Appendix C Fluvial Geomorphology Assessment
Transcript
Page 1: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

Appendix C Fluvial Geomorphology Assessment

Page 2: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

MUD CREEK ENVIRONMENTAL ASSESSMENT:

FLUVIAL GEOMORPHOLOGY

CITY OF LONDON

DRAFT REPORT June 22, 2015

Page 3: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

June 16, 2015 WE 14046 Tom Mahood, P.Eng. Project Manager CH2M 72 Victoria Street South, Suite 300 Kitchener, ON N2G 4Y9 Dear Mr Mahood: RE: Mud Creek Environmental Assessment – City Of London

Fluvial Geomorphological Component – Draft Report

1. INTRODUCTION In anticipation of development in the Mud Creek Subwatershed, the City of London (City) has requested consulting services to support a Municipal Class Schedule B Environmental Assessment (EA). An original Subwatershed Study was completed in 1995, with recent studies completed in 2009 and 2014. The most recent update addressed water resources components, and included some preliminary mitigation strategies to address existing issues within the watershed, with specific direction to improve flooding, erosion, and sedimentation issues. Within the EA, the City requires that the mitigation strategies from the Subwatershed Study Update (2014) be considered in developing sound environmental design alternatives that consider the current and future conditions of the subwatershed as they relate to development. Water’s Edge was authorized by CH2M to undertake a fluvial geomorphological assessment for Mud Creek which confirms and updates previous findings/issues through a desktop and field assessment. The results of the assessment will be used develop and assess design alternatives, ultimately contributing to the selection of a preferred. Functional concept designs for the preferred alternative are required to fulfill the requirements of the EA that enhance the conveyance of flood events, while creating a dynamically stable river channel. Issues identified through the background review and those explicitly stated by the City in their RFP will be used to guide this study, particularly when updating the existing conditions and reviewing prior mitigation recommendations. Furthermore, the EA process requires that insight, concerns, and feedback from local stakeholders) be considered in the selection and design of the preferred alternative. Emphasis in this study will be placed on developing functional, concept designs that consider the existing issues and future impacts, and stakeholder feedback which may then be used to advise the detailed design of Mud Creek prior to and during development. The entire Mud Creek subwatershed has a drainage area of 7.59km2, but the focus of this study is placed on the remaining open watercourses of East Mud Creek that has a drainage area of 3.58km2 (Figure 1.1) The primary goal for the remediation of streams in this area is to reduce overland flooding along Oxford Street in the central portion of the catchment. Coincidentally, flood mitigation requires channel design updates that enhance both the ecological and physical condition and function of the system to convey, and store, water and sediment, while improving the quality of the stream and riparian habitat zones.

Page 4: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

Mud Creek EA – City of London Fluvial Geomorphological Component – Draft Report June 16, 2015

Page 2 of 22

Figure 1.1: Area map, detailing the location of East Mud Creek and the remaining open channels. 2. BACKGROUND REVIEW A number of data sources including the latest Subwatershed Update and provide pertinent information on the existing and future conditions including: watershed and channel characteristics, hydrology and hydraulics, geology, specific issues related to erosion and deposition, and potential alternatives to manage future conditions. The following data sources were used to review background information and gather an understanding of existing and future conditions for the study area:

City of London Subwatershed Studies – Group 1 Subwatersheds Medway, Stanton, and Mud Creeks. Final Report. (Marshal Macklin Monaghan, 1995).

East Mud Creek Tributary Storm Drainage and Stormwater Management (SWM) Servicing Study – Class EA – Draft Report (Development Engineering Ltd. 2009). Supporting Documentation:

o Geomorphic Existing Conditions Mud Creek (Geomorphic Solutions, 2008).

o Supporting Technical Memoranda (Geomorphic Solutions, 2008)

Mud Creek Subwatershed Study – Update of the Water Resources Components (Delcan, 2014). Supporting Documentation:

o Mud Creek Erosion Assessment – Final Report (Parish Geomorphic Ltd, 2013).

Page 5: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

Mud Creek EA – City of London Fluvial Geomorphological Component – Draft Report June 16, 2015

Page 3 of 22

Hec-Ras Models from Delcan (2014) and Upper Thames River Conservation Authority (UTRCA, 2015).

Historical aerial photography (Multiple photosets spanning 1945-2013)

Historical Topographical Mapping (1913)

Physiography of Southern Ontario (Chapman and Putnam, 2007)

Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream channel morphology for Mud Creek: Physiography and Surficial Geology Reviewing the site area’s surficial materials is important to evaluate active channel processes. Stream channel form and sediment supply are controlled by the region’s physiography and underlying surficial geology. The Mud Creek drainage basin is located entirely within the Stratford Till Plain physiographic region (Chapman and Putnam 2007). The Thames River valley was a glacial spillway, and much of Mud Creek passes over fluvial sands and gravels associated with glacial outwash. Borehole data suggest that much of the area is underlain by silty Tills with occurrences of loose sands and gravels. The upper portions of Mud Creek flow over glacial tills that have a low stone content and are less consolidated than other Ontario Tills (e.g. Newmarket Till). Overburden thickness is ~30m to around ~70m, through which Mud Creek has cut some distinctive valley features, creating some confined reaches. Ravine features vary along the system and likely relate to a transition between different stratigraphic units (e.g. tills to sands). Land Use/Cover Within the floodplain of Mud Creek, land is primarily forested, with agricultural land and open space running adjacent to the upper reaches, north of Oxford Street. Land use is primarily urban beyond the floodplain, with mixed low and high density residential, commercial, roads, and open space (cemetery and golf course). A CP rail corridor acts as the northern limit of the study area, while another CN Rail Corridor crosses the main channel with a concrete-pipe culvert beneath. Oxford Street West and Proudfoot Lane cross the open watercourse with concrete box culverts Historical air photo assessment from previous work determined that land-cover transitioned from being primarily agricultural to urban through the 1960s and 1970s. Channel Characteristics The historical assessment in earlier studies also characterized channel adjustments and inferred the mode of adjustment. Development directly altered the channel configuration and drainage pattern of Mud Creek. Early modifications (pre-1945) included channel straightening to maximize the land available for agricultural activity. As the urbanization of London expanded into Mud Creek’s catchment, many tributaries were piped to accommodate development. Most of the piping occurred upstream of the CP Rail embankment, while downstream was left natural or straightened to accommodate agricultural practices. From the CN Railway to upstream of Oxford Street, the creek was straightened and widened. Evidence was found to indicate significant backwatering upstream of the CN Culvert historically and within contemporary photography. The channel was realigned, causing some length increase at the Proudfoot Lane culvert between 1972 and 1982 (Figure 2.1). Using surficial geology, topographic data, and colour aerial photography, Geomorphic Solutions delineated reaches to allow for a systematic review of channels in the watershed. Parish Geomorphic Ltd used the same general reach segments in their analysis, and updated work that included Rapid Geomorphic Assessments (RGAs), the Rapid Stream Assessment Technique (RSAT), to characterize the stability and ecological health of each reach, respectively. During these rapid assessments, general channel characteristics were recorded and summarized.

Page 6: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

Mud Creek EA – City of London Fluvial Geomorphological Component – Draft Report June 16, 2015

Page 4 of 22

RGA and RSAT results varied between each study, and will be revisited later in this report. But, RGA (stability) scores ranged from in regime (stable), to in adjustment (unstable), and RSAT scores revealed primarly low stream heatlth with some moderately healthy reaches. Some general fluvial characteristics were observed along the system:

Upstream sections that were previously straightened were actively recovering by eroding the channel boundaries. Coarse gravels and cobbles made up some bedforms (bars and riffles), and were likely supplied from the eroding banks and bed.

Closer to Oxford Street, bank definition became more poorly defined as aggradation and in channel vegetation (cattails) encroached upon the channel. These sediments formed a soft bed and were likely supplied from upper reaches. Water was slow moving, exhibiting a backwater effect.

This backwater effect, soft bed, and aggradation continued down towards the CN Culvert which was identified as the major cause for this issue. Banks downstream of Oxford were better defined through these forested reaches. Immediately upstream of the CN Culvert, a large ponded section exists with no defined channel. These sections were entirely straightened similar to those upstream.

Downstream of the CN Culvert, Mud Creek was straightened, and flows between the CN Culvert and a large concrete aquaduct that drains the system to the Thames River. This section had high steep banks, with exposed tree roots, and wood debris, which are indicative of the channel’s tendency to widen. Well developed pools and riffles of sorted gravels and cobbles were observed, as were a number of artificial weirs and one private foot bridge. This section flows through private property at the rear of detatched residential parcels.

The Subwatershed Study (2014) included an erosion threshold analysis that determined the hydraulics such as discharge, flow depth, and average velocity, at which the enough shear stress is produced to mobilize an index grainsize characteristic of a selected reach.

Page 7: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

Mud Creek EA – City of London Fluvial Geomorphological Component – Draft Report June 16, 2015

Page 5 of 22

Figure 2.1: Channel realignment between Oxford and the CN Rail embankment to accommodate

development and the Proudfoot Lane crossing.

Existing Channel Issues Each study dating back to 1995 identified the significant backwatering impact that the CN Rail culvert. Compared to the culverts at Proudfoot Land and Oxford Street, the invert of the CN Culvert sits approximately 1.38m higher than the Proudfoot Invert located 485m upstream. This culvert impedes the conveyance of water and sediment under a range of flow conditions, and prolongs the erosive effects of flood events downstream. The low gradient and backwater effect extend upstream of Oxford Street, resulting in excessive sedimentation in the channel, and a lack of variation in bedforms and material, limiting the amount of available low flow habitat through these middle reaches. The storage of excess sediment upstream of the CN rail can also enhance the erosive effect downstream as the channel erodes its boundary to expend energy. Sediment buildup in the Proudfoot and Oxford culverts has severely reduce the capacity, and gradient through the middle reaches. Recommended Stream Remediation To address the primary issues resulting from the existing CN Culvert an important recommendation was made to enlarge and/or lower the culvert to improve upstream slopes and enhance flow and sediment conveyance. Recognizing the potential complications of such a construction project, recommendations were also made to enhance the backwatered sections upstream of the CN Rail corridor under existing conditions by managing stormwater and reconstructing the channel and floodplain to convey predicted flows. The control of flows would reduce the amount of sediment delivered to the middle reaches, and the reconstruction or “cleaning and lowering” of the channel and floodplain would help reduce downstream flow energy during floods and store some fine sediment in the system. The reach downstream of the CN

Page 8: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

Mud Creek EA – City of London Fluvial Geomorphological Component – Draft Report June 16, 2015

Page 6 of 22

Culvert could be designed with a channel cross-section, floodplain connectivity, profile, and substrates that create a more natural habitat where peak flows of around a 1.5 to 2-year recurrence interval will move the sediment and support the riparian zone and floodplain. Final alternatives out of the Delcan (2014) Subwatershed Study Update included the aforementioned recommendations with the following actions:

On-site water quality/quantity (SWM) controls;

Cleaning out the Proudfoot and Oxford Culverts

Cleaning stormwater pipes affected by the reduced culvert capacity;

Line the CN culvert to address structural stability;

Bank treatments to reduce erosion downstream of the CN Culvert;

Channel “cleaning” and “deepening” from the CN Culvert to upstream of Oxford Street, and;

Channel stabilization further upstream. These recommendations and the background review in general have been considered in the development and assessment of additional alternatives presented as a part of this study. 3. REACH DELINEATION Channel morphology and substrate characteristics tend to change along a watercourse. Hence, it becomes imperative to account for this variation by delineating lengths of a watercourse that exhibit similar planform, sediment substrate, land use, local geology, valley confinement, hydrology and gradient. Typically reaches are comprised of at least two meander bends and range in length from 200m to a few thousand metres. Since reaches were already previously delineated by Geomorphic Solutions (GS) in 2008, and adapted by Parish Geomorphic Limited (PGL) in 2013, this assessment also adopted the existing reach delineation to allow for comparison between studies. PGL subdivided reach 7C into two reaches due to an obvious change in sinuosity, creating 15 reaches. Based on updated aerial photography and an initial site visit, Water’s Edge reverted back to the original reach breaks delineated by GS in 2008. Each of these 14 reaches was walked, but rapid field assessments were only performed upon 11 reaches in total due to lack of channel definition. Table 3.1 contains some general descriptions of each reach assessed. Descriptions and discussions throughout the rest of this document refer to left and right banks as viewed in a downstream direction.

Page 9: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

Mud Creek EA – City of London Fluvial Geomorphological Component – Draft Report June 16, 2015

Page 7 of 22

Figure 3.1: Reach map.

Page 10: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

Mud Creek EA – City of London Fluvial Geomorphological Component – Draft Report June 16, 2015

Page 8 of 22

Table 3.1: General Reach Characteristics

Reach Characteristics

MC-1

Straightened channel with bank scour. Primarily run features with few pools and riffles. The channel flows through a woodlot/residentaly property, with manicured lawns and some fencing along the top of bank. The lower 30m is a confined rip-rap channel that flows into the Riverside Drive culvert which discharges directly to the Thames River.

MC-2 Entirely backwatered by CN Culvert, no identifiable channel.

MC-3

Previously straightened and realigned to accommodate the commercial development along the right bank. Flows through forested section of floodplain. Right bank is confined downstream of a 90° bend, with a narrow floodplain bench for some of this confined stretch. The woodlot provides channel cover and wood debris. No defined low-flow channel, bed is soft and fine.

MC-4 Similar to MC-3, but with a narrower wooded riparian buffer. Minor bank erosion noted within closer proximity to Proudfoot Lane.

MC-5

Designed channel running parallel to Oxford St W. Backwater effect still present, causing siltation. Riparian zone and channel margins dominated by cattails. Riparian width confined to channelized section. Mowed lawn beyond riparian zone. Bank erosion and widening downstream of twin driveway culverts.

MC-6

Backwater effect ends around the upstream limit of this reach where the outfall reach 6b joins. Similar to MC-3&4 with heavy siltation. Channel migration evident. Fallen trees provide wood debris. Large forest canopy and riparian habitat

MC-7

Flowing channel, previously straightened but lateral bars indicate a meandering tendency. Gravels and cobbles comprise bedforms (riffles, and bars). Large forest canopy and riparian habitat

MC-7a

Heavy silt/sand content – possibly from adjacent farm runoff. Straight channel with minor undulations in the planform. In channel vegetation present near the confluence with MC-7. Bank erosion and widening occurring around failing bridge footings of former farm crossing. Bedforms present, but irregularly between areas of siltation.

MC-7b Sinuous, narrow single-thread channel with gravel riffles and some deep pools. Banks are overhanging along the outer side of bends.

MC-7c

Bed materials dominated by cobbles, and boulders. Flows through a defined valley, with forested banks. Channel appears to be widening, causing trees to fall. A series of step-pools through glacial till occurs nearer the top end of the reach. Channel originates at the upstream end from an outfall structure.

MC-8

Originates at stormwater outfall, with deep/wide scour pool into glacial till. Gravel/cobble substrates throughout. Bedforms include riffles and bars, pools are generally shallow. Steep. High (3m) bank comprised of sands and gravels actively eroding. Some sections of the channel highly confined to the channelized geometry imposed during straightening. Bank scour is contributing wood debris from the vegetated banks.

Page 11: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

Mud Creek EA – City of London Fluvial Geomorphological Component – Draft Report June 16, 2015

Page 9 of 22

4. FIELD ASSESSMENTS Staff visited East Mud Creek in early December of 2014 to gather a synoptic level understanding of the trends and channel condition through the application of rapid assessments (check sheets). Rapid field assessments provide an indication of the channel stability and ecological health and impacts, while also identifying primary processes in action (e.g. widening). Staff then returned on two occasions in April of 2015 to complete a geomorphic survey of channel dimensions and compositoin to provide a detailed characterization to support an erosion thresholds assessment and the development of concept designs.

4.1. Rapid Assessments Rapid Geomorphic Assessment (RGA) Creek stability was assessed using a Rapid Geomorphic Assessment (MOE, 2003). The RGA assessment focuses entirely on the geomorphic component of a river system. The RGA method consists of four factors that summarize various components of channel adjustment, specifically: aggradation, degradation, channel widening and plan form adjustment. Each factor is assessed separately and the total score indicates the overall stability of the system. This methodology has been applied to numerous streams and rivers and the following table details the ranking criteria (see Table 4.1).

Table 4.1: Interpretation of RGA Score

Stability Index (SI) Value

Classification Interpretation

SI ≤ 0.20 In Regime

The channel morphology is within a range of variance for rivers of similar hydrographic characteristics and evidence of instability is isolated or associated with normal river meander processes.

0.21 ≤ SI ≤0.40 Transitional/Stressed

Channel morphology is within a range of variance for rivers of similar hydrographic characteristics but the evidence of instability is frequent.

SI ≥ 0.40 In Adjustment Channel morphology is not within the range of variance and evidence of instability is wide spread.

Rapid Stream Assessment Technique (RSAT) Rapid Stream Assessment Technique was developed by John Galli and other staff of the Metropolitan Washington (DC) Council of Governments (Galli et al, 1996). The RSAT systematically focuses on conditions reflecting aquatic-system response to watershed urbanization. It groups responses into six categories, presumed to adequately evaluate the conditions of the river system at the time of measurement on a reach-by-reach basis. The six categories are:

1. Channel stability; 2. Channel scouring and sediment deposition; 3. Physical in-stream habitat; 4. Water quality; 5. Riparian habitat conditions; and 6. Biological conditions.

River channel stability and cross-sectional characterization is a critical component of RSAT. The entire channel was inspected for signs of instability (such as bank sloughing, recently exposed non-woody tree roots, general absence of vegetation within bottom third of the bank, recent tree

Page 12: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

Mud Creek EA – City of London Fluvial Geomorphological Component – Draft Report June 16, 2015

Page 10 of 22

falls, etc.) and channel degradation or downcutting (such as high banks in small headwater streams and erosion around man-made structures). A rapid assessment of soil conditions along the river banks is also conducted to determine soil texture and potential erodibility of the watercourse bank. Qualitative water quality measurements were also made (temperature, turbidity, colour and odour) along with an indication of substrate fouling (i.e., the unwanted accumulation of sediment). RSAT also typically involves a quantitative sampling and evaluation of benthic organisms. As no benthic sampling was undertaken, the score was based on site conditions and general observations of water quality.

Table 4.2: Interpretation of RSAT Score

RSAT Score Ranking

41-50 Excellent 31-40 Good 21-30 Fair 11-20 Poor 0-10 Degraded

Qualitative Habitat Evaluation Index (QHEI) Another rapid evaluation of the creek characteristics was carried out in order to rate the ecological impacts in the creek system by using the Qualitative Habitat Evaluation Index (QHEI). This evaluation system details the creek characteristics and relates them to the habitat of the system, ultimately rating the environmental and ecosystem considerations. This differs from the RSAT scoring by using a check-sheet of physical features and attributes, each with an assigned value based on the ecological significance, rather than assigning a score from a range based on the observed stream quality. The Qualitative Habitat Evaluation Index (QHEI) is a physical habitat index designed to provide an empirical, quantified evaluation of the general lotic macrohabitat characteristics that are important to fish communities. A detailed analysis of the development and use of the QHEI is available in Rankin (1989) and Rankin (1995). The QHEI is composed of six principal metrics each of which are described below. The maximum possible QHEI site score is 100. Each of the metrics are scored individually and then summed to provide the total QHEI site score. This is completed at least once for each sampling site during each year of sampling. An exception to this convention would be when substantial changes to the macrohabitat have occurred between sampling passes. Standardized definitions for pool, run, and riffle habitats, for which a variety of existing definitions and perceptions exist, are essential for accurately using the QHEI. For consistency the following definitions are taken from Platts et al. (1983). Metric 1, Substrate includes two components, substrate type and substrate quality. The Substrate origin refers to the "parent" material that the stream substrate is derived from. The Embeddedness is the degree that cobble, gravel, and boulder substrates are surrounded, impacted in, or covered by fine materials (sand and silt). Silt cover is the extent that substrates are covered by a silt layer (i.e., a 1 inch thick or that is obviously affecting aquatic habitats). Silt cover differs from the embeddedness metric in that it only considers the fine silt size particles whereas fine gravels, sands, and other fines are considered in assessing embedded conditions. Metric 2, Instream Cover, scores presence of instream cover types and amount of overall instream cover. Each cover type that is present in an amount occurs in sufficient quantity to support species that may commonly be associated with the habitat type should be scored.' Cover should not be counted when it is in areas of the stream with insufficient depth (usually < 20 cm) to make it useful. For example a logjam in 5 cm of water contributes very little, if any cover, and at

Page 13: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

Mud Creek EA – City of London Fluvial Geomorphological Component – Draft Report June 16, 2015

Page 11 of 22

low flow may be dry. Other cover types with limited function in shallow water include undercut banks and overhanging vegetation, boulders, and root wads. Metric 3, Channel Morphology, emphasizes the quality of the stream channel that relates to the creation and stability of macrohabitat. It includes channel sinuosity (i.e. the degree to which the stream meanders), channel development, channelization, and channel stability. Metric 4, Riparian Zone and Bank Erosion, emphasizes the quality of the riparian buffer zone and quality of the floodplain vegetation. This includes riparian zone width, floodplain quality, and extent of bank erosion. Metric 5, Pool, glide and riffle-run quality emphasizes the quality of the pool, glide and/or riffle-run habitats. This includes pool depth, overall diversity of current velocities (in pools and riffles), pool morphology, riffle-run depth, riffle-run substrate, and riffle-run substrate quality. Metric 6, Local or map gradient is calculated from topographic maps by measuring the elevation drop through the sampling area. This is done by measuring the stream length between the first contour line upstream and the first contour line downstream of the sampling site, and dividing the distance by the contour interval. If the contour lines are closely "packed" a minimum distance of at least 1.6 km (one mile) should be used. The final QHEI scores can be qualitatively compared to other scores by the use of Table 4.3 which provides narrative equivalents to QHEI ranges.

Table 4: QHEI Narrative Ranges

QHEI Range QHEI Rating

>70 Excellent 55-70 Good 43-54 Fair 30-42 Poor <30 Very Poor

4.2. Rapid Assessment Results Similar to previous studies, the reaches of East Mud Creek exhibit a tendency to adjust, either in a transitional state or in a state of adjustment, with the exception of MC 7-a which was “in regime” in both the PGL and GS reports (Table 4.3). It is possible that the observed failure around the former farm crossing abutments occurred subsequently. The primary modes of adjustment are aggradation (MC-3,4,5,6,7a), and widening elsewhere. Overall, Reaches MC-7&8 are the most unstable, showing general enlargement trends, and attempts to recover from channelization and the urbanized flow regime. RSAT results vary from upstream to downstream, with “Poor” to “Good” conditions. Some general trends can be identified, for example, the backwatered and aggrading reaches scored “fair” and “poor” in terms of stream health, while the more active channels with variation in bed form, material, and in-channel cover upstream of reach MC-6, and downstream of the CN Culvert exhibit better stream function from an ecological perspective. QHEI values also indicate trends of poor channel characteristics for ecological function for those backwatered and aggrading reaches. Compared to other reaches, these sections lacked quality substrates, channel morphology, well developed bedforms (pools-riffles-runs) and hence any functionality, and were of a relatively low gradient.

Page 14: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

Mud Creek EA – City of London Fluvial Geomorphological Component – Draft Report June 16, 2015

Page 12 of 22

Table 4.3: RGA Results

Reach

Form of Adjustment

Stability Index Condition

PGL 2013

GS 2008

Aggradation Degradation Widening Planform

Adjustment Stability

Index Stability

Index

MC-1 0.00 0.40 0.78 0.00 0.29 Transitional 0.25 0.17

MC-3 0.71 0.00 0.33 0.14 0.30 Transitional 0.30 0.47

MC-4 0.86 0.00 0.56 0.00 0.35 Transitional 0.30 0.37

MC-5 0.86 0.00 0.00 0.00 0.21 Transitional n/a 0.18

MC-6 0.86 0.00 0.22 0.00 0.27 Transitional 0.25 0.36

MC-7 0.43 0.00 0.44 0.29 0.29 Transitional 0.29 0.31

MC-7a 0.86 0.10 0.33 0.00 0.32 Transitional 0.19 0.18

MC-7b 0.57 0.00 0.25 0.29 0.28 Transitional 0.36 0.30

MC-7c 0.29 0.22 0.88 0.29 0.42 In

Adjustment 0.39 0.35

MC-8 0.43 0.50 0.67 0.00 0.40 Transitional 0.32 0.24

Table 4.4: RSAT Scores

Reach

RSAT Parameter/Maximum Score PGL 2013 GS 2008

Ch

an

nel

Sta

bilit

y/1

1

Sco

ur

an

d

Dep

osit

ion

/

8

In-S

tream

Hab

itat/

8

Wate

r

Qu

ality

/8

Rip

ari

an

Co

nd

itio

n/

7

Bio

log

ical

Ind

icato

rs/

8 Total

Score/50 Condition Score/50 Score/50

MC-1 8 6 6 5 3 5 33 Good 28.5 26.5

MC-3 6 2 2 4 4 3 21 Fair 24.5 14.5

MC-4 6 2 2 4 3 3 20 Poor 24.5 14.5

MC-5 5 2 2 4 1 2 16 Poor n/a 11

MC-6 6 2 2 4 4 3 21 Fair 23.5 13.5

MC-7 6 6 5 5 4 5 31 Good 31 16

Mc-7a 5 4 4 5 3 4 25 Fair 24.5 18.5

MC-7b 6 6 6 6 3 4 31 Good 26.5 21.5

MC-7c 5 6 6 6 5 5 33 Good 27 16.5

MC-8 3 5 6 6 3 5 28 Fair 27 13.5

Table 4.5: QHEI Scores

Page 15: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

Mud Creek EA – City of London Fluvial Geomorphological Component – Draft Report June 16, 2015

Page 13 of 22

Reach Su

bstr

ate

/20

Instr

eam

Co

ver/

20

Ch

an

nel

Mo

rph

olo

gy/2

0

Ban

k E

rosio

n

an

d R

ipari

an

Zo

ne/1

0

Po

ol/G

lid

e a

nd

Rif

fle/R

un

Qu

ality

/12

Fu

ncti

on

ality

of

Rif

fles/8

Gra

die

nt/

10

Total Score/100 Rating

MC-1 19 15 11 6 6 6 6 69 Good

MC-3 2 13 5 9 3 0 2 34 Very Poor

MC-4 2 8 5 6.5 6 0 2 29.5 Very Poor

MC-5 2 6 5 5.5 5 0 3 26.5 Very Poor

MC-6 2 10 8 8 4 0 6 38 Poor

MC-7 18 13 10 8.5 7 5 7 68.5 Good

MC-7a 2 13 7 4.5 5 2 4 37.5 Poor

MC-7b 15 15 11 6.5 7 4 6 64.5 Good

MC-7c 20 16 15 7 10 6 8 82 Very Good

MC-8 19 15 10 4.5 10 6 7 71.5 Very Good

4.3. Detailed Field Surveys In addition to rapid field assessments, detailed surveys were completed using a survey grade GPS and/or total station in April of 2015. This detailed work included cross-section and profile surveys, and Wolman pebble counts to quantify bed material size. Bank materials were also noted at each cross-section Reaches MC-1, MC-7 and MC-8 were selected for detailed analysis in anticipation of the conceptual channel design having to tie-into a location upstream of the backwater effect, and similarly downstream of the CN Culvert as it is relocated to a lower elevation. This detailed assessment focused on surveying the bankfull channel dimensions at each cross-section using known indicators such as inflection points and vegetation patterns. The “bankfull” channel represents the maximum capacity of the channel to contain flows before water inundates the floodplain. This channel form is generally thought to respond to prevailing flow and sediment regimes, with some influence of valley confinement, bedrock/cohesive horizons, and artificial channel hardening. The prevailing flow that shapes the channel is often referred to as the “channel forming” or “prevailing” discharge, and has a recurrence of 1.5 to 2-years. The bankfull channel survey of cross-section and gradient (energy slope), and material roughness can be utilized to estimate bankfull discharge, and other hydraulic characteristics including shear stress. Table 4.6 presents the results of the detailed bankfull surveys, and Table 4.7 contains the estimated hydraulics for each reach. Bankfull dimensions generally enlarge in the downstream direction with areas increasing from Reaches MC-7 and 8 down to MC-1, which is typical of alluvial systems. Slopes are moderate through the surveyed reaches, with the exception of the upmost section of Reach MC-8 that is slightly higher. Bed materials in both surveys are in the gravel to cobble range, with sands located in the interstitial spaces. Two parameters of particular importance with respect to channel stability are the width-to-depth and entrenchment ratios. The former indicates a tendency for a channel to widen and aggrade as this value increases, and incise and narrow as it decreases. Values above 15 and below 8 are indicative of a channel becoming unstable. The entrenchment ratio is similar in that it provides a direct measure of channel incision. Low entrenchment ratios (<1.4) indicate that the bankfull

Page 16: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

Mud Creek EA – City of London Fluvial Geomorphological Component – Draft Report June 16, 2015

Page 14 of 22

channel has little access to the floodplain, and larger floods are conveyed within a greater cross-section area above the bankfull elevation before spilling onto available floodplain, attenuating forces and depositing sediment/nutrients. Cross-sections 3 and 4 from Reach MC-7 and 8 are located in MC-7 have high width to depth ratios as the channel is widening. But this may also be a residual backwater effect under larger flood events. Channel entrenchment is low to moderate for most cross-sections, with the exception of XS2 in Reach 8, which was quite confined to the previously channelized banks. Estimated bankfull hydraulics show an increase in discharge and shear stress between upstream and downstream reaches, as expected. Under these bankfull conditions coarse gravels and finer can be expected to mobilize.

Table 4.6: Reach Averaged Bankfull Channel Summary

Parameter

Reach

MC-1 MC-7 MC-8

Bankfull Width (m) 5.95 7.51 3.94

Bankfull Mean Depth (m) 0.45 0.36 0.37

Bankfull Max Depth (m) 0.62 0.65 0.59

Bankfull Area (m2) 2.74 2.67 1.47

Wetted Perimeter (m) 6.30 7.97 4.25

Hydraulic Radius (m) 0.43 0.34 0.35

Width-Depth Ratio 13.24 21.45 10.68

Entrenchment Ratio 2.76 2.10 1.84

Bankfull Slope (m/m) 0.005 0.005 0.006

Channel Substrate D50 (mm) 17.58 5.79 23.00

Channel Substrate D84 (mm) 79.47 30.86 71.89

Table 4.7: Reach Averaged Estimated Bankfull Hydraulics

Parameter

Reach

MC-1 MC-7 MC-8

Relative Roughness (m) 25.54 55.88 14.42

Shear Velocity (m/s) 0.14 0.13 0.14

Velocity based on ff/RR (m/s) 1.47 1.60 1.25

Bankfull Discharge (m3/s) 4.27 4.23 1.83

Froude # 0.69 0.86 0.66

Stream Power (W/m) 209.49 207.26 109.31

Unit Stream Power (W/m2) 33.74 27.93 27.78

Mean Bed Shear (N/m2) 19.27 15.86 18.46

Critical Particle Size (mm) 25.33 20.85 24.27

Page 17: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

Mud Creek EA – City of London Fluvial Geomorphological Component – Draft Report June 16, 2015

Page 15 of 22

5. EROSION THRESHOLD ANALYSIS An erosion threshold assessment calculates the channel hydraulics such as discharge, velocity, and flow depth that produces enough shear stress to mobilize an index particle size (e.g. D50 or D84). This analysis can evaluate the sensitivity of a channel to erosion by comparing the boundary shear stress under bankfull conditions with the critical shear stress for particle entrainment. Similarly, the discharge and flow depths can also be compared. To determine the critical shear stress for particle entrainment, the methods presented by Komar (Critical velocity - 1987) and Fischenich (critical shear stress - 2001) were used. These methods adapt and update the work of Shields (1936). The Komar method is most appropriate to gravel sized material, while Fischenich also incorporates finer material (sands). Based on the critical shear stress determined by each method, a critical depth is back-calculated and a critical discharge is determined. The median particle size (D50) was used as the index grain in this analysis (see Table 4.6). Selection of appropriate threshold values was based on site conditions and the assumptions under which these two models are applicable. Erosion threshold values were completed for cross-sections within each site, and averaged (Table 5.1). Essentially, flows are modeled through each cross-section until the critical depth to mobilize the median particle size (D50) is achieved, then the critical discharge is calculated. The results in Table 5.1 reveal that critical thresholds vary through the reaches that are actively moving material. What is interesting is that the upstream and downstream most reaches (MC-1 and MC-8) have the highest values, while MC-7 has a much lower threshold. This is likely a sediment supply issue. Reach MC-1 has the CN Culvert impeding the passage of sediment downstream, resulting in a coarser bed fraction developing downstream as fines are continually removed but not supplied. Similarly, Reach MC-8 originates at a stormwater outfall and depends on it is existing channel boundaries for sediment supply. Conversely, MC-7 is downstream of a tributary that supplies fines from upstream. Comparing these estimates of critical discharge using both methods to the bankfull estimates (Table 4.7), these critical flows appear to be occurring with a greater frequency than the bankfull discharge, with critical flow values only a fraction of the bankfull flow. If these flows are sustained for a long period of time, or occur with relatively high frequency, excessive erosion will occur. Excessive erosion was noted in each of these reaches during field inspections, as beds were artificially armouring and the less resistant banks scouring. Depending on the risk associated with these channels (e.g. property risk), designs may need to account for some bank protection and roughness, or addition of some grade control to slow flow velocities through these reaches. These results differ from those in the PGL (2013) document, with lower values for reaches MC-1 and MC-7 (MC-8 was not assessed previously). There are many possible reasons for this including different cross-section locations, different grainsize distributions, and potential channel adjustments or flood events that occurred between surveys. What could be derived during a comparison between the two studies is that PGL measured a slope in MC-1 of 0.25%, which is half of what Water’s Edge determined (0.5%). Slopes increase velocities and shear stresses, so this may be the reason for the lower threshold here. Differences between studies for MC-7 can be attributed to different median grainsizes. PGL had a median size 248mm (coarse cobble), compared to 5.79mm (fine gravel) in the current study. These differences highlight that caution needs to be applied when using erosion threshold values as flow-targets, as such things like the timing of floods and channel adjustment can ultimately change the existing characteristics of a channel.

Page 18: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

Mud Creek EA – City of London Fluvial Geomorphological Component – Draft Report June 16, 2015

Page 16 of 22

Table 5.1: Reached averaged erosion threshold results

Method Parameter

Reach

MC - 1 MC-7 MC-8

KOMAR 1987

Critical Shear (N/m2) 16.75 4.22 12.80

Ratio of Critical Shear/Bed Shear 1.12 3.76 1.72

Critical Depth (m) 0.28 0.09 0.26

Critical Flow (m3/s) 0.298 0.015 0.413

Ratio of Critical Flow/Bankfull Flow 0.155 0.004 0.173

FISCHENICH 2001

Critical Shear (N/m2) 13.82 4.09 11.33

Ratio of Critical Shear/Bed Shear 1.34 3.88 1.88

Critical Depth (m) 0.23 0.08 0.23

Critical Flow (m3/s) 0.187 0.014 0.291

Ratio of Critical Flow/Bankfull Flow 0.098 0.003 0.117

6. CONCEPTUAL CHANNEL DESIGN The main objective of natural channel/corridor design is to restore, and where possible, enhance long term form and function of a creek system. Additionally, attempts should be made to reduce flooding risk by conveying existing or predicted storm events. These upgrades should be made with consideration of local constraints by proposed development, local area residents, and natural features. Geomorphological and hydraulic analyses (modeling), are used to determine the appropriate channel form and design elements (e.g. treatments). It is the intent of natural channel design to mimic the natural adjustments that streams typically undergo. Dynamically stable streams maintain an equilibrium form that responds to prevailing discharge and sediment regimes. Channels need to be designed that balance erosive forces (i.e. shear stresses ) against resistive forces (i.e.. boundary roughness – bed material and vegetation). The designed channel cross-section, profile, planform, and materials control the rate at which energy is expended through the system. Flows contained within the equilibrium bankfull channel are controlled by existing bedforms and channel variation. While energy associated with flows greater than bankfull are dissipated on the floodplain, provide there is sufficient connection to the floodplain (i.e. not entrenched). Channel designs proposed in this study aim to develop a channel configuration that conveys a specific discharge, with sufficient floodplain area and connectivity, while attempting to adhere to constraints and concerns of local residents. Unlike previous iterations of conceptual designs for the remediation of Mud Creek, two new alternatives have been proposed that include a lowered and enlarged CN Rail Culvert. These are identified as Alternatives 3 and 4, and are the focus of the natural channel/corridor design component. Alternative 3 essentially maintains the current planform geometry of Mud Creek, and utilizes the existing culverts at Oxford Street and Proudfoot Lane. Alternative 4 realigns the channel upstream of Proudfoot Lane and would require a new crossing installation at Oxford Street further to the East, then flowing through the existing Proudfoot Lane culvert and adapting the same geometry as Alternative 3 downstream of Proudfoot. The realignment of Alternative 4 does not restore the previous planform, but is more representative of the geometry prior to the construction of the Proudoot Lane crossing. Furthermore, relocation of the channel away from the roadside reduces the lateral constraint, and lends to the design and establishment of a more natural corridor/buffer.

6.1. Design Considerations and Constraints Within both a natural and urbanized system, there are a number of considerations to be made. The following list includes considerations from an variety of perspectives including natural, economical, socio-political, and constructability:

Page 19: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

Mud Creek EA – City of London Fluvial Geomorphological Component – Draft Report June 16, 2015

Page 17 of 22

Flooding at Oxford Street West Oxford Street in London, Ontario is one of the main East-West throughways through the City. Under existing conditions, the backwater effect that has constricted the movement of water and sediment causes extreme rainfall events to surcharge flow from Mud Creek (Reach MC-5) over the road, creating a mobility hazard to vehicular and pedestrian traffic. The City of London requires that floods with a return period of 250-years under future (developed) conditions to pass without flooding Oxford Street. Constructability of the CN Culvert The size of the existing rail berm/embankment, and explicit desire from CN to maintain rail traffic during the construction process, does not permit for an open cut installation. Therefore, less invasive methods like directional drilling or jack-and-bore need to be utilized. These more favourable technologies in this instance limit the size and shape of the culvert that can be designed. As a result, the design needs to consider the installation of a new culvert with a diameter of 3m at a maximum. Residential Concerns Through public consultation a number of concerns were brought forth by residents that own property along Mud Creek, or others whom enjoy the natural setting of the corridor. Typical concerns of flooding and loss of property were highlighted, as were concerns for local habitat and the preservation of trees. Attempts to minimize negative impacts were made in the design as flood mitigation at Oxford was addressed. In areas that are impacted, recommendations and examples for re-naturalization will be discussed and provided. Floodplain Access With the lowering of the CN Culvert, channel entrenchment becomes a possible issue throughout. To avoid entrenchment, where possible, a floodplain bench of three times the bankfull width has been designed, from which grading at a 3:1 slope is made up to the existing ground. In areas that are laterally constrained such as those around culverts, efforts to stabilize the bed and banks with rock treatments will be proposed to avoid excessive erosion. Erosion and Sedimentation Appropriate bank and bed treatments will be recommended with respect to the output channel shear stresses from modeling of future conditions for each alternative. The improved slopes from lowering the CN Culvert should improve the conveyance of sediment at a range of flows, reducing aggradations upstream, and the excessive erosion downstream. Other recommendations of bank stabilization may be made for properties at risk to erosion. Channel Planform and Topographical Variation The relatively low slopes through these reaches and lateral constraints lend to a straighter design channel to be created close to the existing planform, however improvements at tight bends were made. In light of the inability to fully meander the design reaches, topographic variation will be recommended through the design of riffles. This functional design will not develop the specific number, spacing, and geometry of these riffles, but recommendations on material size will be made using shear stresses from the hydraulic modeling. It is expected that a low flow channel will develop and meander through the larger bankfull design cross-section. Tie-In Elevations and Road Crossings Upstream and downstream tie-in elevations of the entire design were selected at stable or relatively stable locations, with a surveyed riffle at the upstream end (MC-7), and the invert of the Riverside Drive Culvert at the downstream end. Alternative 3 has tie-in elevations 0.3m above the invert of each the Oxford and the Proudfoot culverts. Alternative 4 is only required to tie into the Proudfoot culvert (0.3m of cover), and the new Oxford culvert will have an open bottom. The CN culvert was arbitrarily lowered by 2m, to roughly fit with the straight line slope between Proudfoot Lane and Riverside Drive.

Page 20: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

Mud Creek EA – City of London Fluvial Geomorphological Component – Draft Report June 16, 2015

Page 18 of 22

Stream and Riparian Ecology Riffle materials will be sized relative to the predicted shear stresses, but will contain gravels for fish and invertebrate habitat. Banks will be planted with scrub vegetation, and the floodplain and constructed valley will be a combination of scrub vegetation, shrubs, and trees. Recommendation of other floodplain habitat features and variation will be made at a high level with terrestrial and aquatic species considered.

6.2. Design Discharge The selection of a design discharge is essential in developing a cross-section of a bankfull geometry, whether it reflects the existing conditions or some future alteration. Future development in the East Mud Creek watershed will alter the existing flow regime, including the frequency and magnitude of flows, and discharge points along the channel (i.e. outfalls). Although modelling has incorporated some assumptions of SWM to manage runoff, the existing channel instabilities throughout cannot be used to determine a design discharge entirely using field indicators of the bankfull elevation. Therefore, in this conceptual design, the 2-year modeled flow from Hec-Ras has been selected as the design discharge. This may be altered to a lower value in the design of the bankfull channel (e.g. 1.5-year event) during detailed design. But for the purposes of developing functional design concepts, the 2-year is sufficient in creating a bankfull channel for the future flow conditions of Mud Creek. As design slopes and flow inputs affect the 2-year flow volume, a number of design segments were delineated for each alternative with different design discharges assigned to each (Figure 6.1 and Table 6.1).

Figure 6.1: Alternative Planform Configuration and Design Sections

Page 21: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

Mud Creek EA – City of London Fluvial Geomorphological Component – Draft Report June 16, 2015

Page 19 of 22

Table 6.1: Design Discharge Summary

Section

Alternative 3 Alternative 4

Length (m) Slope (%) Discharge (m3/s) Length (m) Slope (%) Discharge (m3/s)

1 551.97 0.27 9.69 551.97 0.27 9.69

2 325.95 0.27 9.29 325.95 0.27 9.29

3 31.05 0.23 9.29 33.61 0.36 9.29

4 136.48 0.23 8.68 84.44 0.36 8.68

5 58.67 0.35 8.68 572.39 0.36 5.42

6 513.04 0.35 5.42 23.85 0.36 3.68

7 23.85 0.35 3.68

6.3. Bankfull Channel

Preliminary design concepts proposed here lacks detail such as the size and specific location of bedforms (pools and riffles). During detailed design, it is recommended that riffles are designed with appropriate dimensions to ensure that the channel has the capacity to covey the bankfull or design discharge before inundating the floodplain. Riffles should be spaced so that the crest of a riffle just begins to backwater the tail of the next riffle upstream, effectively creating a pool that may naturally scour under larger events. Enlarged pool sections should be created downstream of culverts and any other flow constrictions to dissipate energy resulting from increased flow velocities. Additionally, pools can be initially enlarged at meander bends to provide some refugia and overwintering habitat for resident aquatic organisms. Appropriate dimension are required to ensure that the channel capacity is sufficient to convey the design discharge before inundating the floodplain. Cross-sections developed for the conceptual design of each alternative, and can be considered the “typical” cross-section with 2:1 bank slopes, and width to depth ratios that balance the erosive forces within the cross section (see section 4.3). Table 6.2 provides bankfull channel parameters for each alternative. The design of the bankfull channel was an iterative process between design and modeling to determine appropriate dimensions that convey the 2-year flood within the main channel before inundating the floodplain. The dimensions in Table 6.2 were enlarged relative to the initial design cross-section, and present the final adjustments made in the model for the bankfull channel. Overall, the slight reduction in channel length for Alternative 4, only results in a slope adjustment of 0.01%, therefore cross-sections do not dramatically change between alternatives.

Table 6.2: Bankfull channel design summary

Section

Alternative 3 Alternative 4

Width (m) Depth (m) W/D Width (m) Depth (m) W/D

1 12.6 1.2 10.91 12.6 1.2 10.9

2 11.1 0.9 11.1 11.1 0.9 11.1

3 12.6 1.2 10.9 12.6 1.2 9.3

4 12.6 1.2 10.9 12.6 1.2 8.7

5 12.7 1.2 10.9 9.4 0.9 5.4

6 9.4 0.9 11.1 8.0 0.7 11.5

7 8.0 0.7 11.5

Page 22: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

Mud Creek EA – City of London Fluvial Geomorphological Component – Draft Report June 16, 2015

Page 20 of 22

6.4. Chanel and Bank Treatments Recommended bank and bed materials and treatments will be limited to the design sections, with some future recommendations provided for those reaches upstream that may be altered separately when the remaining area is developed. Slopes through the design reaches are relatively low, and the bankfull channel has been designed with an accessible floodplalin area, limiting the amount of entrenchment/confinement to areas of convergence (i.e. culverts). Hec-ras output tables provided Channel Shear (N/m2) for a number of cross-sections within each design reach. Shear was highest immediately downstream of culverts, and would decrease with distance downstream. Stone treatments using the maximum critical particle size with a factor of safety (e.g. 1.5 to 2-times) should be used in the vicinity of these culverts (Table 6.3). Elsewhere, shear stresses are relatively low. It is recommended that constructed banks are secured with coir fabric and live stakes (Permissible Shear of 105 N/m2). The coir should extend onto the floodplain for 1m of width outside of the bankfull channel and secured with live stakes. This table can also be used as a guide for sizing riffle material where the average critical particle size can be applied as the median diameter for a distribution of particles. A factor of safety maybe required for riffle material sizing to make the features static. This may be necessary if it is revealed that development will severely reduce sediment supplied from upper reaches.

Table 6.3: Summary Shear Stresses and Critical Particle Sizes

Section

Shear (N/m2) Critical Particle Size (mm)

Average Max Average Max

Alternative 3

1 7.46 16.37 9.81 21.52

2 19.16 22.99 25.19 30.22

3 8.61 10.57 11.32 13.89

4 11.00 11.42 14.45 15.01

5 11.42 11.42 15.01 15.01

6 7.92 11.77 10.42 15.47

7 4.97 4.97 6.53 6.53

Alternative 4

1 5.29 12.75 6.95 16.76

2 14.05 22.96 18.46 30.18

3 9.49 11.52 12.47 15.14

4 9.49 11.52 12.47 15.14

5 17.61 37.80 23.15 49.69

6 10.26 10.26 13.49 13.49

6.5. Ecological Enhancements Treatments can also be applied for ecological enhancement. The design corridor includes a bankfull channel, set within a floodplain, from which new valley slopes grade up to the existing land-surface. This extensive clearing and grading will require the removal of a number of trees. Therefore, treatments and plantings are required to help establish a healthy riparian zone and provide immediate habitat following construction. Gravel riffles discussed above create areas of fast and slow moving water, as well as suitable substrates for local aquatic organisms. Overhanging vegetation and debris are also essential features of Southern Ontario streams that provided added habitat (cover, backwater, scour pools) and nutrients. We recommend harvesting trees to use for rootwad structures along the outer bank of the few available meander bends. Additionally, where erosion risk to property or infrastructure is less of a factor, trees can also be embedded into stream banks, parallel to flow. Leaving some

Page 23: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

Mud Creek EA – City of London Fluvial Geomorphological Component – Draft Report June 16, 2015

Page 21 of 22

logs on the floodplain can provide some wood debris to the channel under higher events, but culverts will need to be monitored to avoid the development of severe debris-jams. The existing floodplains in the area have depressions such as side-channels, or general wet depressions. The floodplain should be constructed with undulations (high and low) that divert and direct flow under high events, while also storing water and material between floods. 7. SUMMARY and CONCLUSIONS Over the past 20 years, Mud Creek has been studied for the purpose of development planning, with a focus on flood remediation. Coupled with reduction in flooding is the development of a functional channel of a relatively (dynamically) stable form. Common to each was the recognition that the CN Rail Culvert impedes the natural conveyance of water and sediment in the downstream direction. Recommendations were made to enlarge and/or lower the culvert to restore the stream function through Mud Creek and reduce flooding. However, the potential compications and costs with such an undertaking resulted in the recommendation of more minor channel work - “cleaning” and “deepening” – which may have provided a short term solution, but ultimately the CN Culvert would continue to act as barrier. The current study includes the development and assessment of alternatives with an upgrade to the CN Culvert. The current study updated and confirmed findings of the existing conditions of East Mud Creek. Then through identifying a list of considerations and constraints, developed functional designs for two new alternatives to assess for remediation of the watercourse. Hec-ras modeling was used to refine the channel dimensions, and select appropriate channel materials and bank treatments based on the channel shear modeled for each alternative. Eclological enhancements for the channel, riparian zone, and floodplain that focus on providing habitat features and variation in topography were also recommended. We feel that these design recommendations include enough detail to move forward with the planning and development of Mud Creek. The Detailed Design phase can build upon these recommendations and update accordingly with specific dimensions and sizes of features, and treatments. The conceptual design drawings that have been submitted with this Environmental Assessment include typical locations and details for the recommended features and erosion control applications. Respectfully submitted, Ed Gazendam, M.Eng., P.Eng., John McDonald, M.Sc, President, Sr. Geomorphologist Fluvial Geomorphologist Water’s Edge Environmental Solutions Team Ltd.

Page 24: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

Mud Creek EA – City of London Fluvial Geomorphological Component – Draft Report June 16, 2015

Page 22 of 22

REFERENCES: Chapman, L.J. and Putnam, D.F. 2007. Physiography of Southern Ontario; Ontario Geological Survey, Miscellaneous Release – Data 228. Delcan. 2014. Mud Creek Subwatershed Study – Update of the Water Resources Components. Submitted to the City of London. Development Engineering Ltd. 2009. East Mud Creek Tributary Storm Drainage and Stormwater Management (SWM) Servicing Study – Class EA – Draft Report. Submitted to the City of London. Fischenich. C. 2001. Stability Thresholds for Stream Restoration Materials. EMRRP Technical Notes Collection (ERDC TN-EMRRP-SR-29), U.S. Army Engineer Research and Development Center, Vicksburg, M.S. www.wes.army.mil/e/emrrp Galli, J. 1996. Development and Application of the Rapid Stream Assessment Technique (RSAT) in the Maryland Piedmont. Paper presented at American Engineering Foundation Conference, Snow Bird, UT. Geomorphic Solutions. 2008. Geomorphic Existing Conditions: Mud Creek. Submitted to Development Engineering Ltd. Geomorphic Solutions. 2008. Memorandum. Geomorphic Component, Master Plan for Storm Drainage and Stormwater Management Servicing EA for the East Tributary of Mud Creek, Phase II. Project No. 07341.450. Submitted to Development Engineering Ltd. on May 26, 2008. Geomorphic Solutions. 2008. Memorandum. Geomorphic Component, Master Plan for Storm Drainage and Stormwater Management Servicing EA for the East Tributary of Mud Creek, Phase II. Project No. 07341.450. Submitted to Development Engineering Ltd. on July 13, 2008. Komar, P. D. 1987. Selective grain entrainment and the empirical evaluation of flow competence. Sedimentology, 34: 1165-1176. Marshal Macklin Monaghan, 1995. City of London Subwatershed Studies – Group 1 Subwatersheds Medway, Stanton, and Mud Creeks. Final Report. Ontario Geological Survey (OGS) 2010. Surficial Geology of Southern Ontario; Ontario Geological Survey, Miscellaneous Release – Data 128 – Revised Ontario Ministry of the Environment (OMOE). 2003. Stormwater Management Planning and Design Manual. Ontario Ministry of the Environment, Toronto, Ontario. Parish Geomorphic Ltd. 2013. Mud Creek Erosion Assessment – Final Report. Submitted to Delcan. Rankin, E.T. 1989. The qualitative habitat evaluation index (QHEI): rationale, methods and application. Ohio Environmental Protection Agency, Columbus, Ohio.

Page 25: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

APPENDIX A:

Detailed Survey

Page 26: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

File #:14046

Mud Creek

Figure 1: Mud Creek - Existing Profile of Mud Creek Detailed Survey - Reaches 7 & 8

Page 27: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

File #:14046

Mud Creek

Reaches 7 & 8 Cross Section 1

Reaches 7 & 8 Cross Section 2

Page 28: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

File #:14046

Mud Creek

Reaches 7 & 8 Cross Section 3

Reaches 7 & 8 Cross Section 4

Page 29: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

File #:14046

Mud Creek

Reaches 7 & 8 Cross Section 5

Reaches 7 & 8 Cross Section 6

Page 30: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

File #:14046

Mud Creek

Figure 8: Mud Creek - Existing Profile of Mud Creek Detailed Survey - Reach 1

Page 31: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

File #:14046

Mud Creek

Reach 1 Cross Section 1

Reach 1 Cross Section 2

Page 32: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

File #:14046

Mud Creek

Reach 1 Cross Section 3

Reach 1 Cross Section 4

Page 33: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

APPENDIX B:

Field Photography

Page 34: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

File #:14046

Mud Creek, London

PHOTOGRAPH NO.: 1 FROM: Reach MC-1 LOOKING: Upstream from Riverside Culvert COMMENT: Rip rap along channel

PHOTOGRAPH NO.: 2 FROM: Reach MC-1 LOOKING: Upstream towards CN Rail Embankment COMMENT:

Page 35: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

File #:14046

Mud Creek, London

PHOTOGRAPH NO.: 3 FROM: Reach MC-2 LOOKING: Downstream towards CN Rail Embankment COMMENT: Backwater due to CNR culvert

PHOTOGRAPH NO.: 4 FROM: Reach MC-3 LOOKING: Upstream from Pedestrian Bridge COMMENT:

Page 36: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

File #:14046

Mud Creek, London

PHOTOGRAPH NO.: 5 FROM: Reach MC-4 LOOKING: Upstream from Proudfoot Lane COMMENT:

PHOTOGRAPH NO.: 6 FROM: Reach MC-5 LOOKING: Upstream from Golf Course Driveway COMMENT: Cattail encroachment

Page 37: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

File #:14046

Mud Creek, London

PHOTOGRAPH NO.: 7 FROM: Reach MC-6 LOOKING: Upstream COMMENT: Backwater effect still evident

PHOTOGRAPH NO.: 8 FROM: Reach MC-6 LOOKING: Downstream COMMENT: Backater effect causing soft sediment deposits on margins

Page 38: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

File #:14046

Mud Creek, London

PHOTOGRAPH NO.: 9 FROM: Reach MC-6A LOOKING: Upstream COMMENT:

PHOTOGRAPH NO.: 10 FROM: Reach MC-7 LOOKING: Upstream COMMENT: Lateral bar formation

Page 39: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

File #:14046

Mud Creek, London

PHOTOGRAPH NO.: 11 FROM: Reach MC-7 LOOKING: COMMENT: Confluence

PHOTOGRAPH NO.: 12 FROM: Reach MC-7A LOOKING: Upstream COMMENT:

Page 40: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

File #:14046

Mud Creek, London

PHOTOGRAPH NO.: 13 FROM: Reach MC-7A at upstream end LOOKING: Upstream COMMENT: multi thread channels

PHOTOGRAPH NO.: 14 FROM: Reach MC-7B LOOKING: Upstream COMMENT: Eroding cutbank, gravel riffle and point bar.

Page 41: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

File #:14046

Mud Creek, London

PHOTOGRAPH NO.: 15 FROM: Reach MC-7B LOOKING: Downstream COMMENT: Medial bar

PHOTOGRAPH NO.: 16 FROM: Reach MC-7C LOOKING: Upstream COMMENT: Well defined valley. Cobble/boulder bed material

Page 42: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

File #:14046

Mud Creek, London

PHOTOGRAPH NO.: 17 FROM: Reach MC-8 LOOKING: Upstream COMMENT:

PHOTOGRAPH NO.: 18 FROM: Reach MC-8 LOOKING: At right bank COMMENT: Bank Erosion of sands and gravels.

Page 43: Appendix C Fluvial Geomorphology Assessment · Surficial Geology Mapping (OGS, 2010) The following sections summarize general and specific points relating to or influencing stream

File #:14046

Mud Creek, London

PHOTOGRAPH NO.: 19 FROM: Reach MC-8 LOOKING: At upstream end. COMMENT: Sewer outfall and deep plunge pool


Recommended