+ All Categories
Home > Documents > Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS...

Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS...

Date post: 13-Aug-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
33
Appendix 4 - Value management report (Part 3 long-term study)
Transcript
Page 1: Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS introduced the workshop and affirmed the purpose of the workshop and the project objectives

Appendix 4 - Value management report (Part 3 long-term study)

Page 2: Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS introduced the workshop and affirmed the purpose of the workshop and the project objectives
Page 3: Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS introduced the workshop and affirmed the purpose of the workshop and the project objectives

R

ICH

MO

ND

BR

IDG

E A

ND

AP

PR

OA

CH

ES

CO

NG

ES

TIO

N S

TU

DY

LO

NG

TE

RM

OP

TIO

NS

AS

SE

SS

ME

NT

V

AL

UE

MA

NA

GE

ME

NT

WO

RK

SH

OP

RE

PO

RT

24 O

CT

OB

ER

201

2

Page 4: Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS introduced the workshop and affirmed the purpose of the workshop and the project objectives

A

BN

36

082

506

171

Pre

pare

d b

y:-

T

he A

ustr

alia

n C

en

tre F

or

Valu

e M

an

agem

ent

55 A

lbio

n S

treet

Surr

y H

ills N

SW

2010 A

ustr

alia

P

.O. B

ox 1

598

Str

aw

berr

y H

ills

NS

W 2012 A

ustr

alia

T

el (6

1 2

) 92

11 6

48

8

Fax (

61 2

) 9

211 6

499

acvm

@acvm

.com

.au

Page 5: Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS introduced the workshop and affirmed the purpose of the workshop and the project objectives

Ta

ble

of

Co

nte

nts

BA

CK

GR

OU

ND

1

TH

E S

TU

DY

AR

EA

2

INF

OR

MA

TIO

N P

HA

SE

3

CO

MM

UN

ITY

FE

ED

BA

CK

3

CO

MM

UN

ITY

PE

RS

PE

CT

IVE

S

3

VA

LU

E F

AC

TO

RS

5

RIC

HM

ON

D B

RID

GE

& A

PP

RO

AC

HE

S V

AL

UE

FA

CT

OR

S 6

P

RO

JEC

T O

BJE

CT

IVE

S

6

PU

RP

OSE

(S)

6

INT

EN

DE

D /

EX

PE

CT

ED

BE

NE

FIT

S

7

IMP

OR

TA

NT

ASP

EC

TS

7

OP

TIO

NS

ASS

ESS

ME

NT

8

W

OR

KSH

OP

RE

CO

MM

EN

DA

TIO

N

8

KE

Y A

CT

ION

S A

RIS

ING

9

AP

PE

ND

IX 1

: WO

RK

SH

OP

PA

RT

ICIP

AN

TS

1

0

WO

RK

SHO

P F

AC

ILIT

AT

OR

1

0

INV

ITE

D B

UT

UN

AB

LE

TO

AT

TE

ND

: 1

1

AP

PE

ND

IX 2

: OP

TIO

NS

AS

SE

SS

ME

NT

CO

MM

EN

TS

1

2

AP

PE

ND

IX 3

: BA

CK

GR

OU

ND

IN

FO

RM

AT

ION

& T

HE

PR

INC

IPA

L O

PT

ION

S

19

OP

TIO

N A

2

5

OP

TIO

N B

2

6

OP

TIO

N C

2

7

OP

TIO

N D

2

8

Page 6: Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS introduced the workshop and affirmed the purpose of the workshop and the project objectives

Ric

hm

on

d B

rid

ge a

nd

Ap

pro

ach

es C

on

ge

sti

on

Stu

dy –

Lo

ng

term

op

tio

ns

assessm

en

t V

alu

e M

an

ag

em

en

t W

ork

sh

op

Rep

ort

- 2

4 O

cto

be

r 2

012

P

ag

e 1

Ba

ck

gro

un

d

The to

wnsh

ip of

Ric

hm

ond is

appro

xim

ate

ly 6

5km

w

est

of

the S

ydn

ey

CB

D.

At

Ric

hm

ond,

the R

ichm

ond B

ridge c

rosses t

he H

aw

kesbury

Riv

er

connecting B

ells

Lin

e o

f R

oad to

the

west

with K

urr

ajo

ng R

oad t

o th

e e

ast.

Urb

an

expansio

n

an

d

lan

d

use

ch

ang

es

in

nort

h-w

este

rn

Syd

ne

y

are

contr

ibu

ting to

in

cre

ased tr

aff

ic volu

mes on th

e exis

ting ro

ad netw

ork

, especia

lly b

etw

een R

ichm

ond a

nd N

ort

h R

ichm

ond a

nd a

t pre

se

nt

there

is

insuff

icie

nt

ca

pacity f

or

the

brid

ge a

nd

its

ap

pro

aches t

o c

ope w

ith t

raff

ic

congestion duri

ng p

eak periods.

A

s a re

sult,

duri

ng th

e m

orn

ing and

aft

ern

oon

peak

perio

ds,

Ric

hm

ond

Brid

ge

and

the

appro

ach

roa

ds

betw

een

G

ross

Va

le

Roa

d

an

d

East

Mark

et

Str

ee

t experi

ence

tr

aff

ic

congestion.

The l

evel

of

serv

ice a

long t

his

section o

f R

ichm

ond B

ridg

e

and its

ap

pro

ach r

oads is w

ell

belo

w t

he e

xpecte

d le

ve

l fo

r ro

ads o

f sim

ilar

cla

ssific

ation

in

Syd

ne

y.

To a

ssess t

his

issue a

nd t

o u

ndert

ake a

pro

cess o

f options d

evelo

pm

ent

a

feasib

ility

stu

dy h

as c

om

menced.

The f

easib

ility

stu

dy i

s f

unded b

y t

he

F

edera

l G

overn

ment

an

d

managed

by

Roads

an

d

Mari

tim

e

Serv

ices

(RM

S)

with S

ME

C p

rovid

ing c

onsultancy s

erv

ices a

nd

ad

vic

e.

The p

urp

ose o

f th

is s

tud

y i

s t

o u

nd

ert

ake i

nvestig

ations fo

r lo

ng

er-

term

solu

tions t

o a

ddre

ss c

onge

stion.

The o

vera

ll pro

ject obje

ctives a

re:

1.

Define t

he r

oa

d c

orr

idor

be

tween R

ichm

ond a

nd N

ort

h R

ichm

ond t

hat

is r

equ

ired t

o b

e r

eserv

ed f

or

the p

refe

rre

d o

ptio

n.

2.

Main

tain

the o

pera

tio

ns o

f R

ichm

ond B

ridge

& i

ts a

ppro

aches d

urin

g

constr

uction.

3.

Reduce t

raff

ic c

ongestion

to a

n a

ccepta

ble

le

vel

for

this

cla

ssific

ation

of

road.

4.

Main

tain

and im

pro

ve a

cce

ssib

ility

to a

nd

acro

ss R

ich

mond B

ridg

e.

5.

Min

imis

e a

ny e

nviro

nm

enta

l im

pact alo

ng t

he r

oute

. 6.

Impro

ve s

afe

ty f

or

all

road

users

. 7.

Min

imis

e the p

roje

ct “w

hole

of

life c

ost”

.

Short

-term

str

ate

gie

s are

als

o b

ein

g d

evelo

pe

d as part

of

the stu

dy in

re

sponse

to

str

ong

com

munity

concern

s

that

an

y

exte

nd

ed

dela

y

in

imple

me

nting

a

long

-term

solu

tion

mig

ht

see

the

traff

ic

congestion

accentu

ate

d, cre

ating a

less s

afe

road s

itua

tion d

urin

g p

eak tim

es.

A

varie

ty

of

options

were

consid

ere

d

to

incre

ase

the

cap

acity

of

the

exis

tin

g r

oad n

etw

ork

and inte

rsectio

ns in o

rder

to s

ele

ct

a c

orr

idor

for

the

futu

re

road

and

bri

dg

e

work

s

that

wo

uld

be

necessary

to

achie

ve

an

accepta

ble

le

ve

l of

functio

nalit

y –

especia

lly d

urin

g p

eak p

eriods.

These

have b

een r

efined t

o e

sta

blis

h f

our

(4)

princip

al lo

ng

-te

rm o

ptions:-

Wid

enin

g o

f th

e e

xis

tin

g b

ridge inclu

din

g p

ossib

le c

ontr

a f

low

optio

ns.

Constr

uction o

f a n

ew

tw

o lane b

rid

ge a

dja

cent to

th

e e

xis

tin

g b

ridge

Constr

uction o

f a n

ew

tw

o lane n

ew

brid

ge (

1 in 5

year

flood e

ve

nt)

.

Constr

uction o

f a n

ew

tw

o lane n

ew

brid

ge (

1 in 2

0 y

ear

flood e

ve

nt)

.

These w

ere

recently e

xh

ibited f

or

com

munity c

om

ment

until

17 O

cto

ber

2012

. C

om

munity s

ubm

issio

ns w

ill b

e inclu

ded i

n t

he s

tud

y r

ep

ort

and i

ts

recom

mendatio

ns.

An i

mport

ant

com

ponent

of

the s

tud

y r

eport

is t

he q

ualit

ative a

ssessm

ent

of

these p

rincip

al

options in

ord

er

to dete

rmin

e i

f a p

refe

rred l

ong

-term

option fo

r th

e ro

ad

corr

ido

r can b

e se

lecte

d.

A

sta

kehold

er

work

shop,

inclu

din

g c

om

munity r

epre

senta

tion w

as d

ete

rmin

ed a

s t

he b

est

means t

o

undert

ake

this

qualit

ative

assessm

ent.

A

Valu

e

Manag

em

ent

Revie

w

Work

shop w

as t

here

fore

held

at

the S

ebel

Resort

an

d S

pa a

t W

indsor

on

24 O

cto

ber

20

12.

The lis

t of

part

icip

ants

is inclu

de

d a

t A

pp

en

dix

1.

The

agre

ed w

ork

shop p

urp

ose w

as to:

To a

ssess t

he p

rincip

al

long

-term

options f

or

futu

re i

mpro

vem

ent

to

the

Ric

hm

ond

Brid

ge

and

ap

pro

ach

es

capacity

and,

if

appro

priate

, to

re

com

mend

a

pre

ferr

ed

option

for

deta

iled

pla

nnin

g.

The w

ork

shop m

eth

odolo

gy i

nvolv

ed t

he c

onsultant

team

giv

ing a

brief

pre

senta

tion o

f th

e p

roje

ct

conte

xt

and o

f th

e p

rincip

al

long-

term

options.

Part

icip

an

ts w

ere

ab

le t

o s

eek c

larifications s

o t

hat

a s

hare

d a

ppre

cia

tio

n w

as d

evelo

pe

d a

bout

each o

f th

e o

ptio

ns.

A dra

ft s

et

of

assessm

ent

crite

ria w

as r

evie

we

d a

nd w

ith s

om

e

min

or

adju

stm

ents

was a

do

pte

d f

or

the a

ssessm

ent pro

cess.

These

are

in

clu

ded

at

Ap

pen

dix

2

to

geth

er

with

the

work

shop

assessm

ent com

ments

and r

ela

tive r

atings.

Page 7: Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS introduced the workshop and affirmed the purpose of the workshop and the project objectives

Ric

hm

on

d B

rid

ge a

nd

Ap

pro

ach

es C

on

ge

sti

on

Stu

dy

Valu

e M

an

ag

em

en

t R

evie

w L

on

g-t

erm

Op

tio

ns A

ssessm

en

t W

ork

sh

op

– 2

4 O

cto

be

r 2012

P

ag

e 2

Th

e S

tud

y A

rea

Page 8: Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS introduced the workshop and affirmed the purpose of the workshop and the project objectives

Ric

hm

on

d B

rid

ge a

nd

Ap

pro

ach

es C

on

ge

sti

on

Stu

dy

Valu

e M

an

ag

em

en

t R

evie

w L

on

g-t

erm

Op

tio

ns A

ssessm

en

t W

ork

sh

op

– 2

4 O

cto

be

r 2012

P

ag

e 3

Info

rma

tio

n P

ha

se

The part

icip

ants

ha

d b

ee

n pro

vid

ed

w

ith som

e ba

ckgro

und in

form

ation

prior

to t

he w

ork

shop,

but

the o

pport

un

ity w

as g

ive

n t

o w

alk

them

thro

ugh

the p

lannin

g a

nd t

he

princip

al options t

o b

e a

ssessed.

Part

icip

ants

were

ab

le t

o a

sk q

uestions a

nd g

ain

a d

eeper

ap

pre

cia

tio

n o

f each o

ption,

are

as o

f pote

ntia

l be

nefit a

nd im

pacts

.

The

sum

mary

in

form

ation

pre

sente

d

at

the

work

shop

is

inclu

ded

at

Ap

pen

dix

3.

Fio

na

Ch

an o

f R

MS

intr

od

uced t

he w

ork

shop a

nd a

ffirm

ed t

he p

urp

ose o

f th

e w

ork

shop a

nd t

he p

roje

ct

obje

ctives a

nd h

ighlig

hte

d t

he

im

port

ance o

f ta

kin

g i

nto

consid

era

tio

n t

he i

ssues a

nd c

oncern

s o

f th

e c

om

munity and

sta

kehold

ers

.

The c

om

munity f

eedback p

rocess f

or

the e

xhib

ite

d p

lans w

as n

ote

d,

with

subm

issio

ns h

avin

g c

losed o

n 1

7 O

cto

ber

201

2.

Concern

abo

ut

gettin

g s

om

e s

hort

-term

relie

f m

easure

s i

n p

lace w

as a

lso

note

d a

nd t

raff

ic m

odelli

ng

was b

ein

g u

ndert

aken t

o h

elp

in d

ecid

ing h

ow

best

to a

llevia

te c

ong

estio

n

in t

he s

hort

-term

. H

ow

ever,

th

is w

ork

shop

had to

fo

cus on th

e lo

ng

-term

str

ate

gy,

so th

at

an appro

pri

ate

corr

idor

could

b

e dete

rmin

ed and

th

us pro

vid

e

gre

ate

r cert

ain

ty fo

r ro

ads and

tr

aff

ic

pla

nnin

g.

H

avin

g

the

corr

idor

defin

ed

wo

uld

a

lso

assis

t th

e

com

munity i

mple

ment

its d

eve

lopm

ent

and c

ultura

l a

ctivitie

s w

ith g

reate

r cert

ain

ty.

Of

part

icula

r concern

is t

he

tre

atm

ent

of

Yarr

am

undi

Lane a

nd a

part

form

th

e peak w

eekda

y tr

aff

ic th

ere

w

as a

lso th

e sport

ing activitie

s

– b

oth

eve

nin

g

sp

ort

s

tra

inin

g

sessio

ns

as

well

as

weekend

sport

s

and

recre

atio

nal

eve

nts

– w

he

n tr

aff

ic tr

yin

g to

use th

e in

ters

ectio

n acro

ss

Kurr

ajo

ng

Roa

d w

as m

ost pro

ble

matic.

It

was

accepte

d

that

an

y

short

-term

str

ate

gy

must

have

a

work

able

solu

tion f

or

this

inte

rsectio

n.

Tra

nsport

for

NS

W h

ighlig

hte

d t

ha

t th

e o

pp

ort

un

ity f

or

furt

her

com

munity

subm

issio

ns on t

he d

raft

NS

W T

ransport

Maste

rpla

n,

especia

lly on a

ny

short

-term

fix

es r

em

ain

ed o

pen u

ntil 26

Octo

ber

20

12.

Co

mm

un

ity F

ee

db

ac

k

Jacqu

i H

yn

e,

of

Id

Pla

nnin

g

ad

vis

ed

the

work

shop

on

the

com

munity

consulta

tio

n p

rocess a

nd o

utc

om

es t

o d

ate

. I

nfo

rmation s

essio

ns a

s w

ell

as o

n-l

ine

op

port

unitie

s h

ave b

een t

aken u

p.

Som

e 8

0 p

eo

ple

atte

nde

d t

he c

om

munity i

nfo

rmation

sessio

ns a

nd d

rop

-in

s.

A tota

l of

56 s

ubm

issio

ns h

ave

be

en r

ece

ived s

ince J

uly

201

2.

The k

ey m

essages that deri

ve f

rom

all

of

this

feedback s

o f

ar

are

:-

Flo

od

im

munity

Ke

y

inte

rsections

con

gestion

and

safe

ty

(e.g

. Y

arr

am

undi

Lane)

Pro

pert

y im

pacts

Land

use a

nd d

eve

lopm

ent

Pro

ject scope

Tim

efr

am

es a

nd f

undin

g

It w

as n

ote

d t

hat

herita

ge d

id n

ot

com

e t

hro

ugh a

s a

str

ong issue f

rom

the

subm

issio

ns a

nd f

eedb

ack.

Overa

ll com

munity f

eed

back a

bout th

e lo

ng

-term

optio

ns w

as f

or:

-

D

C

B

A

D ist cho

ice

C

2nd c

ho

ice

B

3rd

cho

ice

A

last

Co

mm

un

ity P

ers

pe

cti

ve

s

The c

om

munity r

epre

senta

tives w

ere

asked t

o s

hare

their v

iew

s a

bou

t th

e

stu

dy a

nd

the

pote

ntia

l solu

tions:-

What altern

ative b

y-p

ass o

ptio

ns w

ere

be

ing c

onsid

ere

d b

y R

MS

?

Ho

w f

urt

her

develo

pm

ent

is o

ccurr

ing in N

ort

h R

ichm

ond a

nd o

nto

Gro

se

Vale

Ro

ad.

The im

port

ance o

f ha

vin

g a

n a

ltern

ative b

ridge in t

he e

ven

t of

the e

xis

ting

bridg

e b

ein

g c

ut-

off

.

Page 9: Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS introduced the workshop and affirmed the purpose of the workshop and the project objectives

Ric

hm

on

d B

rid

ge a

nd

Ap

pro

ach

es C

on

ge

sti

on

Stu

dy

Valu

e M

an

ag

em

en

t R

evie

w L

on

g-t

erm

Op

tio

ns A

ssessm

en

t W

ork

sh

op

– 2

4 O

cto

be

r 2012

P

ag

e 4

Cong

estio

n o

n t

he t

wo b

rid

ges a

cro

ss t

he r

iver

in t

his

are

a (

i.e.

Ric

hm

ond

and W

indsor)

usually

occurr

ing a

t th

e s

am

e tim

e is a

seri

ous p

roble

m.

It n

eeds a

glo

ba

l (i

.e.

str

ate

gic

) p

ers

pective a

nd

a t

hir

d b

ridge

to a

llevia

te

the c

on

gestion.

It w

ould

be e

xp

ecte

d t

o r

educe t

he

need f

or

an

y e

xp

end

iture

at

Win

dsor

or

Ric

hm

ond.

If t

he f

ocus o

f th

e s

tud

y i

s just

Ric

hm

ond /

Nort

h R

ich

mond t

hen its

lik

ely

th

at th

e p

roble

ms w

ill b

e e

xacerb

ate

d f

or

the c

om

munitie

s.

The

dem

ogra

phic

s

are

chang

ing

no

lo

ng

er

a

rura

l are

a

as

urb

an

com

mute

rs a

re m

ovin

g into

the

are

a (

especia

lly o

n t

he

weste

rn s

ide o

f th

e

river)

– t

his

is b

ringin

g s

ign

ific

antly h

igher

peak f

low

s t

hro

ug

h th

is c

orr

idor.

Flo

od

im

munity i

s a

lso i

mport

ant

– p

eo

ple

ne

ed t

o b

e a

ble

to g

et

to w

ork

fr

om

the N

ort

h R

ichm

ond s

ide

so f

loo

d f

ree a

ccess is n

eede

d.

The o

bvio

us s

olu

tio

n is t

o h

ave

a b

y-p

ass –

it

wou

ld b

e a

better

long

-term

solu

tion.

Must ha

ve

all

turn

options a

t th

e Y

arr

am

undi R

oad

inte

rsection.

Flo

od

fre

e a

ccess to the

we

st of

the e

xis

ting b

rid

ge is a

lso n

eede

d.

If w

e h

ave n

o g

row

th t

hen

the c

om

munity w

ill s

tag

nate

and d

eclin

e.

D a

nd

C a

re t

he p

refe

rred o

ptio

ns a

mongst th

e c

om

munity.

The loss o

f health f

acili

ties a

t K

urr

ajo

ng w

ill f

orc

e m

ore

tra

ffic

thro

ugh t

he

corr

idor

in s

eek o

f m

edic

al (a

nd o

ther)

serv

ice a

t W

indsor.

There

is f

urt

her

develo

pm

ent

occurr

ing a

nd t

here

will

no d

ou

bt

be m

ore

over

the p

eri

od t

hat th

is s

tud

y is p

lann

ing f

or

(i.e

. up t

o 2

03

6).

Safe

ty is a

co

ncern

with t

he

curr

ent in

ters

ections c

ong

estion

.

Access a

cro

ss the r

iver

duri

ng f

loods

A h

igh l

eve

l of

scepticis

m t

hat

noth

ing

will

happ

en b

ecause t

here

is n

o

mone

y –

so w

hy n

ot

look a

t a b

y-p

ass a

nyw

ay?

Ho

w w

ill t

he c

orr

idor

str

ate

gy i

mpro

ve p

ub

lic t

ransport

– e

specia

lly i

n t

he

morn

ing p

eak p

erio

ds to a

nd f

rom

Nort

h R

ichm

ond.

Intr

oduction

of

more

no

-rig

ht-

turn

s.

The bridg

e itself is

not

the pro

ble

m

– it's

th

e flo

ws to

a

nd fr

om

O

ld

Kurr

ajo

ng

Roa

d a

nd Y

arr

am

undi Lan

e.

A b

y-p

ass c

an h

ave b

en

efits

– b

ut

it w

ou

ld s

erio

usly

reduce e

conom

ic

activity in R

ichm

ond a

nd N

ort

h R

ichm

ond.

Access t

o m

edic

al

serv

ice

s,

especia

lly d

uri

ng f

loo

din

g –

its

oth

erw

ise a

100km

road t

rip t

o g

et

to N

epe

an H

osp

ita

l – w

ith L

ithgo

w t

oo s

mall

to

cope.

Ke

y

facili

ties

that

are

re

lied

upon

duri

ng

flo

od

events

Am

bula

nce

S

tation

, F

ire S

tation

and P

olic

e a

re a

ll lo

ca

ted

on

th

e e

aste

rn s

ide o

f th

e

river

– s

o h

avin

g f

lood f

ree a

ccess is h

igh

ly c

ritica

l.

An

y i

ncre

ased d

eve

lopm

ent, e

sp

ecia

lly h

ousin

g o

n t

he w

este

rn s

ide w

ill

exacerb

ate

tra

vel dem

ands thro

ug

h th

e c

orr

idor.

A b

y-p

ass w

ould

be a

bette

r valu

e s

olu

tio

n.

Whate

ver

ha

pp

ens t

he h

eri

tage issues n

eed t

o b

e s

en

sitiv

ely

addre

ssed

.

Over

investm

ent

in s

hort

-te

rm a

nd w

iden

ing o

f th

e c

orr

idor

and a

dd

ing

a

bridg

e c

rossin

g m

ay,

by t

he t

ime t

he

y a

re f

unde

d a

nd c

onstr

ucte

d,

ha

ve

le

ss t

han 1

5-1

0 y

ears

wort

h o

f usefu

l lif

e –

a b

y-p

ass e

arlie

r w

ou

ld g

ive

better

va

lue

-for-

mone

y.

Flo

od

ing a

nd c

om

munity d

eve

lopm

ent

should

be t

he

focus o

f th

e l

on

g-

term

solu

tio

n – addre

ssin

g congestion an

d in

ters

ection tr

eatm

ents

are

short

er-

term

consid

era

tio

ns.

A t

hird,

floo

d f

ree b

ridg

e a

cro

ss t

he r

iver

is a

lrea

dy c

learl

y e

ssentia

l w

ith

at pre

sen

t th

e o

nly

flo

od f

ree a

ccess b

ein

g t

he b

ridg

e a

t P

enrith

.

The c

om

munity w

ould

be

concern

ed t

hat

solv

ing t

his

congestion t

hro

ugh

one o

f th

ese o

ptions m

ay e

nd u

p d

efe

rrin

g i

nd

efinitely

the b

y-p

ass –

a

better

lon

g-t

erm

solu

tion –

giv

en a

ny f

urt

her

develo

pm

ent

on t

he N

ort

h

Ric

hm

ond s

ide o

f th

e r

iver.

RM

S

note

d

that

the

traff

ic

modelli

ng

has

aff

irm

ed

that

this

pro

ject

is

need

ed a

nyw

ay b

eca

use a

long

er-

term

third c

rossin

g o

f th

e r

iver

does n

ot

oth

erw

ise re

lieve th

e con

gestio

n alo

ng th

is corr

idor

betw

ee

n R

ichm

ond

and N

ort

h R

ichm

ond.

Page 10: Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS introduced the workshop and affirmed the purpose of the workshop and the project objectives

Ric

hm

on

d B

rid

ge a

nd

Ap

pro

ach

es C

on

ge

sti

on

Stu

dy

Valu

e M

an

ag

em

en

t R

evie

w L

on

g-t

erm

Op

tio

ns A

ssessm

en

t W

ork

sh

op

– 2

4 O

cto

be

r 2012

P

ag

e 5

Va

lue

Fa

cto

rs

What

is it

that

is v

alu

ed a

bout

the R

ichm

ond B

ridg

e a

nd its

appro

ach

es f

or

the lon

ger-

term

?

One of

the essentia

l e

lem

ents

of

the V

alu

e M

an

agem

ent

Pro

cess (f

or

exam

ple

, as d

efined i

n t

he

Austr

alia

n S

tand

ard

for

Valu

e M

an

agem

ent

-

AS

4183

-200

7)

1is

to i

dentify

the ‘

valu

e f

acto

rs’

of

an e

ntity

(in

th

is c

ase,

the R

ichm

ond B

ridge a

nd

its

’ appro

aches).

Valu

e

facto

rs

are

defin

ed

as

the

com

bin

ation

of

the

usefu

l p

urp

oses

fulfill

ed

by

that

entity

, th

e

be

neficia

l outc

om

es

from

fu

lfill

ing

those

purp

oses a

nd

th

ose o

ther

featu

res/c

hara

cte

ristics o

f th

e e

ntity

th

at

are

of

part

icu

lar

import

ance

or

conseque

nce.

T

hese

thre

e

facto

rs

usefu

l purp

oses,

ben

efits

an

d

import

ant

chara

cte

ristics

in

com

bin

ation

, dete

rmin

e th

e v

alu

e p

lace

d o

n t

he e

ntity

fro

m m

ultip

le p

ers

pectives.

It i

s i

mport

ant

to r

eco

gn

ise

that

the

perc

eptio

ns o

f pu

rpose,

benefits

and

import

ance

diffe

r fr

om

pers

on

to

pers

on

and,

from

org

anis

atio

n

to

org

an

isation and

so o

ne ta

sk o

f th

is w

ork

shop w

ill be to

captu

re th

ose

perc

eptions,

unders

tand a

nd re

cord

th

em

in

a str

uctu

red fo

rmat. T

his

concept of

valu

e is illu

str

ate

d in th

e f

ollo

win

g d

iagra

m.

Valu

e

1 T

he

Au

str

alia

n S

tand

ard

fo

r V

alu

e M

an

ag

em

ent

AS

418

3-

200

7 inclu

des a

n

exp

lan

atio

n o

f ‘V

alu

e’ as o

utlin

ed

in t

his

rep

ort

.

The n

otion o

f valu

e f

or

mo

ney b

uild

s o

n t

his

model of

valu

e,

and is s

ho

wn

in th

e fo

llow

ing d

iagra

m.

A

dis

tin

gu

ishin

g aspect

of

this

m

odel

is th

e

separa

tion of

“valu

e”

from

“m

one

y”

meanin

g t

hat

a b

asis

is p

rovid

ed t

o

enab

le

com

parisons

be

tween

options

to

dete

rmin

e

whic

h

option

(or

com

bin

ation

of

options)

will

pro

vid

e

the

best

va

lue

fo

r th

e

am

ount

of

mone

y t

o b

e e

xp

end

ed.

In s

eekin

g b

est

valu

e f

or

money,

the v

alu

e m

anage

ment

work

shop

-gro

up

develo

ps

pro

posals

th

at

will

fu

lfil

the

defined

purp

oses,

achie

ve

the

desired b

en

efits

and i

ncorp

ora

te t

he r

equ

ired i

mport

an

t chara

cte

ristics,

all

at th

e lo

west to

tal cost (m

eanin

g t

he life c

ycle

costs

).

Use

ful

pu

rpo

se

Ben

efic

ial

ou

tco

mes

Ric

hm

on

d B

rid

ge

& A

pp

roac

hes

-

Lo

ng-

Ter

m

Imp

ort

ant

char

acte

rist

ics

Page 11: Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS introduced the workshop and affirmed the purpose of the workshop and the project objectives

Ric

hm

on

d B

rid

ge a

nd

Ap

pro

ach

es C

on

ge

sti

on

Stu

dy

Valu

e M

an

ag

em

en

t R

evie

w L

on

g-t

erm

Op

tio

ns A

ssessm

en

t W

ork

sh

op

– 2

4 O

cto

be

r 2012

P

ag

e 6

Impro

vem

ents

in

valu

e

for

mon

ey

ma

y

be

achie

ved

thro

ugh

vari

ous

com

bin

ations o

f valu

e a

nd t

ota

l cost, a

s s

ho

wn b

elo

w.

Incr

easi

ng

the

use

ful p

urp

ose

s, b

enef

its

and

im

po

rtan

t ch

arac

teri

stic

s o

f th

e en

tity

wh

ile

red

uci

ng

the

tota

l co

st.

Val

ue

T

ota

l co

st

Incr

easi

ng

the

use

ful p

urp

ose

s, b

enef

its

and

im

po

rtan

t ch

arac

teri

stic

s o

f th

e en

tity

wit

ho

ut

chan

gin

g th

e to

tal c

ost

.

Val

ue

T

ota

l co

st

Mai

nta

inin

g th

e u

sefu

l pu

rpo

ses,

ben

efit

s an

d

imp

ort

ant

char

acte

rist

ics

of

the

enti

ty w

hil

e re

du

cin

g th

e to

tal c

ost

.

Val

ue

T

ota

l co

st

Mar

gin

ally

red

uci

ng

th

e u

sefu

l pu

rpo

ses,

ben

efit

s an

d im

po

rtan

t ch

arac

teri

stic

s o

f th

e en

tity

wh

ile

sub

stan

tial

ly r

edu

cin

g t

he

tota

l co

st.

Val

ue

T

ota

l co

st

Sub

stan

tial

ly in

crea

sin

g th

e u

sefu

l pu

rpo

ses,

b

enef

its

and

imp

ort

ant

char

acte

rist

ics

of

the

enti

ty w

hil

e m

arg

inal

ly in

crea

sin

g th

e to

tal c

ost

.

Val

ue

T

ota

l co

st

Ric

hm

on

d B

rid

ge

& A

pp

roa

ch

es

Va

lue

Fa

cto

rs

Pro

jec

t O

bje

cti

ve

s

Impro

ved tra

vel cond

itio

ns a

nd r

oad s

afe

ty a

lon

g th

e c

orr

idor

betw

een

Ric

hm

ond a

nd

Nort

h R

ich

mond

To e

nsure

opera

tion o

f R

ichm

ond B

rid

ge a

nd its

ap

pro

aches c

an b

e

main

tain

ed d

urin

g c

onstr

uction

To m

ain

tain

/ im

pro

ve t

he a

ccessib

ility

on R

ichm

ond B

ridg

e

To m

inim

ise im

pacts

on the

built

and n

atu

ral en

viro

nm

ent a

long t

he r

oute

To m

inim

ise the w

ho

le-o

f-lif

e c

ost

The s

takeh

old

er

work

shop

was a

ble

to d

efin

e th

e fo

llow

ing

Va

lue F

acto

rs:-

NB

: T

hese a

re n

ot

liste

d in a

ny p

art

icula

r ord

er

of

pri

ori

ty o

r th

em

ed.

Pu

rpo

se

(s)

Esta

blis

hm

ent of

an a

gre

ed

corr

idor

and s

trate

gy f

or

impro

vin

g t

ravel

conditio

ns b

etw

ee

n R

ichm

ond a

nd N

ort

h R

ichm

ond to a

n a

ccepta

ble

le

ve

l of

serv

ice f

or

the p

eri

od u

p t

o 2

036

Cre

ation o

f str

ate

gic

conce

pt p

lans a

nd a

n a

ssocia

ted c

ost pla

n to info

rm

decis

ion

-makin

g b

y t

he

Co

mm

onw

ea

lth

an

d N

SW

Govern

ments

.

Page 12: Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS introduced the workshop and affirmed the purpose of the workshop and the project objectives

Ric

hm

on

d B

rid

ge a

nd

Ap

pro

ach

es C

on

ge

sti

on

Stu

dy

Valu

e M

an

ag

em

en

t R

evie

w L

on

g-t

erm

Op

tio

ns A

ssessm

en

t W

ork

sh

op

– 2

4 O

cto

be

r 2012

P

ag

e 7

Inte

nd

ed

/ E

xp

ec

ted

Be

ne

fits

reserv

ation o

f a c

orr

idor

for

the d

evelo

pm

ent str

ate

gy

Com

monw

ealth a

nd N

SW

Sta

te G

overn

ment fu

ndin

g t

o a

n a

gre

ed

pro

gra

m

few

er

accid

ents

and f

ata

litie

s

impro

ved journ

ey t

imes a

long th

e c

orr

idor

safe

r conditio

ns a

nd f

acili

ties f

or

pedestr

ians a

nd c

yclis

ts a

lon

g th

e

corr

idor

cla

rity

to a

llow

com

munity a

nd c

om

merc

ial d

evelo

pm

ents

to b

e

pro

gre

ssed a

long t

he c

orr

idor

facili

tate

public

tra

nsp

ort

op

tions a

nd m

odal shifts

fro

m p

rivate

ve

hic

les

impro

ved n

etw

ork

connections f

or

the n

ort

h w

est gro

wth

centr

e

impro

ved a

ccessib

ility

alo

ng the

co

rrid

or

- in

clu

din

g f

or

em

erg

ency

serv

ices

impro

ved q

ualit

y o

f lif

e f

or

the r

esid

ents

- s

ocia

l, c

ultura

l a

nd

connectivity

pote

ntial im

pro

ved f

lood im

munity

facili

tate

Bells

Lin

e o

f R

oad

as a

n a

ltern

ative h

ea

vy v

ehic

le r

oute

acro

ss the B

lue

Mo

unta

ins

pote

ntial to

allo

w th

e e

xp

an

sio

n o

f oth

er

serv

ices infr

astr

uctu

re

facili

tate

develo

pm

ent / exp

ansio

n o

f N

ort

h R

ichm

ond -

bro

ad

er

econom

ic s

pin

-off

s

impro

ved r

ea

l esta

te v

alu

es -

with incre

ase

d / im

pro

ved

connectivity o

f

the a

rea to

the

rest of

Sydn

ey

Imp

ort

an

t A

sp

ec

ts

havin

g a

pla

n th

at allo

ws e

asin

g th

e c

urr

ent conge

stion a

s q

uic

kly

as

possib

le -

to

pro

gre

ss s

hort

-term

options

the r

elia

bili

ty o

f th

e m

odelli

ng that

the s

trate

gic

concept d

esig

n is b

ased

up

on

- s

o tha

t th

e d

esig

n s

olu

tion w

ill m

eet re

quir

em

ents

up

to

20

36

-

pic

kin

g u

p o

n p

ote

ntial fu

ture

develo

pm

ents

and

their

im

pacts

on t

raffic

pro

tection o

f heri

tage

valu

es a

long t

he c

orr

idor

reducin

g th

e n

um

ber

of

accid

ents

and

inju

rie

s -

inclu

din

g for

pedestr

ians

and c

yclis

ts

allo

win

g th

e c

om

munity's

com

merc

ial and e

mplo

ym

ent a

ctivitie

s to th

rive

an

d n

ot

be

ad

ve

rse

ly im

pa

cte

d b

y t

he

wo

rks t

o im

pro

ve

th

e t

rave

l

conditio

ns a

long t

he c

orr

idor

avoid

ing s

ubje

cting th

e c

om

munity to 'c

ontinuou

s' w

ork

s a

long t

he c

orr

idor

for

an e

xte

nd

ed p

erio

d

impro

vin

g th

e level of

serv

ice a

long t

he c

orr

idor

what is

don

e f

or

the s

hort

term

- inte

gra

ting w

ith th

e long

-term

str

ate

gy

inte

gra

ting w

ith N

ort

h W

est G

row

th C

en

tre a

nd f

utu

re c

onne

ction to

the

M7 &

Bells

Lin

e o

f R

oad c

orr

idor

reducin

g s

ocia

l is

ola

tion th

rough b

ette

r pub

lic tra

nsp

ort

conne

ctions

heavy h

au

lage a

long t

he c

orr

idor

- m

anag

ing incre

ased f

low

s a

nd

min

imis

ing im

pacts

on t

he local com

munity -

app

recia

ting r

ela

tionship

to

oth

er

pro

jects

alo

ng B

ells

Lin

e o

f R

oad

successfu

lly inte

gra

ting th

e e

nds o

f th

e c

orr

idor

to e

nsure

tra

ffic

conge

stion is n

ot

just shifte

d

pro

tection o

f environm

enta

l, r

iverin

e v

alu

es o

f th

e a

rea

min

imis

ing im

pact on p

ropert

ies

retire

ment

vill

age a

ccessib

ility

and

qua

lity o

f lif

e a

dja

cent to

the

road

corr

idor

the e

xis

ting b

ridge -

str

uctu

ral and

heri

tage

fe

atu

res

urb

an d

esig

n f

eatu

res a

nd

outc

om

es -

vis

ual am

enity a

nd c

hara

cte

r of

the

are

a

the level of

flood im

munity a

long t

he c

orr

idor

Page 13: Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS introduced the workshop and affirmed the purpose of the workshop and the project objectives

Ric

hm

on

d B

rid

ge a

nd

Ap

pro

ach

es C

on

ge

sti

on

Stu

dy

Valu

e M

an

ag

em

en

t R

evie

w L

on

g-t

erm

Op

tio

ns A

ssessm

en

t W

ork

sh

op

– 2

4 O

cto

be

r 2012

P

ag

e 8

Op

tio

ns

As

se

ss

me

nt

The

part

icip

an

ts

were

o

rganis

ed

into

4

gro

ups

to

undert

ake

the

assessm

ent,

ensurin

g

a

bala

nce

of

com

munity

repre

senta

tion,

ke

y

sta

kehold

ers

, R

oads a

nd M

aritim

e S

erv

ices a

nd t

he S

ME

C t

eam

.

The m

em

bers

of

the S

ME

C t

eam

only

pro

vid

ed i

nfo

rmation f

or

the R

MS

and c

om

munity r

epre

senta

tives to m

ake their a

ssessm

ents

.

Each

gro

up

to

ok re

sponsib

ility

to

assess

the

4

options fo

cusin

g o

n a

part

icu

lar

set

of

the c

rite

ria:

Gro

up 1

: S

afe

ty a

nd

Ro

ad C

apacity

Gro

up 2

: E

nviro

nm

ent and C

ultura

l H

erita

ge

Gro

up 3

: E

ng

ineerin

g

Gro

up 4

: V

isua

l &

Landscap

e, N

ois

e a

nd P

rop

ert

y

The d

escriptions o

f th

e c

rite

ria

are

sho

wn

at

Ap

pen

dix

2,

inclu

din

g t

he

specific

qua

litative a

ssessm

ent com

ments

.

Each g

rou

p u

ndert

ook i

ts a

ssessm

ent

and t

hen

th

is w

as p

resente

d t

o t

he

w

hole

gro

up f

or

cla

rificatio

ns a

nd c

om

ments

. I

n t

his

wa

y t

he w

ho

le g

roup

had o

pport

unity t

o r

ais

e a

ny q

ueri

es,

sugg

est

an

y c

ha

nges a

nd a

s a

wh

ole

gro

up a

ffirm

the r

ela

tive

assessm

ent.

Once t

he

assessm

ent

was d

on

e t

he g

roup

was a

sked t

o r

eflect

on

wh

ere

th

e n

um

ber

‘1s’

were

and

wh

eth

er

or

not

this

would

suggest

an o

vera

ll pre

ferr

ed o

ption

.

Wo

rks

ho

p R

ec

om

me

nd

ati

on

Follo

win

g t

heir f

urt

her

dis

cu

ssio

ns t

he w

ork

shop g

roup w

as a

ble

to m

ake a

re

com

mendatio

n a

s f

ollo

ws.

We r

eco

mm

en

d O

pti

on

D c

orr

ido

r b

ec

au

se:

It g

ives s

up

erior

outc

om

es f

or

the p

rincip

al

obje

ctive

s – i

mpro

ved t

rave

l

conditio

ns and s

afe

ty outc

om

es a

s w

ell

as f

or

accessib

ility

duri

ng f

loo

d

eve

nts

an

d n

etw

ork

inte

gra

tion

;

Bu

t su

bje

ct

to:

Addre

ssin

g

som

e

of

its

environm

enta

l and

possib

le

herita

ge

/

cu

ltura

l

impacts

and

po

ten

tially

im

pro

vin

g

th

e

Yarr

am

und

i La

ne

access

/

functiona

lity.

Althou

gh i

t w

as n

ote

d t

hat

a w

ider

corr

idor

will

im

pact

som

e p

eople

once

off

, but giv

e b

road

er

ben

efits

to m

an

y m

ore

pe

ople

ove

r a lo

nger

peri

od

.

Page 14: Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS introduced the workshop and affirmed the purpose of the workshop and the project objectives

Ric

hm

on

d B

rid

ge a

nd

Ap

pro

ach

es C

on

ge

sti

on

Stu

dy

Valu

e M

an

ag

em

en

t R

evie

w L

on

g-t

erm

Op

tio

ns A

ssessm

en

t W

ork

sh

op

– 2

4 O

cto

be

r 2012

P

ag

e 9

Ke

y A

cti

on

s A

ris

ing

The f

ollo

win

g k

ey a

ctions w

ere

note

d t

o b

e a

ddre

ssed b

y t

he p

roje

ct te

am

:

(The

y a

re n

um

bere

d f

or

refe

rence p

urp

oses o

nly

)

1.

O

ptio

n D

will

ne

ed a

flo

od

access /

majo

r accid

ent

contr

a-f

low

arr

angem

ent fo

r th

e n

ew

ca

rria

ge

wa

y.

2.

H

ann

a P

ark

access n

eeds t

o b

e d

efin

ed t

o a

nd f

rom

the n

ew

ro

ad

wa

y,

inclu

din

g r

equ

ired

sig

na

ge

to d

irect p

eop

le t

o the p

ark

.

3.

In

term

itte

nt

traff

ic

movem

ents

associa

ted

with

sp

ort

ing

and

oth

er

com

munity e

vents

needs t

o b

e i

nclu

ded i

n t

he

modelli

ng

fo

r an

y s

hort

er-

term

solu

tio

ns to th

e c

on

gestion.

4.

T

he m

odelli

ng n

eeds t

o m

ake s

ure

that

the e

nd p

oin

ts o

f th

is

corr

idor

can cope w

ith th

e anticip

ate

d flo

ws and th

e curr

ent

pro

ble

ms a

re n

ot ju

st be

ing

pushe

d to e

ither

end o

f th

e c

orr

idor.

5.

A

ccessib

ility

fo

r p

edestr

ian

s fr

om

th

e re

tire

ment

vill

age to

b

e

cla

rified.

6.

C

ouncil

to r

evie

w t

he l

ocal

traff

ic n

etw

ork

for

the im

pacts

of

the

options e

sp

ecia

lly in r

ela

tio

n to Y

arr

am

undi L

ane

.

7.

P

ost

on-l

ine t

he r

ep

ort

on t

he c

om

munity f

eedb

ack a

s w

ell

as

for

the lo

ng-t

erm

optio

ns.

Page 15: Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS introduced the workshop and affirmed the purpose of the workshop and the project objectives

Ric

hm

on

d B

rid

ge a

nd

Ap

pro

ach

es C

on

ge

sti

on

Stu

dy

Valu

e M

an

ag

em

en

t R

evie

w L

on

g-t

erm

Op

tio

ns A

ssessm

en

t W

ork

sh

op

– 2

4 O

cto

be

r 2012

P

ag

e 1

0

Ap

pe

nd

ix 1

: W

ork

sh

op

Pa

rtic

ipa

nts

Nam

e

Org

an

isa

tio

n

Y

in Q

ian

D

oIT

Bry

an S

mith

Co

mm

unity r

ep

D

avid

Ma

rsh

all

Co

mm

unity r

ep

M

ela

nie

Ba

urh

en

n

Co

mm

unity r

ep

R

icci G

reen

Co

mm

unity r

ep

V

ene

cia

Wils

on

Co

mm

unity r

ep

A

lan W

he

en

Co

mm

unity r

ep

S

ean

Pe

rry

Ha

wke

sbu

ry C

ity C

oun

cil

Jeff

Org

an

Ha

wke

sbu

ry C

ity C

oun

cil

Ja

cq

ui H

yn

e

Id P

lann

ing

B

ern

ie M

ills

RM

S

D

evik

a S

itin

am

alu

we

R

MS

Fio

na

Cha

n

RM

S

G

reg

Upto

n

RM

S

Ia

n M

acle

od

R

MS

Je

nn

ifer

Gatt

RM

S

L

yn

da

ll T

horn

hill

R

MS

Ra

eb

urn

Cha

pm

an

RM

S

B

rad H

am

ilto

n

SM

EC

Nic

ole

Vu

kic

S

ME

C

P

ete

r S

crive

ns

SM

EC

Ro

drig

o E

str

ada

SM

EC

Sh

an

e H

igg

ins

SM

EC

Sh

au

n N

adin

S

yd

ne

y W

ate

r

Jo

an

n T

ule

tt

TfN

SW

Viv

Ma

nw

aring

T

fNS

W

C

arl N

ug

ent

Tra

ct

W

ork

sh

op

Fa

cilit

ato

r M

ark

Ne

asb

ey

AC

VM

Page 16: Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS introduced the workshop and affirmed the purpose of the workshop and the project objectives

Ric

hm

on

d B

rid

ge a

nd

Ap

pro

ach

es C

on

ge

sti

on

Stu

dy

Valu

e M

an

ag

em

en

t R

evie

w L

on

g-t

erm

Op

tio

ns A

ssessm

en

t W

ork

sh

op

– 2

4 O

cto

be

r 2012

P

ag

e 1

1

Invit

ed

bu

t u

na

ble

to

att

en

d:

Lucin

da

McT

agg

art

D

oIT

D

err

yn

Jo

hn

Do

PI

C

hris A

mit

HC

C

D

enis

e W

ilso

n

Id P

lann

ing

B

ruce T

ag

gart

R

MS

H

ilary

Jo

hn

son

R

MS

K

en L

ysa

ug

ht

RM

S

N

eil

Forr

est

RM

S

S

han

e S

ch

ne

ider

RM

S

S

ure

sh

Su

ren

dra

n

RM

S

R

olf L

un

sm

an

n

TfN

SW

G

arr

y J

one

s

RM

S

R

ahm

an M

anju

r R

MS

S

ala

h A

ssi

RM

S

A

lliso

n F

laxm

an

S

ES

D

avid

Hein

s

RM

S

Jo

sep

h F

an

ou

s

RM

S

P

ete

r E

llis

RM

S

P

ete

r C

inq

ue

SE

S

Page 17: Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS introduced the workshop and affirmed the purpose of the workshop and the project objectives

Ric

hm

on

d B

rid

ge a

nd

Ap

pro

ach

es C

on

ge

sti

on

Stu

dy

Valu

e M

an

ag

em

en

t R

evie

w L

on

g-t

erm

Op

tio

ns A

ssessm

en

t W

ork

sh

op

– 2

4 O

cto

be

r 2012

P

ag

e 1

2

Ap

pe

nd

ix 2

: O

pti

on

s A

ss

es

sm

en

t C

om

me

nts

Th

e a

sse

ssm

ent

of

the o

ption

s is r

efle

cte

d in

th

e f

ollo

win

g t

able

, w

hic

h a

lso

se

ts o

ut

the a

gre

ed c

rite

ria.

Th

e r

ela

tive

ra

ting

of

the o

ptio

ns is r

efle

cte

d b

y

the w

ork

sh

op

allo

cating

a n

um

ber

from

1 –

bein

g ‘

the b

est’ t

o 4

– b

ein

g ‘

the w

ors

t’.

Th

e c

rite

ria

we

re n

ot

we

igh

ted

as t

he

assessm

ent

wa

s t

o l

oo

k a

t re

lative

me

rit fo

r e

ach

of th

e o

ptio

ns a

nd t

hen t

o d

raw

any c

onclu

sio

ns a

bo

ut th

e o

ptio

ns o

ve

rall.

Cri

teri

on

C

rite

ria

Des

crip

tio

n

Op

tio

n A

O

pti

on

B

Op

tio

n C

O

pti

on

D

Safe

ty

A q

ual

itat

ive

com

par

iso

n o

f th

e o

vera

ll im

pro

vem

ent

to s

afet

y fo

r ea

ch o

pti

on

.

Key

fac

tors

to

co

nsi

der

are

:

Div

ided

car

riag

ew

ays

for

80

km/h

zo

nes

, pro

tect

ed

turn

bay

s, s

ign

al c

on

tro

l wit

h p

edes

tria

n c

ross

ing

fa

cilit

ies

at in

ters

ecti

on

s, s

afe

ty b

arri

ers,

off

ro

ad

shar

ed p

ath

s.

A h

igh

er p

erfo

rmin

g o

pti

on

wo

uld

be

on

e th

at

pro

vid

es t

he

grea

test

imp

rove

men

t to

saf

ety.

con

tra

flo

w s

yste

m –

saf

ety

of

shar

ed p

ath

is a

lso

th

e sa

me;

op

erat

ion

al r

isks

an

d

OH

&S

haz

ard

s co

mp

ared

to

th

e o

ther

op

tio

ns

wh

ich

h

ave

du

al c

arri

age

way

s

4

2

thes

e co

uld

be

safe

r if

un

con

tro

lled

RT’

s w

ere

rem

ove

d (

and

m

ade

sam

e as

op

tio

n

D)

at Y

arra

mu

nd

i La

ne

inte

rse

ctio

n

2

thes

e co

uld

be

safe

r if

un

con

tro

lled

RT’

s w

ere

rem

ove

d (

and

m

ade

sam

e as

op

tio

n

D)

at Y

arra

mu

nd

i La

ne

inte

rse

ctio

n

1

rem

ove

s cr

oss

-ove

r m

ove

men

ts o

f th

e ca

rria

gew

ay; r

edu

ced

n

um

ber

of

mo

vem

ents

of

RT’

s ac

ross

op

po

sin

g tr

affi

c at

Yar

ram

un

di L

ane;

safe

ty a

t Ya

rram

un

di L

ane

inte

rse

ctio

n is

see

n t

o

imp

rove

as

som

e o

f th

e m

ove

men

ts a

t Ya

rram

un

di

are

rem

ove

d

Pro

visi

on

of

off

ro

ad s

har

ed p

ath

fac

iliti

es

and

saf

er

cro

ssin

g lo

cati

on

s (m

id b

lock

an

d w

ith

sig

nal

co

ntr

ol

at in

ters

ecti

on

s).

Safe

ty o

n t

he

shar

ed p

ath

way

.

A h

igh

er p

erfo

rmin

g o

pti

on

wo

uld

be

on

e th

at

pro

vid

es t

he

grea

test

imp

rove

men

t to

saf

ety.

on

es o

ver

& u

nd

er e

xist

ing

bri

dge

req

uir

ed

4

1

shar

ed p

ath

on

d

ow

nst

ream

sid

e o

f b

rid

ge c

on

nec

ts w

ith

p

ath

on

sam

e si

de

of

new

car

riag

eway

1

1

Ove

rall

for

Safe

ty

4

2

2

1

Page 18: Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS introduced the workshop and affirmed the purpose of the workshop and the project objectives

Ric

hm

on

d B

rid

ge a

nd

Ap

pro

ach

es C

on

ge

sti

on

Stu

dy

Valu

e M

an

ag

em

en

t R

evie

w L

on

g-t

erm

Op

tio

ns A

ssessm

en

t W

ork

sh

op

– 2

4 O

cto

be

r 2012

P

ag

e 1

3

Cri

teri

on

C

rite

ria

Des

crip

tio

n

Op

tio

n A

O

pti

on

B

Op

tio

n C

O

pti

on

D

Ro

ad

cap

acit

y

A q

ual

itat

ive

asse

ssm

ent

of

the

imp

rove

men

t to

co

nge

stio

n p

rovi

ded

by

the

op

tio

n w

hen

co

mp

ared

ag

ain

st a

‘Do

no

thin

g’ s

cen

ario

.

A h

igh

er p

erfo

rmin

g o

pti

on

wo

uld

be

on

e th

at p

rovi

des

th

e b

est

po

ssib

le r

edu

ctio

n in

tra

ffic

co

nge

stio

n.

Pro

vid

es b

ette

r in

tegr

atio

n w

ith

lon

g-te

rm r

egio

nal

n

etw

ork

.

set-

up

an

d p

ull

do

wn

of

con

tra

flo

w s

yste

m im

pac

tin

g o

n t

rave

l tim

es; a

lso

lan

e m

ergi

ng

an is

sue;

ou

tsid

e o

f p

eak

per

iod

s n

o c

on

tra

flo

w

wit

h in

crea

sed

co

nge

stio

n;

4

2

2

1

rem

ove

s cr

oss

-ove

r /

righ

t tu

rn m

ove

men

ts t

her

efo

re

mo

re c

on

tro

l at

Yarr

amu

nd

i La

ne

inte

rsec

tio

n –

lead

ing

to

less

co

nge

stio

n;

A q

ual

itat

ive

asse

ssm

ent

of

the

imp

rove

men

t to

tra

vel

tim

e p

rovi

ded

by

the

op

tio

n w

hen

co

mp

ared

aga

inst

a

‘Do

no

thin

g’ s

cen

ario

.

Pro

vid

es b

ette

r p

ub

lic t

ran

spo

rt in

tegr

atio

n a

nd

ti

me

tab

le p

erfo

rman

ce.

A h

igh

er p

erfo

rmin

g o

pti

on

wo

uld

be

on

e th

at p

rovi

des

th

e b

est

po

ssib

le im

pro

vem

ent

to t

rave

l tim

e.

set-

up

an

d p

ull

do

wn

of

con

tra

flo

w s

yste

m im

pac

tin

g o

n t

rave

l tim

es; a

lso

lan

e m

ergi

ng

an is

sue;

4

2

2

1

imp

rove

d (

mar

gin

ally

) fl

ow

co

mp

ared

to

B &

C d

ue

to

the

rest

rict

ed m

ove

men

ts a

t Ya

rram

un

di L

ane

inte

rse

ctio

n;

Min

imis

ing

the

rest

rict

ion

of

turn

ing

mo

vem

ents

on

to

and

off

th

e co

rrid

or

and

pro

vid

ing

safe

r fa

cilit

ies

(TC

S o

r sh

elte

red

tu

rnin

g b

ays)

.

A h

igh

er p

erfo

rmin

g o

pti

on

wo

uld

be

on

e th

at p

rovi

des

th

e gr

eate

st im

pro

vem

ent

to s

afet

y.

A d

edic

ated

rig

ht

turn

bay

fo

r ea

stb

ou

nd

tra

ffic

on

K

urr

ajo

ng

Ro

ad t

o a

cces

s O

ld K

urr

ajo

ng

Ro

ad /

Ya

rram

un

di l

ane

will

als

o b

e p

rovi

ded

.

1

no

ch

ange

to

cu

rren

t m

ove

men

ts a

t Ya

rram

un

di

Lan

e in

ters

ecti

on

1

no

ch

ange

to

cu

rren

t m

ove

men

ts a

t Ya

rram

un

di L

ane

inte

rsec

tio

n

1

no

ch

ange

to

cu

rren

t m

ove

men

ts a

t Ya

rram

un

di L

ane

inte

rsec

tio

n

red

uce

d t

raff

ic m

ove

men

ts a

t Ya

rram

un

di L

ane

inte

rsec

tio

n

will

hav

e a

neg

ativ

e im

pac

t

4

Re

gio

nal

Ne

two

rk P

lan

nin

g /

Inte

grat

ion

Co

ntr

a fl

ow

tra

ffic

imp

acts

an

d n

o e

xtra

flo

od

imm

un

ity

– so

no

reg

ion

al n

etw

ork

im

pro

vem

ent;

4

No

ext

ra f

loo

d

imm

un

ity

so n

o

regi

on

al n

etw

ork

im

pro

vem

ent;

3

2

bet

ter

flo

od

imm

un

ity

imp

rove

s re

gio

nal

n

etw

ork

co

nn

ecti

vity

;

1

give

s b

est

regi

on

al n

etw

ork

in

tegr

atio

n d

ue

to im

pro

ved

fl

oo

d im

mu

nit

y co

mb

ined

w

ith

max

imu

m c

orr

ido

r ca

pac

ity;

Page 19: Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS introduced the workshop and affirmed the purpose of the workshop and the project objectives

Ric

hm

on

d B

rid

ge a

nd

Ap

pro

ach

es C

on

ge

sti

on

Stu

dy

Valu

e M

an

ag

em

en

t R

evie

w L

on

g-t

erm

Op

tio

ns A

ssessm

en

t W

ork

sh

op

– 2

4 O

cto

be

r 2012

P

ag

e 1

4

Cri

teri

on

C

rite

ria

Des

crip

tio

n

Op

tio

n A

O

pti

on

B

Op

tio

n C

O

pti

on

D

Pu

blic

Tra

nsp

ort

Inte

grat

ion

Co

ntr

a fl

ow

off

pea

k o

nly

1

lan

e th

eref

ore

hig

her

ch

ance

s o

f p

ub

lic t

ran

spo

rt d

elay

s;

4

1

imp

rove

s ab

ility

to

m

ain

tain

an

d in

crea

se

pu

blic

tra

nsp

ort

se

rvic

es t

hro

ugh

th

e co

rrid

or

incl

ud

ing

at

pea

k ti

mes

;

1

imp

rove

s ab

ility

to

m

ain

tain

an

d in

crea

se

pu

blic

tra

nsp

ort

se

rvic

es t

hro

ugh

th

e co

rrid

or

incl

ud

ing

at

pea

k ti

mes

;

1

imp

rove

s ab

ility

to

mai

nta

in

and

incr

ease

pu

blic

tra

nsp

ort

se

rvic

es t

hro

ugh

th

e co

rrid

or

incl

ud

ing

at p

eak

tim

es;

Ove

rall

for

Ro

ad C

apac

ity

4

3

1

imp

rove

d s

afet

y an

d

cap

acit

y; a

lso

pro

vid

e b

ette

r fl

oo

d im

mu

nit

y so

inte

grat

e b

ette

r w

ith

reg

ion

al n

etw

ork

1

acce

ssib

ility

per

form

s o

nly

at

4 -

nee

d t

o g

et b

ett

er

acce

ssib

ility

at

Yarr

amu

nd

i La

ne;

als

o p

rovi

de

bet

ter

flo

od

imm

un

ity

so in

tegr

ate

bet

ter

wit

h r

egio

nal

net

wo

rk

Vis

ual

an

d

lan

dsc

ape

This

mea

sure

aim

s to

pro

vid

e an

ind

icat

ion

of

the

visu

al im

pac

t o

f th

e p

rop

ose

d b

rid

ge o

pti

on

s w

hen

co

mp

ared

to

th

e cu

rren

t si

tuat

ion

.

Hig

her

per

form

ing

op

tio

ns

wo

uld

pro

vid

e a

des

ign

th

at e

ith

er m

ain

tain

s a

view

do

wn

stre

am o

f th

e ri

ver

(fro

m t

he

exis

tin

g b

rid

ge)

or

pro

vid

es

a b

rid

ge

stru

ctu

re t

hat

min

imis

es

any

dis

rup

tio

n o

f th

is v

iew

.

A h

igh

er p

erfo

rmin

g o

pti

on

is o

ne

that

wo

uld

hav

e th

e le

ast

visu

al a

nd

ph

ysic

al im

pac

t o

n t

he

bu

ilt a

nd

n

atu

ral v

alu

es o

f th

e co

rrid

or.

Po

ten

tial

imp

rove

d v

ista

s -

off

erin

g b

ette

r vi

ew

s.

A h

igh

er p

erfo

rmin

g o

pti

on

is t

he

on

e th

at p

rovi

des

th

e gr

eate

st o

pp

ort

un

itie

s to

str

engt

hen

an

d

imp

rove

th

e vi

sual

am

enit

y an

d la

nd

scap

ed v

alu

es /

ch

arac

ter

of

the

corr

ido

r.

1

leas

t vi

sual

imp

act

mai

nta

ins

do

wn

stre

am

vie

ws;

sti

ll im

pac

ts t

ho

ugh

o

n H

ann

a P

ark

new

bri

dge

; ex

ten

sio

n -

wo

uld

imp

rove

o

vera

ll vi

ew

s o

f b

rid

ge

ele

vati

on

fro

m d

ow

nst

ream

;

blo

cks

view

s d

ow

nst

ream

fro

m

exis

tin

g b

rid

ge b

ut

crea

tes

grea

ter

view

s fr

om

th

e n

ew

bri

dge

; m

ain

tain

s a

nar

row

co

rrid

or

thro

ugh

th

e co

mm

un

ity;

ne

eds

to

be

des

ign

ed t

o b

e sy

mp

ath

etic

to

th

e ex

isti

ng

bri

dge

;

4

3

par

tial

ly b

lock

s vi

ew

s /

fram

es

and

vie

ws

un

der

th

e b

rid

ge;

gain

new

vie

ws

fro

m

the

exis

tin

g b

rid

ge;

1

fram

es

vie

ws

do

wn

stre

am

(can

se

e u

nd

er it

); g

reat

ly

imp

rove

d v

iew

s fr

om

th

e n

ew b

rid

ge (

hig

her

leve

l);

imp

rove

d v

iew

s ac

ross

th

e fl

oo

dp

lain

fro

m t

he

ne

w

alig

nm

ent;

vis

ual

imp

acts

al

on

g fl

oo

d p

lain

fo

r tr

avel

lers

alo

ng

the

rou

te -

b

lock

s vi

ews

fro

m t

he

exis

tin

g ro

ad; a

dd

itio

nal

va

nta

ge p

oin

ts a

chie

ved

by

new

bri

dge

;

N

B:

the

sket

ches

pro

vid

ed a

re c

on

sid

ered

mis

lea

din

g in

ter

ms

of

the

ap

pa

ren

t p

ylo

n b

ulk

ines

s &

ass

oci

ate

d v

isu

al i

mp

act

s;

Page 20: Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS introduced the workshop and affirmed the purpose of the workshop and the project objectives

Ric

hm

on

d B

rid

ge a

nd

Ap

pro

ach

es C

on

ge

sti

on

Stu

dy

Valu

e M

an

ag

em

en

t R

evie

w L

on

g-t

erm

Op

tio

ns A

ssessm

en

t W

ork

sh

op

– 2

4 O

cto

be

r 2012

P

ag

e 1

5

Cri

teri

on

C

rite

ria

Des

crip

tio

n

Op

tio

n A

O

pti

on

B

Op

tio

n C

O

pti

on

D

No

ise

Ther

e is

a c

orr

elat

ion

bet

we

en

th

is c

rite

rio

n a

nd

th

e o

ccu

rren

ce o

f (L

max

) n

ois

e le

vels

du

e to

tru

ck n

ois

e co

mp

ress

ion

bra

kin

g as

soci

ated

wit

h s

teep

er g

rad

es.

A

hig

her

per

form

ing

op

tio

n w

ou

ld h

ave

a sh

ort

er

ove

rall

len

gth

of

ste

ep g

rad

es.

Th

ese

incl

ud

e sc

ho

ols

, p

lace

s o

f w

ors

hip

etc

.

A h

igh

er p

erfo

rmin

g o

pti

on

wo

uld

imp

act

less

on

co

mm

un

ity

faci

litie

s.

Mar

gin

al in

crea

ses

in n

ois

e o

nly

; im

pac

ts f

rom

tru

cks

and

no

ise

fro

m c

on

cret

e b

arri

ers?

3

mar

gin

al in

crea

ses

in

no

ise

on

ly w

ith

ac

cele

rati

on

/

dec

eler

atio

n o

n a

nd

o

ff t

he

low

er b

rid

ge;

3

1

mo

re c

ar n

ois

e b

ut

less

tru

ck n

ois

e -

ove

rall

neu

tral

;

2

slig

htl

y m

ore

no

ise

thro

ugh

th

e fl

oo

d p

lain

fro

m t

he

ele

vate

d r

oad

;

Pro

pe

rty

This

ind

icat

es

less

eco

no

mic

dis

rup

tio

n w

ith

in t

he

stu

dy

area

.

A h

igh

er p

erfo

rmin

g o

pti

on

wo

uld

hav

e a

low

er

nu

mb

er o

f b

usi

ne

sses

aff

ect

ed

.

A h

igh

er p

erfo

rmin

g o

pti

on

will

hav

e le

ss im

pac

t an

d

req

uir

emen

t fo

r p

rop

erty

acq

uis

itio

n t

her

efo

re h

ave

a lo

wer

are

a o

f la

nd

acq

uis

itio

n.

Ho

we

ver,

re

sid

enti

al/b

usi

nes

s/ c

om

mer

cial

lan

d w

ill

be

mo

re v

alu

able

th

an r

ura

l/ f

loo

d p

lain

lan

d.

M

inim

ise

s o

r av

oid

s p

rop

erti

es

of

com

mu

nit

y si

gnif

ican

ce.

As

a re

sult

a h

igh

er p

erfo

rmin

g o

pti

on

w

ou

ld a

lso

hav

e le

ss im

pac

t o

n r

esid

enti

al/b

usi

nes

s/

com

mer

cial

lan

d.

Aff

ect

on

bu

sin

esse

s al

so in

re

lati

on

to

acc

essi

bili

ty /

d

isru

pti

on

in g

ener

al.

1

mai

nta

in n

arro

w c

orr

ido

r -

so m

inim

ises

pro

per

ty

imp

acts

;

1

mai

nta

in n

arro

w

corr

ido

r -

so

min

imis

es

pro

per

ty

imp

acts

;

incr

ease

of

foo

tpri

nt

- so

aff

ects

mo

re

pro

per

ty;

3

slig

htl

y in

crea

se o

f fo

otp

rin

t -

as it

aff

ects

mo

re

pro

per

ties

th

an t

he

oth

er

op

tio

ns;

4

NB

: im

pa

cts

thro

ug

h R

ich

mo

nd

an

d N

ort

h R

ich

mo

nd

are

see

n t

o b

e th

e sa

me

for

all

of

the

op

tio

ns

so t

hes

e h

ave

no

t b

een

co

nsi

de

red

as

a d

iffe

ren

tia

tin

g f

act

or

bet

wee

n t

he

op

tio

ns.

Page 21: Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS introduced the workshop and affirmed the purpose of the workshop and the project objectives

Ric

hm

on

d B

rid

ge a

nd

Ap

pro

ach

es C

on

ge

sti

on

Stu

dy

Valu

e M

an

ag

em

en

t R

evie

w L

on

g-t

erm

Op

tio

ns A

ssessm

en

t W

ork

sh

op

– 2

4 O

cto

be

r 2012

P

ag

e 1

6

Envi

ron

me

nt

and

cu

ltu

ral

he

rita

ge

A h

igh

er p

erfo

rmin

g o

pti

on

wo

uld

hav

e a

low

er

imp

act

on

th

e ar

chae

olo

gy.

Pre

sen

ce o

f ar

chae

olo

gy a

dja

cen

t to

th

e ro

ad.

1

as a

bo

ve p

lus

even

th

ou

gh g

reat

er im

pac

t o

n w

oo

den

bri

dge

th

ere

is

po

ten

tial

to

mit

igat

e im

pac

ts o

n e

xist

ing

wo

od

en

bri

dge

1

as a

bo

ve p

lus

even

th

ou

gh g

reat

er

imp

act

on

wo

od

en

bri

dge

th

ere

is

po

ten

tial

to

mit

igat

e im

pac

ts o

n e

xist

ing

wo

od

en b

rid

ge

3

larg

er f

oo

tpri

nt

so

po

ten

tial

ly a

bro

ader

eff

ect

4

This

cri

teri

on

acc

ou

nts

fo

r p

ote

nti

al a

ffe

cts

to f

lora

an

d f

aun

a in

clu

din

g th

reat

ened

sp

ecie

s an

d

terr

ito

rial

an

imal

s. W

her

e ri

par

ian

flo

ra a

nd

fau

na

has

bee

n m

app

ed, t

his

will

als

o b

e in

clu

ded

. A

hig

her

per

form

ing

op

tio

n w

ou

ld h

ave

a lo

wer

n

um

ber

an

d a

rea

(ha)

imp

acte

d.

1

1

3

po

ten

tial

imp

acts

on

fro

gs

and

Han

na

Par

k 4

The

cult

ura

l her

itag

e ev

alu

atio

n in

clu

des

Ab

ori

gin

al

and

no

n-

Ab

ori

gin

al s

ites

. A

hig

her

per

form

ing

op

tio

n w

ou

ld h

ave

a lo

wer

n

um

ber

an

d t

her

efo

re in

dic

ate

a lo

wer

dis

turb

ance

o

f cu

ltu

ral h

erit

age

site

s.

No

n-A

bo

rigi

nal

2

bas

ed o

n in

form

atio

n

curr

entl

y av

aila

ble

(fu

rth

er

surv

eys

are

ne

eded

)

Ab

ori

gin

al 4

No

n-A

bo

rigi

nal

/

Bu

ilt H

erit

age

3

bas

ed o

n in

form

atio

n

curr

entl

y av

aila

ble

(f

urt

her

su

rvey

s ar

e n

eed

ed)

Ab

ori

gin

al 4

No

n-A

bo

rigi

nal

/

Bu

ilt H

erit

age

3

bas

ed o

n in

form

atio

n

curr

entl

y av

aila

ble

(f

urt

her

su

rvey

s ar

e n

eed

ed)

Ab

ori

gin

al 4

bas

ed o

n in

form

atio

n

curr

entl

y av

aila

ble

(fu

rth

er

surv

eys

are

ne

eded

) at

trac

t gr

eate

r tr

affi

c vo

lum

es

par

ticu

larl

y h

eavy

veh

icle

s

Ab

ori

gin

al 4

N

on

-Ab

ori

gin

al /

Bu

ilt

Her

itag

e 4

Ove

rall

for

Envi

ron

men

t an

d H

erit

age

1

less

er f

oo

tpri

nt;

less

tra

ffic

d

ue

to c

on

tra

flo

w

arra

nge

men

t (3

lan

es v

s. 4

)

2

3

larg

est

foo

tpri

nt;

like

ly t

o

hav

e gr

eate

st im

pac

t o

n

envi

ron

men

tal v

alu

es;

la

rges

t fo

otp

rin

t ac

ross

th

e ri

ver;

eff

ect

s o

n H

ann

a P

ark

4

Page 22: Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS introduced the workshop and affirmed the purpose of the workshop and the project objectives

Ric

hm

on

d B

rid

ge a

nd

Ap

pro

ach

es C

on

ge

sti

on

Stu

dy

Valu

e M

an

ag

em

en

t R

evie

w L

on

g-t

erm

Op

tio

ns A

ssessm

en

t W

ork

sh

op

– 2

4 O

cto

be

r 2012

P

ag

e 1

7

Engi

ne

eri

ng

This

cri

teri

on

nee

ds

to b

e as

sess

ed q

ual

itat

ive

ly.

It in

clu

des

asp

ect

s o

f co

nst

ruct

ion

tec

hn

iqu

es

incl

ud

ing

traf

fic

man

agem

ent,

mo

vem

ent

of

con

stru

ctio

n m

ater

ials

th

rou

gh t

he

stu

dy

area

, eas

e o

f b

rid

ge c

on

stru

ctio

n, n

ois

e, d

ust

, en

viro

nm

enta

l m

anag

emen

t st

rate

gie

s, g

eolo

gica

l co

nsi

der

atio

ns

and

co

nst

ruct

ion

pro

gram

. A

hig

her

per

form

ing

op

tio

n w

ou

ld b

e o

ne

that

is

per

ceiv

ed t

o b

e a

mo

re c

on

stru

ctib

le d

esig

n.

imp

acts

on

tra

ffic

m

anag

emen

t; in

crea

sed

co

nst

ruct

ion

wit

hin

w

ater

way

; bu

ildin

g ad

jace

nt

to e

xist

ing

stru

ctu

re; a

lrea

dy

con

stra

ined

loca

tio

n t

o b

uild

in

; ove

rall

bu

ild t

ime

may

be

1-2

yea

rs; m

ore

dif

ficu

lt t

o

con

stru

ct c

om

par

ed t

o t

he

oth

er o

pti

on

s; m

od

ific

atio

ns

nec

ess

ary

to t

he

exis

tin

g st

ruct

ure

- r

elo

cati

on

of

the

wat

er m

ain

als

o a

d

isad

van

tage

; po

ssib

ly t

he

chea

pes

t to

bu

ild;

du

stie

st

affe

ctin

g tr

affi

c ad

jace

nt;

in

crea

sed

pili

ng

in t

he

rive

r;

safe

ty o

f ex

isti

ng

stru

ctu

re

du

rin

g co

nst

ruct

ion

- p

ilin

g ac

tivi

tie

s; a

ny

pro

ble

ms

wit

h

the

exis

tin

g b

rid

ge w

ou

ld

hav

e to

be

add

ress

ed w

ith

n

ew b

rid

ge c

on

stru

ctio

n

alo

ngs

ide;

4

a b

igge

r st

ruct

ure

co

mp

ared

to

op

tio

n

A; t

ie-i

ns

- co

nge

stio

n

cau

sed

by

clo

se

pro

xim

ity

- im

pac

ts

on

loca

l co

mm

un

ity

3

1

slig

htl

y sh

ort

er

bri

dge

; le

ss m

ater

ial

req

uir

ed t

o b

e u

sed

(b

rou

ght

into

th

e co

rrid

or)

; po

ten

tial

si

te s

tora

ge a

reas

aw

ay f

rom

th

e co

rrid

or

and

so

less

co

nst

ruct

ion

tra

ffic

im

pac

t;

2

mo

re s

pac

e an

d la

rger

st

ruct

ure

s fo

r o

pti

on

s C

&D

; gr

eate

r im

pac

ts o

n t

he

wh

ole

of

the

alig

nm

ent;

se

par

atio

n a

nd

wo

rkin

g o

ff-

line

is a

ben

efi

t fo

r o

pti

on

s C

&D

; ap

pro

ach

ro

ads

on

n

ort

her

n s

ide

will

hav

e an

im

pac

t o

n e

xist

ing

pro

per

ty

and

par

k -

sou

th s

ide

no

t su

ch a

big

issu

e; a

cces

s fr

om

ex

isti

ng

pro

per

ties

du

rin

g co

nst

ruct

ion

will

be

an

issu

e; o

pti

on

s C

&D

invo

lve

less

wo

rk w

ith

in t

he

rive

r w

hic

h is

a b

on

us;

can

oe

lau

nch

ing

wh

arf

may

nee

d

to b

e re

loca

ted

to

fac

ilita

te

op

tio

ns

C&

D; a

cces

s to

th

e p

ark

wo

uld

be

wo

rst

wit

h

op

tio

ns

C&

D; e

asie

r fu

ture

co

nst

ruct

ion

of

ano

ther

bri

dge

in o

pti

on

s C

&D

;

Engi

ne

eri

ng

Imp

rovi

ng

the

flo

od

imm

un

ity

and

mai

nta

inin

g fl

oo

d

acce

ss a

lon

g th

e co

rrid

or

for

a 1

:5yr

AR

I flo

od

eve

nt.

A

hig

her

per

form

ing

op

tio

n w

ou

ld im

pro

ve a

cces

s d

uri

ng

flo

od

eve

nts

an

d m

inim

ise

the

soci

al a

nd

ec

on

om

ic im

pac

ts.

3

exis

tin

g b

rid

ge le

vel b

elo

w

the

1:5

3

1

abo

ve t

he

1:5

1

abo

ve t

he

1:5

Imp

rovi

ng

the

flo

od

imm

un

ity

and

mai

nta

inin

g fl

oo

d

acce

ss a

lon

g th

e co

rrid

or

for

a 1

:20

yr A

RI f

loo

d

even

t.

A h

igh

er p

erfo

rmin

g o

pti

on

wo

uld

imp

rove

acc

ess

du

rin

g fl

oo

d e

ven

ts a

nd

min

imis

e th

e so

cial

an

d

eco

no

mic

imp

acts

.

3

3

2

1

on

ly o

pti

on

th

at a

chie

ves

1:2

0

Page 23: Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS introduced the workshop and affirmed the purpose of the workshop and the project objectives

Ric

hm

on

d B

rid

ge a

nd

Ap

pro

ach

es C

on

ge

sti

on

Stu

dy

Valu

e M

an

ag

em

en

t R

evie

w L

on

g-t

erm

Op

tio

ns A

ssessm

en

t W

ork

sh

op

– 2

4 O

cto

be

r 2012

P

ag

e 1

8

Engi

ne

eri

ng

(co

nt.

)

This

is a

qu

alit

ativ

e as

sess

me

nt

for

each

op

tio

n

agai

nst

th

e d

egre

e an

d e

ase

of

mai

nte

nan

ce o

f b

rid

ge s

tru

ctu

res.

A

hig

her

per

form

ing

op

tio

n w

ou

ld b

e o

ne

that

wo

uld

b

e ea

sier

to

mai

nta

in a

nd

min

imis

es lo

ng-

term

ro

ad

op

erat

ing

cost

s.

add

ing

com

plic

atio

n t

o

mai

nte

nan

ce o

f ex

isti

ng

stru

ctu

re;

mo

st d

iffi

cult

wit

h

add

itio

n o

f a

lon

gitu

din

al

join

t; h

eigh

t ac

cess

to

dec

k an

d p

iers

fo

r m

ain

ten

ance

n

ot

real

ly a

ny

dif

fere

nce

ac

ross

th

e o

pti

on

s; a

cce

ss t

o

A t

ho

ugh

wo

uld

be

an

on

goin

g is

sue

4

3

1

bri

dge

len

gth

a b

it

sho

rter

th

an f

or

op

tio

n D

2

This

is a

qu

alit

ativ

e as

sess

me

nt

for

each

op

tio

n

agai

nst

th

e d

egre

e an

d e

ase

of

mai

nte

nan

ce o

f th

e ro

ad c

arri

agew

ay a

nd

ass

oci

ated

str

uct

ure

s.

A h

igh

er p

erfo

rmin

g o

pti

on

will

be

on

e th

at w

ou

ld

be

easi

er t

o m

ain

tain

an

d m

inim

ises

lon

g-te

rm r

oad

o

per

atin

g co

sts.

lack

of

flex

ibili

ty w

ith

th

is

alig

nm

ent

3

1

new

bri

dge

ne

w

alig

nm

ent

- sm

alle

st

add

itio

nal

new

st

ruct

ura

l ele

men

ts

2

larg

est

sch

em

e w

ith

mo

st

infr

astr

uct

ure

to

be

mai

nta

ined

3

Lon

g-te

rm o

per

atio

nal

co

st

cost

of

do

ing

the

con

tra-

flo

w s

yste

m 4

1

1

1

Ove

rall

for

engi

nee

rin

g 4

3

1

2

Pro

ject

C

apit

al C

ost

Ro

ute

op

tio

ns

cost

s w

ill r

epre

sen

t th

e lik

ely

tota

l p

roje

ct c

ost

fo

r ea

ch o

pti

on

, in

clu

din

g al

low

ance

s fo

r d

esig

n, p

roje

ct d

eve

lop

men

t co

sts

incu

rred

by

RM

S,

lan

d a

cqu

isit

ion

, lit

igat

ion

me

asu

res

etc.

A

hig

her

per

form

ing

op

tio

n w

ou

ld h

ave

a lo

wer

ca

pit

al c

ost

.

1

bas

e ca

se

1

1.0

5X

bas

ecas

e

3

1.6

xbas

eca

se

3

1.7

xbas

eca

se

Page 24: Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS introduced the workshop and affirmed the purpose of the workshop and the project objectives

Ric

hm

on

d B

rid

ge a

nd

Ap

pro

ach

es C

on

ge

sti

on

Stu

dy

Valu

e M

an

ag

em

en

t R

evie

w L

on

g-t

erm

Op

tio

ns A

ssessm

en

t W

ork

sh

op

– 2

4 O

cto

be

r 2012

P

ag

e 1

9

Ap

pe

nd

ix 3

: B

ac

kg

rou

nd

In

form

ati

on

& T

he

Pri

ncip

al O

pti

on

s

The ‘R

ichm

ond B

ridge a

nd A

ppro

aches C

on

gestion

S

tud

y’

is a corr

idor

options

stu

dy

fun

de

d

by

the

Austr

alia

n

Go

vern

men

t to

addre

ss

traff

ic

congestion o

n R

ichm

ond B

ridge a

nd i

ts a

ppro

ach r

oa

ds a

nd t

o r

eserv

e a

ro

ad c

orr

idor

for

futu

re tra

ffic

needs.

Ric

hm

ond B

ridge

an

d its

appro

ach r

oads c

om

prise a

tw

o-la

ne (

one lan

e in

each d

irection)

config

ura

tio

n.

Ric

hm

ond B

rid

ge is l

iste

d o

n t

he R

MS

S17

0

Herita

ge

an

d

Conserv

atio

n

Regis

ter

as

an

item

of

sig

nific

ant

sta

te

herita

ge.

The t

ow

n o

f R

ichm

ond is a

lso a

Ma

cquarie t

ow

n im

port

ant

for

its

str

eets

capes

an

d

heri

tage

chara

cte

r.

T

he

corr

idor

com

prisin

g

Marc

h

Str

eet,

K

urr

ajo

ng R

oad,

and B

ells

Lin

e of

Road,

betw

ee

n E

ast

Mark

et

Str

eet,

R

ichm

ond

and

Gro

se

Vale

R

oa

d,

Nort

h

Ric

hm

ond

curr

ently

experie

nces t

raff

ic c

ongestion issues e

astb

oun

d in t

he

morn

ing (

AM

) peak

perio

d a

nd w

estb

oun

d i

n t

he a

ftern

oo

n/e

ve

nin

g (

PM

) peak p

eriod.

The

Ric

hm

ond B

rid

ge is locate

d t

o t

he w

este

rn e

nd o

f th

e s

tud

y a

rea a

nd is t

he

only

H

aw

kesbury

R

iver

cro

ssin

g serv

ing th

e re

sid

entia

l are

as of

Nort

h

Ric

hm

ond,

Kurr

ajo

ng,

Bilp

in a

nd B

ell.

T

he r

oads a

ppro

achin

g t

he

bri

dge

com

prise a

tw

o-w

ay,

two

-la

ne c

onfig

ura

tion.

The A

ustr

alia

n G

overn

ment

has p

rovid

ed f

und

ing t

o R

MS

to u

ndert

ake a

str

ate

gic

conce

pt

options s

tud

y t

o d

eve

lop s

uitab

le o

ptions t

hat

ad

dre

ss

the t

raff

ic c

ongestion i

ssu

e i

n o

rder

to r

eserv

e a

ro

ad c

orr

idor

for

futu

re

traff

ic n

eeds in t

he v

icin

ity o

f th

e e

xis

ting b

rid

ge.

The s

tud

y h

as b

een s

plit

in

to tw

o sta

ges.

S

tage 1

w

as com

ple

ted b

y H

yd

er

Consultin

g P

ty L

td

(Hyder)

a

nd

iden

tifie

d

sh

ort

-term

str

ate

gie

s

to

ad

dre

ss

the

congestion

issue

(up

to

2021).

Sta

ge

2

curr

ently

bein

g

und

ert

aken

by

SM

EC

(A

ustr

alia

) P

ty L

td (

SM

EC

) on b

eha

lf o

f R

MS

ide

ntifies lon

g-t

erm

options t

o

addre

ss c

ong

estio

n (

be

yo

nd 2

021 t

o 2

036).

As p

art

of

revie

win

g a

nd a

dd

ressin

g t

he c

on

gestion issue,

Hyder

assessed

the p

erf

orm

ance o

f R

ichm

ond B

ridge

an

d i

ts a

ppro

aches a

nd d

evelo

pe

d

short

-term

(up t

o 2

021)

so

lutions t

o t

raff

ic c

ongestion

alo

ng t

he c

orr

idor.

T

he S

tag

e 1 pro

posa

ls d

eve

loped in

clu

ded in

ters

ection tr

eatm

ents

a

nd

lo

calis

ed m

easure

s s

uch a

s t

he r

em

oval

of

on

-str

eet

park

ing d

uri

ng p

eak

perio

ds.

In J

uly

20

12 a

co

nsultation w

ork

shop w

as h

eld

with m

em

bers

of

the p

ublic

to

pre

sen

t th

e S

tag

e 1

pro

posals

.

This

foru

m w

as a

lso u

se

d t

o g

ath

er

info

rmation f

rom

the p

ublic

with r

eg

ard

to

lo

ng

-term

solu

tio

ns.

T

his

in

form

ation

has

bee

n

consid

ere

d

in

the

refinem

ent

of

the str

ate

gic

concept

options de

ve

lop

ed fo

r th

e lo

ng

-term

m

easure

s f

or

Sta

ge 2

. F

igure

1 o

n t

he f

ollo

win

g p

ag

e s

ho

ws t

he

location

of

Ric

hm

ond.

Pro

ject

Ju

stif

ica

tio

n

Urb

an expa

nsio

n and la

nd use changes in

nort

h-w

este

rn S

yd

ne

y h

ave

contr

ibu

ted

to

the

traff

ic

gro

wth

on

the

exis

ting

road

netw

ork

.

Conseq

uently,

durin

g

morn

ing

an

d

aft

ern

oon

peak

peri

ods,

Ric

hm

ond

Brid

ge a

nd its

appro

ach r

oads b

etw

een E

ast

Mark

et

Str

eet,

Ric

hm

ond a

nd

Gro

se V

ale

Road,

Nort

h R

ichm

ond e

xperi

ence

tra

ffic

congestion

.

The L

eve

l of

Serv

ice a

lon

g t

his

section

of

road i

s b

elo

w t

he

avera

ge f

or

sim

ilar

roads i

n S

ydn

ey a

nd w

ill w

ors

en w

itho

ut

incre

ases i

n t

he c

ap

acity

of

the corr

idor

to addre

ss pro

jecte

d fu

ture

de

ve

lop

ment

in th

e are

a.

In

add

itio

n

consid

era

tio

n

ha

s

been

giv

en

to

the

op

port

un

ity

to

develo

p

options t

hat

pro

vid

e a

hig

her

leve

l of

floo

d i

mm

unity t

here

by r

educin

g t

he

impact of floods a

nd a

ssocia

ted a

ccess r

estr

iction o

n t

he local co

mm

unity.

Pro

ject

Ov

erv

iew

Ric

hm

ond i

s a

to

wn a

bo

ut

65 k

ilom

etr

es n

ort

h w

est

of

the S

yd

ne

y C

BD

and

loca

ted

in

the

Ha

wkesbury

C

ity

Co

uncil

loca

l govern

ment

are

a.

Ric

hm

ond B

ridg

e s

pans t

he H

aw

kesbury

R

iver

con

nectin

g t

he t

ow

ns o

f R

ichm

ond to

th

e east

an

d N

ort

h R

ichm

ond to

th

e w

est.

T

he corr

idor

com

prisin

g M

arc

h S

treet,

Kurr

ajo

ng

Roa

d,

and

Be

lls L

ine o

f R

oad (

Be

lls

Lin

e o

f R

oad)

betw

een e

astb

oun

d i

n t

he m

orn

ing

(A

M)

pe

ak p

eriod

an

d

westb

ou

nd in t

he a

ftern

oon

/evenin

g (

PM

) p

eak p

eriod

.

The A

ustr

alia

n G

overn

ment

has p

rovid

ed f

un

din

g t

o R

oads a

nd

Mari

tim

e

Serv

ices (

RM

S)

to u

ndert

ake a

stu

dy t

o i

nvestig

ate

the t

raff

ic c

ongestion

issue in th

e s

hort

and lo

ng t

erm

s.

The purp

ose of

the s

tud

y i

s t

o d

eve

lop s

uitab

le options t

o a

ddre

ss t

he

traff

ic c

ongestion i

ssue i

n t

he s

hort

(201

6-2

02

1)

term

(S

tage 1

) an

d t

he

lon

g (

20

21

-20

36)

term

(S

tage 2

).

Page 25: Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS introduced the workshop and affirmed the purpose of the workshop and the project objectives

Ric

hm

on

d B

rid

ge a

nd

Ap

pro

ach

es C

on

ge

sti

on

Stu

dy

Valu

e M

an

ag

em

en

t R

evie

w L

on

g-t

erm

Op

tio

ns A

ssessm

en

t W

ork

sh

op

– 2

4 O

cto

be

r 2012

P

ag

e 2

0

Pro

ject

ob

ject

ive

s

The obje

ctives of

the stu

dy are

to

im

pro

ve tr

ave

l conditio

ns and ro

ad

safe

ty alo

ng th

e corr

idor

betw

een R

ichm

ond an

d N

ort

h R

ichm

ond.

To

support

these

obje

ctives,

the f

ollo

win

g a

dditio

na

l o

bje

ctives a

lso n

eed

to

be s

atisfied b

y th

e s

tud

y:

Ensure

the

op

era

tion

of

Ric

hm

ond B

ridg

e a

nd

its

app

roaches c

an

be m

ain

tain

ed d

uri

ng

constr

uction.

Main

tain

/im

pro

ve th

e a

ccessib

ility

of

Ric

hm

ond B

rid

ge.

Min

imis

e t

he i

mpacts

on t

he

built

an

d n

atu

ral

en

viro

nm

ent

alo

ng

the r

ou

te.

Min

imis

e the p

roje

ct

who

le o

f lif

e c

ost.

Stu

dy

Are

a

The s

tud

y a

rea i

nclu

des t

he c

orr

idor

com

prisin

g M

arc

h S

tree

t, K

urr

ajo

ng

Road,

and

Be

lls

Lin

e

of

Road

and

exte

nds

from

E

ast

Mark

et

Str

eet,

Ric

hm

ond t

o G

rose V

ale

Road,

Nort

h R

ichm

ond i

nclu

din

g t

he R

ichm

ond

Brid

ge.

The R

ichm

ond B

ridge i

s l

ocate

d t

o t

he w

este

rn e

nd o

f th

e s

tud

y

are

a an

d is

th

e o

nly

H

aw

kesbury

R

iver

cro

ssin

g se

rvin

g th

e re

sid

en

tia

l are

as

of

Nort

h

Ric

hm

ond,

Kurr

ajo

ng,

Bilp

in

an

d

Be

ll.

The

roads

appro

achin

g th

e b

ridg

e c

om

prise a

tw

o-w

ay,

two

-lan

e c

onfigura

tion

.

The stu

dy are

a w

as div

ided in

to fo

ur

dis

tinct

sectio

ns in

as part

of

the

initia

l o

ption d

eve

lopm

ent p

rocess. T

hese s

ections w

ere

:

Section 1

: R

ichm

ond a

rea

Section 2

: K

urr

ajo

ng R

oa

d

Section 3

: R

ichm

ond B

rid

ge

Section 4

: N

ort

h R

ichm

ond

Te

chn

ica

l In

ve

stig

ati

on

s

A s

eries o

f te

chnic

al

investigatio

ns (

liste

d b

elo

w)

pro

vid

e t

he b

asis

for

the

assessm

ent

of

the r

ou

te o

ptio

ns.

These

stu

die

s a

im t

o i

nfo

rm t

he p

roje

ct

obje

ctives a

nd

allo

w a

ssessm

ent

of

the

route

options a

gain

st

the c

rite

ria.

T

he k

ey o

utc

om

es in t

he f

orm

of

issues a

nd o

pport

unitie

s a

ssocia

ted w

ith

each r

oute

option a

re p

rese

nte

d in t

his

backgro

und p

aper.

The technic

al stu

die

s c

om

mis

sio

ned t

o info

rm the S

tage 2

stu

dy inclu

de:

Tra

ffic

modelli

ng

an

d tra

nsport

assessm

ent.

Flo

od

modelli

ng.

En

viro

nm

enta

l stu

die

s (

inclu

din

g b

iodiv

ers

ity a

nd h

erita

ge).

Urb

an a

nd la

ndscape d

esig

n s

tud

y inclu

din

g v

isu

al assessm

ent.

Constr

ain

ts m

appin

g (b

ased on outp

uts

fr

om

th

e E

nvironm

enta

l stu

die

s).

Revie

w o

f utilit

y s

erv

ices.

Str

ate

gic

conce

pt d

esig

ns (

road a

nd b

ridg

e).

Pre

limin

ary

geote

chnic

al in

vestigations.

De

sig

n o

bje

ctiv

es

an

d c

rite

ria

D

esi

gn

ob

ject

ive

s

The p

rim

ary

obje

ctive o

f th

e s

tud

y i

s t

o a

llevia

te t

raff

ic c

ongestion a

long

th

e c

orr

idor

be

twee

n R

ichm

ond a

nd N

ort

h

Ric

hm

ond.

The s

econdary

obje

ctive o

f th

e s

tud

y is t

o p

rovid

e a

n im

pro

ved

le

vel of

flood im

munity f

or

the c

orr

idor.

To s

upport

these k

ey o

bje

ctives,

the f

ollo

win

g a

dditio

na

l obje

ctives a

lso

need

to b

e s

atisfied b

y t

he s

tud

y:

Ensure

th

e o

pera

tions o

f R

ichm

ond B

rid

ge a

nd its

ap

pro

aches c

an

be m

ain

tain

ed d

uri

ng

constr

uction.

Main

tain

/Im

pro

ve t

he a

ccessib

ility

of

Ric

hm

ond B

rid

ge.

Min

imis

e t

he i

mpacts

on t

he b

uilt

an

d n

atu

ral

en

viro

nm

ent

alo

ng

the r

ou

te.

Impro

ve s

afe

ty f

or

ped

estr

ians, cyclis

t an

d m

oto

rists

.

Min

imis

e the p

roje

ct

who

le o

f lif

e c

ost.

En

gin

ee

rin

g s

tan

da

rds

The f

ollo

win

g E

ngin

eeri

ng S

tan

dard

s h

ave b

ee

n u

sed

in t

he d

eve

lopm

ent

of

the s

trate

gic

conce

pt o

ptions:

AU

STR

OA

DS

(pre

vio

usl

y N

AA

SRA

) G

uid

elin

es a

nd

pu

blic

atio

ns.

RM

S Su

pp

lem

ents

an

d T

ech

nic

al D

irec

tio

ns.

Au

stra

lian

Sta

nd

ard

s

Page 26: Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS introduced the workshop and affirmed the purpose of the workshop and the project objectives

Ric

hm

on

d B

rid

ge a

nd

Ap

pro

ach

es C

on

ge

sti

on

Stu

dy

Valu

e M

an

ag

em

en

t R

evie

w L

on

g-t

erm

Op

tio

ns A

ssessm

en

t W

ork

sh

op

– 2

4 O

cto

be

r 2012

P

ag

e 2

1

Ro

ad

de

sig

n c

rite

ria

The f

ollo

win

g r

oa

d d

esig

n c

rite

ria

ha

ve

be

en

ad

opte

d i

n t

he d

evelo

pm

ent

of

the o

ptio

ns:

The

pro

visi

on

of

the

nec

ess

ary

nu

mb

er o

f tr

avel

lan

es a

lon

g th

e co

rrid

or

and

wit

h s

uit

able

in

ters

ecti

on

tre

atm

ents

to

pro

vid

e an

ac

cep

tab

le L

evel

of

Serv

ice

to m

anag

e tr

affi

c co

nge

stio

n in

20

36

.

Des

ign

sp

eed

– u

rban

se

ctio

n 7

0km

/h

Des

ign

sp

eed

– r

ura

l sec

tio

n 9

0km

/h

Sign

po

ste

d s

pee

d l

imit

– u

rban

an

d r

ura

l se

ctio

ns

10

km/h

les

s th

an t

he

des

ign

sp

eed

Sto

pp

ing

Sigh

t D

ista

nce

(SS

D)

– ru

ral

sect

ion

120

met

res

wit

h a

re

acti

on

tim

e o

f 1

.5 s

eco

nd

s

Sto

pp

ing

Sigh

t D

ista

nce

(SS

D)

– u

rban

sec

tio

n 8

0 m

etre

s w

ith

a

reac

tio

n t

ime

of

1.5

se

con

ds

Ty

pic

al

cro

ss s

ect

ion

an

d c

lea

ran

ces

Cro

ss s

ecti

on

ele

men

t M

inim

um

val

ues

(an

d r

ange

)

Lan

e w

idth

Exi

stin

g ca

rria

gew

ay: 2

.9 -

3.2

met

res

New

car

riag

eway

: 3.0

- 3

.5 m

etre

s

Typ

ical

m

edia

n

wid

th

Min

imu

m

wid

th

= 4

.2

met

res

(wh

ere

app

licab

le)

Typ

ical

ver

ge w

idth

2.0

met

res

or

reta

inin

g e

xist

ing

wid

th

Sho

uld

er w

idth

Exi

stin

g ca

rria

gew

ay -

0.5

met

res

New

car

riag

eway

: 1.5

- 2

.0 m

etre

s (w

her

e ap

plic

able

)

Shar

ed u

se p

ath

wid

th 3

met

res

Foo

tpat

h w

idth

(ex

isti

ng)

1.2

met

res

Ver

tica

l cle

aran

ce 5

.3 m

etre

s

Bri

dg

e d

esi

gn

cri

teri

a

The f

ollo

win

g b

ridg

e d

esig

n c

rite

ria h

ave b

een a

do

pte

d in

th

e d

eve

lopm

ent

of

the o

ptio

ns:

Au

stra

lian

Sta

nd

ard

51

00 (

Bri

dge

Des

ign

Co

de)

.

RM

S Su

pp

lem

ents

an

d T

ech

nic

al D

irec

tio

ns.

10

0 y

ear

des

ign

life

.

Lan

e w

idth

3.2

5 m

etre

s fo

r O

pti

on

A

3.5

met

res

for

Op

tio

ns

B, C

, D

Sho

uld

er w

idth

2.0

met

res

for

Op

tio

n A

1.5

– 2

.0 m

etre

s fo

r O

pti

on

s B

,C a

nd

D

Foo

tpat

h w

idth

Exi

stin

g w

idth

of

foo

tpat

h (

2.1

met

res)

fo

r O

pti

on

A

3 m

etre

wid

e sh

ared

use

pat

h f

or

Op

tio

ns

B, C

, D

Co

ntr

a fl

ow

bar

rier

wid

th 0

.6 m

etre

s (O

pti

on

A o

nly

)

Lon

gitu

din

al g

rad

e To

mat

ch t

he

road

alig

nm

ent

Cro

ssfa

ll 3

per

cen

t to

mat

ch t

he

road

alig

nm

ent

Sup

erst

ruct

ure

cla

ssif

ied

as

par

tial

ly s

ub

mer

ged

as

clo

sed

cel

l st

ruct

ure

s ar

e co

nsi

der

ed u

nsu

itab

le

Des

ign

lo

ads

theo

reti

cal

des

ign

lo

ads

to m

od

el t

raff

ic l

oad

ings

(S

M1

60

0 a

nd

HLP

40

0).

Ro

ad

de

sig

n c

on

stra

ints

The r

oad d

esig

n c

onstr

ain

ts a

lon

g th

e c

orr

idor

inclu

de

the f

ollo

win

g:

The

exis

tin

g R

ich

mo

nd

Bri

dge

.

Exis

tin

g p

rop

erty

bo

un

dar

ies.

The

exis

tin

g al

ign

men

t th

rou

gh a

bu

ilt u

p u

rban

are

a w

ith

mix

ed

lan

d u

ses

in R

ich

mo

nd

fro

m E

ast

Mar

ket

Stre

et t

o C

hap

el S

tree

t (a

lon

g M

arch

Str

eet

and

Ku

rraj

on

g R

oad

) an

d in

No

rth

Ric

hm

on

d,

Bel

ls L

ine

of

Ro

ad f

rom

th

e H

ann

apak

ind

ust

rial

co

mp

lex

to G

rose

V

ale

Ro

ad/T

erra

ce R

oad

.

Sen

siti

ve h

erit

age

(Ab

ori

gin

al a

nd

no

n-A

bo

rigi

nal

) e

lem

ents

.

Flo

ra a

nd

fau

na

hab

itat

s an

d s

pec

ies.

Co

nfl

ict

wit

h u

tilit

y se

rvic

es.

Page 27: Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS introduced the workshop and affirmed the purpose of the workshop and the project objectives

Ric

hm

on

d B

rid

ge a

nd

Ap

pro

ach

es C

on

ge

sti

on

Stu

dy

Valu

e M

an

ag

em

en

t R

evie

w L

on

g-t

erm

Op

tio

ns A

ssessm

en

t W

ork

sh

op

– 2

4 O

cto

be

r 2012

P

ag

e 2

2

Co

nsi

de

rati

on

of

flo

od

im

mu

nit

y

Consultation w

ith th

e S

tate

E

merg

ency S

erv

ice (S

ES

) and H

aw

kesbury

C

ity C

ouncil

(HC

C)

consid

ere

d t

he i

mpacts

of

a 1

:5 y

ear,

1:1

0 y

ear

an

d

1:2

0 ye

ar

AR

I flo

od e

vent

and th

e f

loo

d a

ccess i

ssues t

hat

ne

ed t

o b

e

addre

ssed w

ith r

egard

to t

he b

ridg

e a

nd a

ppro

ach

es.

Thro

ug

h t

his

pro

cess

it w

as esta

blis

hed

th

at

the ro

ute

s consid

ere

d are

not

flo

od

e

vacuatio

n

route

s f

or

either

the S

ES

or

HC

C.

Co

nsi

de

rati

on

of

gra

de

se

pa

rati

on

in

ters

ect

ion

tre

atm

en

ts

Optio

ns th

at

invo

lved fu

ll gra

de sep

ara

tion of

the e

xis

ting in

ters

ections

such a

s G

rose V

ale

Road

/Bells

Lin

e o

f R

oa

d w

ere

not

consid

ere

d f

urt

her

due t

o th

e f

ollo

win

g issues:

Traf

fic

volu

mes

w

ere

ca

pab

le

of

bei

ng

cate

red

fo

r b

y at

gr

ade

inte

rsec

tio

ns

and

can

sti

ll p

rovi

de

an a

deq

uat

e le

vel o

f se

rvic

e.

The

pre

limin

ary

eco

no

mic

ass

essm

ent

of

the

cap

ital

co

st o

f gr

ade

sep

arat

ion

in

terc

han

ges

ind

icat

ed

that

th

ese

op

tio

ns

we

re

no

t ec

on

om

ical

ly ju

stif

iab

le.

En

vir

on

me

nta

l C

on

sid

era

tio

ns

In c

onju

nctio

n w

ith

th

e d

evelo

pm

ent

of

options,

pre

limin

ary

environm

enta

l in

vestigations w

ere

und

ert

aken f

or

the

stu

dy are

a.

The re

sults of

these

were

use

d

to

ide

ntify

th

e

exis

ting

en

vironm

ent

in

the

are

a

and

an

y

pote

ntial

co

nstr

ain

ts fo

r th

e optio

ns be

ing

co

nsid

ere

d.

A

s part

of

this

in

vestigation,

deskto

p e

nvir

onm

enta

l searc

hes w

ere

undert

aken fo

r th

e

stu

dy a

rea.

This

was f

ollo

wed b

y a

fie

ld i

nvestigatio

n t

hro

ugh

the

stu

dy

are

a,

ho

we

ver

it w

as l

imited t

o p

ub

lic s

paces,

such a

s t

he r

oad c

orr

idor

and r

iver

ba

nk. N

o f

ield

in

vestiga

tio

ns w

ere

und

ert

aken o

n p

rivate

land.

In g

enera

l, because

a

ll op

tions are

th

e sam

e th

roug

h th

e to

wnsh

ips of

Ric

hm

ond and N

ort

h R

ich

mond,

the

environm

enta

l constr

ain

ts in

th

ese

are

as w

ould

be c

onsis

tent

for

all

options.

In a

dd

itio

n,

optio

ns a

cro

ss t

he

flood

p

lain

a

nd

Ha

wkesbury

R

iver

all

occur

within

abou

t a

50

metr

e

corr

idor,

there

fore

the e

nvir

onm

enta

l constr

ain

ts in

th

ese a

reas w

ould

als

o

be s

imila

r fo

r all

op

tio

ns.

The m

ain

dis

tinctions b

etw

een t

he c

onstr

ain

ts a

re:

The

op

tio

ns

clo

sest

to

th

e ex

isti

ng

road

co

rrid

or

(op

tio

ns

A a

nd

B)

may

hav

e h

igh

er A

bo

rigi

nal

an

d n

on

-Ab

ori

gin

al c

on

stra

ints

th

rou

gh

the

flo

od

pla

in a

nd

acr

oss

th

e ri

ver.

Op

tio

ns

C a

nd

D w

ou

ld r

equ

ire

mo

re p

rop

erty

acq

uis

itio

n a

s th

ey

hav

e a

wid

er r

oad

co

rrid

or.

Op

tio

n C

an

d D

may

req

uir

e m

ore

flo

od

an

d h

ydro

logy

man

agem

ent

du

e to

th

e h

eigh

t o

f th

e n

ew r

oad

em

ban

kmen

t ac

ross

th

e fl

oo

d

pla

in.

Ho

wev

er t

hes

e o

pti

on

s w

ou

ld a

lso

pro

vid

e a

hig

her

lev

el o

f fl

oo

d im

mu

nit

y fo

r th

e lo

cal c

om

mu

nit

y.

Bio

div

ers

ity

co

nst

rain

ts

Lo

w q

ua

lity R

iver-

flat

euca

lyp

t fo

rest

on c

oasta

l flood

pla

ins (

of

the N

SW

N

ort

h

Co

ast,

Sydn

ey

Basin

an

d

South

E

ast

Corn

er

bio

reg

ions)

enda

ngere

d e

co

log

ical

co

mm

unity e

xis

ts w

ith

in t

he s

tud

y a

rea a

lon

g t

he

banks o

f th

e H

aw

kesbury

Riv

er.

This

constr

ain

t is

com

mon for

all

options.

Fre

shw

ate

r w

etlands on coasta

l flood

pla

ins (o

f th

e N

SW

N

ort

h C

oast,

Syd

ne

y B

asin

and S

outh

East

Corn

er

bio

reg

ions)

endan

gere

d e

colo

gic

al

com

munity e

xis

ts a

roun

d t

he P

ugh

’s L

ago

on w

etla

nd

. T

his

constr

ain

t is

com

mon f

or

all

op

tio

ns.

There

is p

ote

ntia

l fo

r G

reen a

nd G

old

en B

ell

Fro

gs t

o e

xis

t w

ithin

Pu

gh’s

Lago

on. T

his

constr

ain

t w

ould

be c

om

mon f

or

all

optio

ns.

Hollo

w b

earin

g t

rees e

xis

t w

ith

in t

he r

ipari

an f

ore

st

on t

he s

outh

ern

bank

of

the H

aw

kesbury

R

iver

alo

ng th

e ba

nks of

the ri

ver

adja

cent

to th

e

exis

tin

g b

ridge

.

Optio

ns A

and B

ha

ve m

ore

pote

ntia

l to

im

pact

these,

there

fore

th

is i

s a

com

mon f

or

these o

ptio

ns.

Noxio

us w

eeds in t

he a

rea

are

com

mon f

or

all

options.

Ab

ori

gin

al

He

rita

ge

Co

nst

rain

ts

There

are

know

n A

borig

inal

sites c

lose

to t

he e

xis

ting b

ridge

alig

nm

ent.

This

wou

ld b

e a

gre

ate

r co

nstr

ain

t to

options A

an

d B

.

There

is a

pote

ntia

l fo

r fu

rther

unre

cord

ed A

borig

inal

herita

ge a

nd

cultura

l sites

to

occur

within

th

e

local

landscape

.

This

constr

ain

t w

ou

ld

be

com

mon to a

ll o

ptio

ns.

Page 28: Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS introduced the workshop and affirmed the purpose of the workshop and the project objectives

Ric

hm

on

d B

rid

ge a

nd

Ap

pro

ach

es C

on

ge

sti

on

Stu

dy

Valu

e M

an

ag

em

en

t R

evie

w L

on

g-t

erm

Op

tio

ns A

ssessm

en

t W

ork

sh

op

– 2

4 O

cto

be

r 2012

P

ag

e 2

3

No

n-A

bo

rig

ina

l H

eri

tag

e c

on

stra

ints

Within

or

adja

cent

to t

he s

tud

y a

rea 1

0 i

tem

s l

iste

d o

n t

he S

tate

Herita

ge

Regis

ter

occur

with

in t

he R

ichm

ond t

ow

nsh

ip,

som

e im

media

tely

adja

cen

t to

the r

oa

d c

orr

idor.

A

s a

ll options t

hro

ugh t

he t

ow

nship

are

the s

am

e,

this

constr

ain

t is

com

mon f

or

all

options.

Thre

e ite

ms lis

ted

on

Section 1

70

Re

gis

ters

, in

clu

din

g R

ichm

ond B

rid

ge in

th

e

RM

S

regis

ter,

occur

with

in

the

stu

dy

are

a.

T

he

constr

ain

t w

ithin

R

ichm

ond is th

e s

am

e f

or

all

options.

Ho

we

ver,

the

exis

ting

Ric

hm

ond B

ridg

e is o

nly

a c

onstr

ain

t fo

r optio

n A

as

it w

ould

req

uire m

odific

atio

ns to

th

e b

ridg

e s

tructu

re.

105 l

oca

l heri

tag

e i

tem

s l

iste

d o

n t

he c

urr

ent

an

d d

raft

Haw

kesbury

City

Council

Local

Environm

ent

Pla

ns o

ccur

with

in t

he

stu

dy a

rea.

These a

re

pre

dom

inantly w

ith

in t

ow

nship

s a

nd w

ou

ld b

e a

com

mon c

onstr

ain

t fo

r all

options.

There

is

po

tentia

l fo

r arc

haeo

logic

al

rem

ain

s of

the o

ld ri

ver

cro

ssin

g,

inclu

din

g t

he

pu

nt

wharf

and f

orm

er

tim

ber

brid

ge

to e

xis

t a

dja

cent

to t

he

curr

ent

road c

orr

idor.

This

is a

hig

her

constr

ain

t fo

r options A

and B

as

the

y a

re c

loser

to t

he e

xis

ting r

oa

d a

lignm

ent at th

e r

iver.

There

is p

ote

ntia

l fo

r arc

haeo

log

ical

rem

ain

s o

f th

e f

orm

er

railw

ay l

ine t

o

Nort

h R

ichm

ond t

o e

xis

t w

ithin

the s

tud

y a

rea.

This

would

be a

com

mon

constr

ain

t fo

r a

ll options.

Lan

dfo

rm, g

eolo

gy a

nd

so

ils c

on

stra

ints

Pote

ntial

to exp

ose acid

sulp

hate

soils

at

vario

us lo

catio

ns acro

ss th

e

pro

posa

l site.

This

constr

ain

t w

ould

be

fair

ly c

om

mon for

all

op

tions.

Giv

en t

he c

lose p

roxim

ity o

f th

e o

ptio

ns,

the s

oil

type c

onstr

ain

ts w

ould

be

sim

ilar

for

all

options.

Wat

er

qu

alit

y an

d h

ydro

logy

co

nst

rain

ts

The H

aw

kesbury

Riv

er

is a

com

mon c

onstr

ain

t fo

r all

optio

ns.

Pug

h’s

Lago

on o

n t

he

nort

hern

sid

e o

f th

e e

xis

tin

g r

oad c

orr

idor

wo

uld

pro

vid

e a

constr

ain

t fo

r all

options a

s a

wid

enin

g r

oa

d c

orr

idor

wo

uld

be

re

quire

d in th

is a

rea.

Mana

gin

g h

ydro

log

y a

cro

ss t

he f

lood p

lain

wo

uld

be

a c

onstr

ain

t fo

r all

options.

Ho

we

ver

optio

n C

and D

would

requ

ire a

dditio

nal

co

nsid

era

tio

n f

or

flood

mitig

atio

n u

nd

ern

eath

th

e n

ew

road a

lignm

ents

due t

o t

he p

ote

ntia

l he

ight

of

the e

mbankm

ents

. T

hese o

ptio

ns w

ould

als

o p

rovid

e a

hig

her

leve

l of

flood im

munity f

or

the local com

munitie

s.

No

ise

co

nst

rain

ts

Sensitiv

e r

eceiv

ers

within

the R

ichm

ond a

nd

Nort

h R

ichm

ond a

reas w

ou

ld

be a

no

ise c

onstr

ain

t fo

r all

options.

Herita

ge b

uild

ings t

hat

may b

e a

ffecte

d b

y a

n i

ncre

ase i

n v

ibra

tio

n f

rom

th

e o

pera

tio

n o

f th

e r

oad w

ould

be

a c

om

mon c

onstr

ain

t fo

r all

optio

ns.

Sh

ort

list

ed

op

tio

ns

for

de

ve

lop

me

nt

The f

inal short

lis

t of

str

ate

gic

op

tio

ns f

or

the R

ichm

ond B

ridge

are

:

Optio

n A

; O

ption B

; O

ptio

n C

; O

ption D

Com

mon to the f

our

op

tio

ns is the p

rovis

ion o

f:

Tw

o

lanes

in

the

peak

dir

ection

duri

ng

pe

ak

perio

ds

betw

ee

n

Ric

hm

ond a

nd N

ort

h R

ich

mond.

This

wo

uld

be a

ch

ieve

d t

hro

ugh

a m

ix o

f peak h

our

on

-str

eet

park

ing r

estr

ictions a

nd t

he p

rovis

ion

of

a n

ew

tw

o l

ane c

arr

iag

ew

ay b

etw

een C

hape

l S

treet

and O

ld

Kurr

ajo

ng

Roa

d/Y

arr

am

undi La

ne.

Sig

na

lise

d

inte

rsections

with

righ

t tu

rn

ba

ys

an

d

pe

destr

ian

cro

ssin

g f

acili

ties,

except

at W

est

Mark

et

Str

eet

and O

ld K

urr

ajo

ng

Road/Y

arr

am

undi Lan

e.

A t

hre

e m

etr

e w

ide s

hare

d u

se p

ath

be

twe

en R

ichm

ond a

nd N

ort

h

Ric

hm

ond.

Page 29: Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS introduced the workshop and affirmed the purpose of the workshop and the project objectives

Ric

hm

on

d B

rid

ge a

nd

Ap

pro

ach

es C

on

ge

sti

on

Stu

dy

Valu

e M

an

ag

em

en

t R

evie

w L

on

g-t

erm

Op

tio

ns A

ssessm

en

t W

ork

sh

op

– 2

4 O

cto

be

r 2012

P

ag

e 2

4

Op

tio

n A

– T

hre

e-l

ane

con

tra f

low

tra

ffic

managem

ent option t

o p

rovid

e t

wo la

nes in t

he p

eak d

irection.

This

would

involv

e:

Wid

enin

g o

f th

e e

xis

tin

g b

ridge d

ow

nstr

eam

to a

ccom

modate

thre

e tra

vel la

nes a

cro

ss the b

rid

ge.

An a

dd

itio

nal tw

o lanes f

or

the K

urr

ajo

ng R

oad

eastb

ound c

arr

iag

ew

ay b

etw

een

Chap

el S

tre

et

and

Old

Kurr

ajo

ng R

oa

d/Y

arr

am

undi

La

ne t

o p

rovid

e f

our

lanes (

two

lan

es in e

ach d

irection).

Contr

a f

low

tra

ffic

managem

ent

from

appro

xim

ate

ly 5

0 m

etr

es w

est

of

Old

Kurr

ajo

ng R

oa

d/Y

arr

am

undi L

an

e t

o a

ppro

xim

ate

ly 1

20 m

etr

es e

ast

of

Pitt

La

ne

inclu

din

g

acro

ss the b

ridge.

No c

han

ge t

o th

e c

urr

ent

leve

l of

flood im

munity.

Op

tio

n B

- P

rovid

e a

tota

l of

four

lanes, tw

o in e

ach d

irection,

with n

o c

han

ge t

o t

he c

urr

ent

leve

l of

flood im

munity. T

his

wou

ld in

vo

lve:

A n

ew

tw

o la

ne b

rid

ge f

ive m

etr

es d

ow

nstr

eam

fro

m the e

xis

ting b

rid

ge c

onstr

ucte

d a

t th

e s

am

e le

ve

l as th

e e

xis

ting b

rid

ge.

Reta

inin

g t

he e

xis

ting b

ridg

e.

An a

dd

itio

na

l tw

o l

an

es f

or

the K

urr

ajo

ng R

oad e

astb

ound

carr

iag

ew

ay b

etw

een

Chap

el

Str

eet

and O

ld K

urr

ajo

ng R

oad/Y

arr

am

undi

Lane w

hic

h w

ill p

rovid

e f

our

lan

es (

two lan

es in e

ach d

irection).

Op

tio

n C

- P

rovid

e a

tota

l of

four

lanes, tw

o in e

ach d

irection,

with th

e b

ridge

an

d a

dd

itio

na

l e

astb

ound

carr

iage

wa

y c

onstr

ucte

d a

t a

le

ve

l to

pro

vid

e 1

:5 y

ear

AR

I

flood im

munity.

This

wou

ld in

vo

lve:

A n

ew

tw

o la

ne b

rid

ge p

rovid

ed 2

5-5

0 m

etr

es d

ow

nstr

eam

fro

m the e

xis

tin

g b

ridg

e.

Reta

inin

g t

he e

xis

ting b

ridg

e.

An a

dd

itio

na

l tw

o l

an

es f

or

the K

urr

ajo

ng R

oad e

astb

ound

carr

iag

ew

ay b

etw

een

Chap

el

Str

eet

and O

ld K

urr

ajo

ng R

oad/Y

arr

am

undi

Lane w

hic

h w

ill p

rovid

e f

our

lan

es (

two lan

es in e

ach d

irection).

Op

tio

n D

- P

rovid

e a

tota

l of

four

lanes, tw

o in e

ach d

irection,

with th

e b

ridge

an

d a

dd

itio

na

l e

astb

ound

carr

iage

wa

y c

onstr

ucte

d a

t a

le

ve

l to

pro

vid

e 1

:20 y

ear

AR

I

flood im

munity.

This

wou

ld in

vo

lve:

A n

ew

tw

o-l

an

e b

ridg

e p

rovid

ed 2

5-5

0 m

etr

es d

ow

nstr

eam

fro

m the e

xis

tin

g b

ridg

e.

Reta

inin

g t

he e

xis

ting b

ridg

e.

An a

dd

itio

na

l tw

o l

an

es f

or

the K

urr

ajo

ng R

oad e

astb

ound

carr

iag

ew

ay b

etw

een

Chap

el

Str

eet

and O

ld K

urr

ajo

ng R

oad/Y

arr

am

undi

Lane w

hic

h w

ill p

rovid

e f

our

lan

es (

two lan

es in e

ach d

irection).

Rem

oval of

som

e turn

ing

movem

ents

at O

ld K

urr

ajo

ng R

oad /

Yarr

am

undi La

ne.

In a

ll th

e f

our

op

tio

ns,

park

ing a

lon

g t

he c

orr

idor

wou

ld b

e r

estr

icte

d t

o o

ff p

eak h

ours

in R

ichm

ond a

nd

Nort

h R

ichm

ond,

to p

rovid

e f

or

four

lan

es d

uri

ng t

he m

orn

ing

and a

ftern

oon

pe

aks.

Co

nsi

de

rati

on

of

a n

ew

fo

ur-

lan

e b

rid

ge

A s

ub-o

ption o

f O

ptions C

and D

consis

ting o

f a n

ew

four-

lane b

ridg

e o

n t

he d

ow

nstr

eam

sid

e o

f th

e e

xis

ting b

ridg

e a

nd w

ith t

he s

am

e l

evel

of

flood i

mm

unity a

s

Optio

ns C

and D

has a

lso

been c

onsid

ere

d.

This

altern

ative b

rid

ge o

ption w

ou

ld p

rovid

e t

wo l

anes i

n e

ach d

irection a

cro

ss a

sin

gle

brid

ge a

nd c

ou

ld a

llow

the

exis

tin

g b

ridge

to b

e u

se

d f

or

recre

ationa

l p

urp

oses s

uch a

s a

gre

en lin

k p

edestr

ian a

nd c

ycle

route

acro

ss th

e r

iver.

This

four-

lane b

ridg

e c

ould

be a

ccom

modate

d w

ith

in t

he p

rop

osed c

orr

idor.

Due t

o t

he h

eig

ht

diffe

rence i

n t

he a

ppro

ach a

lignm

ent

for

the s

ub O

ption D

, th

e n

ew

fo

ur

lane b

ridg

e o

ption w

ou

ld h

ave im

pacts

on t

urn

ing m

ovem

ents

at

Old

Kurr

ajo

ng R

oad /

Yarr

am

undi L

ane t

hat

wo

uld

requ

ire a

dju

stm

ents

to b

e m

ade a

t B

osw

ort

h

Str

eet

to c

ate

r fo

r th

e a

dd

itio

na

l tr

aff

ic.

Page 30: Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS introduced the workshop and affirmed the purpose of the workshop and the project objectives

Ric

hm

on

d B

rid

ge a

nd

Ap

pro

ach

es C

on

ge

sti

on

Stu

dy

Valu

e M

an

ag

em

en

t R

evie

w L

on

g-t

erm

Op

tio

ns A

ssessm

en

t W

ork

sh

op

– 2

4 O

cto

be

r 2012

P

ag

e 2

5

Op

tio

n A

Page 31: Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS introduced the workshop and affirmed the purpose of the workshop and the project objectives

Ric

hm

on

d B

rid

ge a

nd

Ap

pro

ach

es C

on

ge

sti

on

Stu

dy

Valu

e M

an

ag

em

en

t R

evie

w L

on

g-t

erm

Op

tio

ns A

ssessm

en

t W

ork

sh

op

– 2

4 O

cto

be

r 2012

P

ag

e 2

6

Op

tio

n B

Page 32: Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS introduced the workshop and affirmed the purpose of the workshop and the project objectives

Ric

hm

on

d B

rid

ge a

nd

Ap

pro

ach

es C

on

ge

sti

on

Stu

dy

Valu

e M

an

ag

em

en

t R

evie

w L

on

g-t

erm

Op

tio

ns A

ssessm

en

t W

ork

sh

op

– 2

4 O

cto

be

r 2012

P

ag

e 2

7

Op

tio

n C

Page 33: Appendix 4 - Value management report (Part 3 long-term study) · Appendix 3. Fiona Chan of RMS introduced the workshop and affirmed the purpose of the workshop and the project objectives

Ric

hm

on

d B

rid

ge a

nd

Ap

pro

ach

es C

on

ge

sti

on

Stu

dy

Valu

e M

an

ag

em

en

t R

evie

w L

on

g-t

erm

Op

tio

ns A

ssessm

en

t W

ork

sh

op

– 2

4 O

cto

be

r 2012

P

ag

e 2

8

Op

tio

n

D


Recommended