Archaelogical AreasSignificant Maori AreasOutstanding Natural Features And Landscapes Plan AreaImportant Amenity Landscapes Plan AreaSpecial Ecological Area Category 1Special Ecological Area Category 2Conservation Zone

    Rule 4C.5(c) - Non-complying

  • ")

    ")")Kinonui Pa

    Waipatukakahu

    Kinonui

    MAUAO BASE TRACK REMEDIATION

    Tauranga City Plan with Rule Annotations - Rule 5A.6(b)Date: 12 July 2018 | Revision: 0

    Plan prepared for Tauranga City Council by Boffa Miskell LimitedProject Manager: [email protected] | Drawn: JWa | Checked: SGrwww.boffamiskell.co.nz

    File Ref: T17136_10_TCCCP_Rule5A_Anno.mxd

    0 40 m

    1:1,500 @ A3

    Projection: NZGD 2000 New Zealand Transverse Mercator

    Data Sources: Lysaghts Ltd, GHD Ltd, Tauranga City Council,Bay of Plenty Regional Council.

    °This plan has been prepared by Boffa Miskell Limited on thespecific instructions of our Client. It is solely for our Clients usein accordance with the agreed scope of work. Any use orreliance by a third party is at that partys own risk. Whereinformation has been supplied by the Client or obtained fromother external sources, it has been assumed that it is accurate.No liability or responsibility is accepted by Boffa MiskellLimited for any errors or omissions to the extent that theyarise from inaccurate information provided by the Client orany external source.

    Proposed Base Track AlignmentRecorded Archaeological SiteHistoric Place [NZHPT]

    Proposed Boardwalk AlignmentProposed CorridorSignificant Archaelogical AreasSignificant Maori AreasOutstanding Natural Features And Landscapes Plan AreaImportant Amenity Landscapes Plan AreaSpecial Ecological Area Category 1Special Ecological Area Category 2Conservation Zone

    Rule 5A.6(b) - Restricted Discretionary

  • ")

    ")")Kinonui Pa

    Waipatukakahu

    Kinonui

    MAUAO BASE TRACK REMEDIATION

    Tauranga City Plan with Rule Annotations - Rule 6A.4(b)Date: 12 July 2018 | Revision: 0

    Plan prepared for Tauranga City Council by Boffa Miskell LimitedProject Manager: [email protected] | Drawn: JWa | Checked: SGrwww.boffamiskell.co.nz

    File Ref: T17136_10_TCCCP_Rule6A_Anno.mxd

    0 40 m

    1:1,500 @ A3

    Projection: NZGD 2000 New Zealand Transverse Mercator

    Data Sources: Lysaghts Ltd, GHD Ltd, Tauranga City Council,Bay of Plenty Regional Council.

    °This plan has been prepared by Boffa Miskell Limited on thespecific instructions of our Client. It is solely for our Clients usein accordance with the agreed scope of work. Any use orreliance by a third party is at that partys own risk. Whereinformation has been supplied by the Client or obtained fromother external sources, it has been assumed that it is accurate.No liability or responsibility is accepted by Boffa MiskellLimited for any errors or omissions to the extent that theyarise from inaccurate information provided by the Client orany external source.

    Proposed Base Track AlignmentRecorded Archaeological SiteHistoric Place [NZHPT]

    Proposed Boardwalk AlignmentProposed CorridorSignificant Archaelogical AreasSignificant Maori AreasOutstanding Natural Features And Landscapes Plan AreaImportant Amenity Landscapes Plan AreaSpecial Ecological Area Category 1Special Ecological Area Category 2Conservation Zone

    Rule 6A.4(b) - Restricted Discretionary

  • ")

    ")")Kinonui Pa

    Waipatukakahu

    Kinonui

    MAUAO BASE TRACK REMEDIATION

    Tauranga City Plan with Rule Annotations - Rule 7C.7(b)Date: 12 July 2018 | Revision: 0

    Plan prepared for Tauranga City Council by Boffa Miskell LimitedProject Manager: [email protected] | Drawn: JWa | Checked: SGrwww.boffamiskell.co.nz

    File Ref: T17136_10_TCCCP_Rule7C_Anno.mxd

    0 40 m

    1:1,500 @ A3

    Projection: NZGD 2000 New Zealand Transverse Mercator

    Data Sources: Lysaghts Ltd, GHD Ltd, Tauranga City Council,Bay of Plenty Regional Council.

    °This plan has been prepared by Boffa Miskell Limited on thespecific instructions of our Client. It is solely for our Clients usein accordance with the agreed scope of work. Any use orreliance by a third party is at that partys own risk. Whereinformation has been supplied by the Client or obtained fromother external sources, it has been assumed that it is accurate.No liability or responsibility is accepted by Boffa MiskellLimited for any errors or omissions to the extent that theyarise from inaccurate information provided by the Client orany external source.

    Proposed Base Track AlignmentRecorded Archaeological SiteHistoric Place [NZHPT]

    Proposed Boardwalk AlignmentProposed CorridorSignificant Archaelogical AreasSignificant Maori AreasOutstanding Natural Features And Landscapes Plan AreaImportant Amenity Landscapes Plan AreaSpecial Ecological Area Category 1Special Ecological Area Category 2Conservation Zone

    Rule 7C.7(b) - Restricted Discretionary

  • ")

    ")")Kinonui Pa

    Waipatukakahu

    Kinonui

    MAUAO BASE TRACK REMEDIATION

    Tauranga City Plan with Rule Annotations - Rule 7E.4(a)Date: 12 July 2018 | Revision: 0

    Plan prepared for Tauranga City Council by Boffa Miskell LimitedProject Manager: [email protected] | Drawn: JWa | Checked: SGrwww.boffamiskell.co.nz

    File Ref: T17136_10_TCCCP_Rule7E_Anno.mxd

    0 40 m

    1:1,500 @ A3

    Projection: NZGD 2000 New Zealand Transverse Mercator

    Data Sources: Lysaghts Ltd, GHD Ltd, Tauranga City Council,Bay of Plenty Regional Council.

    °This plan has been prepared by Boffa Miskell Limited on thespecific instructions of our Client. It is solely for our Clients usein accordance with the agreed scope of work. Any use orreliance by a third party is at that partys own risk. Whereinformation has been supplied by the Client or obtained fromother external sources, it has been assumed that it is accurate.No liability or responsibility is accepted by Boffa MiskellLimited for any errors or omissions to the extent that theyarise from inaccurate information provided by the Client orany external source.

    Proposed Base Track AlignmentRecorded Archaeological SiteHistoric Place [NZHPT]

    Proposed Boardwalk AlignmentProposed CorridorSignificant Archaelogical AreasSignificant Maori AreasOutstanding Natural Features And Landscapes Plan AreaImportant Amenity Landscapes Plan AreaSpecial Ecological Area Category 1Special Ecological Area Category 2Conservation Zone

    Rule 7E.4(a) - Restricted Discretionary


Recommended