Appendix 3 Boundary and environmental maps for each pilot area
1. Alt Crossens2. Bottesford Beck3. River Brue4. Duckow5. East Lytham6. River Eau7. Isle of Axholme and River Idle8. Upper Thames9. Winestead Drain
LIT 10354
Alt Crossens River Maintenance Pilot Area Environmental Requirements
Protected Sites & Associated Buffers
Scheduled Monument
Scheduled Monument buffer
Special Protection Area
Special Protection Area buffer
Special Area of Conservation
Special Area of Conservation buffer
Site of Special Scientific Interest
Site of Special Scientific Interest buffer
Local Nature Reserve
Local Nature Reserve buffer
0 1 2 3 4
Kilometers-
Ribble Estuary SSSI & NNR
Ainsdale Sand Dunes NNR
Cabin Hill NNR
Mere Sands Wood SSSI
Martin Mere SPA,Ramsar & SSSI
Ribble and Alt EstuariesSPA and Ramsar
Hesketh Golf Links SSSI
Sefton Coast SAC & SSSI
buffer forMersey Narrows SSSI
Downholland Moss SSSI
The main rivers in this Pilot Area are classifiedas cyprinid rivers. De-silting must not be carriedout between 15 March and 15 June.
If you want to discuss further please contact your pilot lead.
If you wish to undertake works within a protected site or its bufferarea, or a Water Framework Directive sensitive area, you will needto apply for Flood Defence Consent.Please contact your pilot lead.
LegendMain RiverWFD Sensitive Area
0 0.5 1 1.5 2
Kilometers
Bottesford Beck River Maintenance Pilot Area Environmental Requirements
-Manton &Twigmoor SSSIbuffer for
MessinghamSand Quarry SSSI
Risby Warren SSSI
The main rivers in this Pilot Area are classifiedas cyprinid rivers. De-silting must not be carriedout between 15 March and 15 June.
If you want to discuss further please contactyour pilot lead.
If you wish to undertake workswithin a protected site or its bufferarea, or a Water FrameworkDirective sensitive area,you will need to apply for Flood Defence Consent.
Please contact your pilot lead.
buffer for Messingham Heath SSSI
Protected Sites & Associated Buffers
Scheduled Monument
Scheduled Monument buffer
Site of Special Scientific Interest
Site of Special Scientific Interest buffer
Local Nature Reserve
Local Nature Reserve buffer
Legend
Main River
Water Framework Directive Sensitive Area
0 1 2 3
Kilometers
River Brue River Maintenance Pilot Area Environmental Requirements
Protected Sites & Associated BuffersScheduled Monument
Scheduled Monument buffer
Special Protection Area buffer
Special Protection Area
Site of Special Scientific Interest
Site of Special Scientific Interest buffer
National Nature Reserve
National Nature Reserve buffer
-
Somerset Levels and MoorsSPA, Ramsar & NNR
Street Heath SSSI buffer
Ham Wall NNR buffer
Please be aware that the main rivers in this Pilot Area are classified as cyprinid rivers.De-silting must not be carried out between15 March and 15 June.If you want to discuss further pleasecontact your pilot lead.
If you wish to undertake works withina protected site or its buffer area or aWater Framework Directive sensitivearea you will need to apply for FloodDefence Consent.
Please contact your pilot lead.
LegendMain River
Water Framework Directive Sensitive Area
0 0.5 1 1.5 2
Kilometers
Duckow River Maintenance Pilot Area Environmental Requirements
Protected Sites & Associated Buffers
Scheduled Monument
Scheduled Monument buffer
-
If you wish to undertake workswithin a protected site or its bufferarea, you will need to apply forFlood Defence Consent.
Please contact your pilot lead.
NB There have been no stretchescurrently identified as requiring aFlood Defence Consent for WaterFramework Directive concerns.
LegendMain River
The main rivers in this Pilot Area are classifiedas cyprinid rivers. De-silting must not be carriedout between 15 March and 15 June.
If you want to discuss further please contact your pilot lead.
0 0.4 0.8 1.2 1.6
Kilometers
East Lytham River Maintenance Pilot Area Environmental Requirements
-
Lytham Coastal Changes SSSI
The main rivers in this Pilot Area are classifiedas cyprinid rivers. De-silting must not be carriedout between 15 March and 15 June.
If you want to discuss further please contactyour pilot lead.
If you wish to undertake workswithin a protected site or its bufferarea, or a Water FrameworkDirective sensitive area,you will need to apply for Flood Defence Consent.
Please contact your pilot lead.
Protected Sites & Associated Buffers
Special Protection Area
Special Protection Area buffer
Site of Special Scientific Interest
Site of Special Scientific Interest buffer
Legend
Main River
Lytham St Annes Dunes SSSI buffer
Lytham Coastal Changes SSSI
Ribble & Alt Estuaries SPA buffer
Ribble & Alt Estuaries SPA buffer
0 0.5 1 1.5 2
Kilometers
River Eau River Maintenance Pilot Area Environmental Requirements
-
Manton &Twigmoor SSSI
MessinghamSand Quarry SSSI
Tuetoes Hills SSSI
The main rivers in this Pilot Area are classifiedas cyprinid rivers. De-silting must not be carriedout between 15 March and 15 June.
If you want to discuss further please contactyour pilot lead.
If you wish to undertake workswithin a protected site or its bufferarea, or a Water FrameworkDirective sensitive area,you will need to apply for Flood Defence Consent.
Please contact your pilot lead.
Messingham Heath SSSI
Protected Sites & Associated Buffers
Scheduled Monument
Scheduled Monument buffer
Site of Special Scientific Interest
Site of Special Scientific Interest buffer
EAU_Polygon
Legend
Main River
EAU_Polygon
Scotton & LaughtonForest Ponds SSSI
Scotton Common SSSI
Scotton Beck Fields SSSI
Manton Stone Quarry SSSI
Cleatham Quarry SSSI buffer
Cliff Farm Pit SSSI buffer
0 1 2 3 4
Kilometers
Isle of Axholme & River Idle Maintenance Pilot Area Environmental Requirements
-
Misson TrainingArea SSSI
Haxey GrangeFen SSSI
Mother Drain,Misterton SSSI
ChesterfieldCanal SSSI
Sutton & LoundGravel Pits SSSI
Mattersey HillMarsh SSSI buffer
Scrooby TopQuarry SSSI buffer
Barrow HillsSandpit SSSI
Misson LineBank SSSI
If you wish to undertake works within a protected site or its bufferarea you will need to apply for Flood Defence Consent.Please contact your pilot lead.
NB There are no stretches currently identified as requiring a Flood Defence Consent for Water Framework Directive concerns.
The main rivers in this Pilot Area are classified as cyprinid rivers.De-silting must not be carried out between 15 March and 15 June.
If you want to discuss further please contact your pilot lead.
Protected Sites & Associated BuffersScheduled Monument
Scheduled Monument buffer
Special Protection Area
Special Protection Area buffer
Special Area of Conservation
Special Area of Conservation buffer
Site of Special Scientific Interest
Site of Special Scientific Interest buffer
National Nature Reserve
National Nature Reserve buffer
Local Nature Reserve
Local Nature Reserve buffer
LegendMain River
River Idle Washlands SSSI
Humberhead Peatlands NNR
Thorne Moor SPA & SAC andThorne, Crowle & Goole Moors SSSI
Humber Estuary SAC
Hatfield Moor SPA, SAC & SSSI
Edlington Wood SSSI
Potteric Carr SSSI
Sandall Beat SSSI
Maltby Low Common SSSI buffer
Wood Lee Common SSSI buffer
Styrrup Quarry SSSI
Hewson's Field SSSI
Rush Furlong SSSI
Haxey Turbary SSSI
Epworth Turbary SSSI
Hatfield Chase Ditches SSSI
0 0.5 1 1.5 2
Kilometers
Upper Thames River Maintenance Pilot Area Environmental Requirements
Protected Sites & Associated Buffers
Scheduled Monument
Scheduled monument buffer
Site of Special Scientific Interest
Site of Special Scientific Interest buffer
-
Chimney MeadowsSSSI & NNR
Grafton LockMeadow SSSI
The main rivers in this Pilot Area are classified as cyprinidrivers. De-silting must not be carried out between 15 Marchand 15 June.
If you want to discuss further please contact the pilot lead.
If you wish to undertake works within a protected site, itsbuffer area, or a Water Framework Directive sensitive area,you will need to apply for Flood Defence Consent.
Please contact the pilot lead.
LegendMain RiverWater Framework Directive Sensitive Area
0 0.5 1 1.5 2
Kilometers
Winestead Drain River Maintenance Pilot Area Environmental Requirements
Protected Sites & Associated Buffers
Scheduled Monument
Scheduled Monument buffer
Special Protection Area
Special Protection Area buffer
-Humber Estuary SAC,SPA, Ramsar & SSSI
If you wish to undertake workswithin a protected site, its buffer area, you will need to applyfor Flood Defence Consent.Please contact your pilot lead.NB There have been no stretchescurrently identified as requiring aFlood Defence Consent for WaterFramework Directive concerns.
The main rivers in this Pilot Area are classifiedas cyprinid rivers. De-silting must not be carriedout between 15 March and 15 June.If you want to discuss further please contactyour pilot lead.
LegendMain River